Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

For personal use only

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

Cuba: Binding farmout agreement signed for Block 9

For personal use only

For personal use only

GALOC PHASE II DEVELOPMENT APPROVED AND RESERVES UPGRADED

For personal use only

Phoenix South-3 drilling commenced 17 April 2018

For personal use only

Dorado-1 drilling commenced 5 June 2018

For personal use only

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

FY19 production and capital expenditure guidance

Phoenix South-3 drilling update 29 June 2018

Phoenix project drilling update 29 June 2017

Dussafu Gabon Update January, 2018

Buffalo field moving closer to production 3 May 2018

For personal use only

3D Oil Limited Accelerated Growth Strategy

For personal use only

World class oil discovery offshore Senegal. RIU Good Oil Conference 14 September 2016

For personal use only

Address to the 2018 Annual General Meeting of Cooper Energy Ltd by the Managing Director, David Maxwell 8 November 2018

Annual General Meeting 11 September 2017

Letter of Intent Signed for Philippines Drill Rig

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

The world s largest oil discovery since Resources Rising Stars 24 th & 25 th May 2016 Gold Coast, Queensland

Annual Statement of Reserves

JACKA REPORTS INITIAL OIL RESERVES FOR AJE FIELD DEVELOPMENT, OFFSHORE NIGERIA

ASX Release NILDE AREA PERMIT FARMOUT OFFSHORE ITALY. Highlights

For personal use only

MARCH 2009 QUARTERLY REPORT. Herewith is Tap Oil Limited s Quarterly Report for the period ended 31 March 2009.

Persistence, partnership and the prize

BUILDING VALUE THROUGH WORLD CLASS ASIAN ASSETS AGM, 5 SEPTEMBER 2018

Quarterly Report 31 December 2018

Quarterly Exploration Activities Report

For personal use only

QUARTERLY ACTIVITY REPORT

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

For personal use only

Matthew Allen MD & CEO Joint Venture partner Byron Energy (Operator) is a proven

Corporate Presentation

For personal use only

For personal use only

For personal use only

ADX Energy. Investor Update. For personal use only. Recent Progress and Immediate Opportunities. Ian Tchacos - Executive Chairman 8 November 2016

For personal use only

Company Presentation. AGM 29 th November, 2016

Experience, Role, and Limitations of Relief Wells

3D Oil Limited Annual General Meeting

ABN SIGNIFICANT HYDROCARBON POTENTIAL IN JACKA S RUHUHU BASIN EXPLORATION PROJECT IN TANZANIA

Macquarie Oil & Gas Explorers Conference. 9 January 2012

Oil and Gas Exploration Economic Model Manual. Version Introduction

Quarterly Activities Summary for Period Ended 30 June 2018

Nido Petroleum Limited Investor Update. Phil Byrne, Managing Director

For personal use only

2015 Trinidad Update. Trinidad & Tobago Energy Conference

FAR in the MSGBC Basin

LICENCE P.691 RELINQUISHMENT REPORT

PRESENTATION OUTLINE

3D Oil Limited. Annual General Meeting 26 November Stamford Plaza Collins Street Melbourne

For personal use only

MERMAID MARINE AUSTRALIA LTD INVESTOR BRIEFING DEVELOPMENT OF DAMPIER SUPPLY BASE

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA

ΙΠB IPB Petroleum. For personal use only. BROWSE FLNG Proposed Development 15.5 TCF Gas 417 MMbbls Condensate (IPB 100%) (IPB 100%) (IPB 100%)

ASX ANNOUNCEMENT ASX: IVZ CLARIFICATION REGARDING PRESS REPORTS ON OIL DISCOVERY IN ZIMBABWE. 2 NOVEMBER 2018.

Kinetiko Energy Limited ACN:

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Manager of Company Announcements ASX Limited Level 6, 20 Bridge Street SYDNEY NSW By E-Lodgement

Attached please find Cue Energy Resources Limited s release with respect to the above mentioned.

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City

Leni Gas and Oil plc. Annual General Meeting. London (AIM): LGO 1. 7 July 2014

ALASKA OPERATIONS UPDATE WINX-1

New Field Development Challenges in a Late Life Setting - Cladhan

For personal use only. Nkembe PSC. Havoc Partners option and Add Energy s well planning agreements

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources

Subsea Field Development

For personal use only

SDX ENERGY INC. SDX Energy Inc. (TSXV, AIM: SDX), the North Africa focused oil and gas company, is pleased to provide an operational update.

Executive Summary and Table of Contents

Digital Oil Recovery TM Questions and answers

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company')

The Schoonebeek Field: EOR redevelopment of a European onshore giant

CORPORATE PRESENTATION TSX-V: TGC I OTCQX: TNVMF

Pareto s 8th annual E&P Independents Conference London, January 22, 2013 Jan Kielland (CEO)

CORPORATE PRESENTATION March, 2018

The standout emerging oil and gas company on ASX October 2018

Good Oil Conference. 7-8 September Slide 0

Hague and London Oil Plc

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

ASX ANNOUNCEMENT INVESTOR PRESENTATION

For personal use only

Initial Drilling Program Update

The petroleum industry, internationalisation, 11 and technology development. Industry development and internationalisation

TMS Initial Drilling Program Update

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012

Transcription:

MEO Australia Limited ABN 43 066 447 952 Level 23 Tel: +61 3 8625 6000 500 Collins Street Fax: +61 3 9614 0660 Melbourne Victoria 3000 Email: admin@meoaustralia.com.au Australia Website: www.meoaustralia.com.au ASX & Media Release Seruway PSC - Rig Status Key Points: Hercules #208 rig handover anticipated to occur on 18 th September 2012 expected to spud on or around the 22 nd September 2012 MELBOURNE, AUSTRALIA (13 th September, 2012) MEO Australia Limited (ASX: MEO; OTCQX: MEOAY) advises that its subsidiary company, Seruway Offshore Exploration Limited (SOEL) has been informed that the Hercules #208 jack-up drilling rig is expected to be handed over to SOEL on 18 th September 2012. MEO anticipates that will commence drilling activities on or around 22 nd September 2012 and take approximately 35 days to complete on an untested basis. The Gurame discovery has been intersected by six previous wells which recovered oil from the two deeper target horizons. A modern transition zone 3D seismic survey was acquired by the previous operator, however no wells have been drilled for the deeper targets with the benefit of this data. MEO selected the location as the lowest risk, drill-ready candidate with the highest probability of advancing the resource towards commercial development. The well will test the target reservoirs within a structural closure at a level that is substantially higher than where oil samples were recovered from these same intervals in previous wells. MEO expects the target reservoirs at this location to be naturally fractured and gas bearing, a combination which will enhance the potential to achieve a commercial flow rate. An overview of Gurame is provided overleaf and a detailed technical supplement is attached. MEO s CEO and MD Jürgen Hendrich commented on the announcement: SOEL is well positioned to accept assignment of the Hercules #208 drilling rig and to commence the drilling operation. MEO is very excited about the prospects of a commercial development based on the significant in place resource at Gurame. A commercial gas flow rate will accelerate the development potential of this resource. We look forward to SOEL undertaking a safe and successful drilling campaign. Jürgen Hendrich Managing Director & Chief Executive Officer MEO Australia Limited 1 ASX & Media Release

Gurame Overview, Seruway PSC, Indonesia The Gurame gas and oil field was discovered in 1968. The first well drilled on the field encountered hydrocarbons and experienced a loss of control (blowout) from the Baong Sandstone. Subsequent wells were drilled in a manner to prevent a recurrence of this unfortunate event. MEO s technical assessment is that the drilling practices employed may have compromised reservoir performance. Although the blowout demonstrated the presence of hydrocarbons and the ability of the reservoir to flow at high rates, high mud weights used in the subsequent wells at this time may have damaged the reservoir close to the well bore, leading to uncertainty about reservoir performance. Formation Interval Tests (FITs) on these wells recovered both oil and gas low in CO 2 from several intervals. The FIT data and all other available other data was collated and evaluated by SOEL under the direction of MEO and resulted in the interpretation summarised in the simplified cross section below. (proposed) A-2 (proj.) A-1 G-1X (proj.) (proj.) Idi North (proj.) (proposed) HKO -2724m (A2) LKO -2777m (1X) fold hinge HKO -3012m (A4) LKO -3038m (A2) blue plane = lowest known oil Figure 1. Simplified Structural Cross Section Figure 2. 3D render of Gurame field has been located near the crest of the closed structure which has been defined by modern 3D seismic data. A major objective of the well is to determine the performance capability of the Baong and Belumai reservoirs. Reservoir performance is likely to be enhanced by the expected development of natural fractures associated with the fold hinge adjacent to the crestal region of the structure. Drilling techniques will be employed to reduce the potential for formation damage. MEO s internal resource assessment estimated the P50 recoverable resource of the Gurame field to be 0.5 Tcf of low CO 2 gas and 57 mmbbl of liquids. Figure 2. - Gurame Prospective Resource Assessment - MEO Preliminary Estimate Total Baong & Belumai Reservoirs Unit P90 P50 P10 Recoverable Hydrocarbon Gas Bscf 273 497 863 Recoverable Oil and Condensate MMstb 27 57 126 Subject to success of the well, the Gurame discovery represents the most likely current candidate for early development. Initial studies of potential development plans for the P50 resources case have included both a gas only development to supply local regional gas demand and an oil development with future gas cap blowdown. MEO Australia Limited 2 ASX & Media Release

Offshore Seruway PSC, North Sumatra, Indonesia Location One PSC with multiple low risk opportunities The Seruway Production Sharing Contract (PSC) is located within the offshore portion of the North Sumatra Basin, Indonesia and contains multiple existing gas and oil discoveries as well as undrilled prospects. Seruway Offshore Exploration Limited (SOEL), a wholly owned subsidiary of MEO Australia Limited, has 100% equity in the PSC and is the operator. The proposed well will be drilled on the Gurame discovery, following-up on the oil and gas blow out in the 1968 ONS-A1 discovery well, to demonstrate reservoir productivity and establish commercial viability. Seruway PSC location map: LNG Plant Ibu Horst: Multiple wells with hydrocarbons 2012 Ibu Horst 3D seismic (MEO 100%) GURAME Ibu High Cluster Gurame gas/oil discovery: Multiple wells with oil and gas 0.3 0.8 Tcf gas resource* 26 126 mmbbl oil & liquids * Gross Contingent Recoverable Resource (excludes CO 2 and other inerts) Juaro Prospect SALEM Kuala Langsa gas discovery: 222m gas column in KL-1 Multi-tcf potential Resource straddles Seruway PSC Seruway PSC is updip Reported CO 2 content on test inconsistent with RFT/FIT results Summary Substantial resource potential is designed to test the deep gas potential of the structure, updip of existing well penetrations and will be drilled to a planned total depth of 3425mMD within the Miocene Belumai Formation. The well will test an estimated (P50) 0.5 Tcf low CO 2 gas resource with a potential 57 MMstb liquids within the Baong Sandstone and Belumai Formation primary targets. Seruway Offshore Exploration Limited 1 www.meoaustralia.com.au

Gurame Prospective Resource Assessment - MEO Preliminary Estimate Baong Reservoir Unit P90 P50 P10 Recoverable Hydrocarbon Gas Bscf 168 321 583 Recoverable Oil and Condensate MMstb 18 41 86 Belumai Reservoir Unit P90 P50 P10 Recoverable Hydrocarbon Gas Bscf 105 176 280 Recoverable Oil and Condensate MMstb 9 16 40 TOTAL Unit P90 P50 P10 Recoverable Hydrocarbon Gas Bscf 273 497 863 Recoverable Oil and Condensate MMstb 27 57 126 Drilling updip from recovered gas and oil. The Gurame structure is a prominent 4-way dip closed compressional feature which is faulted on the leading north eastern limb. Previous wells drilled on Gurame were located well down dip on the structure, outside of local closure but still recorded significant recoveries of oil and gas from within the Miocene Baong Sandstone and Belumai Formations. Definitive results from these wells were hampered by the fact that the wells were drilled highly overbalance due to the blow-out in the original 1968 ONS-A1 discovery well, which is thought to have caused significant formation damage. Well Year Hydrocarbon Recoveries ONS-A1 1968 Oil & Gas blow out - Baong Sandstone ONS-A2 1968 Oil & Gas recovery - Baong and Belumai ONS-A3 1969 Gas flow - Belumai ONS-A4 1969 Oil circulated in mud ONS-A5 1972 Gas flow Baong & Belumai Gurame-1X 2008 Oil shows in Baong. TD above Belumai Gurame schematic cross section: Seruway Offshore Exploration Limited 2 www.meoaustralia.com.au

has been located to intersect the prospective deep reservoir section structurally up dip from existing well control, near the crest of the closed structure which has been defined by modern 3D seismic data. A major objective of the well is to determine the performance capability of the Baong and Belumai reservoirs. Drilling techniques will be optimised to limit formation damage. Up dip local anticlinal closure well defined on 3D seismic at two reservoir levels. Objective is to demonstrate deliverability of hydrocarbons at commercial rates Objectives of the well are to establish the presence of hydrocarbon within local trap closure and to demonstrate reservoir deliverability at sufficient rates that would lead to a commercially viable development. Alur Rambong-1, located approximately 17km to the west, tested 21 mmcfd of gas with 600 BPD of associated liquids from the Baong Sandstone in a similar trap setting, demonstrating that the reservoir is capable of production at commercially viable rates if the well is drilled in the optimum structural position. The well is being drilled approximately 375m updip of the highest known oil recovery from the Baong Sandstone and as such is expected to intersect the gas cap within a 235m thick gross reservoir interval. Positioned on crest of structure close to fold hinge Seruway Offshore Exploration Limited 3 www.meoaustralia.com.au

Well Targets The well is planned to be drilled from a surface location in 10m of water and be deviated toward the south west to intersect the primary objectives of the Baong Sandstone and Belumai Formations within structural closure. The shallower Keutapang and Serula Formations form a secondary objective within the shallow section and have been proven to be productive on the north western end of the greater structure (ONS-A5). The deeper Belumai Carbonates form an additional secondary objective of the well and have the potential to be a separate or connected reservoir to that already established within the Belumai clastics. This interval is productive at the giant Arun field located approximately 55 km to the west Rig contracted The Hercules #208 shallow water jack-up rig has been contracted to drill the exploration well on the Gurame gas and oil discovery. Attractive fiscal terms Growing domestic gas demand increasing gas prices Stand-alone development concept. Attractive returns Commercialisation The Seruway PSC enjoys favourable fiscal terms with an after tax contractor take for oil of 25% and for gas of 40%. Domestic North Sumatra gas demand is currently greater than 120mmscd per day and is growing quickly with significant consumption from power and fertiliser industries. Additionally, with Indonesia now a net importer of energy, the Indonesian government and Pertamina have been renegotiating existing gas sale contact pricing to be commensurate with world competitive pricing, benchmarking new gas sales to commercialise internal gas resources. The Gurame development concept is for subsea-wells tied back to a stand-alone offshore production facility, incorporating gas conditioning and separation. In a gas development scenario, the gas production and delivery infrastructure construction would be accelerated to meet industrial customer demand. Current scoping provides for an offshore pipeline to transport gas to customers facilities however, the potential to optimise this by potentially using existing onshore infrastructure may be feasible. In an oil and gas development scenario, oil would initially be produced and off-taken via a floating storage and offloading vessel (FSO) with gas reinjected for enhanced oil recovery. After optimised oil production the gas cap would be blown down, with gas sold to domestic industrial consumers. Further appraisal drilling may be required to establish deliverability for production of the oil leg. Under conservative development and economic assumptions successful appraisal of the Gurame field yields attractive returns to the contractor, underpinning the commercial development of the resources. Contacts For more information regarding, please contact: Australian Office: Indonesian Office: Robert Gard Muslim Basya Commercial Manager, MEO Australia Limited President, SOEL Limited Email: robert.gard@meoaustralia.com.au Email: mbasya@soel.co.id Phone: +61 3 8625 6000 Phone: +62 21 573 1135 Seruway Offshore Exploration Limited 4 www.meoaustralia.com.au