Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Similar documents
Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

Floating LNG facilities

Abstract. Mission. Exceptions

marine, construction, drilling, floating production, decommissioning and renewables industries.

Offshore Construction Management Services. Capability & Experience

Oil&Gas Subsea Production

Riser Installation in Deep & Ultra Deep Water

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

Subsea Positioning In deep water

Marine Construction Support & Dimensional Control

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

Local Contribution to the Aasta Hansteen development

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning Sep 2017, Dubai

Floating Systems. Capability & Experience

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

SUBSEA INSTALLATION WITHOUT A HEAVY LIFT VESSEL A STEP CHANGE IN SUBSEA INSTALLATION

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Engineering Procurement Construction Installation. Company Profile.

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

THE GLOBAL PARTNERS FOR COMPLETE FLEX-LAY SOLUTIONS...

Offshore Wind Risks - Issues and Mitigations

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

TechCon Engineering & Consulting

Floating Production Installations

WHITE ROSE DEVELOPMENT PROJECT. Canada-Newfoundland and Labrador Benefits Report. For the Period April 1 June 30, 2004

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

CAPETANO OIL LIMITED (+233) (+233)

The World Floating Production Report

Developments in Deepwater Handling Systems. Gregor McPherson, Caley Ocean Systems

LIFE OF FIELD SOLUTIONS - ONSHORE AND OFFSHORE

Goliat FPSO Marine Installation Execution Highlights and Learnings

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations

SPOOLBASE & MULTIJOINT SERVICES

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL

HELIX ENERGY SOLUTIONS

FPSO Operation and Maintenance

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Richard Rickett, General Manager Engineering and Procurement - March Case Study

Subsea 7 Norway. Monica Th. Bjørkmann Sales and Marketing Director

FPSO Design and Technology

Implementing a Deepwater- Pipeline-Management System

IBC Information and Communication Committee, Nils Andreas Masvie 27 January Paris Marriott Opera Hotel. Ungraded

MOBILISATION SUPPORT. Joint Competency Statement

DNV GL s 16 th Technology Week

Summary of Changes and Current Document Status

Innovative Subsea Engineering

Joint Industry Programme on E&P Sound and Marine Life - Phase III

Opportunities and Challenges in Deepwater West Africa Projects

OBSERVATORY SERVICING AND MAINTENANCE

Capital Marked Presentation. Dof Subsea Atlantic Region

Evolution of Deepwater Subsea / Offshore Market

Send your directly to

Emerging Subsea Networks

Managing Offshore Field Development & Marine Asset

Delivering Subsea Solutions Using a Systems Engineering Approach

Commercial. Committee. Technical Planning. Committee. Development and Construction. Operations

Marine Risers. Capability & Experience

Experienced project management Total flexibility of the workforce Modern drydocking facilities

Next Generation FPSO: The Engineering & Construction Contractor Solution

INDONESIA DEEPWATER INVESTMENT

Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi

James Fisher Offshore. Your specialist partner in the delivery of subsea and topside projects.

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

Marine Well Containment Company Outer Continental Shelf Summer Seminar

FPS Spending: $20 Billion a Year and Growing By Bruce Crager

Taking a broader view

POWER GENERATION OFFSHORE SERVICE ELECTRONIC DEVICES & COMMUNICATIONS

Subsea STP Buoy Mooring

Wave & Tidal Safety & Construction Guidelines

FIELD JOINT COATING SOLUTIONS

Lifting Engineering. Capability & Experience

REPLACING FULL MOORING SYSTEM FOR COOEC IN THE SOUTH CHINA SEA

MOE125 Offshore Well Construction

Offshore Pipelines. Capability & Experience

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

SEMCO MARITIME. Projects, solutions and competences for the energy sector

Technip Floating Production: A Comprehensive Portfolio

Using Norwegian competence from oil and gas subsea operations towards the development of ocean mining operations

A marginal field (re-)development using several alternative methodologies 1

Dry trees for cost effective solution with the Wellhead Barge: WHB

SEMCO MARITIME Projects, solutions and competences for the energy sector

Strategic performance in the toughest environments

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007

Swiber Holdings Limited 1Q FY08 Results Briefing

INDUSTRIAL PROCESS CLEANING SPECIALISTS SEPTEMBER 2017

UK Subsea Sector, The Invisible Global Player

Single / Dual Barrier HP Drilling Risers

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING

Our projects Shell Prelude FLNG

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

The use of an integrated contract model (iepci) for Subsea developments

Integrity Management of Offshore Assets

Transcription:

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa 1 SAFER, SMARTER, GREENER

Content Going Deeper Scale/Size of Deepwater Mega Subsea Developments FPSO and related issues Subsea and Innovative Technology Challenges Installation Logistics Technical Local Content Conclusions Deepwater West Africa 2

Installation Market Going Deeper Source: 2014 Deepwater Solutions & Records For Concept Selection, Offshore Magazine, May 2014 Global Deepwater Review Driving deepwater growth, Offshore Engineer, May 2014. 3

Typical field development - artist impression FPSO Offshore Loading Terminal (OLT) * FPSO floating, production, storage and offloading Mooring Anchors Flexibles Risers, Umbilicals Pipelines Wellheads 4

FPSO Typical Footprint and Basic Statistics Component parts Facts: No. Vessels 50 (installation, tugs, barges and support) Umbilicals 80 km Water injection flow-line 60 km Production flow-line pipeline 40 km 800km 2 Mooring lines 10 s km 16km No. Spools 37 5

Recognition of the project footprint - Global Supply Chain With the increase in size of projects we have seen a significant increase in the footprint of the global supply chain. Subsea & Moorings FPSO Construction Installation FPSO Supply Chain The variability in the supply chain poses particular challenge for consistency in the offshore operations experience and local content during the design, planning and execution of the project 6

Project A. Topside Integration Flare Tower Language barrier English to Korean to Japanese for Floating Crane Operator Two booms of cranes are manually controlled Our Solutions Identifying problem at an early stage Making the crane operator aware of difficulties and precautions they need to take while operating two booms manually in tandem 7

Project A. FPSO Sailaway Initial refusal of yard to complete all seafastening before start of the voyage as they wanted to start sailaway as early as possible This was not acceptable to MWS Our Solutions Seafastening needs to be completed prior to departure Working in coordination with CPY we made yard to accept this which is a vital requirement for sailaway and safe voyage 8

Project A. FPSO Sailaway Is it strong enough? Is it stable enough? Are the marine procedures adequate and safe? 9

Project A. Berthing Technical Challenges Mooring analysis did not satisfy our requirements Berth was not designed for large vessels as FPSO No mooring winch and other required infrastructure FPSO has to moor at shallower draft Mooring line broke Our Solutions Helping in developing emergency procedure Stationing a surveyor to help Advise on daily basis by tele-conference FPSO remain berthed without any incident till its voyage to field 10

Installation Technology Technical challenges moving to deeper water Higher CAPEX Higher loads Higher pressure Extreme temperature Complex installation procedures Challenging installation tolerances Complex subsea field layout Drive by industry REDUCE COST Oil Majors cost saving and redundancies Contract larger packages and even whole projects to the mega SE Asia EPC contractors Smaller companies to enter deep water pipelay market Pipe technology improvements (weight) = Potential for Increased Risk 11

Standardization of Subsea Equipment and Components Installation JIP Bring together installation contractor knowledge and best practice to develop guideline: For installation analysis Limit state criteria In completion phase Certification of deepwater installation systems JIP Develop DNV certification for fibre rope based deep water installation systems based on technology qualification principles Currently in the third and final phase Advantages of using fibre ropes: strong and light that is easier to handle and more environmentally friendly 12

Project A. Logistical Challenges Suitability Survey 48 vessels in SURF & FPSO Suitability Survey are performed at 11 different countries across the globe in Europe, Africa, Asia 50 Surveyor mobilisation in SURF 500 Days of attendance in SURF and 120 days of travel For FPSO 270 days of attendance and 75 days of travel For SURF Surveyor mobilisations are in 12 different countries while for FPSO it is 9 different Countries Different travel and visa regulations Personal Security Local Cultural Sensitivities Managing internal travel without an office in the country concerned Limited notice period for surveyor mobilisations Coordinating surveyor requirement vis-à-vis those of other projects 13

Surveyor Mobilisations Worldwide 14

Project A. Logistical Challenges SOLUTIONS Close coordination between COMPANY Installation Manager and MWS Project Manager Tracking weekly update of project schedule and monthly look ahead Anticipating visa and other travel requirements Taking advance step to meet those requirements Anticipating possible security issues and discussing this with COMPANY Advance planning of meet and greet and accommodation of surveyors with the help of COMPANY logistic coordinator. Dedicated logistic coordinator working closely with COMPANY and in cases with Installation Contractor s logistic coordinator Proper planning of offshore transfer on arrival at mobilisation point in tandem with COMPANY representative 15

Project A. Technical Challenges SURF CARGO BARGE MOBILISATIONS AT ANGOLAN YARD During our initial attendances at Angola Yard we encountered several challenges Problems with ballast management on all three first of series barges. Yard have over-filled nominated tanks which then required de-ballasting. The accuracy of the LOPs was noted with a number of missing items. The Management of Change procedure also tended not to trail the operational status. Riggings are produced without proper certifications Project items loaded out without obtaining necessary approval of attending MWS, exposing COMPANY to risk Lifts were planned without considering other marine traffic 16

Project A. Technical Challenges SURF SOLUTIONS Lift Operation Plan for all lifts to be accepted by attending MWS Rigging Certification for rigging items Documented Deliverables regarding barge ballast condition and barge draft records. Demonstrating clear understanding of ballasting procedure Management of Change No load out of project items without attending MWS approval Adequate visibility to be ensured during load out at night Port traffic and other related activities in the area Crane and crane driver certifications Continued MWS presence till all issues are sorted to the satisfaction of MWS office 17

Project A. Technical Challenges SURF SINGLE HYBRID RISER FABRICATION AND DEPLOYMENT This was one of the most critical stage of Project A subsea development Entire activity of fabrication and deployment was scheduled for 8 days To get sufficient weather window and completing the operation was a challenge Many activities such as lifting and upending of the LRA, URA and buoyancy tank, pulling and docking of SHR are critically weather sensitive Operation close to hull and potential collision issues Smooth planning and execution was essential to avoid delay during operation Early identification and mitigation of risks also essential for above reasons Additional risk is fatigue damage of the SHR during fabrication and deployment 18

Project A. Technical Challenges SURF SOLUTIONS Activity divided into several steps and relevant documents and supporting critically reviewed for each step Making all relevant guidelines, codes, regulations are satisfied. SHR fatigue damage during deployment is within limit. A check list is prepared for each step and CoA issued for each such step All installation aid design and riggings are carefully checked In addition to dedicated HAZID and HIRA, a dedicated workshop is arranged between installation contractor, COMPANY and MWS to run through the entire installation process, closing all MWS comments and concerns Every step of this work MWS, Installation contractor and COMPANY worked as team to successfully meet challenges of this operation Result was to successfully deploy the SHR a day earlier than the scheduled Effective coordination between MWS, COMPANY and Installation Contractor made this happen 19

Local Content and other Challenges in Angola Project A was to provide 9 million man-hours work for Angolans which is 20% of global cost of project for local fabrication and assembly. Angola labour will be for 70,548 tons of fabrication and assembly including 8,492 tons for the FPSO and 60% of the SURF package Large local content possess various challenges As seen during pipe joint load-out, lack of experienced personnel in performing operations such as ballasting Lack of required infrastructure to berth large vessel such as Project A FPSO and doing integration work on it Adequate crane facility to handle large subsea spools In general less awareness of HSE culture required for safe execution of a job Visa and work permit issues 20

Local Content and other Challenges in Angola SOLUTIONS Anticipating the problem ahead and putting alternative solutions in place Spending additional time in explaining local personnel MWS requirements To consider whether additional calculations, design verification can replace some test / trial requirements where such tests/ trials are impossible due to lack of infrastructure (i.e. lifting trial of a spool without offshore rigging) Explaining requirements to produce detailed procedures such as lift plans and to follow accepted procedures Advising and explaining requirement to use certified equipment and riggings. Adopting above approaches we could help in developing work culture in Angola Yard. Yard and other work places for Project A in Angola as per MWS standard. For visa and work permit we could overcome the problem in most cases with help of our local agent and taking necessary steps well in time 21

Conclusions Mega subsea development main challenges are: High CAPEX Ensuring consistent local content a) Facilities, Vessel & Equipment b) Experienced Manpower for execution Technological needs more cost & more specialist equipment i.e. more need for capable local content Standardization reduce risk and reduce cost MWS capable of mobilisation across the Globe Safe execution of the project without major incident and claim Key for component to improve consistency in local content across the whole project installation Expertise on several specialisations and in most challenging environment both technically and logistically 22

Alex Argyros & Tanmay Sarkar alex.argyros@dnvgl.com www.dnvgl.com SAFER, SMARTER, GREENER 23