Select, wear adjust, use and maintain personal protective equipment

Similar documents
NCCER Progress Blvd, Alachua, Florida Phone: (888)

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Sheet Metal Worker Level 2

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Heat Exchanger Construction Checklist

COMPETENCY ANALYSIS PROFILE Tool and Die Maker 430A (All unshaded skill sets must be demonstrated/completed)

Certified Precision Sheet Metal Operator Level I

BHARAT HEAVY ELECTRICALS LIMITED

Pipefitting. or fuel. that are. ICE Level 2. as; to meet specification. Support the. n pipework. positioning. Page 1 of 5

PLACE LOGO HERE. Final Project Report 10/02/2014. Chemical Clean & Oil Flush of Company 1 Lube Oil & Control Oil Systems.

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

Industrial Mechanic (Millwright) On-the-Job Training Guide

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

SECTION PROJECT MANAGEMENT AND COORDINATION

Plumber Level 1 Rev. May 2011

Plating. Level 3 - International Competence: Engineering-Construction (Blue Card)

Sheet Metal Worker A Guide to Course Content

GE018: Interpretation of Engineering Drawings

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

SELF APPRAISAL OF SKILLS - STANDARD FOR ALL DISCIPLINES

SECTION PROJECT COORDINATION VIA BIM

Visual Pipe Stress Analysis for AutoCAD Plant 3D

Construction Phase Project Management and Documentation

SEMPEO Unit H4R3 04 Using and communicating technical information

SEMPEO SQA Unit Code FR0V 04 Using and communicating technical information

ENTRY-LEVEL INDUSTRIAL MECHANIC

Subject Description Form

This specification describes the general requirements for Engineering Services provided to Vale.

Air Tractor, Inc. Repairs Page 5-i AT-802/802A July 30, 2008

1. Competency A Analyze the Design Competency B Prepare for Dress making operations Competency C Develop pattern...

Machinist NOA (2010) Subtask to Unit Comparison

Industrial Mechanic (Millwright) Level 4

CHAPTER 75 STEELWORKER (SW)

WORLDSKILLS STANDARD SPECIFICATION

QPEO2/003N Credit Value: 4 QCF Level: 2 GLH: 29 Using and communicating technical information

Multi-Bowl Applications

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

Duties and Standards. for. Screw Machining--Level III

Computer Technology. Broad-based Courses

Risk Management Department. Control of Hazardous Energy

Dropped Objects Who s Responsible. Presented by Bob Thompson, Chevron Indonesia

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

QCF Unit and Assessment Specification

SECTION COMMON WORK RESULTS FOR HVAC

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

SEMAER2_02 Using and interpreting engineering data and documents

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Guidance for producing centre devised tasks for 2660

Apprenticeship Training Standard. Schedule of Training. Draftsperson Mechanical. Trade Code: 614A

Machinist NOA (1998) Subtask to Unit Comparison

Machinist Level 4 Rev. December 12, 2012

COMPETENCY ANALYSIS PROFILE MOULD MAKER 431A (All unshaded skill sets must be demonstrated/completed)

Carpentry. Full Time

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

COMPETENCY ANALYSIS PROFILE GENERAL MACHINIST 429A. (All unshaded skill sets must be demonstrated/completed)

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment

SECTION III SUBMITTALS AND APPROVALS

SHEET METAL STUDENT GRADE RECORD Career & Technical Education

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

Inspection of aerial platforms in Poland

STANDARD PHRASEOLOGY SECTION G. 1. This section of standard phraseology is for general use in piping disciplines.

DACUM Workshop Report Composite Repair Technician

CHAPTER 75 STEELWORKER (SW) NAVPERS F CH-77

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

CHAPTER 29 ELECTRICIAN S MATE (EM) NAVPERS G CH-76

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #

CHAPTER 53 MACHINERY REPAIRMAN (MR) NAVPERS E CH-65

ELECTRONICS AND INSTRUMENTATION (For the State of Haryana)

ClearSpan PolyMax Windbreak Wall

Model Curriculum. Irrigation Service Technician

NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD

apprenticeship curriculum standard NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD SHEET METAL WORKER

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

SECTION OPERATION AND MAINTENANCE DATA

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

NOVA SCOTIA APPRENTICESHIP CURRICULUM STANDARD

SECTION SUBMITTAL PROCEDURES

INDUSTRIAL MECHANIC (MILLWRIGHT)

Carpentry. Full Time Job Title: Cabinet Installer Job Number: 3547 Hours/Days: Monday-Friday Salary: $15+DOE Location:

Construction Trades Foundation

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

UNIFIED FACILITIES GUIDE SPECIFICATIONS

AMTEC Modules. AMT 102: General PM and Predictive Maintenance AMT 1021: Basic PM AMT 1022: Advanced Technologies

Full Time Positions Available: Plant Site Superintendent. Industrial Maintenance Mechanic. Pipefitter. Welder

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

Construction III Curriculum Maps

Industrial Maintenance Mechanics

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PRESSURE GAUGES, Section 15130

APPLICANT GUIDE ENGINEERING OCCUPATIONS

1. ASME A Scheme for the Identification of Piping Systems.

HIRING COMPANY: Dynomax Inc. INDUSTRY: Aerospace and Defense POSITION: CNC Programmers, Machinists, Operators

Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013

Transcription:

ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and hazardous conditions Control Hazards Assemble, erect use and dismantle elevated platforms and scaffolds 5470.0 5470.01 5470.02 5470.03 5470.04 5470.05 Perform lock out and tagging Select, operate and maintain tools and Perform housekeeping duties 5470.06 5470.07 5470.08 COMUNICATE Demonstrate effective interpersonal relations Receive and react to instructions Give instructions Read and interpret documents and/or job specifications Write job-related documents 5471.0 5471.01 5471.02 5471.03 5471.04 5471.05 Practice personal hygiene 5471.06 READ, INTERPRET, AND MAINTAIN DRAWINGS AND SPECIFICATIONS Identify drawings and specifications interpret industry symbols and abbreviations select drawing Create drawings and sketches drawing approval process 5472.0 5472.01 5472.02 5472.03 5472.04 5472.05 Maintain 5472.06 ANALYSE AND DESIGN Identify types of Perform jobrelated calculations requirements Identify and devices to be to be. 5473.0 5473.01 5473.02 5473.03 5473.04 5473.05 devices to be Layout and illustrate the piping (s) Submit design documents for approval(s) 5473.06 5473.07 5473.08

ANALYSIS PROFILE PLAN AND PREPARE FOR THE PROJECT Prepare material and labour take off lists Complete all applications and tools and Expedite job Establish a job schedule 5474.0 5474.01 5474.02 5474.03 5474.04 5474.05 Verify orders Store material, and tools 5474.06 5474.07 LAYOUT AND INSTALL PIPE FITTINGS VALVES AND SUPPORTS Field check and verify site drawings select piping materials pipe fittings control valves joining methods 5475.0 5475.01 5475.02 5475.03 5475.04 5475.05 pipe supports and Create a series of structural openings Fabricate all pipe supports, sleeves, guides and anchors Install pipe supports, fabricated components and Perform various cutting 5475.06 5475.07 5475.08 5475.09 5475.10 Join material Perform tube and pipe bending operations Prepare pipe and fittings Install and join pipe and fittings 5475.11 5475.12 5475.13 5475.14 ASSEMBLE AND INSTALL PROCESS PIPING SYSTEM select the process piping s to be Verify pipe and fittings verify the location Install piping s Label and tag piping s 5476.0 5476.01 5476.02 5476.03 5476.04 5476.05 Install fire stopping measures 5476.06

ANALYSIS PROFILE INSTALL AND MAINTAIN INSTRUMENTATION CONTROL select piping requiring control types and function of piping instrumentation the control requirements select the control s to be Install, calibrate and maintain control (s) 5477.0 5477.01 5477.02 5477.03 5477.04 5477.5 INSTALL EQUIPMENT to be to be Assemble the location of the 5478.0 5478.01 5478.02 5478.03 5478.04 5478.05 Install the supports and hanger Install and connect the to various piping 5478.6 5478.7 INSTALL DEVICES Install the devices device devices used for the Assemble the devices locations of the devices 5479.0 5479.01 5479.02 5479.03 5479.04 5479.05 Install device supports and Install and connect the device to various and piping s 5479.06 5479.07 TEST select the tests for s s the type, duration, pressures and set up requirements for test Perform and/or arrange destructive and non-destructive testing Perform visual inspection of various piping s Perform stress relieving on trade related materials 5480.0 5480.01 5480.02 5480.03 5480.04 5480.05 Arrange for test or a testing schedule Perform piping testing Perform water treatment testing Receive and document test reports and results 5480.06 5480.07 5480.08 5480.09

ANALYSIS PROFILE COMISSION ACTIVATE piping s that require commissioning and/or activation and perform the tests for final inspections Flush and chemically treat s calibration and operation of and controls Instruct the end users 5481.0 5481.01 5481.02 5481.03 5481.04 5481.05 Check that the s are commissioned/ activated 5481.06 PERFORM RIGGING AND HOISTING Read and interpret specifications and shop drawings Inspect the job site the Schedule the operation Inspect the 5482.0 5482.01 5482.02 5482.03 5482.04 5482.05 Connect the rigging to the load Secure the area Perform the lift and moving operation Position and secure the load Disconnect the load 5482.06 5482.07 5482.08 5482.09 5482.10 Remove and store the rigging Communicate throughout the operation Operate power lifting and 5482.11 5482.12 5482.13 PERFORM PREVENTIVE MAINTENANCE Prepare the for inspection mechanical components which require scheduled Prepare service schedules for the client Liaise with the client Obtain approvals to proceed with schedule 5483.0 5483.01 5483.02 5483.03 5483.04 5483.05 Perform the performed Recommission the after / full operational status of the Clean up the jobsite 5483.06 5483.07 5483.08 5483.09 5483.10 Submit relevant 5483.11

ANALYSIS PROFILE TROUBLESHOOT AND REPAIR MECHANICAL Diagnose and assess problem(s) Prepare a service proposal Liaise with the client Arrange for Prepare the s for the approved repairs 5484.0 5484.01 5484.02 5484.03 5484.04 5484.05 Perform the service Operate the after all repairs are completed calibration of the and/or components Re-commission the Clean up the job site 5484.06 5484.07 5484.08 5484.09 5484.10 Submit the relevant 5484.11