19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA

Similar documents
21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX. February 7, 2007 Joint Meeting - 8:30 am

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:00 AM and outlined various safety and housekeeping issues.

John Bednar, Chairman

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

MINUTES 21 st Joint Meeting API C2/SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment Houston, Texas February 7, 2007

Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015

ISO/TC 67/SC 4 N 267 ISO/TC 67 N

API 17G Update. API SC17 Summer Meeting 12 Jun API 17G Monthly Leadership Update 1

Recommended Practice for Flexible Pipe

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS

Specification for Subsea Umbilicals

ISO INTERNATIONAL STANDARD

2015 Exploration & Production Winter Standards Meeting Subcommittee 10. January 27-29, 2015 Intercontinental Hotel New Orleans, LA

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS STATUS OF API 17J,B,K AND ISO ,11,10 FLEXIBLE PIPE STANDARDS

2014 Exploration & Production Standards Conference Subcommittee 10. January InterContinental Dallas Addison, Texas

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals

SC20 MEETING MINUTES January 29, E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

Annual Report to ISO TC67 / SC4 For 2005 Plenary Meeting May 12-13, 2004 Milan, Italy

HPHT Case Study: Kristin Field, North Sea

OBSERVATORY SERVICING AND MAINTENANCE

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

API 17G Update. API SC17 Winter Meeting 07 Feb API 17G Update SC17 Winter Meeting 1

ISO/TR TECHNICAL REPORT

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

MINUTES OF MEETING OF SUBCOMMITTEE 6 ON VALVES AND WELLHEAD EQUIPMENT June 15, 2006 Hilton Atlanta Hotel Atlanta, Georgia

ISO/TC67/SC4 Work Group 4 Annual Report

4 Briefing. Responsible investor

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17G4 Riserless Subsea Well Intervention Systems REVISION TASK GROUP STATUS

Subsea Developments Status and Trends. Tore Halvorsen Senior Vice President

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

Matrix Composites & Engineering Ltd

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

MARS. Multiple application reinjection system

Send your directly to

Cost Reduction in Frontier Deepwater Riser Systems

Single / Dual Barrier HP Drilling Risers

Draft MEETING MINUTES SUBCOMMITTEE17 ROUNDTABLE DISCUSSIONS June 23, 2009 Westminster, Colorado John Bednar, Chair, Subcommittee 17

Building Subsea Capability

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING

In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance

API Subcommittee MAY 2018 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

Reliability of Deepwater Technologies

7 Briefing. Responsible investor

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

Progressing Cavity Pump Systems for Artificial Lift Surface-drive Systems

ISO INTERNATIONAL STANDARD

SAFER, SMARTER, GREENER

The use of an integrated contract model (iepci) for Subsea developments

Industry Response - Post Macondo

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

Update on API and ISO Gas-Lift Standards and Recommended Practices

Overview and Update of API Standards

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Oil&Gas Subsea Subsea Technology and Equipments

Wells Expert Committee Bulletin

API Subcommittee JAN 2019 TABLE OF CONTENTS 1. SCOPE OF WORK PREVIOUS STATUS REPORT DATE MEMBERSHIP...

SoSECIE Webinar. Welcome to the 2019 System of Systems Engineering Collaborators Information Exchange (SoSECIE)

Flow Assurance. Capability & Experience

A marginal field (re-)development using several alternative methodologies 1

Challenging Inspections of Offshore Pipelines by Intelligent Pig

Presenter: John T. Gremp President and Chief Operating Officer. February 2011

SWiG Subsea Wireless Group - Presentation to API

API COPM CPMA Chapter 20.X

Wave & Tidal Safety & Construction Guidelines

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

QUARTERLY UPDATE Q2 FY13

Subsea Structural Engineering Services. Capability & Experience

QUARTERLY UPDATE. Summary

Software as a Medical Device (SaMD)

Vertical Tie-in Systems

Marginal Project Development

Marine Well Containment Company Response Overview New Orleans Area Committee

Flexible Pipe Technip

Vertical Tie-in Systems

Advisory Committee for the Ocean Energy Safety Institute

Transcription:

19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA June 14, 2005 Joint Meeting - 8:00 am 1. Opening of the meeting (Bednar/Inderberg) 2. Roll call/roster Update (Jordan) 3. Adoption of the proposed agenda (Bednar/Inderberg) 4. Adoption of the minutes from 18 th joint meeting (Bednar/Inderberg) 5. Status and action plan update (See Attached Action Items) 6. Task Group/Project Group Reports (See Attached Work Program) A. Subsea Production Systems (API TG7) Discussion from Tuesday session B. Flexible Pipe (API TG1) (Doynov) ISO 13628-2/API Spec 17J & ISO 13628-11/API RP 17B report on progress and status of JIP to update standards Status of ISO FDIS Ballot & Adopt-back for 17J/-2 & 17B/-11 17L - Flexible Pipe Ancillary Equipment JIP report on progress to date C. TFL Systems (API TG6) (Yonker) ISO 13628-3/API RP 17C Report on ballot to reaffirm D. Subsea Wellheads/Tree (API TG5) (Frazer/Skeels) ISO Spec 13628-4 report on progress of DIS preparation E. Umbilicals (API TG4) (McManus) ISO 13628-5/API Spec 17E - report on progress of revision F. Control Systems (API TG 2) (Neuenkirchen) ISO 13628-6/API Spec 17F report on FDIS & Adopt-back ballots G. Completion/Workover Risers (Skeels) ISO 13628-7/API RP 17G report on FDIS & API Adoption ballots Barrier philosophy for wellbore intervention systems H. ROV/ROT (API TG3) (White) ISO 13628-8 and 9/API RP 17H and RP 17M report on progress of NWI to combine documents into one standard I. Dynamic Risers (Stanton) ISO 16389/API RP 2RD report on status of revision J. Subsea Reliability RP (Allen) Update on RP17N activity K. HIPPS RP (Goggans) Update on RP17O activity L. Templates and Manifolds (Whipple) Update on 17P activity M. Subsea System Engineering (tbd) Update on 17Q activity N. Materials Study Group (Haeberle) Update on activity 7. Summary of Discussions of Prior Meetings Composite Suite of API/ISO subsea standards and gaps in existing standards (Bednar/Inderberg) Report on Path Forward for Insulation and Buoyancy Spec and RP (Given) 8. Other Business Discussion of Sunset Committees Role (Hurta) 2006/2007 Research Funding Proposals () 9. Review of Action Items 10. Next meetings Winter 2007, TBA; Summer 2007, June 25-29 San Francisco, CA

ISO SC4/WG6 / API SC17 Action Items March 3, 2006 Joint Meeting General Requirements 13628-1 (17A) Flexible Pipe 13628-2 (17J), 2004-14: Form a team to look at the scope of 17A/13628-1 with regard to these items and other new work topics as they relate to the composite suite of subsea standards. Some of the topics to be covered include: 9/30/05 Ongoing 3/3/06 Work session for Tuesday in Atlanta planned. Systems Engineering Subsea processing Multiphase pumping Intelligent wells interfacing Interaction between flowlines and subsea structures Integrated Production Umbilical (IPUs) Spec breaks Existing flowline specifications and their relationship/applications to SC17 2005-9: Leadership Team to identify candidates to replace Vince Vetter as 17A TG chair. 2004-6: Olav Inderberg to prepare an ISO NWI based on the 17Ls work for consideration at the June meeting. Jonathan Jordan to send notice on Atlanta meeting and request input to L Souza on -1 content May 23-24 ISO Meeting planned for Paris. Olav Inderberg to send notice on Paris meeting. Olav Inderberg to follow-up on possible NWI for an RPIW interfacing Jan 06 Bruce Crager identified Luiz Sousa, Petrobras America 6/29/05 - Ongoing 9/30/05 Ongoing 13628-10 (17K), 13628-11 (17B) 17L1, 17L2 (Ancillary Equipment) 2004-18: Krassimir Doynov to forward a draft of 17Ls (when draft is deemed ready for widespread release) to be used in the ISO new work item and this should include a proposed title and how it could also include umbilicals. 9/30/05 - Ongoing 3/3/06 Incorporating comments into draft documents March 3, 2006 1

TFL 13628-3 (17C) Subsea Wellheads and Trees 13628-4 (17D) Umbilicals 13628-5 (17E) Control Systems 13628-6 (17F) Comp./Work over Risers 13628-7 (17G) 2004-16: Brian Skeels/Ross Frazer to provide a report at the next meeting on the repair/remanufacture issue. 2006-1: Resolve horizontal tree patent issue 2005-10: Jonathan Jordan to contact John Bodine (now with Chevron) to discuss continuing role as API TG chair 2005-5: Brian Skeels will prepare New Work Item to form a new API task group related IWOCS with ISO participation. This will then be submitted Olav Inderberg to prepare an ISO New Work Item request before the June API meeting. 6/29/05 - Ongoing 3/3/06 Referred back API SC6 for action. New Action Item 10/05 Confirm J. Bodine (now w/ Chevron) to continue at TG Chair 3/3/06 By end of March, Ross Frazer to provide status update and recommendation on how to proceed. 9/30/05 - Ongoing 3/3/06 - Brian Skeels to propose an approach on what systems (including IWOCS?) the TG will address and how the documents will be structured by June 06 meeting ROVs 13628-8 (17H) ROTs 13628-9 (17M) 17N (Subsea Reliability) 2006-2: TG to provide a proposal wrt barrier philosophy for wellbore interventions systems. 2004-7: Charley White and Eric Luszi to develop an API NWI that details the path forward on combining 13628-8 and 13628-9 into one document and incorporating the additional items received in comments during the ISO ballots and the API adopt-back ballots. 2006-3: Determine path forward on publication status New Action Item 12/15/05 To be combined into a new -13 document 3/3/06 - Brian Skeels to provide update on barrier discussion at June 06 meeting John Allen to confirm API and Deepstar are aligned on issue of API document. Decide on timing for initiation of ISO NWI. HIPPS John Allen to provide information to Olav Inderberg for SC4/WG6 meeting in May. 17O March 3, 2006 2

Templates and Manifolds 2004-23: Olav Inderberg to 9/30/05 - Ongoing 3/3/06 Waiting on working draft prior initiate an ISO NWI on this to NWI subject. 17P System Engineering 17Q 13628-12 (API RP 2RD) Dynamic Risers 2005-7: Jeff Whipple to circulate an electronic draft to 17P members for review. Olav Inderberg will send this draft to interested ISO members. Jonathan Jordan to post on API SC 17 website. 2005-11: David Wilkinson to contact Jeff Whipple to check on status of 17P project. 2006-4: Jeff Whipple and Dave Wilkinson to develop proposal requesting API funding for technical writing of draft 2005-8: Revisit Systems Engineering in June 2005 and determine if there is a champion. All SC17 members are requested to consider who might be involved with this effort. 2006-5: Olav Inderberg to make presentation in Atlanta Meeting on Systems Engineering 9/30/05 - Ongoing 3/3/06 - FTP site created to facilitate TG input 9/30/05 - Ongoing 12/15/05 No candidate identified 3/3/06 Jonathan Jordan to send RFP form to TG Chairs. 3/3/06 - Ongoing 3/3/06-Olav to prepare presentation General/ Admin. 2002-23: Alf Reidar Johansen will prepare a document outlining how ISO and API will work together to ensure that the standards work is well coordinated. This document will provide guidance on how both groups should handle comments made on the various documents throughout the development/ review process. 2004-25: Leadership team to explore ways to get information out to industry in a more timely manner. 3/3/06 - Ongoing. 6/29/05 - Ongoing 3/3/06 Verify document status sheet on API website and/or develop dedicated page. Review System Poster in Atlanta March 3, 2006 3

Permanent Discussion Items New Work 9/30/05 - Ongoing 3/3/06 To be discussed at Atlanta meeting during -1 and -7 sessions. 2001-18: John Bednar, Gary Hurta, and Olav Inderberg are to look at the direction that SC17 should be pursuing relative to the composite suite of API 17 Series general and specific documents that address the broad spectrum of subsea hardware. 2003-8: SC17 Leadership Team to discuss how experiences gained when using the standards/specifications are captured and fed into future revisions. 6/29/05 - Ongoing 3/3/06 - Comments/Questions received are forwarded to TG Chair for resolution and potential action in next revision. Complete, will be removed following next meeting. 2003-21: Maintenance of N172. 9/30/05 Ongoing 3/3/06 - Olav Inderberg to provide update on ISO progress on developing hierarchal definition structure at June 06 Meeting. 2003-22: Brian Skeels to develop a plan for dealing with HPHT issues for subsea production system standards, addressing: - what areas should be covered in terms of equipment and procedures; - how this would best be integrated into the SC17 documents e.g. stand alone document versus HPHT Annexes in each existing document; - what else is going on in the industry in this regard e.g. API sponsorship of testing of effects of HT on material properties. 2004-13: Dave Wilkinson, John Bednar, and Andy Radford to determine path forward for Insulation and Buoyancy standards prior to the June meeting. 2006-6: David Wilkinson to contact Andrew Wainright regarding ihs proposal for NWI on standardized installation reels for coiled subsea products 12/15/05 Ongoing Multi-SC Task Group is developing a tentative draft of proposed API RP 6HP 1/15/06 Mike Given, Vetco to review MCS documents and provide recommendation on TR 3/3/06: Maintain continued SC17 awareness of issue and provide input relevant to SC17 3/3/06 Mike Given to provide update/recommendation at June 06 Meeting. 3/3/06 - Ongoing March 3, 2006 4

API SC17 (ISO TC67/SC4/WG6), SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS 2006 WORK PROGRAM Revised March 2006 BRIEF DESCRIPTION API ISO API Chair ISO Project Leader SC17 STATUS OF WORK/SCOPE Standard Standard Leadership Team Champion Design and operation of subsea systems RP 17A 13628-1 Luiz Souza, Petrobras America (TG7) Per Dahl, Norsk Hydro Wilkinson Published (Jan 2006) Flexible pipe RP 17B 10420 Proposed as 13628-11 Wilkinson FDIS ballot 2 nd quarter 06. TFL systems RP 17C 13628-3 TBD (TG6) TBD Hurta API RP17C/ISO 13628-3 published. Reaffirmation ballot passed. No action needed at this time. Subsea wellhead and tree equipment Spec 17D 13628-4 Ross Frazer, ATP Vice Chair: Brian Skeels, FMC (TG5) Ross Frazer, ATP Vice Chair: Brian Skeels, FMC Hurta Work ongoing. Preparing for DIS submission. Resolution of patent issues in progress regarding horizontal tree issue. Production control umbilicals Spec 17E 13628-5 John McManus, Gibson Tube (TG4) Subsea controls Spec 17F 13628-6 John Bodine, Chevron (TG2) Design & operation of completion/workover risers Ron Dee, Shell TBD Currently undergoing editorial checks, expect ISO DIS in 3 rd quarter 06. Jens Neuenkirken, Statoil RP 17G 13628-7 Brian Skeels, FMC Anthony Muff, FMC Bednar Hurta ISO FDIS ballot closed March 19 (API TAG ballot March 10). API Adopt-back Ballot closed March 29. FDIS ballot skipped per ISO SC4 Resolution. API adopt-back ballot passed. To be published. ROV interfaces RP 17H 13628-8 Charles White, DORIS, Inc (TG3) Eric Luszi, Statoil Hurta ISO 13628-8/API 17H published. NWI passed to combine with 13628-9 to become 13628-13. Unbonded flexible pipe Spec 17J 13628-2 Bonded flexible pipe Spec 17K 13628-10 Wilkinson ISO DIS comments resolved. FDIS scheduled for 2Q06. Wilkinson Second Ed Published Nov 2005.

BRIEF DESCRIPTION OF WORK/SCOPE API Standard ISO Standard API Chair ISO Project Leader SC17 Leadership Team Champion STATUS Flexible Pipe Ancillary Equipment (Spec) Spec 17L1 TBD Wilkinson Incorporating comments in working draft. Flexible Pipe Ancillary Equipment (RP) RP 17L2 TBD Wilkinson Incorporating comments in working draft. ROT Intervention System RP 17M 13628-9 Charley White, DORIS Inc. Eric Luszi, Statoil TBD NWI passed to combine with 13628-8 to become 13628-13. Dynamic Risers RP2RD 13628-12 Paul Stanton, Technip Paul Stanton, Technip Bednar Working draft being prepared. Subsea Reliability RP 17N TBD John Allen, Vetco- Grey Olav Inderberg, FMC TBD Working draft being prepared. HIPPS 17O TBD Tim Goggans, FMC Tim Goggans, FMC Bednar Document ready for TG review. Templates and Manifolds 17P TBD Jeff Whipple, Intec TBD Wilkinson Working draft being prepared. Systems Engineering 17Q TBD (-TBD-) Olav Inderberg, FMC Wilkinson Decision on continuing this project is pending discussion at next meeting. Materials Study Group n/a annexes to existing Tim Haeberle, Vetco-Grey Ragnar Mollan, Norsk Hydro Inderberg Generating annex materials for 17A (-1) and 17P