PANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D " NAILS/ SPACING " o.c. SILL BOLT SPACING 1 2 " 36" O.C. 1 2 " Ø

Similar documents
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2

24 X32 3 CAR GARAGE POLE BARN STYLE FRAME

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

3.1 General Provisions

E-Blueprints. Children s Backyard Playhouse 8 x sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height

Garage Design Guide. October 2018

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

Accessory Dwelling Unit Prototype 4 Plan Sets. Prototype 4: Detached 1- Story ADU using alternate materials and techniques

KOLO SHELTER Installation Instructions Parts List

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.

2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ

APPLICATION FOR A BUILDING PERMIT

Shearwall System Installation Guide

GLOSSARY OF TERMS SECTION 8

Sections & Details VOCABULARY

Foundation Specifications for 5.6-Meter Modular Earth Station Antennas

Foundation Specifications for 7.6-Meter Modular Earth Station Antennas

Deck Design Guide. One and Two Family Residential Dwellings

KO LO SH E LT E R. High Capacity and Flexibility

APA Performance Rated Rim Boards

Ohlson Project Property Owner: Kathy Ohlson Property Address: Deer Lake Rd. Derwood MD 20855

Load Tables, Technical Data and Installation Instructions

Featuring TJ Rim Board and TimberStrand LSL

POST FRAME CONSTRUCTION MANUAL

S001 LOWER LEVEL ISO SECOND FLOOR ISO S001 FULL ISO FIRST FLOOR ISO. O="Katahdin Engineering, LLC",

Exterior Wall Fastener Schedule

Typical Deck Details

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

A. Rough carpentry includes but is not limited to the following:

Typical Deck Details

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

VERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA

Building for High Wind Resistance in Light-Frame Wood Construction

Steel Strong-Wall Shearwall Installations

UNDER-FLOOR PLAN SCALE: 3/16"=1'-0"

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

GlasRoc Sheathing Type X

Sections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES

GENERAL NOTES ABBREVIATIONS DRAWING THEME STRUCTURAL DRAWING LIST SUBMITTALS S101 GENERAL NOTES SOUTH DYKE RIVERFRONT WALKWAY

FASTENERS BUILDING DEPARTMENT

Vertical Offset Base and Safety Rail System Installation Instructions

DIVISION 6 WOOD AND PLASTICS

SHEARMAXTM INSTALLATION

Chapter 7 - Porch Framing

Use the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7

SDWH TIMBER-HEX Screw

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

8x8 Shed Plans and Building Guide

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Midwest Roadside Safety Facility

Midwest Roadside Safety Facility

SECTION ROUGH CARPENTRY

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

Single-Family Dwelling Submittal Requirements

TYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

A - 1 ELEVATIONS ELEVATION 1/A1 ELEVATION 2/A1 PROJECT TITLE: CALLENDER HANDCRAFTED LOG HOME PREPARED FOR:

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE

City of Los Angeles RR Values for Connectors in Shear Walls and Wall Anchorage Assemblies

10x10 Shed Plans and Building Guide

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1

Samples from

TRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs

THE ENGINEERED WOOD ASSOCIATION

Fine Homebuilding. Cottage Shed Plans

ESR-2403 Reissued October 1, 2009 This report is subject to re-examination in one year.

6x6 Shed Plans and Building Guide

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Attachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder. Installation Instructions Revised 9/2/2016

12x12 Shed Plans and Building Guide

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

HOW TO BUILD A 12X8 SHED

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

Midwest Roadside Safety Facility

ROOF-CEILING CONSTRUCTION

ROOF-CEILING CONSTRUCTION

STRATUS SHELTER. Take bike parking to new heights

ROOF-CEILING CONSTRUCTION

Hurricane Shutter Designs Refer to Form No. T460 for design considerations for Florida

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.

Typical Deck Details Based on the City of Nixa Residential Deck Ordinance

Foundation Specifications

Main Floor Revisions: 38' 0" Rm1 H3 50' 0" Bk1 B1 Rm2 B5 (26)-2 H2 B2 H3 (3)-3 B3 (11)-4 Bk1 B1 (5)-5 Rm4 Bk1 Rm3 Bk1 24' 0" 6' 0" 20' 0" START FRAMIN

COMPOSITE SIDING INSTALLATION GUIDE

5 5 8 " 60" 53 8 " " 7" 5 1 2" 7" " FIVE MODELS TO MEET YOUR DESIGN REQUIREMENTS.

Deck Evaluation Checklist

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.


Prescriptive Residential Wood Deck Construction Guide Based on the 2006 International Residential Code

Unit 9. Wall and Ceiling Framing

Wood Connections. Concepts of Well Designed Connections

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

Andrew Morrison s Straw Bale Special Reports. Installing Toe Ups. Structural, interior toe up ready for installation

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Transcription:

PANEL NOTATION (3) D2 X2 SHEATHING THICKNESS (IN.) 32 " NAILS/ SPACING 32 " 8d @3" o.c. SILL BOLT SPACING 2 " Ø @ 36" O.C. 2 " Ø @ 2" O.C. 2 " Ø @ O.C. 2 " Ø @ 6" O.C. 2 " Ø @ '-0" O.C. 980 PLF D2X2 32 " 8d @ 2" o.c. N/A 2 " Ø @ 9" O.C. 280 PLF NOTES: SUMMARY OF WORK: LOCATION: KOZAR'S MEADOW LOT 6 PORTLAND, OREGON LATERAL ANALYSIS AND DESIGN FOR SINGLE FAMILY RESIDENCE DESIGN LOADS: CODE: 20 OSSC USE OR OCCUPANCY OF BUILDINGS AND STRUCTURES RISK CATEGORY (ASCE TABLE.-): II WIND SPEED Vult: 20 MPH EXPOSURE 'B', Vasd = 93 MPH (OSSC EQUATION 6-33) SEISMIC DESIGN CATEGORY: 'D' GROUND SNOW LOAD: 2 PSF (ROOF SNOW LOAD: 2 PSF) ROOF DEAD LOAD: PSF FLOOR LIVE LOAD: 0 PSF FLOOR DEAD LOAD: 0 PSF SOIL BEARING PRESSURE: 00 PSF SOIL PASSIVE SOIL PRESSURE: 200 PSF () WALL STUDS TO BE 2X6 DFL-#2 @ 6" O.C., TYPICAL U.N.O. (2) ROOF SHEATHING TO BE 32" APA RATED CDX SHEATHING OR OSB. INSTALL PANELS HORIZONTALLY. SPACE 8d NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS, SPACE 8d NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. (3) TYPICAL WALL SHEATHING (TSN) TO BE 32" APA RATED CDX SHEATHING OR OSB. ALL PANEL EDGES TO BE BACKED WITH 2-INCH NOMINAL OR WIDER FRAMING. INSTALL PANELS HORIZONTALLY OR VERTICALLY. SPACE 8d NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS AND PANEL THICKNESSES, SPACE 8d NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. () FLOOR SHEATHING TO BE APA RATED CDX SHEATHING OR OSB. SPACE 8d NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS, SPACE 8d NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. () FOR NAIL SIZES REFER TO BELOW. (6) SILL PLATE TO BE 2X P.T. U.N.O. (REFER TO SILL BOLT SPACING IN SCHEDULE BELOW). (3) (3) FRAMING REQUIREMENTS: 32 " 32 " 32 " SHEAR WALL SCHEDULE: 8d @ 6" o.c. 8d @ " o.c. 8d @ 3" o.c. 8d @ 2" o.c. (6) E2 32 " 0d @ 2" o.c. (6) (7) (6) (7) 2 " Ø @ " O.C. NAIL 6d 8d 0d 6d Ø.3".3"..62" () SHEATHING TO BE APA RATED SHEATHING OR OSB (GRADE C-C OR C-D STRUCTURAL LENGTH 2" 2 2" 3" 3 2" II OR BETTER). (9) COMMON OR GALVANIZED BOX (2) ALL PANEL EDGES TO BE BACKED WITH 2-INCH NOMINAL OR WIDER FRAMING (DFL-#2). INSTALL PANELS EITHER HORIZONTALLY OR VERTICALLY. SPACE NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES FOR STUDS SPACED 2" O.C. FOR OTHER CONDITIONS AND PANEL THICKNESSES, SPACE NAILS MAXIMUM 2" O.C. ON INTERMEDIATE SUPPORTS. (3) FRAMING AT ADJOINING PANEL EDGES SHALL BE A SINGLE 3" NOMINAL MEMBER OR (2) 2-INCH NOMINAL MEMBER FASTENED TOGETHER WITH 6d NAILS (SPACING ABOVE) TYPICAL ENTIRE HEIGHT OF DBL. STUD. NAILS SHALL BE STAGGERED WHERE NAILS ARE SPACED 2" O.C. () AT SHEAR WALL LOCATIONS, REFER RW/ AND FF/ FOR ROOF TO WALL AND FLOOR TO FLOOR FRAMING. () INSTALL 3" SQUARE X " STEEL PLATE WASHER. (6) FRAMING AT ADJOINING PANEL EDGES SHALL BE SINGLE 3X NOMINAL FRAMING MEMBERS AT EACH END OF THE PANEL. NAILS SHALL BE STAGGERED WHERE NAILS ARE SPACED 2" O.C. INSTALL 3X P.T. SILL PLATE, U.N.O. (7) PLYWOOD TO BE INSTALLED ON BOTH SIDES OF PANEL. (8) IF 7 6" NOMINAL THICK PLYWOOD OR OSB IS USED, STUDS TO BE SPACED AT '-" O/C, TYPICAL. (9) GALVANIZED NAILS SHALL BE HOT-DIPPED OR TUMBLED. HOLDOWN NOTATION 2 8 28 0 NOTES: 'SIMPSON' HOLDOWN TYPE HDU2 HDU HDU HDU8 MSTC28 MSTC0 HOLD-DOWN SCHEDULE: INSTALLATION INSTRUCTIONS INSTALL STRAP ACROSS FLOOR LINE, INSTALL (8) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. INSTALL STRAP ACROSS FLOOR LINE, INSTALL (6) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. () IN LIEU OF SIMPSON 'SSTB' BOLTS ANCHOR BOLTS TO BE A307 OR 'A36' THREADED ROD WITH STD. NUT AND 2" X 2" X 3 6" STEEL PLATE WASHER ON BOTTOM OF BOLT. (2) HOLDOWNS TO BE FASTENED TO DOUBLE STUDS (CONTINUOUS FROM SILL PLATE TO DOUBLE TOP PLATE) AT PANEL ENDS. WALL STUDS SHOULD HAVE PANEL EDGE NAILING FROM SHEAR WALL SHEATHING. (3) IF HOLDOWNS 2,, 6, AND 8 ARE INSTALLED FROM FLOOR TO FLOOR, REFER TO DETAIL FF/. () U.N.O., INSTALL ()-# CONTINUOUS HORIZONTAL TOP BAR 3" DOWN FROM TOP OF WALL AT ALL HOLDOWN ANCHORS. EXTEND BAR '-0" PAST HOLDOWN IN BOTH DIRECTIONS (BEND BAR AROUND AT CORNER CONDITION). FOR THIS 0'-0" INSTALL ()-# VERTICAL BAR @ 2" O.C. TIE HOLDOWN ANCHOR TO HORIZONTAL TOP BAR. SHEAR WALL / HOLDOWN NOTATION DIAGRAM EDGE OF WINDOW, DOOR OR CORNER each face each face (307#) (6#) (6#) MINIMUM CONTINUOUS PANEL LENGTH HLDN. AT END OF PANEL (2) rows (2) rows (980#,6970#, 7870#) 'HDU' (93#) 'HDU' (#) 2 MSTC2 66 MSTC66 (6) DBL. STUD CONN. (FACE NAIL) 6d @ 9" o.c. 6d @ 6" o.c. 6d @ " o.c. 6d @ 3" o.c. N/A N/A D# # HLDN. AT END OF PANEL (6) () SHEAR WALL PANEL HOLDOWN TYPE EDGE OF WINDOW, DOOR OR CORNER (), (2), () SHEAR CAPACITY (SEISMIC) 260 PLF 380 PLF 90 PLF 60 PLF 770 PLF (2), (3), () SDPWS TABLE.3A SHEAR CAPACITY (WIND) 36 PLF 32 PLF 68 PLF 89 PLF 077 PLF 370 PLF 790 PLF STD. 'SB 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d NAILS @ 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. 'SB 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d NAILS @ 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. 'SB 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d NAILS @ 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. 'SB 7 8 X 2' EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF (3)2X6 DFL-#2 WALL STUDS ( 2 3 " EDGE DISTANCE). FASTEN STUDS TOGETHER WITH 6d NAILS @ 6" O/C ENTIRE HEIGHT OF STUD. INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. "Ø ANCHOR BOLT OR ALTERNATIVE TO BE EMBEDDED INTO CONCRETE FOOTING ( 2"). ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF 6X6 DFL-#2 ( 2 3 " EDGE DISTANCE). INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. STD. "Ø ANCHOR BOLT OR ALTERNATIVE TO BE EMBEDDED INTO CONCRETE FOOTING (PER 2/). ANCHOR TO BE INSTALLED PLUMB AND LOCATED ALONG CENTER LINE OF 6X6 DFL-#2 ( 2 3 " EDGE DISTANCE). INSTALL HOLDOWN PER MANUFACTURE'S SPECIFICATIONS. INSTALL STRAP ACROSS FLOOR LINE, INSTALL (2) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. INSTALL STRAP ACROSS FLOOR LINE, INSTALL (3) 6d NAILS INTO DOUBLE WALL STUDS ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL NAILS INTO MIDDLE THIRD OF STUD. SIMPSON 'A3' CLIP @ 2'-0" O/C 2X BLOCK SIMPSON 'H2.' MANUFACTURED TRUSS (BY OTHERS) DBL. TOP PLATE RW ROOF SHEATHING PER ARCH. PLANS 2X DOUBLE TOP PLATE, TYPICAL PER PLAN 2X STUDS PER PLAN RW SILL PLATE 'SP' NAILING PER SCHEDULE BELOW SIMPSON 'A3' CLIP (SPACING PER SCHEDULE BELOW), EACH CLIP WITH TOTAL OF (2) 8d 2" NAILS, (2) ROWS PER SCHEDULE FLOOR SHEATHING PER PLAN FLOOR JOISTS PER PLAN FF PANEL TYPE D2 E2 X2 D2X2 2 " EDGE DISTANCE FROM STEM WALL FACE TO EDGE OF SILL PLATE WASHER P.T. SILL PLATE AND ANCHOR BOLT PER SHEAR WALL SCHEDULE CONCETE WALL FSP ROOF TO SHEAR WALL FLOOR TO FLOOR AT SHEAR WALL. IN LIEU OF CLIPS, BREAK SHEAR WALL PANELS AT BLOCKING OR RIM JOIST (INSTALL PANEL EDGE NAILING AT BREAK). 'SP' NAIL SPACING 6d @ O.C. 6d @ " O.C. 6d @ 3" O.C. 6d @ 3" O.C. 6d @ 2" O.C. 6d @ 3" O.C. (2) ROWS 6d @ 2" O.C. (2) ROWS SIMPSON CLIP SPACING '- O.C. '-2" O.C. 0'-" O.C. O.C. 7" O.C. '-0" O.C. (2) ROWS 0" O.C. (2) ROWS FDN. SILL PLATE PANEL EDGE NAILING ROOF TO SHEAR WALL RAISED HEEL OPTION SHEAR WALL SHEATHING, BREAK ON DBL. TOP PLATE PANEL EDGE NAILING TRUSS HANGER BY OTHERS SIMPSON 'A3' CLIP (SPACING PER SCHEDULE BELOW), EACH CLIP WITH TOTAL OF (2) 8d 2" NAILS, (2) ROWS PER SCHEDULE) ROOF EDGE 'RE' NAILING PER SCHEDULE BELOW (2ND ROW PER SCHEDULE) EXTENDED EAVES PER ARCH. PLANS 2X BLOCK (DBL. BLOCK PER SCHEDULE) SHEAR WALL SHEATHING AND PANEL EDGE NAILING PER PLAN 2X WALL STUDS PER PLAN, DBL. 2X WALL STUDS AT HOLD-DOWN LOCATIONS BOLTED OR STRAP HOLDOWN PER PLAN FOR FLOOR-TO-FLOOR CONNECTION UPPER SHEAR WALL SHEATHING AND PANEL EDGE NAILING PER PLAN SILL PLATE NAILING (2ND ROW PER SCHEDULE) NOTE # BELOW 2X BLOCKING OR RIM JOIST (DBL. BLOCK PER SCHEDULE) LOWER SHEAR WALL SHEATHING AND PANEL EDGE NAILING PER PLAN 2X WALL STUDS PER PLAN, DBL. 2X WALL STUDS AT HOLDOWN LOCATIONS HOLDOWN, SAME TYPE AS ABOVE 'RE' NAIL SPACING 8d @ O.C. 8d @ " O.C. 8d @ 3" O.C. 8d @ 2 2" O.C. 8d @ 2" O.C. 8d @ 3" O.C. (2) ROWS 8d @ 2" O.C. (2) ROWS S S (NOTE #) HLDN. (NOTE #) HLDN. HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) 2'-6" 9'-0" F F 8'- '- 6'-" 28 3'-3" ROOF 7 6 '-9" 28 ALIGN FOR DRAG STRUT ATTACHMENT 3 3 6 ROOF ROOF 3'-3" UPPER FLOOR SHEARWALL PLAN. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING AND NAILING (TSN), ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND NAILING REQUIREMENTS. FOUNDATION NOTES. REFER TO MAIN FLOOR SHEAR WALL PLAN FOR HOLDOWN SIZE. 2. THIS DRAWING IS FOR LATERAL INFORMATION ONLY, REFER TO ARCHITECTURAL PLANS FOR ALL OTHER INFORMATION. 9'-0" 22'-" F2 ALIGN TRUSS FOR SHEAR ATTACHMENT ALIGN FOR DRAG STRUT ATTACHMENT MATERIALS: CONCRETE: 28-DAY CONCRETE STRENGTH = 200 psi. GRADE BEAMS, PIERS, AND SPREAD FOOTINGS SHALL BE POURED ONTO UNDISTURBED, NATIVE SOIL WHICH IS FREE FROM ANY MATERIAL THAT WILL ADVERSELY AFFECT THE SOIL DESIGN BEARING PRESSURE REFERENCED ABOVE. ALL NON-STRUCTURAL WEATHER PROOFING AND FINISH MATERIAL TO BE DETERMINED "BY OTHERS". SLAB CONTROL JOINTS: PER OWNERS REQUIREMENTS OR DIRECTION: MISC. SITE PREPARATIONS: OBTAIN AND OBEY ALL APPLICABLE REGULATIONS REGARDING GRADING AND EXCAVATION. IDENTIFY, MARK, AND PROTECT FROM DAMAGE ALL EXISTING UNDERGROUND PIPES, CONDUITS, AND CABLE (WATER SUPPLY, SANITARY SEWER, STORM SEWER, GAS, STEAM, ELECTRICAL AND COMMUNICATION CABLE). REMOVE SOIL WITH ORGANIC MATTER. PERFORM BACKFILL AND COMPACTION IN A SYSTEMATIC PATTERN, TO ASSURE COMPLETE AND CONSISTENT WORK. IF ANY OVER-EXCAVATION ACCIDENTALLY OCCURS, CORRECT IT WITH WELL-COMPACTED BACKFILL. PROVIDE TESTING AND INSPECTION OF BACKFILL AND COMPACTION. LAYER BACKFILL IN 6 IN. TO 2 IN INCREMENTS. COMPACT ALL FILL. USE STABLIZED FILL MATERIAL OF AN APPROVED TYPE AND FROM AN APPROVED SOURCE. TEST AND APPROVE MATERIAL DELIVERED FROM OTHER SITES. DO NOT ALLOW ANY DEBRIS TO BE MIXED WITH FILL. CURE CONCRETE TO FULL REQUIRED STRENGTH BEFORE BACKFILLING. PROVIDE DRAINAGE CATCHERS PER ARCHITECTURAL DRAWINGS. SPECIAL INSPECTION: NONE RET. WALL, SIM. 3 PARETIAL FOUNDATOION PLAN HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) RET. WALL, SIM. HLDN. (NOTE #) HLDN. (NOTE #) HLDN. (NOTE #) F2 HLDN. (NOTE #) RET. WALL HLDN. (NOTE #) S S 0 0 DTT2Z PER 8/ 7'-0" 6'-0" '-6" 9'-0" '-6" 2 F '-" 20'-0" WALL 0 '- 2 3'-" '-" 0 3'-3" SIMPSON MSTC 28 FROM TOP PLATE TO BEAM 28 3'-3" '-2" 0 '-6" 2 9'-6" '-" 0 3'-3" WALL MAIN FLOOR SHEARWALL PLAN. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING AND NAILING (TSN), ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND NAILING REQUIREMENTS. F 8 DECK DTTZ 8 DECK 3'-3" WALL LOWER FLOOR SHEARWALL PLAN. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING AND NAILING (TSN), ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND NAILING REQUIREMENTS. '-3" 2'-3" F2 0'-0" F2 03-2- EXP. DATE: 06-30-6

EXTERIOR SHEATHING AND NAILING PER PLAN 2X STUD ROOF SHEATHING AND NAILING 8d NAILS @ 6" O.C., TYP. ENTIRE LENGTH OF TRUSS TYPICAL ROOF SHEATHING AND NAILING DECK JOIST AND HANGER PER PLAN 2X DECKING FLOOR JOIST AND SHEATHING PER PLAN DBL. TOP PLATE WALL STUDS PER PLAN 2X6 X BLOCK, FACE NAIL TO TRUSS BOTTOM CHORD WITH (2) 6d NAILS AT '-0" O/C SIMPSON 'DSCR/L-SD' FROM DBL. TOP PLATE TO TRUSS WITH BLOCKING ATTACHED MANUFACTURED TRUSS BY OTHERS SIMPSON 'L0' CLIP @ 2'-0" O.C, TYP. ENTIRE LENGTH OF SHEAR WALL (IF SHEAR WALL IS EXTENDED TO ROOF SHEATHING, CLIPS NOT REQUIRED) DOUBLE TOP PLATE TRUSS TO TRANSFER HORIZONTAL LOAD OF 3000# FROM TOP CHORD TO BOTTOM CHORD, OR EXTEND THE SHEAR WALL SHEATHING AND NAILING TO TOP CHORD OF TRUSS SHEAR WALL SHEATHING AND NAILING PER PLAN SIMPSON 'DTT2Z' (2) Ø A307 THRU- BOLTS @ 2" O.C. ENTIRE LENGTH OF DECK 2 2" ". THIS DETAIL DESIGNED FOR LATERAL FORCES ONLY, REFER TO ARCHITECTURAL PLANS FOR VERTICAL CONNECTION. 2. FLASHING BY OTHERS. 2X0 P.T. LEDGER 2X WALL STUDS PER PLAN 6 ROOF SCALE: NONE 7 WALL SCALE: " = '-0" 8 WALL SCALE: " = '-0" STRAP HOLDOWN PER PLAN 2X STUD FLOOR JOIST AND SHEATHING PER PLAN 2X STUD 03-2-. ASSUMPTIONS: MAX DESIGN PRESSURE = 0 PSF ALLOWABLE SOIL BEARING PRESSURE = 00 PSF COEFFICIENT OF FRICTION = (SLAB TO RESIST SLIDING) PASSIVE SOIL PRESSURE = 0 PSF SEISMIC Kh = Sds/2. (MONONOBE-OKABE) F'C = 200 PSI AT 28 DAY STRENGTH, " SLUMP. Fy (STEEL) 60 KSI SOIL WEIGHT = 0 PCF 2. CONCRETE FOUNDATION WALL DESIGNED TO CARRY SOIL LOAD ONLY. TOP OF CONCRETE WALL PONY WALL 3. COMPACTED BACKFILL TO BE INSTALLED BEFORE INSTALLING WOOD FLOOR.. SHORE WALL BEFORE COMPACTING WITH BACKFILL.. REINFORCING BARS TO BE ASTM A6, GRADE 60, DEFORMED BARS ( LAP SPLICE 0 BAR DIAM.). 6. DEFORMED WELDED WIRE TO BE ASTM A8. 7. GW/GP: WELL GRADED OR POORLY GRADED GRAVEL OR GRAVEL WITH SAND. SW/SP: WELL GRADED OR POORLY GRADED SANDY OR SAND WITH GRAVEL. 't' P.T. SILL PLATE WITH 2" J-TYPE BOLT, EMBED 7" INTO STEM WALL FREE-DRAINING MATERIAL (GW, GP, SW, OR SP, NOTE #7 ABOVE) SHEAR WALL SHEATHING AND NAILING PER PLAN SIMPSON 'MSTC28' STRAP AT EACH END OF BEAM SILL PLATE AND CLIP INFORMATION PER SHEAR WALL SCHEDULE HEADER OVER WINDOW/DOOR STAIR FRAMING PER ARCH. FLOOR JOIST AND SHEATHING PER PLAN SIMPSON CLIP AND NAILING PER SHEAR WALL SCHEDULE SHEAR WALL SHEATHING AND NAILING PER PLAN 'HEIGHT' WALL SCALE: " = '-0" WALL SCALE: " = '-0" 'DEPTH' FOOTING BOTTOM REINFORCING PER SCHEDULE # DOWEL AT 3'-0" O/C, TYP. SLAB TO STEM WALL " SLAB WITH 6X6 W.XW. WELDED WIRE MESH OR # BARS EACH WAY @ O.C. AT CENTER OF SLAB, ALLOW SLAB TO CURE 7 DAYS BEFORE BACKFILLING WALL RETAINING WALL/FTG. SCHEDULE HEIGHT 't' TOE HEEL DEPTH '-0" 2'-6" 0'- 0" 6'-0" '-9" 0'- 0" 8'-0" 7'-6" 0'- 0" 'TOE' RETAINING WALL LAP SPLICE 'WIDTH' WALL REINFORCEMENT WALL VERT. REINF. WALL HOR. REINF. # @ '-0" O.C. # @ 2" O.C. # @ 0'-0" O.C. # @ 2" O.C. # @ 6" O.C. # @ 2" O.C. 'HEEL' WALL HORIZONTAL AND VERTICAL REINFORCING PER SCHEDULE ABOVE (VERTICAL BAR WITH STD. HOOK) CONTINUOUS DRAIN BY OTHERS REFER TO VERTICAL REINFORCING FOOTING REINFORCEMENT TOE BTM. HORIZONTAL # @ 2" O.C. # @ 2" O.C. # @ 2" O.C. '-0" ANCHOR EMBEDMENT. FOOTING TO BE PLACED ON UNDISTURBED NATIVE SOIL. 2. DRIVEWAY SURFACE NOT SHOWN. 2 PANEL FRAMING ABOVE 3" CLR. '-6" FOOTING SCALE: " = '-0" SLAB (THICKNESS PER ARCHITECTURAL DRAWINGS) WITH 6X6 -W. X W. WIRE MESH, 6" LAP SPLICE HOLD-DOWN PER SHEAR WALL SCHEDULE DETAIL NOT USED (2)-# CONTINUOUS BAR AT CENTER OF FOOTING (EXTEND REBAR AROUND CORNERS '-0") SIMPSON SHEAR WALL, REFER TO PLAN AND SHEET, SSW, SSW2 EXTERIOR SHEAR WALL SHEATHING AND NAILING PER SHEAR WALL PLAN SIMPSON ANCHOR PER PLAN () - # VERTICAL BAR @ 2" O.C. WITH 6" HOOK AT EACH END '-". FOOTING TO BE PLACED ON UNDISTURBED NATIVE SOIL. 2. REFER TO SHEAR WALL SCHEDULE SILL BOLT SPACING AT SHEAR WALL LOCATIONS. 3 3" CLR. FOOTING SCALE: NONE P.T. SILL PLATE WITH 2" J-TYPE BOLT, EMBED 7" INTO STEM WALL '-6" VENT, BLOCKOUT, OR BEAM POCKET (2)-# CONTINUOUS BAR AT BOTTOM OF FOOTING AND ()-# AT TOP OF STEM WALL (EXTEND REBAR AROUND CORNERS '-0") EXP. DATE: 06-30-6

. ASSUMPTIONS: MAX DESIGN PRESSURE = 0 PSF MAX SURCHARGE LOAD = 0 PSF ALLOWABLE SOIL BEARING PRESSURE = 00 PSF COEFFICIENT OF FRICTION =.3 PASSIVE SOIL PRESSURE = 0 PSF SEISMIC Kh = Sds/2. (MONONOBE-OKABE) F'C = 200 PSI AT 28 DAY STRENGTH, " SLUMP. Fy (STEEL) 60 KSI SOIL WEIGHT = 0 PCF 2. CONCRETE FOUNDATION WALL DESIGNED TO CARRY SOIL LOAD ONLY. 3. COMPACTED BACKFILL TO BE INSTALLED BEFORE INSTALLING WOOD FLOOR.. SHORE WALL BEFORE COMPACTING WITH BACKFILL.. REINFORCING BARS TO BE ASTM A6, GRADE 60, DEFORMED BARS ( LAP SPLICE 0 BAR DIAM.). 0-06- " CONC. SLAB OUTLINE OF STEM WALL BEYOND FLOOR SHEATHING PER PLAN FLASHING (BY OTHERS) DRIVEWAY (BY OTHERS) '-6" MAX. 8'-0" MAX. END OF SHEAR WALL PANEL 7'-0" MAX. FLOOR/ROOF FRAMING ABOVE X6 DFL-#2 NAILER SHEAR WALL SHEATHING AND NAILING PER PLAN TYPICAL EXTERIOR SHEATHING AND NAILING SIMPSON 'MSTC0' STRAP, FILL ALL HOLES BEAM PER ARCHITECTURAL PLAN, CONTINUE BEAM TO END OF SHEAR WALL PANEL SIMPSON LTP (2) ON FRONT SIDE (2) ON THE OTHER (() TOTAL) DOUBLE 2X STUD AT EACH END OF PANEL, FACE NAIL STUDS TOGETHER WITH 6d NAILS @ 6" O.C. (STAGGER NAILS), U.N.O. 2X STUD WALL " SLAB PER ARCH. PLANS P.T. 2X LEDGER WITH Ø J-TYPE BOLT @ 2'-0" O/C, TYP. ENTIRE LENGTH OF WALL () - # VERTICAL BAR @ 2" O.C. WITH 6" HOOK AT EACH END 3'-0" EXTERIOR SHEAR WALL SHEATHING AND NAILING PER SHEAR WALL PLAN P.T. SILL PLATE WITH 2" J-TYPE BOLT, EMBED 7" INTO STEM WALL 'H' 'DEPTH' JOISTS AND HANGERS PER PLAN 3X P.T. RIM JOIST WITH 2 " J-TYPE BOLT AT '-0" O/C, EMBED 3" INTO STEM WALL REINFORCING TO MATCH VERT. REINFORCING 'D' SOIL 3" CLR. LAP SPLICE " CLR. FREE-DRAINING MATERIAL (COMPACTED BACKFILL, 3 " MINUS IN LIFTS) WALL HORIZONTAL AND VERTICAL REINFORCING PER SCHEDULE ABOVE (VERTICAL BAR WITH STD. HOOK) CONTINUOUS DRAIN BY OTHERS HEEL TOP REINFORCING PER SCHEDULE HEEL TOP HORIZONTAL REINFORCING PER SCHEDULE 2" CLR. '-0" SILL PLATE PER SHEAR WALL SCHEDULE 3" CLR. '-6". FOOTING TO BE PLACED ON UNDISTURBED NATIVE SOIL. 2. REFER TO SHEAR WALL SCHEDULE SILL BOLT SPACING AT SHEAR WALL LOCATIONS. (2)-# CONTINUOUS BAR AT BOTTOM OF FOOTING ()-# BAR AT TOP OF STEM WALL (EXTEND REBAR AROUND CORNERS '-0") TOE BOTTOM HOR. REINFORCING PER SCHEDULE RETAINING WALL/FOOTING SCHEDULE 'TOE' WALL REINFORCEMENT FOOTING TO SIT ON COMPACTED 3 "+/- GRAVEL FOOTING REINFORCEMENT HEIGHT 't' TOE HEEL DEPTH 'D' SOIL WALL VERT. REINF. WALL HOR. REINF. HEEL TOP HORIZ. HEEL TOP TOE BTM. HORIZ. '-0" '-0" 3'-3" 0'-0" 0'-6" # @ '-6" O.C. # @ '-6" O.C. # @ '-6" O.C. # @ '-6" O.C. # @ '-6" O.C. 6'-0" '-6" '-0" 0'-0" 0'-6" # @ 0'-0" O.C. # @ '-0" O.C. # @ 0'-0" O.C. # @ '-6" O.C. # @ '-0" O.C. 'HEEL' EXP. DATE: 06-30-6 2 SHEAR WALL ELEVATION VIEW SCALE: NONE 3 FOOTING SCALE: " = '-0" RETAINING WALL