Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB

Similar documents
IR introduction + Beam BG simulation /12/11 M. Iwasaki (Univ. of Tokyo)

IR assembly + BG simulation 2009/7/7 M. Iwasaki (Tokyo) For Belle-II MDI Group Tokyo / Tohoku / KEK

RESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS

Chapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections

Production Measurements of Magnets for the NSLS-II Storage Ring*

Rotating Coil Measurement Errors*

VIBRATION MEASUREMENTS IN THE KEKB TUNNEL. Mika Masuzawa, Yasunobu Ohsawa, Ryuhei Sugahara and Hiroshi Yamaoka. KEK, OHO 1-1 Tsukuba, Japan

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

IR summary. 2009/7/9 M. Iwasaki (Tokyo) For Belle-II MDI Group Tokyo / Tohoku / KEK

Emilia Cruz. September 21, 2015

Brett Parker, representing the

Design of beam optics for FCC-ee

HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION

A Study of undulator magnets characterization using the Vibrating Wire technique

Experience with Insertion Device Photon Beam Position Monitors at the APS

Vibrating Wire R&D for Alignment of Multipole Magnets in NSLS-II

CONSTRUCTION AND TESTING OF ARC DIPOLES AND QUADRUPOLES FOR THE RELATIVISTIC HEAVY ION COLLIDER (RHIC) AT BNL *

Review of the magnetic measurement technique (experience of the SLC, LEP, CEBAF)

Circumference 187 m (bending radius = 8.66 m)

Improvements on rotating coil systems at CERN

Design of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.

(fb) Nevent/year for 50fb -1. s (GeV) ~ ~ qq q=t. ZZ cos <0.8 W + W tt 175GeV 500,00 5,000. Zh 120GeV. 230GeV. HA 400GeV 220GeV 410GeV

Philippe Lebrun & Laurent Tavian, CERN

Insertion Devices Lecture 4 Undulator Magnet Designs. Jim Clarke ASTeC Daresbury Laboratory

Construction Status of SuperKEKB Vacuum System

SUPERKEKB MAIN RING TUNNEL MOTION

KEKB Status and Upgrade Plan with Crab Crossing

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity,

Mapping of the New IBA Superconducting Synchrocyclotron (S2C2) for Proton Therapy

Physical Design of Superconducting Magnet for ADS Injection I

ALIGNMENT METHODS APPLIED TO THE LEP MAGNET MEASUREMENTS. J. Billan, G. Brun, K. N. Henrichsen, P. Legrand, 0. Pagano, P. Rohmig and L. Walckiers.

A Superconducting Helical Undulator-Based FEL Prototype Cryomodule

Status and Upgrade. P. Elleaume. XVIII ESLS Workshop, November P. Elleaume, ESRF. Slide: 1

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

The ILC Accelerator Complex

Superconducting RF System. Heung-Sik Kang

Title Coil Wound by Surface Winding Techn.

Status of ATLAS & CMS Experiments

TESLA Quad Package With BPM

Seminar. BELLE II Particle Identification Detector and readout system. Andrej Seljak advisor: Prof. Samo Korpar October 2010

ARotating Coil Array in Mono Bloc Printed Circuit Technology for Small Scale Harmonic Measurements

X-Band Linear Collider Report*

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

A novel solution for various monitoring applications at CERN

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

INDUSTRIAL CONTROLS FOR TEST SYSTEMS FROM SUPERCONDUCTING STRANDS TILL MAGNET FIDUCIALISATION IN THE TUNNEL FOR THE LHC PROJECT

Permanent magnet quadrupoles Interaction Point. Detector Steel Superconducting Magnets. First crossing point

Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting NbTi Cable Strands

SIMULATION OF A SIGNAL IN THE BEAM LOSS

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

Set Up and Test Results for a Vibrating Wire System for Quadrupole Fiducialization

Cryogenic Testing of Superconducting Corrector Magnets for the LHC Main Dipole

Preparing for the Future: Upgrades of the CMS Pixel Detector

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

Status of the 12 GeV Upgrade and the SHMS R&D and PED Projects. Antje Bruell Hall C meeting, Jan Page 1

COMPARISON OF DIFFERENT MAGNETIC MEASUREMENT TECHNIQUES.

Sub-millimeter Wave Planar Near-field Antenna Testing

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009

GROUND MOTION IN THE INTERACTION. ensured that the final focus quadrupoles on both. rms amplitudes higher than some fraction of the

RESULTS ON FIELD MEASUREMENTS IN A FLAT POLE MAGNET WITH THE CURRENT CARING SHEETS

THE CRYOGENIC SYSTEM OF TESLA

JEDI. Status of the commissioning of the waveguide RF Wien Filter

Crab Cavities for FCC

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012

Chapter 4 Vertex. Qun Ouyang. Nov.10 th, 2017Beijing. CEPC detector CDR mini-review

MuCool Test Area Experimental Program Summary

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Experiences of the QSBPM System on MAX II

Background suppression with neural networks at the Belle II trigger

Magnet Stability (and Reproducibility).

Design of control network and survey for CSNS. Accelerator center of IHEP Wang tong, Li bo

Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning

APAC 2007, Raja Ramanna Centre for Advanced Technology(RRCAT), Indore, India LHC STATUS. Lyndon Evans, CERN, Geneva, Switzerland

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

Status of the magnet and of the undulator activities for the X ray Free Electron Laser SwissFEL at the Paul Scherrer Institute

LHC: CONSTRUCTION AND COMMISSIONING STATUS

3 Main Linac. 3.1 Introduction. 3.2 Beam Dynamics II-63

TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS

Fast Intra-Train Feedback Systems for a Future Linear Collider

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

Proposal of test setup

MAX IV 3 GeV ring magnets. Martin Johansson, Advanced Low Emittance Rings Technology (ALERT)

CEBAF Overview June 4, 2010

Totem Experiment Status Report

SC UNDULATOR AND SC WIGGLER FOR CORNELL ERL

Insertion Devices. Magnet Design. Future Support. Mechanical Design. Installation & Training. Manufacturing & Assembly. Software

LCLS-II SXR Undulator Line Photon Energy Scanning

Conceptual Design of the LHC Interaction Region Upgrade Phase-I

The CMS Outer HCAL SiPM Upgrade.

Light Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory

Multipole Magnets with High Field Uniformity over Full Length for Super Separator Spectrometer

Orbit Stability Challenges for Storage Rings. Glenn Decker Advanced Photon Source Beam Diagnostics March 8, 2012

Helmholtz coils measure all three components of the total moment of the magnet block.

SUPERCONDUCTING GANTRY AND OTHER DEVELOPMENTS AT HIMAC

Packaging of Cryogenic Components

OPERATION OF A SINGLE PASS, BUNCH-BY-BUNCH X-RAY BEAM SIZE MONITOR FOR THE CESR TEST ACCELERATOR RESEARCH PROGRAM*

BaBar and PEP II. Physics

ILC Reference Design Report Accelerator Executive Summary

Transcription:

Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB Y. Arimoto (KEK) IMMW 20 @ Diamond Light Source 2017/Jun/8

SuperKEKB Final focus magnet system Magnetic field measurement for QCS - Requirements - Harmonic coils - Single stretched wire Summary

SuperKEKB, high energy e+/e- collider is under construction at KEK SuperKEKB is aiming at high luminosity * Target luminosity : 8x10 35 cm -2 s -1 (40 times larger than KEKB) ~1 km Main ring Circumference : 3 km Colliding energy: e - : 7 GeV e + : 4 GeV 2016/Feb : Operation w/o collision 2018/Feb : Operation w/ collision

One of key components at SuperKEKB is a final focus quadrupole magnet system (QCS) QCS squeezes e+/e- beams to 50 nm in vertical direction at an interaction point QCS will be installed in the detector solenoid (Bz= 1.5 T) QCS consists of - 8 SC quadrupole magnets - 43 SC corrector/cancel coils ( built by BNL ) - 4 SC compensation solenoids All magnets of QCS will be operated in DC current mode. Construction of QCS has been completed on Feb. 2017 and installed at an interaction region (IR) of SuperKEKB. Now they are cooled down and starting magnetic measurement.

Quadrupole magnets at interaction region Quadrupole magnets Yoke Cancel magnets Quadrupole magnets Yoke of Belle-II solenoid Yoke

Magnets layout at interaction region w/ solenoids Quadrupole magnets Belle-II detector solenoid QCS compensation solenoids QCS compensation solenoids Quadrupole magnets

QC2LP e-/e+ interaction point QC1LP QC1RE IP QC2RE Electron beam QC2LE QC1LE QC1RP QC2RP Positron beam Magnet Name G [T/m] I [A] Inner Radius [mm] Effective Length [mm] QC1LP/ QC1RP QC2LP/ QC2RP QC1LE/ QC1RE QC2LE/ QC2RE 68.94 / 68.89 1625 / 1624 25 334 28.05 / 26.28 877.4 / 822.1 54 410 72.21 / 70.89 1577 / 1486 33 373 28.44 / 32.41 977.0 / 1068 59 537/419

Quadrupole magnets ( on left side of IP ) QC2LP QC1LP QC2LE QC1LE

Quadrupole magnets ( on right side of IP ) QC1RP QC2RP QC1RE QC2RE

Assembled three quadrupole magnets QC2LP QC1LP QC1LE Cancel magnet

QCS at IR Cryostat : QCS-R QC1RP QC2RP QC1RE QC2RE Correctors Solenoids Cryostat : QCS-L QC1LP QC2LP QC1LE QC2LE Correctors Solenoids

Magnetic measurements

Field harmonics : < 10-4 to main quadrupole - Measurement method: Harmonic coil Alignment error of magnet axis at very early stage of beam commissioning: < ~100 um - Measurement method : Single Stretched Wire - Expected Measurement precision : 100 μm * Precision by SSW : a few μm * Fiducialization of the system to the beam line : 50~100 μm - Should be measured at IR under solenoids field

Harmonic coil measurement

Harmonic coil system Coil configuration Long coil ( L = 600 ~ 800 mm) Short coil (L = 20 mm) Winding radius - R=12 mm - R=25 mm - R=33 mm Winding types - Tangential winding with analog quadrupole and dipole bucking - 2 dipole windings (for digital bucking) - 2 quadrupole windings (for digital bucking) Calibration has been done with reference dipole, quadrupole, and sextupole magnets Integrator: PDI5025 (Metrolab) Rotary motor w/ encoder Magnet in a horizontal cryostat Inclinometer Harmonic coils Translation stage w/ position monitor (magnescale)

Harmonic coil Long windings Short windings

Measurement setup Translation stage Cryostat Rotation motor with rotary encoder Translation stage with position monitor (magnescale) Inclinometer

Measurement setup Cryostat : QCS-L Translation stage Positron ring QC2LP Permendur QC1LP Top view Electron ring Iron QC2LE Helium vessel Iron QC1LE Tangsten radiation shield Compensation solenoid 0 1000 mm

Measured multipoles B y + ib x = B 2 1X (b n ia n ) n=1 x + iy r 0! n 1 Amplitude (units) 5 0 QC1LP Skew Normal 5 0 QC1LE Skew Normal Tolerance (n=3) 10 units (n>3) 5 units -5 3 4 5 6 7 8 9 10-5 3 4 5 6 7 8 9 10 Amplitude (units) 5 0-5 Harmonics Order QC2LP Skew Normal 3 4 5 6 7 8 9 10 5 0-5 Harmonics Order QC2LE Skew Normal 3 4 5 6 7 8 9 10 Multipole component for all magnets are less than 5 units Harmonics Order Harmonics Order

Single stretched wire

The system has been built by Fermilab ( newly upgraded system ) - Control and analysis are based on LabView and MATLAB - New type of Integrator from Metrolab - KEK uses this and feedback some bugs to Fermilab for improvement. Electronics - Integrator * Metrolab FDI2056 - AC Power supply * KEPCO BOP 36-12M - Servomotor driver * Aerotech ensemble - PXI modules * Function generator * Digital voltmeter * Trigger module

x-y stage Model ( Aerotech co.) x ANT130-160-L y ATS 100-150-UF Repeatability Resolution 0.1 um 0.7 um 1 nm 0.5 um Wire Be-Cu ( φ 0.1 mm) Wire fixture Ball bearing Tension control Rotary motor monitoring tension gauge Tension : 800 g

QCS quadrupoles are aligned at different longitudinal positions on beamlines - Magnet does not on center between two SSW units QCS is located inside Belle-II detector solenoid (B=1.5 T). QCS magnets will move if the solenoid is excited due to magnetic force. - We need to measure quadrupole magnet center while the solenoid is excited. - The solenoid generates dipole component because the beamlines are aligned at angle of 41.5 mrad with respect to the solenoid axis. - Long wire ( ~8 m ) SSW unit A QC2LP QC1LP QC1RE QC2RE SSW unit B Electron beam QC2LE QC1LE QC1RP QC2RP Positron beam

SSW Measurement with normal conducting quadrupole magnet To check longitudinal position dependences, we performed SSW measurement with normal conducting magnet. Parameters of the Q-magnet Bore : φ100 Yoke Length : 446 mm I.T.F. : 0.0093 T/A Integrated gradient : 4.8 T @ 500A Setup SSW-B Lw=8.6 m Q-mag SSW-A zmag

Magnet center vs magnet position Wire length = 8.6 m Step size = 20 mm Reference magnet 0.1 0.1 Quadrupole center [mm] 0.08 0.06 0.04 0.02 0 0.05 mm 0.03 mm Quadrupole center [mm] 0.08 0.06 0.04 0.02 0 0.03 mm 0.02 mm Longitudinal position of magnet [m] Δx = 0.03 mm Δy = 0.05 mm Longitudinal position of magnet [m] Δx = 0.02 mm Δy = 0.03 mm Difference between AC and DC : 0.03 mm at maximum

AC measurement of QC2LP with Solenoid (ESL) Solenoid (ESL) QC1LP QC1LE QC2LP HER QC2LP LER QC2LE SC magnet in QCS-L QC2LP GL = 11.47 T @ I=877A 0.0415 rad Bsol Bz Bx LER Solenoid (I=200A) Bz L = 1.131 T Bx L = 0.0488 T dy = 4.2 mm 10 um 50 urad

Warm measurement at IR (interaction region) SSW stage QCS cryostat L Laser tracker QCS cryostat R SSW stage

Warm measurement at IR (interaction region) SSW stage QCS cryostat L BeCu wire Laser tracker QCS cryostat R SSW stage

SSW measurement were performed with 2 setup - Setup 1: A SSW unit is set on QCS-R end, and the other unit set on around IP - Setup 2: Two SSW units are set on end of QCS-R and QCS-L Lw = 4.9 m Set up 1 SSW unit QCS-R SSW unit Set up 2 SSW unit QCS-L QCS-R SSW unit Lw = 8.7 m

Horizontal misalignment Setup 2 Magnet center: x (mm) 150 100 50 0-50 -100 QC2LE dx=-0.418 mm QC2LP dx=-0.076 mm QC1LE dx=-0.098 mm QC1LP dx=-0.053 mm QC1RP dx=-0.531 mm QC1RE dx=-0.205 mm QC2RP HER dx=-0.394 mm dx=-0.048 mm LER QC2RE -150-3000 -2000-1000 0 1000 2000 3000 z (mm) Difference between Set up 1 and 2 : Δx LER (positron ring) : ~ -30 um HER (electron ring): ~ 3 um Magnet center: x (mm) 150 100 50 0-50 -100 Setup 1 QC1RP dx=-0.506 mm QC1RE dx=-0.204 mm QC2RP dx=-0.362 mm HER LER QC2RE dx=-0.045 mm -150 0 500 1000 1500 2000 2500 3000 z (mm)

Vertical misalignment 1 Set up 2 0.8 Magnet center : y (mm) 0.6 0.4 0.2 0-0.2-0.4 QC2LE dy=-0.323 mm QC2LP QC1LE QC1LP dy=-0.292 mm dy=-0.290 mm dy=0.242 mm dy=0.238 mm dy=0.163 mm QC1RP QC1RE QC2RP dy=-0.056 mm QC2RE -0.6 dy=-0.752 mm -0.8 Difference between Set up 1 and 2 : Δy QC1RP : 1 um QC1RE : 57 um QC2RP : 47 um QC2RE : 47 um -1-3000 -2000-1000 0 1000 2000 3000 z (mm) All of magnets in left side of cryostat are low by 0.3 mm to 0.75 mm. It is expected the ground level will be down after detector will be installed, so we lifted up the left-side cryostat by 0.3 mm. Magnet center : y (mm) 1 0.8 0.6 0.4 0.2 0-0.2-0.4-0.6-0.8 Set up 1 dy=0.162 mm dy=0.181 mm QC1RP QC1RE dy=0.289 mm QC2RP dy=-0.103 mm QC2RE -1 0 500 1000 1500 2000 2500 3000 z (mm)

QCS is SC final focus quadrupole magnet system of SuperKEKB Magnet measurement system of QCS - Harmonic coils - SSW Harmonic coil measurements show the higher harmonics of quadrupole magnets are smaller than tolerance We performed SSW measurement - Longitudinal magnet position dependence on SSW results is not shown. - Solenoid field effect can be eliminated by AC measurement - Large misalignment were found in vertical direction and the left side cryostat was realigned. Measurement schedule - 2017/Jun. - Aug. : Magnetic measurement at IR under the particle detector solenoid field * Harmonic coil measurements * SSW measurements