FM 691 CORRIDOR STUDY

Similar documents
I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

King Mill Lambert DRI# 2035 Henry County, Georgia

The Shoppes at Forney Crossings

Exit 61 I-90 Interchange Modification Justification Study

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Single Point Urban Interchange (SPUI) with Signals

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

San Antonio Wrong Way Driver Initiative

Abilene District Traffic Signal Timing and Capacity Analysis

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

Managing traffic through Signal Performance Measures in Pima County

WSDOT LED Adaptive Roadway Lighting & Illumination Reform

NOTICE OF A MEETING. Monday, February 6 2:30 P.M. to 4:00 P.M. AGENDA QUESTIONS? PLEASE CONTACT DINA LOPEZ AT OR

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

Charlton/Oxford Route 20 Reconstruction Project

2017 San Juan College Luminarias 6:00pm - 11:30pm

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

State Road A1A North Bridge over ICWW Bridge

TEXAS SENATE MILES DESCRIPTION: WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION TO: 0.25 MILES N. OF LOOP 20/FM 3464 IN

Updated: April 7, 2016

Attachment #2 PPW133-07

USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT

AMES INDUSTRIAL PARK AND OFFICE PLAZA

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS.

Update on Traffic Results and Findings

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CONCEPT REVIEW GUIDELINES

Aesthetic Steering Committee Meeting No. 8

LAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Sacramento Gateway. J o n Schult z Lic

SHOPPES AT DAVIS LAKE

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

6.5+ Acres: Commercial Zoning Auto Dealership Entitled US 98 North - South of I-4

2015 GDOT PowerPoint. Title Page

Arkansas State Highway and Transportation Department

800 Lake Murray Blvd

CONTACT US. NOW LEASING Woodcreek Plaza SHOP SPACE AVAILABLE

Texas Transportation Institute The Texas A&M University System College Station, Texas

Interchange Feasibility Study

FORMER COMMUNITY BETHESDA SPACE

Adversity Volleyball Center. Energy Sports Complex

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

APPENDIX M NOISE ANALYSIS

Directions to Office

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

Locate Request Information

ACEC OC February 22, 2017

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

ZOO INTERCHANGE PROJECT

LOCATION: RIDGE AVENUE FROM LAKE STREET TO DEMPSTER STREET LENGTH: APPROXIMATELY 1075' 2-WAY STOP AT RIDGE AVENUE AND GREENWOOD STREET

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF

hauger bunch REALTOR 47+ Gross Acres / 33 Upland Acres Mixed Use / Office Sites US Highway 98 South Lakeland, Florida Polk State College

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007

OVERVIEW WATERMARK. "Prestigious Scottsdale Road Business Address in the Valley's Most Vibrant City of Tempe."

Appendix B: Noise Study

WAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD

Planarization & Routing Guide

Newtown SGA Master Plan

PHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground

WAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD

FM SETTLERS VILLAGE

Location, Design & Options

2018 District 1 Highway Construction Program

CTA Blue Line Forest Park Branch Feasibility/Vision Study

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

NORTH TARRANT EXPRESS IH35W / IH820 INTERCHANGE (OPTION B) PROPOSAL SCHEMATIC PLAN SET

Directions to Fields (5/17/12) All directions from Rt 22. Directions from your home location may vary. Please note that

1050 Page Mill Road Office Development

Application of the Network Robustness Index to Identifying Critical Road-Network Links in Chittenden County, Vermont

PLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO

C o n t a c t : J e r r y F e n n e l l y, P a t r i c k D i n t r o n e

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

COMMERCIAL PARCELS AT MIRASOL TOWN CENTER LAUREL ROAD EAST AT KNIGHTS TRAIL ROAD, VENICE, FL 34275

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

CENTENNIAL GATEWAY 5780 CENTENNIAL CENTER BLVD. LAS VEGAS, NV 89149

7972 North Tamiami Trail Sarasota, FL PROPERTY FEATURES ADDRESS acres - Frontage on US ft

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

Chapter 23. Signing and Pavement Marking Plans

INTELLIGENT COMPACTION

WYONG SHIRE COUNCIL S.H.30 CENTRAL COAST HIGHWAY Provision of 4 lanes & turning bays through Long Jetty

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned

Study Description. November 29, Overpass Road Alternatives Public Workshop

PROPERTY HIGHLIGHTS PROPERTY SPECIFICATIONS. The building can be occupied by a single tenant or demised into smaller units

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

D r a f t I m p l e m e n t a t i o n P l a n : D a l l a s a n d K a u f m a n C o u n t i e s

Some of the information contained herein is from owner and has not been independently verified by us. The balance of the information is from sources

2013 FOURTH QUARTER PROPERTY INVENTORY OFFICE LISTINGS CONWAY ROAD ST. LOUIS, MO INTELICACRE.COM

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Transcription:

FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008

Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289 Access Management Schedule

Study Area CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE SSH H PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ 9911 LLOO YY SPUR 503 FM 691 FM FM 131 131 FM FM 1417 1417 FUTURE FUTURE SH SH 289 289 FM FM 131 131 LLAA KK EE NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD

Proposed Developments near US 75/FM 691 Cigna Office Complex Texoma Medical Center (2010) Hotel/Convention Center (2010) Proposed Town Center (2015)

Short-Term Site Generated Trips 2,900 trips 6,100 trips Projected 27,700 Additional Daily Trips 6,800 trips 8,400 trips 5,400 trips

Long-Term Site Generated Trips 2,900 trips 20,000 trips Projected 67,700 Additional Daily Trips 8,400 trips 5,400 trips 6,100 trips 6,800 trips 15,000 trips 5,000 trips

US 75/FM 691 in Short-Term Close Proximity of SB Exit Ramp to Driveway Heavy U-turn traffic to TMC and from Hotel/Convention Center NB access to US 75 from TMC, CIGNA, and Office limited Signalize interchange, Pool Road and Town Center Blvd. Operates acceptably with existing geometry

US 75/FM 691 in Long-Term Increases total trips from 30,000 to 70,000 SB Exit Ramp results in poor operation and potential safety issues NB Entrance Ramp over capacity NB access to US 75 from TMC, CIGNA, and Office limited Gateway Blvd over capacity U-turn traffic to TMC and from Hotel/Convention Center & Town Center

Recommended Short-Term Improvements for US 75/FM 691 Limited access for planned driveway (inbound only) Signalize major intersections once warranted Existing configuration projected to operate acceptable in short-term

Recommended Long-Term Improvements for US 75/FM 691 Four through lanes along FM 691 with exclusive turn lanes for major access points US 75 ramp alternatives

Benefit for US 75 Ramp Alternatives Improve local access to proposed developments Minimize safety and operational impacts to the interchange and local roadways Improve regional movement

US 75 Ramp Option Methodology Provide necessary distance between ramp and access Loy Lake Proper weaving distances Spur 503 Maximize interchange operation Maintain access SH 131 FM 691 Pool Road Theresa Road SH 91 Terrell Road Blue Flame Loy Lake Fallon Dr.

TxDOT s s Planned Ultimate US 75 Ramp Configuration Provide full ramp access to Fallon Drive for improved Midway Mall access Loy Lake Spur 503 Maintain full ramp access to FM 691 SH 131 Pool Road Theresa Road SH 91 FM 691 Terrell Road Blue Flame Loy Lake Fallon Dr. Existing Remove New

US 75 Ramp Option 1 Flip FM 691 ramps to provide frontage road access Loy Lake Eliminate direct connectors to/from Spur 503 Move NB Entrance from FM 691 and SB Exit to FM 691 Continuous NB Frontage Road goes under Spur 503 SH 131 Town Center Hotel/Conv. FM 691 Terrell Road Loy Lake Future Dev. Spur 503 Cigna TMC Future Dev. Pool Road Blue Flame Fallon Dr. Theresa Road SH 91 Existing Remove New

US 75 Ramp Option 2 Flip SB Entrance ramp from Loy Lake Loy Lake Flip FM 691 ramps NB Frontage Road spans over Spur 503 and WB to NB DC Eliminate NB to EB DC in order to provide NB Entrance ramp from FM 691 SH 131 Town Center Hotel/Conv. FM 691 Terrell Road Loy Lake Future Dev. Spur 503 Cigna TMC Future Dev. Pool Road Blue Flame Fallon Dr. Theresa Road SH 91 Existing Remove New

US 75 Ramp Option 3 Rural diamond interchange for Spur 503 with uninterrupted frontage roads Loy Lake Flip FM 691 ramps Spur 503 New ramps between Loy Lake and FM 691 SH 131 Town Center Hotel/Conv. Cigna TMC Pool Road Theresa Road SH 91 FM 691 Future Dev. Future Dev. Terrell Road Blue Flame Loy Lake Fallon Dr. Existing Remove New

FM 691 Corridor Goals Improve east-west movement and provide connection to future SH 289 Sub-regional alternate to US 82 Outline an access plan for future development

FM 691 Corridor Typical Section SSH H PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ 9911 LLOO YY FM FM 131 131 SPUR 503 CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE FM 691 FM FM 131 131 LA LA CIMA CIMA FM FM 1417 1417 FUTURE FUTURE SH SH 289 289 LLAA KK EE NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD

FM 691 Corridor Typical Section (Future SH 289 to FM 131) Rural four-lane with potential expansion to six lanes

FM 691 Corridor Typical Section (FM 131 to Texoma Parkway) Urban four-lane with potential expansion to six lanes

FM 691 Corridor Evaluation (Future SH 289 to FM 131) SSH H PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ 9911 LLOO YY FM FM 131 131 SPUR 503 CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE FM 691 FM FM 131 131 LA LA CIMA CIMA FM FM 1417 1417 FUTURE FUTURE SH SH 289 289 LLAA KK EE NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD

Need for FM 691 Extension Future SH 289 extension Future industrial development along SH 289 Intermodal development at the Airport Sub-regional alternative to US 82

on B LA LA CIMA CIMA 9911 SSH H FM FM 131 131 FM 691 FM 131 131 Op FM tio nc PLAINVIEW RD. PROPOSED TOWN CENTER CIGNA OFFICE COMPLEX HOTEL/ CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE FUTURE DEVELOPMENT DEVELOPMENT GRAYSON COUNTY COLLEGE Op ti FM FM 1417 1417 on A Op ti FUTURE FUTURE SH SH 289 289 NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD SPUR 503 LLOO YY LLAA KK EE FM 691 Corridor Evaluation (Future SH 289 to FM 131)

Comparison of New FM 691 Alignments (Future SH 289 to FM 131) FUTURE SH 289 NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD Option A FM 1417 LA CIMA PLAINVIEW RD. GRAYSON COUNTY COLLEGE Option B FM 131 FM 691 FM 691 PROPOSED TOWN CENTER CIGNA OFFICE HOTEL/ COMPLEX CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE DEVELOPMENT FUTURE DEVELOPMENT Estimated Total Construction Cost $21 million $19.6 million $20.4 million Option C Feature Option A Option B Option C Length Used Along Existing Plainview Road (miles) FM 131 0.75 2.5 3.0 Total Length of New Roadway (miles) 2.5 3.5 4.1 Total Length along existing FM 691 2.65 1.5 1.0 Total New ROW Needed (acres) 56 57 62 Estimated Cost of New Alignment Roadway $10 million $14 million $16.4 million SH 91 SH 91

Evaluation of FM 691 Corridor (FM 131 to Texoma Parkway) FUTURE SH 289 NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD Option A FM 1417 PLAINVIEW RD. PLAINVIEW RD. LA CIMA GRAYSON COUNTY COLLEGE Option B FM 131 FM 691 FM 691 Option C FM 131 PROPOSED TOWN CENTER CIGNA OFFICE HOTEL/ COMPLEX CONVENTION TEXOMA MEDICAL CENTER CENTER FUTURE DEVELOPMENT FUTURE DEVELOPMENT SH 91 SH 91 Feature Total Length of Roadway(miles) Total New ROW Needed (acres) Estimated Cost of Widened Roadway Quantities 1.75 minimal $10.5million

on C Op ti on B 9911 SSH H FM FM 131 131 Phase 3 Op ti on A Phase 2 Phase 2 Phase 2 Op ti FUTURE FUTURE SH SH 289 289 NORTH TEXAS REGIONAL AIRPORT/PERRIN FIELD SPUR 503 LLOO YY LLAA KK EE FM 691 Corridor Phased Implementation Phase 1 Phase 4 Phase 3 Phase 3

Access Management Driveway management Median design and control Signal spacing Interchange design and layout Coordinated land uses

Example of relatively poor access management

Example of relatively good access management

Bad Cross Access

Good Shared Access

Supporting Street Circulation Source: Vergil Stover

Access Management Policy FM 691 Corridor Access Management Plan developed through MPO Driveway spacing Median openings Corner clips Acceleration/deceleration lanes Assist TxDOT and Cities with access for future development

Schedule Evaluation of Existing Conditions June 2008 Develop Conceptual Alternatives June 2008 Technical Steering Committee June 25, 2008 Evaluate Conceptual Alternatives July 2008 Transportation Policy Board Meeting August 13, 2008 Public Meeting August 20, 2008 Completion of Alternatives Comparison August 2008 Finalize FM 691 Corridor Study Report October 2008

FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 and Associates, Inc.

Trip Distribution N N 40% 55% W 10% Site 10% E W 10% Site 10% E 40% 25% S Cigna Office Complex (Existing) Hotel/Convention Center (2010) Proposed Town Center (2015) Future Development on Southern Quadrants (2015) S Texoma Medical Center (2010) Medical / Dental Office (2010)