NTG Technical Drawings

Similar documents
ELECTRONIC DRAFTING GUIDELINES

Section 4: Ontario Realty Corporation CAD Standards and Guidelines

Miami University. Physical Facilities Department. CAD Standards. April 2004

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

This specification describes the general requirements for Engineering Services provided to Vale.

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

Vanderbilt University Standard Specification Revised 2/6/08

DOTD Plan Delivery. Baton Rouge, LA February 10, 2009 Presented by Hollis Ward DOTD Design Automation Manager

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Estates Development & Projects

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects.

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

SECTION SUBMITTAL PROCEDURES

CSI: CAD Standards Implementation

SECTION SUBMITTAL PROCEDURES

FACILITIES CADD STANDARD

Issue Date: August 2018 Revision: 03

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

CMW DELIVERABLES SPECIFICATION Version 1.0

Advanced Topics Using the Sheet Set Manager in AutoCAD

Cloud Based Plan Review Process (Applicant)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

AutoCAD Standards University of California, Santa Cruz Physical Planning & Construction

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

Services Overview. Northeast Blueprint

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

January, 2014 Page 1 of 5

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

U.S.A.C.E. ALBUQUERQUE DISTRICT A/E/C CADD STANDARD SUPPLEMENTAL STANDARD

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

ASIS CAD and Geospatial Data Standards and Procedures December 2013 Release 3.3

CONSULTANT ACCREDITATION SCHEME WATER SUPPLY

CHAPTER A-10 DRAWINGS

Harris County Flood Control District. CAD Standards Manual

Mastering AutoCAD 2D

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

BIM/VDC on TAA Projects:

DWG Register User Guide October Adding Drawings... 2 Statuses... 2 Archive... 4 Change Requests... 5 Transmittals... 5 Admin...

Gippsland Water Drafting Specifications

LA DOTD Electronic Plans Breaking New Ground

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

Record As-Built Drawings for Capital Projects

Listed below are the competencies required and examples from the aforementioned job:

Autodesk Civil 3D Project Management Workflow Using Autodesk Vault

DRAWING PROCESS EXTERNAL DRAWINGS

Designing with BIM for Infrastructure on Large Transportation Projects

Electrical Overcurrent Studies

Drawing Management Brain Dump

SECTION ADMINISTRATIVE REQUIREMENTS

Digital Drawings Submittal Process

CBCL Limited Sheet Set Manager Tutorial 2013 REV. 02. CBCL Design Management & Best CAD Practices. Our Vision

DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS

CADD & Civil 3D User Guidelines

Preview Guide. Contents. AUTOCAD Raster Design 2008

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC

Working Drawing Manual

CT ES-TD-001. Computer Aided Design (CAD) Using AUTOCAD

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

CONSULTANT ACCREDITATION SCHEME SEWER DESIGN

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Company Profile. Introduction. Contents. Orbitcad.com since 2009 Providing AutoCAD & Revit Support to Clients Globally

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

East Central College

e-submission Quick Reference Guide for Economic Operators

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

Drawing Management Standard

Section Table of Contents: Section 16.0

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

THIS PAGE INTENTIONALLY LEFT BLANK

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

5.4 TECHNICAL REQUIREMENTS FOR DRAWINGS AND ELECTRONIC DOCUMENT SUBMISSIONS

Create styles that control the display of Civil 3D objects. Copy styles from one drawing to another drawing.

Nikon Photo Contest International

Design, Drawing and Sheet Composition

all editorial writing.

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

Electronic Plan Review. City of Mesquite, TX. eplan Review Standards Document

Submittal Exchange Design Team User Guide

Facility Design Information (FDI) Section 1A - Project and Record Documents

Jacksonville District Master

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015

COMPUTER AIDED DESIGN STANDARDS AND PRACTICES

Certificate of Appropriateness (CoA) Checklist

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

The coordinate system and vertical datum shall be noted in the drawing in the metadata.

HYDROGRAPHIC SURVEY STANDARDS AND DELIVERABLES

FACADE: Future-proofing Architectural Computer-Aided DEsign

Transcription:

DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS NTG Technical Drawings Part 1 Requirements for Technical Records Management

Approval Sheet Title NTG Technical Drawings Part 1 Requirements for Technical Records Management Version Number 2017.01 Approved By Endorsed By Prepared By Name: Stephen Jackson Date: 6/06/2017 Senior Director Engineering and Environmental Services Name: Lawrence Foscaro Date: 6/06/2017 Manager Projects Specification Services Name: Tony McLean Date: 6/06/2017 Senior Project Officer Technical Records For further information, please contact: Technical Records Department of Infrastructure, Planning and Logistics 3 rd Floor Highway House Telephone: (08) 892 47351 TG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 2 of 17

1 Overview & Function... 4 2 Document Requirements... 5 2.1 General Requirements... 5 2.2 Drawing Number Request Prerequisite... 5 2.3 Drawing Deliverables... 5 2.4 Mandatory File Formats... 6 2.4 Native File Formats... 7 3 Automated Reminder Process... 7 4 Detailed Deliverable Requirements... 8 4.1 Project Stages... 8 4.2 Drawing Requirements... 8 4.3 Drawing Layers... 9 4.4 CAD Data Compression etransmit... 9 5 Data Storage ADR and Documents... 12 5.1 Additional Document Record - ADR... 12 5.2 Native CAD File Formats... 12 5.3 Other Documents... 12 6 NTG Standard Title Blocks and Sheets... 12 6.1 Cad Drawing Sheets... 12 6.2 Title Block... 12 6.3 Title Block Attributes... 15 6.4 Consultant Logos... 15 6.5 NTG Title Block Fonts... 15 6.6 Drawing Fonts... 15 6.7 Drawing Index Sheet... 15 6.8 Status Stamps... 15 7 Electronic File Submission Methods... 16 7.1 Email... 16 7.2 Technical Records File Transfer Service (FTP)... 16 7.3 Internal File Transfer... 16 7.4 Technical Records Links... 16 7.5 Virus Scanning... 16 8 Physical Media Types... 16 8.1 CD, DVD and Flash Drive... 16 8.2 File System Format... 17 8.3 Virus Scanning... 17 9 Key Changes... 17 NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 3 of 17

1 Overview & Function Technical Records is chartered with the responsibility of the issuance of NTG Drawing Numbers and receipt of CAD related documents for storage for whole of Government, for all NTG Assets. To ensure that drawings are there for future use or reference, it is required to provide these plans at the two stages set out on this manual Tender and Handover stage. This Document has been developed to clarify the requirements of preparing consistant and acceptable project drawings, and outline the Technical Records Archiving Process. It describes the process and procedures to be followed when engaged as a consultant, and as a Departmental NTG staff member, in relation to technical drawings for all Northern Territory Government asset construction and maintenance. Communication Plan for all active NTG Projects (fig 1.1) At any stage of the technical document management process, Technical Records Unit can be contacted on Email: Web site: technicalrecords@nt.gov.au https://nt.gov.au/technical-records NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 4 of 17

2 Document Requirements 2.1 General Requirements All of the files stored within Technical Records are CAD (Computer Aided Design) related in the preparation and construction of NTG Assets. Technical Records require all documents in an electronic format for storage. Hardcopy and paper drawings are not acceptable. 2.2 Drawing Number Request Prerequisite Drawing numbers are to be taken out by the NTG Project Manager and provided to the consultant when the following milestones are met PM Confirms project status and funding The Design is greater than 75% review for Building Projects and 90% Review for Civil Projects Sheet quantities are known Overview of the Drawing Number Request Process (fig 1.2) 2.3 Drawing Deliverables For any given project, there will be two sets of drawings submitted to Technical Records. These include: 1. Tender Release Set 2. As Constructed set This is shown in the following flow chart. NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 5 of 17

TYPICAL DRAWING NUMBER REQUEST PROCESS TECHNICAL RECORDS Design Review Approved 75% for Building Projects and 90% for Civil Projects Sheet Quantities Known PM confirms Project Status and Funding Technical Records Drawing Numbers Issued RFT Request Tender Release DESIGN PDF and CAD Files Sent for Archive Construction Phase Handover AS CONSTRUCTED PDF and CAD Files Sent for Archive Overview of the Document Number Request Process (fig 1.3) 2.4 Mandatory File Formats The formats accepted as a mandatory deliverable by government are as follows:.dwg is a commercial computer-aided design (CAD) and drafting software application. Used by government such as Autodesk. It is used across a wide range of industries, by architects, project managers, engineers, designers, and many other professionals. The file extension for this type of file is.dwg MicroStation is a CAD software product for two and three dimensional design and drafting, developed and sold by Bentley Systems. This product is generally used by companies that provide information related to lineal infrastructure such as civil roads or water and power infrastructure. The file extension for this type of file is.dgn.pdf (Portable Document Format) is a file format that has captured all the elements of a printed document as an electronic image that you can view, navigate, print, or forward to someone else. It is used by the NTG to provide an image of the files without the need to obtain expensive CAD software when sharing or displaying drawings. The file extension for this type of file is.pdf Other file type are rarely acceptable and must be approved by Technical Records Prior to delivery NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 6 of 17

2.4 Native File Formats PDF DWG or DGN Only under the following circumstances below shall it be accepted as an etransmitted Archive Format. etransmit when the following occurs: 1. An image file is Externally Referenced (xrefed) as a background to the drafting area. Large images like Aerial Photos can be Externally Referenced (xrefed) but must be etransmitted. 2. There are documents other than CAD format Externally Referenced (xrefed) 3. etransmitted files (.zip) received with no Externally Referenced files will be rejected for resubmission in the Native File formats For further detail, Refer to etransmit Section 3.3 3 Automated Reminder Process During the Life Cycle of a project, Technical Records have an automated reminder system to ensure all those responsible with the acquittal of all drawings are prompted at each stage. Automated Reminders begin 90 days from the issuance of NTG Drawing Numbers There are 11 reminders over 14 months All drawings are to be acquitted, even if they are unused. Technical Records Tender Release PDF and CAD Submission PDF and CAD AS CONSTRUCTED Issue Drawing Numbers Reminders during Construction Phase PRS Reminder Handover Stage Drawing Report By Project Number NTG Project Manager or Project Representative Overview of the Reminder Process (fig 1.4) NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 7 of 17

4 Detailed Deliverable Requirements 4.1 Project Stages Provide Drawings to Technical Records at the following two stages: Tender Stage: 100% Design At this stage all drawings must be Amendment (0) CONTRACT DRAWING for Tender Contract Drawing: PDF Contract Drawing: DWG or Contract Drawing: DGN (where client specific) Handover Stage: As Constructed Drawing: PDF Drawing: DWG or Drawing: DGN (where client specific) PDF, DWG and DGN files must match when printed Drawings to have the latest amendment number. Noted in the amendments description box - As Constructed Electronic stamp drawing AS CONSTRUCTED Section 6.4 Please note that this is the only status stamp to appear on all drawings All drawings are to be delivered to the NTG Project Manager at Handover. This may affect the Financial Completion of all Projects. 4.2 Drawing Requirements PDF and DWG, One file for each NTG Drawing Number Files to be in their native format Generally the following applies to all outputs. Must be rotated as text up. Must use NTG Title Blocks NTG Project Number.mandatory Provide single file matching Drawing Number eg B16-XXXX.xxx PDF and DWG files must match when printed Large raster images eg: Aerial Photos can be xrefed, then must be etransmitted PDF Portable Document Format PDF Do not substitute fonts Single PDF files. Do not submit as multipage pdf s Must be rotated as text up. CAD Format DWG PURGE drawings of any unwanted xref s, layers, fonts Provide DWG with xref s bound-in Logos and non-rotated Images, eg: PDF, JPG to be embedded, not xrefed If etransmit is used, include all entities combine into one file eg B16-XXXX.zip Must be rotated as text up. NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 8 of 17

Specific Client Requirement: PowerWater, NT Generation and NTG Civil CAD Format DGN MICROSTATION - Provide DGN with reference files merged into master or PKZip file containing any associated photos/images used. PDF and DGN files must match when printed Must be rotated as text up. Individual drawing files to be named with the Official NTG Drawing Numbers issued from Technical Records. Specific Client Requirement: NTG Civil Design Section CAD Format 12D 12d Files to be complete Must meet the requirements set out on the CADD Manual Civil File naming to meet Section 5.0 of this Manual Table 1.0 Delivery Requirements by Discipline Discipline DWG PDF DGN Terrain and Design Model 3D Model Building Mandatory Mandatory As Per Contract Roads Mandatory Mandatory Civil Design Either Mandatory Either Mandatory Power Water Optional Mandatory Mandatory Development Optional Mandatory 4.3 Drawing Layers Civil design documentation layer naming convention shall be in accordance with DIPL Civil Standards. Building design documentation shall adopt a layer naming convention organised in a systematic fashion with defined layer name data fields such as: Discipline, Major Group, Minor Group and Status. It is mandatory that all external consultants adopt a layering convention similar to the above mentioned or similar to suit the complexity of the project and allow CAD file to be efficiently used across disciplines. DIPL building design in house layer naming standard is available if required. 4.4 CAD Data Compression etransmit Only to be used if native format cannot be achieved due to externally referenced files. Ensure that all relative paths are maintained when preparing for an etransmit output. Use the etransmit function, do not use a Compression Program, like Winzip or Winrar Note: a raster of any size can be embedded if there is no requirement to rotate or scale it. An example is a Company Logo or a small Location of Works raster image, which should be embedded. a raster of any size can be embedded if there is no requirement to rotate or scale it. An example is a Company Logo Autodesk etransmit - When you select a set of drawing files in a transmittal package, it automatically includes all related dependent files such as xrefs and font files. AutoCAD users may use etransmit to include all related dependent files in a. zip file or a folder option in a transmittal package. Please ensure in the Transmittal setup that the actions of Bind external references and Purge drawings are set as default as per attached image NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 9 of 17

Ensure that the Xrefs are bound, purged and fonts included. (fig 1.6) NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 10 of 17

etransmit Decision Process (fig 1.7) General Rule is, if it can be Embedded and Bound to the CAD file it is required to keep the complete file in its Native Format. NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 11 of 17

5 Data Storage ADR and Documents 5.1 Additional Document Record - ADR Technical Records will also store CAD files in addition to the mandatory deliverables. They are to be submitted with a specific file naming convention for storage against a NTG Project Number. This is for CAD related files submitted for storage only These files will not be audited for content Files to be submitted with a specific naming convention Table 1.1 ADR File Naming Format File Types Naming Convention Native adr *.rvt ADR TED12345 North Building.rvt Archive adr *.rvt.zip ADR TED12345 North Building.rvt.zip Archive adr *.12d.zip ADR RCD45678 Smith Street.12d.zip 5.2 Native CAD File Formats Table showing status of file formats currently stored. Table 1.2 Native File formats File Extensions.dwg Current supported versions >2014.rvt (Revit 2014 Release).dgn (Microstation) 8.0.4dw (12d Model ) Stored Yes as an ADR Yes as an ADR 5.3 Other Documents Additionally Technical Records stores some Awarded Tender Specifications, RFT / RFQ where they have drawings. 6 NTG Standard Title Blocks and Sheets 6.1 Cad Drawing Sheets The Government has developed standard electronic drawing sheets in A1 and A3 with horizontal and vertical title blocks. These have been produced using Autodesk s Autocad. Digital copies are available via the Northern Territory Government Technical Records Internet Web Site, Email Request or as provided by the Principal s representative. No other drawing sheet are to be used or submitted. 6.2 Title Block Requirements and Restrictions Technical Records NTG - Title Blocks mmm yyy.zip will be used for all NTG Plans as a mandatory requirement Title Block Requirements: Mandatory NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 12 of 17

Use the NTG Title Block supplied at time of receiving Drawing Numbers Drawings require information as tabled Building Format: B = Building Title Block Field Format Example Source NTG DRAWING No. B17-1234 Technical Records NTG Project No. TED123456 1 Location in Title Block NTG Project Manager AMEND. and AMENDMENT Alpha or Numeric 1 Character 2 Locations in Title Block Drafter NTG ASSET No. 00123B1A ASNEX AIS SHEET SIZE A1 or A3 Defines Print Scale Drafter Road Format: R = Road Title Block Field Format Example Source NTG DRAWING No. R17-1234 Technical Records NTG Project No. FRD123456 1 Location in Title Block NTG Project Manager AMEND. and AMENDMENT Alpha or Numeric, 1 Character 2 Locations in Title Block Drafter NTG ASSET No. R0001, BD026 ASNEX AIS SHEET SIZE A1 or A3 Defines Print Scale Drafter Example of Title Block LHS Example of Title Block RHS All CAD drawing files to be submitted to Government will be clearly labelled with the following information: Project Name, including Region, Location, Job description and Drawing Title; formatted on Five Lines Line 1 Region: This should be the Region s title (ie: Darwin, Katherine, Alice Springs etc) and should not be confused with a suburb s title (ie: Casuarina, Palmerston, Parap.. etc) Line 2 Location: This should be the identifiable location of the project (Ie: Howard Springs Primary School, Marrara Sports Complex, or Jabiru Area School Secondary Science Building). Line 3 Project Description: This should be used to specify the type of works (ie: Ticket Office Refurbishment, Proposed New Construction). Drawing Title Line(s): This should include the type of drawings shown on that particular sheet (Ie: Ground Floor Plan, Joinery Details - Kitchen) The status of the Drawing or Amendment Description is not to be placed in these fields. NTG Project Number This is the Government specific NTG Project Number, The general convention of three (3) letters followed by five (5) NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 13 of 17

numbers. This can be obtained through the GOVERNMENT Principal s representative. This is not to be confused with the consultants file or project numbers which are not to be placed in this field. Drawing Number The Drawing Number is the unique identifier for each drawing. This will be raised by Technical Records. The unique identifier once raised is allocated and cannot be changed. It is the responsibility of the requestor to notify Technical Records if the number is no longer required as the system will track the number once issued until it is returned. Sheet Number This is the number of sheets in a multi-discipline project. The number will be preceded by the initial of the discipline. Architectural A, Electrical E, Structural S, Civil C, Mechanical M ie: A01 of 3, S04 of 11 Use of 100 series numbering system for Construction drawings, is subject to approval by the Principal s Representative. Consultant logos shall not be inserted as xrefed Images but can be embedded as raster images to drawings. Date, Designer/Drafter Name The initials of the designer/ drafter of the drawing along with the month and year drawn are to be included in the allocated spaces. Amendments are identified in two (2) locations on the drawing sheet, adjacent to the Drawing Number and in a detailed table on the bottom left. Amendments in the table should include an accurate description, the initials of the person who approved the amendments, the company and the date they occurred. 1. Concept / Design: Amendments prior to Tender are listed alphabetically starting at A (ie: A, B, C...) 2. Tender Release: CONTRACT DRAWING Amendment Description at Tender shall be 0 (zero) 3. Post Tender Construction: Amendments shall be numeric starting at 1(ie 1, 2, 3,.) During the design Phase the Alpha characters may be displayed, once the 100% review is complete these will be removed and replace with one entry. 0 CONTRACT DRAWING Set out below are three examples of the LHS Amendment Title Block in various states of amendment. 1: Design Phase Pre Tender C B Final Design Initial Design A Concept Design No Description Date Initial Company Amendments 2: Tender Release / APRO Lodgement 0 Contract Drawing Tender No Description Date Initial Company 3: Post Tender / As Constructed 3 As Constructed Handover 2 Amended.. 1 Changed. 0 Contract Drawing Tender NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 14 of 17

No Description Date Initial Company 6.3 Title Block Attributes The drawings are to be reduced, the annotation character heights shall be selected so that the annotation character heights as reproduced are not less than 1.8 mm. The minimum resolution is to be 600dpi. 6.4 Consultant Logos Government requires true Type Font Arial to be used on Government s Title Blocks as preformatted. For other presentations and design drawings, the following criteria should be met: Where a Raster Logo is used it is to be Embedded Where a Vector Logo is present it is to be bound not xrefed 6.5 NTG Title Block Fonts The NTG Title Blocks have been prepared in.dwg format. Arial Narrow is not to be used under any circumstances If the title block is exploded check font for compliance 6.6 Drawing Fonts Government requires all drawings to be drawn to scale in accordance with AS1100.101 The font is vector based for all descriptions within the drawing Due to PDF production issues Arial Narrow is not recommended. Government s preferred font is true type format for all Title Block / Drawing Sheet script. Cell size / aspect ratio to be 1. Consideration: Any non-true type fonts used in the production of drawings by the Consultant, will be at the consultants risk. Any cost or time delays caused by these errors in relation to the production of Tender Drawings will be borne by the Consultant. 6.7 Drawing Index Sheet Where supplied the index sheet should represent all the drawings in an NTG Project. Display in a Table View Include all drawings sorted by Discipline List all unused drawings as NOT USED in the title column Display NTG drawing numbers and not the sheet numbers 6.8 Status Stamps These have been commonly used to indicate the Amendment Phase of the drawings. eg: ( Construction Issue, For Tender ). This practice will no longer be accepted as the Amendment Description in the lower left corner is to be used to indicate is Amendment Status. No other Status stamps are to be used when submitting drawings for tender. As plans pass through each Amendment Stage the status will change. When plans are deemed complete and ready for storage the drawing is to be stamped As Constructed. Below is an example of Stamp available on the Technical Records website. NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 15 of 17

Stamps such as Certification and Structural compliance are allowable as required All other amendment stages can be described in the Amendment Description Field There are to be no Status Stamps placed on any in drawings amended as Contract Drawing 7 Electronic File Submission Methods 7.1 Email Small Submission Email less than 10MB: to TechnicalRecords@nt.gov.au 7.2 Technical Records File Transfer Service (FTP) Large Submission FTP: for access this service email Technical Records After the files have been uploaded, an email is to be sent to technical records notifying that files have been transferred. Electronic Mail (e-mail). Attachments are to be encoded using MIME. E-mail size is restricted by internet mail s size (10 Mb) and unrestricted within NTG LAN network. This includes the mail message and any accompanying attachments. Electronic documents larger than 10 Mb are to be transmitted via the FTP (File transfer Protocol) site set up by Technical records. The address for this site is http://ftp-doi.nt.gov.au. Access to this site and passwords are arranged by contacting Technical Records via email technicalrecords@nt.gov.au. This site is for the transfer of large documents between external consultants and Technical Records only and is not to be used as a storage device. Note: Electronic transfers through the use of external dropboxes (or similar commercial products) are not accepted. 7.3 Internal File Transfer Internal NTG LAN \\prod.main.ntgov\ntg\dci\den\planroom (Government users only) 7.4 Technical Records Links Technical Records Website https://nt.gov.au/technical-records Templates https://nt.gov.au/technical-records/manuals-templates Drawings Request Forms http://finke.nt.gov.au/dtw/drwnumreq.nsf/drwnumreq?openform Tender Specification Request http://finke.nt.gov.au/dtw/drwnumreq.nsf/specnumreq?openform Internet Users Internet Users NTG Users NTG Users 7.5 Virus Scanning All electronics files included as an attachment from emails shall be scanned prior to transmission and shall be free of any VIRUSES 8 Physical Media Types This type of media is not a preferred method. Electronic file transfer is preferred. If there physical media is the only option then you must comply with the information set out below: 8.1 CD, DVD and Flash Drive CAD data is to be supplied on a media type agreed to by the Department. The media type must be detailed on an NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 16 of 17

accompanying CAD Data Transmission Record. CD/DVD compliant with ISO 9660 Level I conformance. USB thumb drive 8.2 File System Format This must be detailed on an accompanying CAD Data Transmission Record. Accepted media formats are: MS-DOS Version 3.0 or greater file format. Only media formatted using FAT32 or xfat and NTFS is acceptable. Media, which is formatted by other commands such as drvspace and dblspace, are unacceptable. It is the Consultant's responsibility to supply data in a media format appropriate to the Departments system. 8.3 Virus Scanning All electronics files included as an attachment from emails shall be scanned prior to transmission and shall be free of any VIRUSES Revision Log Version Amendment Description Date Amended Endorsed by 2017.02 Enter Details 9 Key Changes This document replaces the original Drawing Archive Requirements 09Nov2015.pdf. Amendment zero (0) at Tender Amendment Description CONTRACT DRAWING at Tender PDF and DWG are a mandatory deliverable at Tender Stage No Status Stamps on drawings when submitted except for AS CONSTRUCTED when deemed complete NTG Project Number(s) is mandatory on all Drawings Road Asset number required for Drawing with chainage reference in the Title Civil Terrain and Design Model are a mandatory deliverable at Tender Stage Recommendation not to use Arial Narrow True Type font in NTG Drawings DWG files shall be supplied in native format, etransmitted files are not the default NTG Technical Drawings Part 1 Requirements for Technical Records Management 2017.01 June 2017 7/06/2017 17 of 17