each time the Frequency is above 51Hz. Continuous operation is required

SUBJECT HEADING: Switching Programmes ISSUE: 18

SYSTEM MONITORING FAULT RECORDING

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Appendix D Fault Levels

ESB National Grid Transmission Planning Criteria

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

Hamdy Faramawy Senior Application Specialist ABB Sweden

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

EDS FAULT LEVELS

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

VI 3 - i TABLE OF CONTENTS

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Table of Contents. Introduction... 1

Loss of Mains Protection

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

ECP HV INSULATION TESTING

EI HIGH VOLTAGE INSULATION TESTING POLICY

Power systems Protection course

ECP HV INSULATION TESTING

Company Directive STANDARD TECHNIQUE: TP14C. Distribution Business Provided Metering Facilities

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS

PRODUCT/TEST MANUAL 2V162K12 VOLTAGE REGULATOR RELAY

E N G I N E E R I N G M A N U A L

Southern Company Interconnection Requirements for Inverter-Based Generation

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Protection of Electrical Networks. Christophe Prévé

Automatic synchronising relay

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

KENYA ELECTRICITY GENERATING COMPANY LTD

High speed bus transfer function block description Operation Manual

Connection of Embedded Generating Plant up to 5MW

Key DRAFT EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 13/12/17

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

Line protection with transformer in the protection zone

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Answers for energy

Single Line Diagram of Substations

PRODUCT TEST MANUAL 2SY110K28 SYNCHRONISM CHECK RELAY

Numerical Check Synchronism Relay ARGUS 7. Operation & Maintenance Instruction Manual

Generation Interconnection Requirements at Voltages 34.5 kv and Below

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

Reyrolle Protection Devices. 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection. Answers for energy

Application of Low-Impedance 7SS601 Busbar Differential Protection

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays

Design of Low Cost Embedded Power Plant Relay Testing Unit

PRODUCT / TEST MANUAL 2V162K4 VOLTAGE REGULATOR RELAY

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions

TABLE 1 COMPARISION OF ENTSO-E RfG TO GB GRID CODE

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Energy Management

Transmission Interconnection Requirements for Inverter-Based Generation

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs

Busbars and lines are important elements

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

BUS2000 Busbar Differential Protection System

Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay

2015 Relay School Bus Protection Mike Kockott March, 2015

OPERATING CODE NO. 5 (OC5)

BED INTERCONNECTION TECHNICAL REQUIREMENTS

Unit 2. Single Line Diagram of Substations

Wind Power Facility Technical Requirements CHANGE HISTORY

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013)

TABLE OF CONTENT

Earth Fault Protection

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

7PG21 Solkor Rf Feeder Protection Energy Management

Company Replaces previous document Document ID Issue E.ON Elnät Sverige AB Ny engelsk utgåva D

Centralized busbar differential and breaker failure protection function

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ELECTRICAL POWER ENGINEERING

Power System Protection Manual

Guideline for Creating Disconnection Points and Establishing a Not Electrically Connected Area

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana

SPAA 341 C. Feeder Protection Relay. User s manual and Technical description SPAA 341 C. U aux V ~ V. f n. t 2 > [ s ] 0 I 0 >> Trip

P.O (November 2009) This is an unofficial translation of the latest draft of the Spanish grid code. Source: Jason MacDowell, GE Energy

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

Electrical Procedure No E032. Procedure No: ELE 032

CONTENTS. Issued April 2010 CC.1 CC.2 CC.3 CC.4 CC.5 CC.6. Objective... 2 Scope... 2 Procedure... 2 CC.6.1. ics... 3 CC.6.2

Transcription:

SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection with this information. This limit on liability applies to all and any claims in contract, tort (including negligence), misrepresentation (excluding fraudulent misrepresentation), breach of statutory duty or otherwise. This limit on liability does not exclude or restrict liability where prohibited by the law nor does it supersede the express terms of any related agreements." PURPOSE AND SCOPE This document describes the technical requirements for User s equipment directly connected to the England and Wales Transmission system and located within NGET s busbar protection zone operating at nominal voltages of 400 kv, 275 kv, 132 kv and 66 kv unless otherwise agreed with the user as defined in the Bilateral agreement. The principles of this document also apply to equipment connected at other voltages. This specification details the functional, performance and interface requirements for synchronising associated with the qualification of circuit breaker closure on the Transmission System in England and Wales. It is also applicable to those associated circuit breakers not owned by NGET but where such qualification is necessary in order to ensure the safety of personnel, plant and equipment. It defines the operations to be undertaken by the synchronising equipment in undertaking either the automatic or manual closure of a circuit breaker or switch with synchronising. This Specification is applicable to the interfacing to all synchronising facilities for control actions undertaken from either the Remote or Substation control points. PART 1 PROCEDURAL 1 GENERAL REQUIREMENTS 1.1 The system shall be arranged such that synchronising under manual control can only take place on one circuit at a time on each voltage level at any one substation. 1.2 The phase sequence on the transmission system is L1-L2-L3, anti-clockwise rotation and the User shall ensure that the phase sequence matches at the interface. Scheme and Voltage Selection Facilities 1.3 The voltage supplies for synchronising on systems operating at 400 kv, 275 kv and 132 kv shall be derived from a single phase-to-earth primary voltage by means of single phase VT s connected to the L2 phase of the primary system. 1.4 The synchronising scheme shall be able to cater for substation extensions 1.5 Two basic schemes of synchronising cover the substation layouts used by NGET: (i) Busbar Stations - The standard scheme shall be based on the use of either busbar VT s or individual circuit VT s with a suitable voltage selection scheme for selection of the appropriate supplies for synchronising purposes. Informative: Where busbar VT s are not provided a simple priority scheme is preferred so that circuit VT supplies are not connected in parallel and the busbar running voltage is derived from only one VT from the circuit having the highest priority. Uncontrolled When Printed Page 1 of 10

(ii) Mesh Type Stations - The standard scheme shall be based on a ring system with a suitable voltage selection scheme for selection of the appropriate supplies for synchronising purposes. 1.6 The synchronising equipment shall be capable of selecting the appropriate running voltage for synchronising by checking the position of disconnectors and circuit breakers. 1.7 These requirements also apply where a User circuit is not synchronised but has the ability to be a voltage source at the transmission interface point, following closure of the circuit breaker, the circuit shall provide a voltage reference feedback to the Substation s voltage selection scheme via appropriate IVT, line disconnector, busbar disconnector and CB auxiliary contacts. Voltage Parameters and Burdens 1.8 A.c. measuring systems shall be capable of being earthed and use interposing voltage transformers (IVT) supplied from the secondary side of voltage transformers connected to the primary plant. Interposing Voltage Transformers 1.9 The rating shall be designed to suit the requirements of the scheme. 1.10 The synchronising facilities shall incorporate suitable means to interface the voltage outputs from main VT s, providing adequate isolation. Function 1.11 Functionality is required to operate circuit breakers for check synchronising, system synchronising and dead line/dead bar conditions and shall automatically select the appropriate method of closure dependant on settings and from measurement of the incoming and running voltages. 1.12 The equipment shall automatically select check or system synchronise, from measurement of the relative frequency between the incoming and running voltages. 1.13 The normal or default mode shall be as a check synchroniser. On initiation, the equipment shall operate in the check synchronise mode. 1.14 Upon receipt of a close command and subsequent initiation of the synchronising function, an indication output shall be provided to indicate that synchronising is in progress. The output shall remain active until either the Circuit Breaker has closed or the synchronising sequence has timed out. 1.15 A facility shall be provided to inhibit the operation of the synchronising function for the failure of either incoming or running VT supplies. Typically, this may be achieved by the use of the following ;. (a) Appropriate auxiliary switch contacts from each VT MCB (b) (c) A suitable algorithm within the equipment A combination of (a) and (b) above 1.16 Circuit breaker closure shall be prevented and operation inhibited for either an under-voltage or differential voltage condition outside the settings chosen within the range stated in Table 2. Uncontrolled When Printed Page 2 of 10

1.17 Receipt of the close command shall initiate the timer. This timer defines the maximum duration for attempting to close the circuit breaker and the sequence shall abort and reset if the circuit breaker has failed to close at the end of this period. 1.18 Upon receipt of the close command and subsequent circuit breaker close indication the synchronising sequence shall be reset and cleared down. 1.19 Circuit Breaker closure outputs shall be initiated without any appreciable delay and any delay shall be constant and quantified. 1.20 If the d.c. supplies or incoming and running voltages are removed the synchronising close output shall be prohibited except when DLLB, LLDB and DLDB modes have been preselected and the conditions have been detected. Uncontrolled When Printed Page 3 of 10

Energising Check 1.21 The energising check facility shall be selectable and shall be configurable for all combinations of the following: (a) Dead line live bus (DLLB) (b) (c) Dead bus live line (DBLL) Dead bus dead line (DBDL) 1.22 The voltage levels, which define both live and dead conditions, shall be configurable separately and within the ranges shown in table 2. Check 1.23 Pre-set selectable values of phase angle shall be provided in the range shown in table 2. 1.24 Whilst in check synchronising mode the functionality shall prevent closure in the event of slip being in excess of a pre selected value in the range defined in Table 2. This shall be irrespective of the phase angle setting. 1.25 If during the period when the function is verifying the system phase angle the voltage vectors move out of the phase angle setting and system synchronising conditions are not detected, circuit breaker closure shall be prevented. System 1.26 The System mode of operation shall commence automatically upon detection of a close command and detection of slip within pre-set selectable values. 1.27 The initiation of the system synchronising function shall result in the following actions: (a) Check closure shall be inhibited whilst asynchronous conditions are detected. (b) (c) The System mode of the device is primed to permit closure of the circuit breaker to proceed within the limits specified for the System function. An output is initiated to provide external indications that the mode of closure has changed. This output shall remain active until either; the Circuit Breaker has closed, asynchronous conditions are no longer detected or the synchronising sequence has timed out. 1.28 When the system synchronising mode is activated the close command shall be initiated with the minimum delay, provided the following requirements are met: (a) The phase angle between the incoming and running voltages is decreasing and measures less than a pre-set selectable value in the range defined in table 2. (b) The slip frequency is within the range defined in table 2. (c) The under-voltage or differential check facilities have not operated. 1.29 The circuit breaker operating time and measured slip should be taken into account when operating in System mode to ensure that circuit breaker closure occurs within the phase angle window of closure. Uncontrolled When Printed Page 4 of 10

1.30 If during a system synchronising sequence the system conditions change such that the criteria for check synchronising closure are met the equipment shall be capable of reverting to check synchronising mode of operation and attempt closure of the Circuit Breaker under these conditions. This feature shall be selectable by configuration settings. 2 FUNCTIONAL INTERFACES Informative: The functional interfaces for the function are depicted in Figure 1. 2.1 The function shall provide the functional interfaces as detailed in Figure 1. The User bay(s) synchronising facility shall meet the same design and functional requirement as NGET s site synchronising scheme that it interfaces with (Figure 2). Close in Progress Running Main Bar VT MCB Failure * System in Progress Running Reserve Bar VT MCB Failure* Incoming VT MCB Failure* Running Volts Main Bar Running Volts Reserve Bar SYNCHRONISING FUNCTION NGTS 3.24.60 Function Faulty VT supply failure Manual Synchrocheck Close Incoming Volts Automatic Synchrocheck Close Synch (Information) * VT MCB inputs may not be required if the relay has suitable internal VT supply supervision Figure 1: Functional Interfaces Table 1: Details each interface s ID, function and type. Table 1: Functional Interfaces Interface Interface Function Type of Interface 2.2.Retracted in line with requirements : 2.3 Manual Synchrocheck Close A Manual Synchrocheck close control output shall be initiated when all criteria are met for a manual synchronising close. Double Pole Control 2.4 Automatic Synchrocheck Close An Automatic Synchrocheck close control output shall be initiated as part of an automatic close sequence such as Delayed Double Pole Control Uncontrolled When Printed Page 5 of 10

Table 1: Functional Interfaces Interface Interface Function Type of Interface Automatic Reclosure when all criteria are met. 2.5 in Progress Indication This indication shall be active for transmission to the control point when the synchronising function has been activated and shall remain on until the conditions in section 1.13 are met. Single Point Digital 2.6 System Indication This indication shall be active for transmission to the control point when the synchronising function has been activated and has detected asynchronous system synchronising conditions and shall remain on until any of the conditions in section 1.26(c) are met. Single Point Digital 2.7 VT Failure This indication shall be active for transmission to the control point when a failure of a synchronising VT supply is detected. Single Point Digital 2.8 Function Faulty This alarm shall be active for any detectable fault within the synchronising function. Single Point Digital 2.9 Information Port 3 SETTING RANGES Retracted in line with requirements Information Port 3.1 The facility function settings as detailed in Table 2 shall be provided as a set of settings that the user can change. Table 2: Setting Ranges Setting Minimum Setting Range Maximum Setting Resolution 3.2 VT Ratio Error Correction 1:1-5000:1 10 3.3 Under-voltage Check Facility 80% 90% of Rated Voltage 2.5% 3.4 Voltage Difference 10% 50% of Rated Voltage 5% 3.5 Check Phase Angle 20º - 90º 5º Uncontrolled When Printed Page 6 of 10

Table 2: Setting Ranges Setting Minimum Setting Range Maximum Setting Resolution 3.6 Check Slip Speed 0.01 0.1Hz 0.01Hz 3.7 System Phase Angle 10º - 20º (or less) 5º 3.8 System Slip Speed 0.02Hz - 0.3Hz 0.01Hz 3.9 Energising Check dead volts 10% 50% of Rated Voltage 5% 3.10 Energising Check live volts 60% 100% of Rated Voltage 5% 3.11 Sequence Timer 0 15 minutes 1 minute 4 PERFORMANCE REQUIREMENTS Voltage Transformers and Burdens 4.1 The burden of the synchronising system on the primary voltage transformers shall not normally exceed 5 VA. 4.2 Selection of the IVT voltage tap shall ensure that with nominal system voltage, the voltage at the synchronising equipment from any switchgear circuit is 63.5 V 1%. 4.3 The IVT shall withstand 2 kv a.c. r.m.s. between windings and between windings and frame and earth screen for 1 minute. Accuracy 4.4 The synchronising function shall maintain the accuracy given below over the frequency range given in TS 1_RES 4.5 The accuracy of the under-voltage and differential voltage check facilities shall be not greater than ±5% of the set value under all specified environmental and power supply variations. 4.6 Phase angle accuracy at 50 Hz shall be ±1º at each setting. The alteration of phase angle settings on site shall not require any re-calibration. 4.7 The total variation from actual setting shall not exceed 2º under the worst combination of voltage, frequency and auxiliary supply deviation. 4.8 If abnormal power supply conditions are encountered then, either accuracy shall be maintained by the synchronising function, or circuit breaker closure shall be inhibited. 4.9 Circuit- breaker closure should not be initiated with a phase angle greater than the nominal setting angle plus tolerance stated above. 4.10 The interposing voltage transformers shall meet the accuracy requirements of Class 0.5/3P of BS 61869. Uncontrolled When Printed Page 7 of 10

4.11 Timers shall have an accuracy of ±2% or better. 4.12 The slip measurement accuracy shall be 0.01 Hz or better. 5 FORMS AND RECORDS None PART 2 - DEFINITIONS AND DOCUMENT HISTORY 6 DEFINITIONS Informative When voltages are present on both sides of an open circuit breaker it is necessary to ensure that these voltages are reasonably in synchronism before closure of the circuit breaker. Two possible conditions apply: a) More usually, the voltage vectors are static in relation to each other with a fixed phase angle between them and; b) Rare occasions when the voltage vectors are at different frequencies because the system has become split. In addition to the two synchronising conditions above, one or both of the voltages may be unavailable in which case the circuit breaker must be closed to energise a dead line, dead busbar or to close a circuit breaker in a dead system. CHECK SYNCHRONISING Check is the term which has historically been used by to check that the voltage vectors across an open circuit breaker are within preset limits of magnitude, phase angle and practically zero slip. This condition is the most common when closing circuit breakers with voltages on either side. DAR - Delayed Automatic Reclose as applied by to feeder circuits usually comprising or mainly comprising overhead line whereby, following the operation of a main protection and subsequent trip of a circuit, the circuit is automatically switched back into service after a minimum period of 10 seconds. The first circuit breaker to close energises the feeder by performing a Dead Line Charge (DLC). The second circuit breaker to close requires that the voltages across its open contacts are reasonably in synchronism. DAR is also applied to certain transformer LV circuit breakers when the transformer is banked on its HV side with a feeder that has DAR. INCOMING VOLTAGE The incoming voltage is the voltage on the opposite side of an open circuit breaker from the running voltage. At busbar-type substations the incoming voltage is on the feeder or transformer side of the circuit breaker. In those cases where the distinction between incoming and running voltages is not clear, for example bus section circuit breakers, the voltages may be identified as A and B voltages where the A voltage is normally associated with the main busbar or the lowest numbered busbar or mesh corner. IVT Interposing Voltage Transformer PHASE ANGLE Phase angle is the angular difference in degrees between the incoming voltage vector and the running voltage vector across the open contacts of a circuit breaker. POWER SYSTEM SYNCHRONISING Power system synchronising, or simply System, is the term which has historically been used by to cover the situation in paragraph b) above. This is when a circuit breaker is being closed to re-parallel a part of the transmission system that has become separated from the main part of the transmission system i.e. islanded. It is necessary to check that the voltage vectors across Uncontrolled When Printed Page 8 of 10

this open circuit breaker are within acceptable limits of magnitude, phase angle and slip when the two parts of the transmission system are running asynchronously. Uncontrolled When Printed Page 9 of 10

RUNNING VOLTAGE - The running voltage is the voltage on the substation side of an open circuit breaker across which synchronism is to be checked. SLIP Slip is the frequency difference between the two voltage vectors across the contacts of an open circuit breaker and is measured in Hertz (Hz). 7 AMENDMENTS RECORD Issue 1 2 Date October 2014 February 2018 Summary of Changes / Reasons Author(s) New document Richard Poole GCRP Alignment with EU codes Thomas Charton GCRP Approved By (Inc. Job Title) 7.1 Procedure Review Date 4 years from publication date. PART 3 - GUIDANCE NOTES AND APPENDICES 8 REFERENCES TS 1_(RES) Ratings and General Requirements for Plant, Equipment, Apparatus and Services for the System and Connection Points to it. 2014 2014 Copyright owned by Electricity Transmission plc, all rights reserved. No part of this publication may be reproduced in any material form (including photocopying and restoring in any medium or electronic means and whether or not transiently or incidentally) without the written permission of Electricity Transmission plc, except: 1. To the extent that any party who is required to comply (or is exempt from complying) with the provisions under the Electricity Act 1989 reasonably needs to reproduce this publication to undertake its licence or statutory duties within Great Britain (or any agent appointed so as to act on that party s behalf); and 2. In accordance with the provisions of the Copyright, Design s and Patents Act 1988. Uncontrolled When Printed Page 10 of 10