Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS

Similar documents
Customer Requirements Commercial Secondary Service

A. Deviation from this standard must be approved by the Project Architect.

.1 Applicability: These criteria shall be applied as follows:

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

Washington County Road Engineering Plan Submittal/Review Checklist

Page Electric Utility Service Specifications

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting

SECTION LIGHTING

Customer Connection Guide Updates Effective May 2017

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

AWOS A Site Preparation Manual

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

St. Monica Food Pantry

ClearSpan PolyMax Windbreak Wall

Chapter 25. Lighting Plans

SECTION 5 TRANSFORMERS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

EXCAVATION AND BACKFILL

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

Chapter 24 Outdoor Lighting Ordinance

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

ClearSpan PolyMax Windbreak Wall

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

Record Drawing Standards for Projects Version 2.1

KC Water Rules and Regulations For Water Main Extensions and Relocations

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

AWOS II & AWOS A-V Site Preparation Manual

SECTION MANHOLES

MERRY GO ROUND ITEM NO: 8030

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

WeatherShield Covered Walkway and Connect-A-Building

INSTALLATION INSTRUCTIONS F Series Floodlight

SIGNALS AND LIGHTING FIELD GUIDE

DETAILED ILLUSTRATION

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

Diamond Knowledge Base. Inductive Loop Guide. Introduction

WARNINGS & SAFETY INFORMATION: PLEASE READ CAREFULLY AND KEEP A COPY ON THE PROPERTY FOR FUTURE REFERENCE!

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Grease Interceptor Design Checklist

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

Item 550 Chain Link Fence

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

ClearSpan Grab Bag Canopy

WeatherShield Daddy Long Legs Canopy

SECTION 39 - MANHOLES TABLE OF CONTENTS

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

3.1 Overview of ATCO Electric s URD System Design

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

Electric Service Guide. Residential Subdivision

PLAY HOUSE IMPORTANT

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

QuadroMAX. Installation Manual. QM Series. LED Outdoor Lighting Fixtures REV: 3/22/16

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

Moo-Tel Small Animal Hut

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

SECTION BASIC MATERIALS AND METHODS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

SECTION 2 GENERAL REQUIREMENTS

Cable Hanging Instruction Manual

TRANSACTION RECORD TR

NEW OR UPGRADED ELECTRICAL SERVICE

B. Manufacturers: Square-D, G.E. or Westinghosue.

CITY OF WHITE PLAINS STANDARD DESIGN CRITERIA AND SPECIFICATIONS FOR SMALL WIRELESS FACILITIES

Ranch Rail Vinyl Fence

HP 2 SERIES Integral Driver - Solid State LED

15 Ft. x 39 Ft. Hoop House Construction

SECTION III SUBMITTALS AND APPROVALS

Installation Instructions

CITY OF MUSKEGO DRAFTING STANDARDS

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

ClearSpan Mini Grab Bag Shelters

SECTION TRACER WIRE FOR NONMETALLIC PIPE

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

Premium Solar Star Greenhouse

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

PART MATERIALS. Section Fencing Materials. Description

SECTION 400 STREET DESIGN

Square Straight Steel - 4 Bolt Base Light Poles

Die Cast Screw-In Connector

Customer Requirements RF Antenna Installations

Nash Chandelier Assembly and Installation Instructions

ClearSpan Attached-Style Awning

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

For crossing under a railroad, contact the specific railroad company's engineering department.

10 PVC Tree Instructions

Transcription:

Section 8 City of Ellensburg ILLUMINATION STANDARDS

Table of Contents STREET ILLUMINATION...3-5 GENERAL NOTES...3 INSTALLATION AND CONNECTIONS...3 MARKING...3 STAKING...3-4 TRENCH REQUIREMENTS...4 ILLUMINATION SYSTEM MATERIAL...4-5 CONDUIT...4 CONDUCTOR WIRE...4 JUNCTION BOXES...4 LUMINAIRE POLES...4 FIXTURES...4 PHOTO CELLS...4 LAMPS...4 BASES...5 FUSES...5 STREET LIGHT REQUIREMENTS FOR ROAD CLASSIFICATIONS...5-6 ARTERIAL STREETS...5 VALMONT STYLE...5 COLLECTOR STREETS...5-6 VALMONT STYLE...5 ACORN STYLE...5-6 CONTEMPO STYLE...6 LOCAL ACCESS STREETS...6 ACORN STYLE...6 CONTEMPO STYLE...6 DOWNTOWN BUSINESS DISTRICT...6 3 GLOBE HISTORIC STREET LIGHT...6 PLASTIC SERVICE PIPE AND CONNECTIONS...6 2

STREET ILLUMINATION All new commercial or residential subdivisions, short plats, building site plans shall provide street lights in accordance with the standards for such improvements of the City and they shall be owned and operated by the City. Street lighting shall be required for all projects when street improvements in Section 3 are triggered. A street lighting plan submitted by the applicant and approved by the Public Works and Energy Services Departments shall be required for all street light installations. Type of installation shall be as set forth in the current edition of the WSDOT/APWA Standard Specifications and as directed by the City except where noted herein. All public street light designs shall be prepared by an engineering firm capable of performing such work. The engineer shall be licensed by the State of Washington. All developments shall submit the lighting plan on a separate sheet, which has approval lines, on which both the Public Works and Energy Services Departments can sign. All developments shall include conduit installed so as to provide adequate capacity for future installation of complete street lighting as set forth in these standards. Positioning of conduit shall be determined by the City engineer. All street light electrical installations including wiring, conduit, and power connections shall be located underground. Exceptions to underground is permissible in limited locations with approval of both Public Works and Energy Services. The General Notes below need to be included on any plans dealing with street design. G E N E R A L N O T E S ( S T R E E T L I G H T C O N S T R U C T I O N ) 1. All workmanship, materials and testing shall be in accordance with the current edition of the WSDOT/APWA, MUTCD, or City of Ellensburg Development Standards unless otherwise specified below. In cases of conflict, the most stringent guideline shall apply. 2. Developer or developer s engineer shall submit proposed lighting layout and types on plans, the City Light Dept. will then design conduit, junction boxes, service locations, and size the wire. The Energy Services Department will be required to sign off on the plans prior to overall development approval. 3. All trenches, conduits, backfilling, and street light bases must be inspected by the City of Ellensburg Public Works Department, prior to backfilling and/or placing or pouring concrete bases. Please contact the Public Works Department at 509-962-7230 for inspections. I N S T A L L A T I O N A N D C O N N E C T I O N S Developer or developer s contractor will be required to install all conduit, street light bases, and junction boxes according to these Development Standards. Developer will be required to furnish all materials for street lighting system. Wire size and color to be determined by the City s Energy Services Department. Developer will be required to pay labor and equipment costs if the City light crews to erect street light poles, install fuses, pull wire, connect and test street lighting system. The service location for new illumination system shall be determined by City s Energy Service Department. M A R K I N G Manufacturer s name or symbol, catalog number, and wattage rating shall be printed on each lamp. S T A K I N G All surveying and staking shall be performed by an engineering or surveying firm capable of performing such work. The engineer or surveyor directing such work shall be licensed by the State of Washington. A preconstruction meeting shall be held with the City prior to commencing staking. All construction staking shall be inspected by the City prior to construction. 3

The minimum staking of luminaries shall be as follows: A. Location and elevation to the center of every pole base; B. Location and elevation of each conduit bend, elbow, or sweep. T R E N C H R E Q U I R E M E N T S As per City of Ellensburg Standard Details located at the end of this Section, Electrical Conduit shall have a minimum of 24 of cover. Conduit shall also be bedded in sand. The sand bedding shall meet the requirements of WSDOT Standard Specifications 9-03.13, and shall be bedded to a point 4 above the top of conduit and 4 below the bottom of the conduit. Twelve inches above the top of conduit the developer or developer s contractor shall install approved electrical warning tape along the entire length of conduit runs. I L L U M I N A T I O N S Y S T E M M A T E R I A L (Refer to Approved Material Supplier sheets and Standard Details at the end of this Section) CONDUIT: Electrical Conduit for street illumination systems shall be 2 from the power source to the junction box and 1.5 from the junction box into the street light base. The City s Energy Services Department will determine the size of conduit to be used. All conduit shall be gray in color. A bushing or bell end shall be used at the end of a conduit that terminates at a junction box or luminaries. All conduit sweeps into light bases, around bends and junction boxes shall be 18 radius gray schedule 40 PVC( 45 or 90 degrees as specified). A nylon pull string is required in every conduit run and tied off at each termination of said run. CONDUCTOR WIRE: Conductor wire shall be #6 AL TPX URD 600V in 2 and #12/3 UF 600V in 1.5, with the size and color coding to be determined by the City s Energy Service Department. Conductor/circuit identification shall be used throughout the illumination system. Direct bury wire and wire splices will not be allowed. All other installations shall conform to WSDOT/APWA and MUTCD standards. All wire connections shall be with Thomas & Bets RAD 1/0-4 connectors or approved equivalent, as shown on City s Energy Services Dept. design. JUNCTION BOXES: Junction boxes shall be Pencell, Penta Head locking lid type Flood-Seal Multi-Port connectors, (part #: PE 20HDX, or PE 14HDX as designed) or approved equivalent. Refer to the catalog cut sheet at the end of this section. Junction boxes shall be installed at a maximum of 200 ft. of conduit runs, at base of each luminaries, and at each road crossing. Exceptions to these locations is permissible with approval of both Public Works and Energy Services. LUMINARIES POLES: Each luminaries pole shall have an in-line, water tight fuse, located at the base of the pole. Access to these fuses shall be through the hand-hole on the pole. The hand hole shall be facing away from on-coming traffic. Additional conductor length shall be left inside the pole and junction box equal to a loop having a diameter of one foot. Load side of in-line fuse to luminarie head shall be a minimum of #12 copper, and shall be supported at the end of the luminaire arm by an approved means. Fuse size and grounding in pole shall conform to NEC standards. Each luminaire base shall be grout packed. FIXTURE: Fixtures must meet specifications at the end of this section and properly fit required luminaire pole. PHOTO CELLS: Each luminaire shall be equipped with a photo cell, to operate independently. Photo cells shall face the North, unless otherwise determined by the City, shall be long life utility grade for LED fixtures, and installed in a vandal/tamper resistant manner. Photo cells shall be per standard details and catalog cut sheets for each individual street light located at the end of this section. LAMPS: Each luminaire lamp shall be Light Emitting Diode (LED) lamps, in accordance with the standard details and catalog cut sheets for each individual street light located at the end of this section. Lamps shall be packaged in containers which will prevent shipping and handling breakage. Each container shall be marked with the manufacturer s name, name of item, wattage, and catalog number. 4

BASES: Refer to the Standard Details at the end of this Section for light base requirements and anchor bolt patterns. Please note, that the light base for the Contempo Style light must be precast. FUSES: Refer to the Standard Details at the end of this Section for required fuses and fuse holders and their catalog numbers. STREET LIGHT REQUIREMENTS FOR ROAD CLASSIFICATIONS A R T E R I A L S T R E E T S Valmont Style Arterial Streets shall be lighted with 35 Valmont Style, 165 watt LED luminaires. Luminaires shall be installed at a maximum 240 spacing and shall be staggered on either side of the road unless otherwise approved by City Engineer. At intersections with Arterial Streets, two luminaries shall be on opposite corners of intersection. At intersections with Collectors or Local Access Streets, one luminaire shall be on one of the four corners of the intersection. If developer is only performing half street improvements, luminaire spacing shall be at a maximum 480. Junction boxes and conduit stubs across roadway may be required for half street improvements. Refer to the Standard Details and catalog cut sheets at the end of this Section for typical spacing, required material and part If overhead power or other obstacles are in conflict with the installation of the luminaires the following options will be decided upon by the City of Ellensburg. Shift the location of light Perform line maintenance (decreasing sag in line, etc.) If City owned pole, install timber mounted light, with approval of the Energy Services Dept. Install Contempo style or Acorn Style lights in accordance with these Development Standards, at a maximum of 150 spacing s and staggered on both sides of the street, with two luminaries at the intersection. C O L L E C T O R S T R E E T S Valmont Style Arterial Streets shall be lighted with 35 Valmont Style, 100 watt LED luminaires. Luminaires should be installed at a maximum 240 spacing and should be staggered on either side of the road. Each completed intersection should have a minimum of one Valmont luminaires at the intersection. If developer is only performing half street improvements, luminaire spacing shall be at a maximum 480. Junction boxes and conduit stubs across roadway may be required for half street improvements. Refer to the Standard If overhead power or other obstacles are in conflict with the installation of the luminaires the following options will be decided upon by the City of Ellensburg. Shift the location of light Perform line maintenance (decreasing sag in line, etc.) If City owned pole, install timber mounted light, with approval of the Energy Services Department, and in accordance with the Standard Details located at the end of this section. Install Contempo style or Acorn Style lights in accordance with these Development Standards, at a maximum 150 spacing and staggered on both sides of the street. Acorn Style Developer may elect to use the Acorn Style light in place of the Valmont Style. Acorn lights should be 54 watt LED and should be staggered on both sides of the street at a maximum 150 spacing. Each completed intersection should have a minimum of one luminaires at the intersection. If developer is only performing half street improvements, luminaire spacing shall be at a maximum 300. Junction boxes and conduit stubs across roadway may be required for half street improvements. Refer to the Standard 5

Contempo Style Developer may elect to use the Contempo Style light in place of the Valmont Style. Contempo lights should be 44 watt LED and should be staggered on both sides of the street at a maximum 150 spacing. Each completed intersection should have a minimum of one luminaires at the intersection. If developer is only performing half street improvements, luminaire spacing shall be at a maximum 300. Junction boxes and conduit stubs across roadway may be required for half street improvements. Refer to the Standard L O C A L A C C E S S S T R E E T S Contempo Style Developer may elect to use the Contempo Style light for Local Access Streets. Contempo lights should be 44 watt LED and should be staggered on both sides of the street at a maximum 240 spacing. Each completed intersection should have a minimum of one luminaires at the intersection. If developer is only performing half street improvements, luminaire spacing shall be at a maximum 480. Junction boxes and conduit stubs across roadway may be required for half street improvements. Refer to the Standard Acorn Style Developer may elect to use the Acorn Style light for Local Access Streets. Acorn lights should be 54 watt LED and should be staggered on both sides of the street at a maximum 240 spacing. Each completed intersection should have a minimum of one luminaires at the intersection. If developer is only performing half street improvements, luminaire spacing shall be at a maximum 480. Junction boxes and conduit stubs across roadway may be required for half street improvements. Refer to the Standard Details and catalog cut sheets at the end of this Section for typical spacing, required material and part numbers, and light bases. D O W N T O W N B U S I N E S S D I S T R I C T 3 Globe Historic Street Light Light specifications and luminaire locations shall be determined by the City of Ellensburg Public Works Department. 6