Summary of the Ninety-Fifth Meeting. Special Committee 159

Similar documents
Special Committee SC-159 Navigation Equipment Using the Global Navigation Satellite System (GNSS) (Version 11)

Special Committee SC-159 Navigation Equipment Using the Global Navigation Satellite System (GNSS) (Version 13)

Summary of the Ninety-Second Meeting. Special Committee 159

Wide Area Augmentation System (WAAS)

Final Project Report. Abstract. Document information

International Civil Aviation Organization THE SIXTH MEETING OF IONOSPHERIC STUDIES TASK FORCE (ISTF/6) OUTCOME OF THE NSP/2 MEETING

HORIZONTAL ARAIM AVAILABILITY FOR CIVIL AVIATION OPERATIONS. ARAIM Outreach event

Ground Based Augmentation Systems (GBAS) Introduction

D. Salos, M. Mabilleau (Egis) C. Rodriguez, H. Secretan, N. Suard (CNES)

AERONAUTICAL COMMUNICATIONS PANEL (ACP) FIRST MEETING OF THE WORKING GROUP OF THE WHOLE. Montreal, Canada JUNE 2005

AEEC 2013 Presentation to the Airlines and the Aviation Industry

Horizontal Advanced RAIM: Operational Benefits and Future Challenges

Radio Navigation Aids Flight Test Seminar

Aviation Benefits of GNSS Augmentation

ARAIM Fault Detection and Exclusion

Satellite-Based Augmentation System (SBAS) Integrity Services

CONCEPT OF OPERATIONS (CONOPS) FOR DUAL-FREQUENCY MULTI-CONSTELLATION (DFMC) GLOBAL NAVIGATION SATELLITE SYSTEM (GNSS)

Recent Progress on Aviation Integrity

Report of Working Group B: Enhancement of Global Navigation Satellite Systems Services Performance

GBAS FOR ATCO. June 2017

IMPLEMENTATION OF GNSS BASED SERVICES

INTEGRITY AND CONTINUITY ANALYSIS FROM GPS JULY TO SEPTEMBER 2016 QUARTERLY REPORT

SBAS DFMC performance analysis with the SBAS DFMC Service Volume software Prototype (DSVP)

GNSS: CNS Dependencies

On Location at Stanford University

GPS/WAAS Program Update

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003 TOOLS AND FUNCTIONS FOR GNSS RAIM/FDE AVAILABILITY DETERMINATION

INTEGRITY AND CONTINUITY ANALYSIS FROM GPS JANUARY TO MARCH 2017 QUARTERLY REPORT

FAA GNSS Programs & GPS Evolutionary Architecture Study (GEAS) Status

DFMC SBAS Receiver Development. Please note that this presentation is also published on the GSA website

Report of the Working Group B: Enhancement of Global Navigation Satellite Systems (GNSS) Services Performance

Latest Evolution of RAIM Prediction Systems

On Location at Stanford University

SATELLITE BASED AUGMENTATION SYSTEM (SBAS) FOR AUSTRALIA

ICAO policy on GNSS, GNSS SARPs and global GNSS developments. Jim Nagle Chief, Communication, Navigation and Surveillance Section ICAO

RAIM Availability prediction

An ARAIM Demonstrator

Understanding GPS: Principles and Applications Second Edition

PBN Operational Approval Course

On Location at Stanford University

International Programmes & GNSS Monitoring

[EN A 78] Development of a CAT III GBAS (GAST D) ground subsystem prototype and its performance evaluation with a long term data set

ICG GNSS Interoperability Workshop A Civil Aviation Perspective

Modernizing WAAS. Todd Walter and Per Enge, Stanford University, Patrick Reddan Zeta Associates Inc.

Seminar on the Ionosphere and its Effects on GNSS Systems (Project RLA/00/009 GNSS Augmentation Trials) (Santiago, Chile, April 2008) AGENDA

GAGAN implementation and certification Programme. Presented by India

Modern ARINC 743B DO-229D and DO-253C GLSSU Solutions For Retrofit

INTERNATIONAL CIVIL AVIATION ORGANIZATION

GPS Adjacent Band Compatibility Assessment

Development of a GAST-D ground subsystem prototype and its performance evaluation with a long term-data set

Progress on Working Group-C Activities on Advanced RAIM

SBAS solution GCC, Yemen and Iraq System baseline and performance

PRELIMINARY PROGRAMME

Benefits and Limitations of New GNSS Signal Designs. Dr. A. J. Van Dierendonck AJ Systems, USA November 18, 2014

Alternate Position, Navigation & Time APNT for Civil Aviation

FOLLOW-UP ON ACTIVITIES OF PROJECT AIR NAVIGATION SYSTEMS IN SUPPORT OF PBN. (Presented by the Secretariat) SUMMARY

[EN-A-008] GBAS Interoperability and Multi-Constellation / Multi-Frequency Trials

Annex 10 Aeronautical Communications

Introduction to Advanced RAIM. Juan Blanch, Stanford University July 26, 2016

The Wide Area Augmentation System

Proposal for ACP requirements

Prototyping Advanced RAIM for Vertical Guidance

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003 INTEGRATION OF GNSS AND INERTIAL NAVIGATION SYSTEMS

Final Project Report. Abstract. Document information

Performance framework for Regional Air Navigation Planning and Implementation

A GLONASS Observation Message Compatible With The Compact Measurement Record Format

Report on DME interference on GPS/L5 (third version, July 99)

P/N 135A FAA Approved: 7/26/2005 Section 9 Initial Release Page 1 of 10

REPORT OF COMMITTEE B TO THE CONFERENCE ON AGENDA ITEM 6

GAGAN-Extension to the Gulf Region. Joint ACAC/ICAO MID Workshop on GNSS 7 th & 8 th November 2017

Radio Navigation Aids Flight Test Seminar

GLOBAL POSITIONING SYSTEM (GPS) PERFORMANCE APRIL TO JUNE 2017 QUARTERLY REPORT

Nigerian Communications Satellite Ltd. (NIGCOMSAT)

Recommendation ITU-R M.1905 (01/2012)

d~//ld UNCLASSIFIED DOCUMENT MILITARY STANDARD ORDER (MSO) DISTRIBUTION STATEMENT A APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED

GNSS-based Flight Inspection Systems

Global positioning system (GPS) equipment including those using GPS augmentations.

Challenges and Methods for Integrity Assurance in Future GNSS

Integrity of Satellite Navigation in the Arctic

Assessing & Mitigation of risks on railways operational scenarios

GA and NextGen How technologies like WAAS and ADS-B will change your flying! Presented By Claire Kultgen

A Brief History of GPS L5

The experimental evaluation of the EGNOS safety-of-life services for railway signalling

Broadcasting Data from an SBAS Reference Network over Low Rate Broadcast Channels

Enabling the LAAS Differentially Corrected Positioning Service (DCPS): Design and Requirements Alternatives

GLOBAL POSITIONING SYSTEM (GPS) PERFORMANCE JANUARY TO MARCH 2016 QUARTERLY REPORT

International Civil Aviation Organization. Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand July 2002

IMPLEMENTATION OF AN SBAS-SACCSA TEST BED IN THE CAR/SAM REGIONS. (Presented by the Secretariat) SUMMARY

Satellite Selection for Multi-Constellation SBAS

Galileo & EGNOS Programmes Status

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

GNSS for Landing Systems and Carrier Smoothing Techniques Christoph Günther, Patrick Henkel

Validation of Multiple Hypothesis RAIM Algorithm Using Dual-frequency GNSS Signals

Spoofing Detection for Airborne GNSS Equipment *

GPS with RAIM or EGNOS? The difference for (mountainous) helicopter operations. Marc Troller Skyguide / CNS expert group

ARAIM: Utilization of Modernized GNSS for Aircraft-Based Navigation Integrity

ASSEMBLY 37TH SESSION

Figure 2: Maximum Ionosphere-Induced Vertical Errors at Memphis

PORTABLE GNSS MONITORING STATION (PGMS)

ACAS Xu UAS Detect and Avoid Solution

Transcription:

RTCA Paper No. 189-16/SC159-1050 August 8, 2016 Summary of the Ninety-Fifth Meeting Special Committee 159 Minimum Operational Performance Standards for Airborne Navigation Equipment Using the Global Positioning System (GPS) The ninety-fifth Plenary meeting of SC-159 was held March 11 th, 2016 at RTCA Headquarters, 1150 18 th Street NW, Suite 910, Washington, D.C. 20036. The attendees were the following: Christopher Hegarty (Co-Chairman) George Ligler (Co-Chairman) Kyle Wesson (Secretary) Ken Alexander (DFO) NAME Adams, Hal Anand, Shiva Ashton, Ken Azoulai, Laurent Biggs, Michael Blanco, Nuria Brenner, Mats Bridges, Kevin Clark, Barbara Domey, Daniel Ennenga, Ben Foley, John Harris, Matt Hiliuta, Adrian Iatsouk, Victor Irwin, Barry Kalyanaraman, Sai O'Laughlin, Dan Owen, John Snowball, Allen Stearn, Geoff Studenny, John Trautenburg, Dr. Hans Walton, Rick Wichgers, Joel The MITRE Corporation PMEI ZETA Associates Federal Aviation Administration COMPANY Accord Software & Systems, Inc. The MITRE Corporation Nu-Approach Ltd Airbus Federal Aviation Administration European Satellite Services Provider (ESSP) SAS Honeywell International, Inc Federal Aviation Administration Federal Aviation Administration Esterline CMC Electronics R.A. Miller Industries, Inc. DBA RAMI Garmin Ltd. The Boeing Company Esterline CMC Electronics Russian Federal Space Agency The MITRE Corporation Rockwell Collins, Inc. The MITRE Corporation Defence Science Technology Laboratory (DSTL) Defence Science Technology Laboratory (DSTL) Ligado Networks Esterline CMC Electronics EASA Lockheed Martin Corporation Rockwell Collins, Inc 1

The agenda for the meeting follows: 1. Chairman s Introductory Remarks. 2. Approval of Summary of the Ninety-Fourth Meeting held October 23, 2015, RTCA Paper No. 041-16/SC159-1047. 3. Review Working Group (WG) Progress and Identify Issues for Resolution. a. GPS/WAAS (WG-2) b. GPS/GLONASS (WG-2A) c. GPS/Inertial (WG-2C) d. GPS/Precision Landing Guidance (WG- 4) e. GPS/Interference (WG-6) f. GPS/Antennas (WG-7) 4. Review of EUROCAE Activities. 5. Action Item Review a. Coordination of SC-159 TOR dates and DFMC MOPS efforts with other standards bodies b. DME Interference to GNSS signals in the future c. Updating SC-159 Document Schedules in the SC-159 TOR 6. Assignment/Review of Future Work. 7. Other Business. 8. Date and Place of Next Meeting. 9. Adjourn ****************************************************************************** In accordance with the Federal Aviation Advisory Committee Act, Ken Alexander, Federal Aviation Administration (FAA), was the designated Federal Employee for this meeting. ****************************************************************************** Agenda Item 1. Chairman s Introductory Remarks. At the suggestion of Co-Chairman George Ligler, attendees introduced themselves. Jennifer Iverson, Program Director of RTCA, discussed RTCA s membership policy and proprietary references policy. Agenda Item 2. Approval of Summary of the Ninety-Fourth Meeting held October 23, 2015, RTCA Paper No. 041-16/SC159-1047. The summary was approved without change. Agenda Item 3. Review Working Group (WG) Progress and Identify Issues for Resolution. a. GPS/3nd Civil Frequency (WG-1) WG-1 was disbanded in October 2012, and there is no activity to report. b. GPS/WAAS (WG-2) (Co-chairs: John Studenny and Laurent Azoulai) Laurent and John provided a summary of WG-2 at the Plenary. The working group covered the following topics, with paper numbers corresponding to the agenda item. For further details, please download the WG-2 presentation to the Plenary from the RTCA workspace. o 2.a - WAAS update o 3.a - EGNOS Performance and LPV Implementation Status o 5.a Galileo status 2

o 6.a SBAS PRN List Expansion o 6.b PRNs allowed for SBAS GEOs o 6.c SBAS PRN proposed MOPS changes o 6.d Proposed approach to address SBAS PRN List expansion o 7.a Prevention of using cross-correlated PRNs o 7.b Navigation Message Correction Table o 7.c (De)-Selection of SBAS providers o 12.a ICAO NSP DF/MC CONOPS o 12.b DFMC standardization activities in the frame of ATLAS project o 12.c DFMC SBAS Definition Document Status o 12.d Status of the DFMC ICD o 12.e Assumptions on the DFMC SBAS MOPS o 12.f GPS IODE/IODC Anomalous Re-Use o 12.g ARAIM Milestone III report o 12.h GPS/Glonass RAIM Regarding the WG-2 recommendation on developing DO-229E to specify receiver requirements for expansion in the number of PRN codes for SBAS geostationary satellites (items 6.a 6.d): o The Plenary decided that the FRAC for DO-229E would start on September 1 st, 2016. o ACTION: Jennifer Iverson will add this agenda item to the Federal Register Notice for the SC-159 Plenary s October 21 st, 2016 meeting. o ACTION: To support the PRN expansion and DO-229E, WG-6 will get updates on Ignss, taking into consideration CA on CA and SBAS aggregate gain factor (Gagg). Regarding the issue of de-selection of SBAS providers (item 7.c): o ACTION: WG-2 will form a subgroup to work the issue and will inform the Plenary by end of June on the necessity of including this content in DO-229E. The next WG-2 meeting will take place over two days the week of the next SC-159 meeting (week of October 17 th, 2016). Please refer to Agenda Item 8 for the proposed scheduling. c. GPS/GLONASS (WG-2A) (Chair: Victor Iatsouk) Victor provided a summary of WG-2A at the Plenary. For further details, please download the WG-2A presentation to the Plenary from the RTCA workspace. The working group covered the following topics: o Concerns over adequacy of current RAIM for GPS/GLONASS /ABAS MOPS and related issues: intended applications (RNP 0.3, optional ADS-B) current GPS-GLONASS accuracy levels constellation failures (Pconst) satellite failure rates (Psat) o Psat discussion o Note to definition of FDE (Section 1.7.3 in draft MOPS): The probability of a GPS or GLONASS satellite integrity failure being included in the position solution used in RAIM is less than or equal to 10-4 per hour (see definition of HAL above). Legacy [GPS] RAIM is based upon ten satellites in view, each with a Psat of 10-5. Values for the algorithm need to account for the increased number of satellites if a combined solution is used. Additionally, the RAIM algorithm needs to be adjusted if Psat of 10-5 is not substantiated. o Interference criteria - no support for proposed optimized integrated mask in this GPS/GLONASS MOPS o Combined antenna specs passive & active designs considered; active option is specified o Proposed antenna specs referred to WG-7 for preliminary general assessment and report to Plenary 3

Antenna manufacturers of GPS-GLONASS antennas responded that the frequency selectivity mask proposed by Ligado (previously LightSquared) in the RTCA WG-2A meeting of October 20, 2015 was not difficult to achieve. Ligado stated, however, that in the interest of getting the MOPS completed by the target date, it has chosen not to press for a mask change in WG-2A, but will focus its efforts on the mask to be developed in WG-7. Ligado said that it believes this information will be useful in developing a mask that maximizes frequency selectivity while meeting all the other performance requirements established by WG-7. ACTION: The Plenary agreed to initiate a GPS/GLONASS/ABAS L1 MOPS 45-day FRAC starting in June/July. WG-7 will provide, within two weeks, WG-2A feedback on the antenna mask if there are any major concerns. Then WG-2A will post the GPS/GLONASS/ABAS L1 MOPS for FRAC. ACTION: Jennifer Iverson will add this agenda item to the Federal Register Notice for SC-159 s October 21 st, 2016 Plenary meeting. ACTION: WG-2A to update the GNSS table for the FDMA GLONASS constellation. The next WG-2A meeting will take place over two days the week of the next SC-159 meeting (week of October 17 th ). If necessary, a meeting on Friday, October 14 th, 2016 may be called. Please refer to Agenda Item 8 for the proposed scheduling. d. GPS/Inertial (WG-2C) (Co-chairs: Kevin Bridges and Mats Brenner) Mats provided a summary of WG-2C at the Plenary. For further details, please download the WG-2C presentation to the Plenary from the RTCA workspace. WG2C is working on a MOPS for GNSS aided inertial systems (including AHRS grade sensors). Discussion and presentations included: o JAXA presentation on ionosphere bubble impact o JAXA update on heading estimation based on aircraft motion o Presentation on GPS fault modes affecting pseudo range and delta range (Rockwell Collins) o Presentation on receiver requirements needed for dual antenna heading determination o Lengthy discussions regarding L1 lambda ambiguity and integrity of heading o GNSS based heading is optional and the plan is to put recommendations on requirements and test methods in an appendix o Completion of section 1 walk-through o Section 2 draft walk-through: Requirements section from appendix R had been updated to address the new scope and associated issues (category A,B and C and sub category 0,1,2). o Request to change false alert rate to false detection rate since that is what being tested o Potential conflict between GNSS aiding allowed by DO-334 and new MOPS resolved o Group discussed necessity of specifying time to alert for other (non-position) parameters o Established that MOPS requirements only apply to parameters that are affected by SIS performance o Some discussion circled around the use of a 99.9% uncertainty limit such as HUL o SBAS aiding discussed: Integration with SBAS would require different error models and fault modes and is out of scope o Group wrestled with formulation of key integration requirement: Claimed performance over and above basic FDE (typically occurring in RAIM holes) o Review continued with non GNSS aiding requirements (clock, barometric altitude, magnetometer and dual antenna based heading) o Ionospheric storm test data currently in custody at Stanford. FAA action (Kevin) to see if it can be moved to RTCA-owned drive (e.g. Workspace) 4

o Issue raised regarding other types of fault modes that could affect velocity, attitude or heading o Result from receiver interface subgroup o Group further discussed output latency for parameters such as (hybrid) pitch and heading o Presentation on test trajectories (Garmin) o Alternative method to address this was suggested (Rockwell Collins) The next WG-2C meeting will take place over two and a half days the week of the next SC-159 meeting. Intermediate telecons will also occur. Please refer to Agenda Item 8 for the proposed scheduling. e. GPS/Precision Landing Guidance (WG-4) (Co-chairs: Joel Wichgers and Matt Harris) Joel provided a summary of WG-4 at the Plenary. For further details, please download the WG-4 presentation to the Plenary from the RTCA workspace. Near Term Work Products o Revise RTCA GPS/LAAS Airborne MOPS (DO-253 rev. C to D) o Revise RTCA GPS/LAAS Interface Control Doc. (ICD) (DO-246 rev. D to E) Near Term work schedule is tied to ICAO NSP. Plan to FRAC after ICAO NSP has completed Validation on the ICAO SARPs ICAO NSP is planning to complete validation for the GBAS SARPs amendment that includes GAST D Service in December 2016 Contingent on ICAO NSP completing validation, plan to FRAC in January 2017 and Seek SC- 159 Plenary Approval of DO-253D & DO-246E in March 2017. A number of issues are taking longer to close, examples: o ICAO GBAS SARPs validation of Iono. Threat Monitoring. o Extended Service Volume (ESV) [May get deferred] A number of issues are emerging: o VDB Compatibility Being Reassessed with ILS, VOR, and VHF Comm. Systems, may result in Adjacent Channel Interference Rqmts. o Antenna Group Delay Variations with Angle of Arrival Possibly Larger than antenna MOPS o Request for VDB Tx Antenna Diversity in Same Time Slot o Open Issues with regard to the Authentication Protocol: SSID Issue with MT2, Antenna Diversity Longer Term Work Products o Revise RTCA GPS/LAAS Airborne MOPS Requirements o Revise RTCA GPS/LAAS Interface Control Doc. (ICD) Requirements The next WG-4 meeting will take place over three days the week of the next SC-159 meeting. Intermediate telecons will also occur. Please refer to Agenda Item 8 for the proposed scheduling. f. GPS/Airport Surface Surveillance (WG-5) There has been no activity since the last meeting. g. GPS/Interference (WG-6) (Chair: Sai Kalyanaraman) Sai provided a summary of WG-6 at the Plenary. For further details, please download the WG-6 presentation to the Plenary from the RTCA workspace. The agenda covered: o Galileo and SBAS Link Budget o C/A on C/A interference discussion o SBAS Gagg discussion o Assessment of OOBE from other wireless Base Stations o Updates to DO-235B and DO-292 5

ACTION [copied from above]: To support the PRN expansion and DO-229 revision, WG-6 will get updates on Ignss, taking into consideration CA on CA and SBAS Gagg. ACTION: WG-6 is to include a recommendation on a new mask in the December 2017 report. The next WG-6 meeting will take place over a half day the week of the next SC-159 meeting. Please refer to Agenda Item 8 for the proposed scheduling. h. GPS/Antennas (WG-7) (Co-chairs: A. J. Van Dierendonck and Sai Kalyanaraman) Sai provided a summary of WG-7 at the Plenary. For further details, please download the WG-7 presentation to the Plenary from the RTCA workspace. The agenda covered: o Ligado, RAMI and PCTEL presented potential antenna design for a more frequency selective design at L1 o Reviewed antenna group delay bias presentation (from Matt Harris) o WG-2A requested that WG7 review updated antenna material in the GPS-Glonass MOPS o Discussions on MCMF (L1/L5/E1b,c/E5a) antenna: G/T discussions for L1/E1 Noise Figure at L5 Antenna gain slope variations (gain vs elevation) Group delay vs Azimuth ACTION [copied from above]: The Plenary agreed to initiate a GPS/GLONASS/ABAS L1 MOPS 45-day FRAC starting in June/July. WG-7 will provide, within two weeks, WG-2A feedback on the antenna mask if there are any major concerns. Then WG-2A will post the GPS/GLONASS/ABAS L1 MOPS for FRAC. The next WG-7 meeting will take place over a half day the week of the next SC-159 meeting. Please refer to Agenda Item 8 for the proposed scheduling. Agenda Item 4. Review of EUROCAE Activities. Laurent Azoulai gave updates on EUROCAE activities (EUROCAE WG-28 and WG-62-39). Please access the presentations on the RTCA workspace for further details. The SC-159 Co-Chairs took an action to discuss with the PMC, in response to requests from EUROCAE, making one or more deliverables related to the DFMC MOPS joint documents between RTCA and EUROCAE. The meeting discussed the need for the schedule and scope of any joint document to be agreed between RTCA and EUROCAE before inception of such a joint effort. Agenda Item 5. Action Item Review a. Coordination of SC-159 TOR dates and DFMC MOPS efforts with other standards bodies Action is to be subsumed into more systematic discussion of the dates that was assigned to the Plenary Status: Closed, see Agenda Item 6. b. DME Interference to GNSS signals in the future FAA is currently determining deployment, relocation, and signal strength Navigation Programs will coordinate with Spectrum to provide a briefing to RTCA at the October 21 st, 2016 Plenary. Status: Open c. Updating SC-159 TOR 6

DO-229E is a new product and there are a slight change to the dates for some existing products in the SC-159 TOR.. ACTION: Jennifer to submit to document PMC with paper number holder from Karan Hofmann. Status: Closed Agenda Item 6. Assignment/Review of Future Work. Plenary Action for the Chairs: draft formal communication to SBAS providers and other standards bodies informing them of SC-159 work products and efforts. Agenda Item 7. Other Business. There was a question about joint WG-4 and ICAO meetings. The consensus was that joint meetings are not a concern and they are in accordance with the RTCA membership policy. 7

Agenda Item 8. Date and Place of Next Meeting The 96th meeting of RTCA SC-159 will be during the week of October 17 th, 2016 at RTCA Headquarters. The proposed meeting schedule is as follows: October 17 (Monday) October 18 (Tuesday) October 19 (Wednesday) October 20 (Thursday) October 21 (Friday) WG-1 (3 rd civil frequency) WG-2 (GPS/WAAS) 1 st day 2 nd day WG-2A (GPS/GLONASS) 1 st day (half) 2 nd day (half) WG-2C (GPS/Inertial) 1 st day 2 nd day 3 rd day (half) @ 9:00 am WG-4 (GPS/Precision Landing) 1 st day 2 nd day 3 rd day WG-5 (Airport Surface Operations) WG-6 (Interference) Half day @ 1:00 p.m. WG-7 (Antenna) Half day Plenary Session One day The 97th meeting will be held during the week of March 13 th, 2017. -S- Kyle Wesson Secretary CERTIFIED as a true and accurate summary of the meeting -S- Christopher Hegarty Co-chairman -S- George Ligler Co-chairman 8