POOL ENCLOSURES LEIA & ALVA. Assembly manual

Similar documents
Installation of HORIZONT and HORIZONT HIGH pool enclosures

Mounting description. AQUACOMET Kft. Internet:

Installation Guide. Bi-fold Doors

DIY GLASS BALUSTRADE AND POOL FENCING THE CHOICE IS SIMPLE

The Nantucket Legacy Arbor

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS

Dura-Lock Roof System

*** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used.

PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

Dublin Stalls Installation Instructions

The Newport Arbor ASSEMBLY INSTRUCTIONS. Material You Will Need (Not Included) 4 in x 4 in x 4 ft Pressure Treated Lumber (4)

Melamine Plastic Laminate. Toilet Partition Installation Manual

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

The Westchester Arbor

Oceanside Outdoor Vinyl Shower Kit (3 x 3 Enclosure)

Greenhouse Assembly Instructions

Shetland Stalls Installation Instructions

Oxford Stalls Installation Instructions

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Franklin Mills Stackable Movable Lateral Instructions

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.


Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Two Panel Frameless Bypass Door

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

VisioGlide 100 System W4F Four doors 2 fixed, 2 sliding

Installation - Sub Cills

INSTALLATION INSTRUCTIONS

Stainless Steel 95C34 Series

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

US RACK, Inc Falcon Drive, Madera, CA

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

Gardman Lean-to Greenhouse Assembly Instructions

ASS 70 FD folding / sliding door. Installation Guide

USER S MANUAL. Horizontal inclinometer system Model TES-AN-25H

EDGE-, COVER-, SLIDEAND SEALING PROFILES

Portofino Installation Guide

Installation Instructions

INSTALLATION GUIDE DUOFUSE GARDEN GATE

Cabonyx Installation Manual

BY ALIEN TECHNOLOGIES CORP

The Devonshire Arbor 85 in

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( )

Assembly Instructions

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Ultra Fast Delivery SGL Toilet Cubicle Pack Fitting Instructions

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

10 x 10 Flat Top Two Tone Pergola

INSTALLATION INSTRUCTIONS

a.k.a. casegoods instructions

Display Shelving Installation Instructions

10x10 Trellis Pergola

Piazzola Pergola Awning Manufacturing and installation guide

Outdoor equipment. Barrier posts. Stainless steel. Barrier elements. Barrier poles. Outdoor equipment - pages

TD10A INSTALLATION GUIDE TUB DOOR

Track Rack. * Track Racks are not lockable

IMPORTANT: WILL NOT FIT COUNTRYMAN MODELS

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

ATLANTIS RAIL Contact Information

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

Mount to the Wall INSTALLATION MANUAL

LAWN AND GARDEN GREENHOUSE

LEGENDS RETRACTABLE DOOR SCREENS

INFINITE RANGE - CENTRE FOLDING DOOR

Frameless Fixed Panel Slider

The Nantucket Legacy Arbor

LEGENDS RETRACTABLE DOOR SCREENS

Laminate Cabinet Installation Instructions

S H E D A S S E M B L Y I N S T R U C T I O N S

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Installation Instructions

W1610 1/2 10 X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Assembly by more than one person is suggested.

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

ICU TRACK SLIDING DOOR

Deauville Installation Guide

INSTALLATION INSTRUCTIONS

ICU TRACKLESS SLIDING DOOR

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

CYCL E STAT IO N. High Capacity

Side Light Frame Pack Assembly Instructions

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

Installation Instructions for Vista Air Vertically Folding Walls

Installation manual. For setting in concrete/on base plates - Panel height 1830

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

Thank you for your order

Organisational Kitchen Fittings Kitchen Cabinet Accessories

FIXED PANEL SLIDER QCI5241

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

EASY-IN POOL STEP SYSTEM NE132

LAWN AND GARDEN GREENHOUSE

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Under Seat Storage Drawer Installation Instructions

S H E D A S S E M B L Y I N S T R U C T I O N S

Transcription:

POOL ENCLOSURES LEIA & ALVA Assembly manual Rev. 07.2017

PARTS LIST Parts for rail installation: Rail Síncsavar screw 1 Plastic Síncsavar anchor 10 50 2 Rail Síncsavar connector 3 Arrest Síncsavar wedge 6 [R-L] x 60 4 Síncsavar Pop rivet 64 x 60 12 5 Release Síncsavar plate [R-L] 6 Síncsavar M6 x 20 6 Screw x 60 7 8 Síncsavar Stopper Rail Síncsavar end cap [R-L] 9 Parts for the side without rails: H-profile end cap Síncsavar 10 4,8 x 40 flat head Síncsavar screw Manual ground Síncsavar fixing Manual ground fixing - lockable Síncsavar 11 12 13 14 Metal anchor Síncsavar Fixing plate for wooden deck Concrete glue Síncsavar Síncsavar 15 16 Parts for end-wall installation: Solid block fixing M6 x 16 screw 4,8 X 60 flat head 4,8 X 50 turned 4,8 x 80 flat head Síncsavar Síncsavar Síncsavar Síncsavar Síncsavar screw head screw screw 17 18 19 20 21 Outside rubber Síncsavar Mounting template Síncsavar 22 23

Installation manual for Leia and Alva pool enclosures General information about pool enclosures Before starting the detailed description of the installation process, we would like to provide information about pool enclosures in general. 1. Gullberg & Jansson s enclosures are delivered in pre-assembled, manually movable structural elements. This means that the installation on site only consists of rail installation, sliding the segments onto the rails, fixing the plastic longitudinal positioning elements and installing the end-walls. During installation, please always take the technical rationality and practicality into consideration. Check the functions of the structure at every phase, to allow the correction of any mistakes as soon as possible. During the manufacturing process, we simulate the final state, adjust the functions and finally test the enclosures. 2. Gullberg & Jansson s pool enclosures are manufactured according to ISO 9001/2000 standard, that among others, prescribes the use of constantly tested and calibrated measuring tools. Important: the installation of pool enclosures must be carried out with good-quality, tested tools that meet the requirements of manufacturing precision. 3. Before starting the assembly please check that the pavement provides a proper foundation for the rails. It must be suitable for the reliable installation of a pool enclosure. The receiving surface must fulfill three requirements: It must be even, waviness or height differences more than 0,5cm within 1m are not acceptable. The surface must be horizontal, with a maximum allowance of 2cm within 1m. The pavement should be sufficiently solid and minimum 10cm deep drillable and anchorable. All structural elements with individual functions - doors, end-wall openings, door locks and safety equipment, segment locks, sealings, profile end caps, handles - that are not covered in the manual are delivered ready mounted and working. The small parts needed for installation screws, anchors, rivets, structural plastic elements, keys can be found in a box that comes with the enclosure. Along with a parts list, a drawing with measurements necessary for installation and with this installation manual. Pool enclosures are manufactured using AW 6060 T6 quality custom made aluminium profiles. The surface treatment can be anodized or powder coated (any RAL colors). Fasteners and other metal sheet components are made of A2 quality stainless steel. Profile closing caps, handles and other plastic parts are made of polyamide (PE). The glazing material is polycarbonate and the rubber profiles used for fastening the panels are EPDM. The rubber seals between the segments and groove covers are silicone rubber.

1. Rail installation 1.1 Measure the width of the pool at its front and back. 1.2. Deduct the width of the pool (front: WF, back: WB) from the outside width of rails (RO) and halve the result to get the distance between the pool edge and the outside of the rails (front: DF, back DB). Mark the positions with a line. (Fig. 1.) 1.3 Connect the points on both sides with a string and mark the positions of the rails outer edges. W F = Width of the outer pool edge at the front W B = Width of the outer pool edge at the back D F = Distance between the outer edge of the pool and the outer edge of the rails at the front D B = Distance between the outer edge of the pool and outer edge of the rails at the back R O = Rail's outer width K = Diagonals L = Rail length

1.4. Join the rail sections with rail connectors (Fig. 1/1, part no.3.). Push the pins into the rail and stabilize them lightly with hammer (Fig. 1/2). Then push it together with the next rail piece without gap. 1.5. Place the rails to both sides of the pool and fit their outer edges to the marked line. 1.6. Adjust the rail positions with the help of diagonals (K). Both diagonals must be equal. (Fig.1) 1.7. Adjust the rails lengthwise by sliding them to the correct positions. Please mind that the diagonals must stay correct! 1.8. Starting on one side of the pool, fix the set rails through the pre-drilled holes with provided anchors (Fig. 1/4, part no.2) and screws (Fig. 1/5, part no.1). 1.9. Before fixing the rails permanently adjust the rails horizontally too (with chocks, string or spirit level). To ensure easy gliding the whole running surface must be at the same level. 3 (1/1) (1/2)

(1/3) 2 (1/4) 1 (1/5)

II. Sliding the segments onto rails and checking wind protection 2.1 Correct positioning and arrangement of segments 2.2. Lay the first segment down to the front of the rails on a plastic foam underlay. 2.3. Lift up the segment at the rail side and remove the underlays from there. Pull the segment carefully toward the rails and then onto the rails. Please mind that the underlay at the back should stay under the segment! 2.4. Slide the segment onto the rails and check the storm hooks by lifting. It must not be possible to lift the segment off the rails! 2.5. Check if the segment slides the full length of the rail without friction. If there is friction anywhere, please adjust the storm hooks vertically with an Allen key (Fig. 2/1). 2.6. Repeat steps 2.2-2.5 with all the segments in order. (2/1)

III. Installing the lengthwise positioning system (arrest system) The arrest system only works if the segments are pushed from the largest towards the smallest segment! Moving the segments the opposite direction one by one is not possible! After opening all segments, they can be pushed towards the front, but only together as a package. Description of the positioning system The lengthwise positioning of the first segment is provided by so-called hidden arrest (Fig. 3/1). All the rest of the segments are equipped with rocker lever arrest (Fig. 3/2). The complete system is called Semi-intelligent arrest system. 4 (3/1) 5 (3/2) 3.1. Install the release plates (Fig. 3/3, part no.6) of the rocker lever arrest on the segments in correct position screws no.7. The smallest segment does not have any release plates! 6 (3/3) 3.2. Move the segment to be set, starting with the largest segment, into the required lengthwise position. 3.3. Set the hidden arrest in closed position and lay the arrest wedge underneath (Fig.3/4-3/5, part no.4). Mark the drill-holes on the rails. 7

(3/4) (3/5) 3.4. Drill the rails at the marked spots and fix the arrest wedges with the provided pop rivets. Repeat the whole procedure on the other side. The arrest wedges must be installed to the same lengthwise positions (in-line) on the opposite side too. 3.5. Check if the arrest pin sits deep enough in the groove of the arrest wedge in its closed position. If the closing does not function properly, please adjust the height of the arrest pin! 3.6. The fixed arrest wedge of the first segment serves as positioning element for the second segment as well (Fig.3/6-3/7). (3/6) (3/7) 3.7. Slide the next segment under the already fixed one so that the rubber seal of the smaller segment closes to the arched profile of the bigger one. Ensure that the outer arched profiles of the segments are in the right positions. Please note! In case of deviation the overall length of the enclosure can differ at the end of the installation from the specified length on the drawing. Repeat above step on all the other segments. 3.8. Thanks to the semi-intelligent positioning system, after opening the hidden arrest of the first segment manually the other segments open each other automatically and all the segments can be pushed to the back of the pool together.

(3/8) 3.9. After installing the lengthwise positioning elements install the safety bumpers (Part no.8) close to the rail ends (Fig.3/7-3/8). When installing the stoppers, it is important to make sure that the wind hooks get caught on them, preventing the segments from running off the rails. 3.10. Glue the plastic rail end-caps (Part no.9) into the rail profiles with silicone or any other kind of glue. (Fig.3/9) 1 8 9 (3/7) (3/8) (3/9)

IV. Pool enclosure with rails on only one side 4.1. Positioning the swivel wheels When sliding the segments into each other, push the swivel wheels into the guiding tracks on the H-profiles of the above (higher) segments. The swivel wheels must point towards the front of the enclosure (big segment). 4.2. Closing the swivel wheel guiding tracks After linking all segments, close the guiding tracks with their end-caps (Part no.10). 10 11

4.3. Fixing the segments to the ground on the side without rails After positioning the segments mark the drill-holes on the ground through the fixing tabs. If the enclosure is installed on a wooden deck, please use the special mounting plates (Part no.16.) Marking the drill-holes through the fixing tabs 14 13 V. End-wall installation 5.1. Fastening the solid block fixings for the middle vertical profiles The installation of the walls starts with fastening the solid block fixings (Part no.17.) with screws no.19.

23 17 19 5.2 Installation of the middle vertical profiles After installing the solid blocks, push the vertical profiles on them and fix them with screws no.18. 18 5.3 Temporary fixation of the glazing panels After removing the protecting foil place the panels into position and fix them temporarily with small, 15-20cm long rubber pieces (Part. no.22) two places along the arch and on the sides. 22

5.4. Installing the bottom horizontal profiles Screw the bottom profile to the middle vertical profile from below with screws no.21. In case the wall is only equipped with 100mm rubber (no flap) and there is not enough space for tightening the screws, then the segment must be pulled off from the rails and lifted. The front (or back) of the segment must be supported with something temporarily at the H-profiles. 21 After fixing the end-wall profile to the middle vertical profile, screw it to the sides with the help of screws no.20. 21 5.4 Sealing the wall panels with rubber Seal the polycarbonate panels with outside rubber (Part no.22.), minding that the corners must be cut in angle for aesthetic fitting. 22 After sealing the polycarbonate panels, carefully hammer the thin covers of the side vertical profiles into place with rubber or plastic hammer.