CVUSD Facilities Master Plan

Similar documents
Cherokee Heights Elementary School

Harding Senior High School

John A Johnson Elementary School

Adams Spanish Immersion 615 Chatsworth Street South

3100 WEST LAKE STREET APARTMENTS 3100 WEST LAKE STREET MINNEAPOLIS, MN TITLE SHEET W Lake St 3100 MSP, LLC

Linwood Monroe Upper 810 Palace Avenue

ouglas Intermediate School

Perspective Views NORTHEAST VIEW 1 SOUTHWEST VIEW 2 AERIAL VIEW - EAST AERIAL VIEW - WEST NORTHEAST VIEW SOUTHWEST VIEW AERIAL VIEW - WEST

Horace Mann Elementary

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

WEST HOLLYWOOD PARK MASTER PLAN 2004

For questions or feedback please contact Perspective Views

DRAFT FOR INTERNAL DISCUSSION ONLY

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work

By Design Ideology. 80 DIVER SIFIED PROJEC TS 20 MILLI ON PROFIC IE NT TO DEVELOP 7.50 LAKH SQ.F T. PER ANNUM A BRAND LED C RAF TED OVER

1001 Feehanville Drive Phone Mt. Prospect, IL Fax

PICO BRANCH LIBRARY ARB SIGNAGE SUBMITTAL

AUTOMATION PARKWAY SAN JOSE, CA

LS-1 ARTS AND COMMUNITY CENTER LIBRARY RENOVATION AUGUSTA SAVAGE 1105 MARTIN LUTHER KING JR. BOULEVARD GREEN COVE SPRINGS, FLORIDA 32043

Continuing Education Credit

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Allan Hancock College

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

CS2.0 COVER SHEET VOL. 2

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013

Virginia - Mathematics Standards of Learning (2009): 3.10a, 3.9d Fairfax County Public Schools Program of Studies: 3.10.a.1,

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

SCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study

Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Updated Sheet Index for DRC Submittal A0.1

Checklist for Minor Plan Modification

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Phalen Lake Hmong Studies Magnet

Southern Oregon University

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL

Outdoor Recreation Facility Assessment Park and Recreation Board Briefing June 4, 2015

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017

Elementary Campus Board Meeting

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

SITE DRAWINGS FOR CHILDREN WITH CANCER

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma.

Richardson olmsted complex core project Community Presentation. buffalo, new york

CAPITAL IMPROVEMENT PROGRAM

TO: All Recipients Date: March 20, 2015

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS

HERITAGE CROSSING IS A NEW, CLASS A INDUSTRIAL DEVELOPMENT IN NORTH AUSTIN ENCOMPASSING 792,839 SQUARE FEET. Located at

Fort Meade Legacy BRAC Program Update High Explosive Impact (HEI) Area

194 EAST BAY ST CHARLESTON HISTORIC DISTRICT

6RZ. > <8ms and <30ms performance versions > Single and dual element versions > Draw out case > Flush panel or rack mount > Made in Australia

SUBJECT: JOHN D. MACARTHUR CAMPUS MASTER PLAN AMENDMENT

Sonoma Cheese Factory

I N T E R N AT I O N A L CHRIS TM AS M ARKET

St. John Paul II Catholic Parish

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

Students play. Teacher present s. Class discussion. Opening. Closing. Copyright min. min. min. min. min

CAMBRIDGE LAKES NORTH - UNIT A6 FINAL PLAT OF SUBDIVISION PINGREE GROVE, ILLINOIS SHEET

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS

Amendment to Bid #1 Minor Office Renovations B /30/2018 No

Tooker Family Residence

OCPS Submittal Register for Product Data and Shop Drawing Reviews

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Jackie Robinson Elementary School

Mezzanine Inspection Report (Scoping)

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY

THE SHOPS AT IVERSON SUBURBAN WASHINGTON, DC LOCATION COMING SOON SPACE AVAILABLE GROSS LEASABLE AREA PROPERTY OVERVIEW CURRENT RETAILERS

MVD MODEL FILE NAMING

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110

Operating Standards Attachment to Development Application

PHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground

JUNCTION RESTON EAST STATION SUNSET HILLS ROAD, RESTON, VA

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST

824 University Mixed-Use

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

3 Basic Code Enforcement, Part 3

Staff Review Date: May 11, 2016 HDC PID#

If the address on this form is different than the address of the building, submit a written explanation.

Elementary Campus - Exterior Design Concepts Board Meeting

6.0 Design Proposals. Hawkins\Brown December

CHAPTER 5 ARCHITECTURE

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

Literacy Curriculum Puzzles

Возрастная группа: 2 Virginia - Mathematics Standards of Learning (2009): 1.9, 2.11a,

If the address on this form is different than the address of the building, submit a written explanation.

SmartSoft MDSD Toolchain 7 May 2010 / SDIR V - Anchorage

Marcus Moziah Garvey Elementary School

SANTA MONICA BOULEVARD BEVERLY HILLS OWNER: 9908 SANTA MONICA BLVD., LLC SAN VICENTE BLVD. SUITE 550

Operating Standards Attachment to Development Application

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.

Transcription:

CVUSD Facilities Master Plan CVUSD - WESTLAKE CLUSTER NAC Architecture 837 North Spring Street, 3 rd Floor Los Angeles, CA 90012 Contact: 323.475.8075 E-mail: lochoa@nacarchitecture.com Website: www.nacarchitecture.com

129 9 130 0 20 0 0 0 - Los Cerritos 110 0 10 0 0 0 - Standard 30 0 0 8 8 0 5 0 0 20 0 0 6 6 0 30 0 10 0 0 4 4 0 10 0 5 0 0 2 20 0 5 0 0 G Li ng ni ity an c Pl apa C 2 t d te nt ec e oj llm 17 Pr ro -20 En 0 16 2 Core Facilities Summary nt en re m ur ll 16 C nro -20 E 0 15 g in nd ou gr rk ay Pa Pl um n io at tr r te el g in in si is na in ym dm A D Sh y h ar br nc PR M Lu ep Pr or do In - Aging finishes on interior and eterior of buildings od - Undersized parking and drop-off Fo - Several challenges at Building 1 Lack of windows Congested hallways & lunch q ueue Need for acoustic separation Lack of proper hardware at classes Insufficient specialty classrooms Insufficient and aging central plant 0 STUDENTS 7 0 0 STALLS 10 0 ACRES SQ UARE FEET 10 9 0 7 4 0 0 0 0 Challenges Summary: 9 6 7 9 0 0 5 0 0 0 Enrollment Summary Current facilities meet school s needs Current facilities DO NOT meet school s needs - G ymnasium ( + 4,311 SF) - Administration ( + 21 SF) - Playground ( + 3 Acres) - Food Prep ( -2,124 SF) Total Current Classrooms: 44 Total Based on Proj ected Enrollment Classrooms: 38 - I ndoor D ining ( -5,19 6 SF) - Aging locker rooms - Lunch Shelter ( -2,9 6 1 SF) - Homogenous eterior play areas - Multi-Purpose Room ( -2,6 8 4 SF) - Lack of covered walkway - Library ( -3,4 17 SF) - Parking ( -117 Stalls) Cerritos MiddleSchool I Alternate Concepts Los Cerritos Banyan Elementary Middle I School Si te Analy Alternate sis Concepts Avenida Las Flores 2100 East 1120 Knollwood Dr,De Newbury Park, Thousand CA 91320 Oaks, CA 91362 91362 March a JFebruary nuary31, 10, 2,2017 2017 2017 Enrollment & &Facilities Data Eisting Condition Enrollment Facilities Data 1.0 1.0

LEGEND Eisting Building (No Work) New Construction High Modernization Medium Modernization Low Modernization Structure Above "P" Building Number Indicates Portable Indicates Uncertified 4 Eisting Conditions 2.0

LEGEND Eisting Building (No Work) New Construction High Modernization Medium Modernization Low Modernization "P" Structure Above Building Number Indicates Portable Indicates Uncertified High level modernization to achieve daylighting & improve circulation/ safety Assembly court & lunch shelter Classroom Building Modernized hardscape/landscape Relocated hard courts Formalized drop-off Epanded parking lot Alternate Concept 1 3.0

LEGEND Eisting Building (No Work) New Construction High Modernization Medium Modernization Low Modernization "P" Structure Above Building Number Indicates Portable Indicates Uncertified High level modernization to achieve daylighting & improve circulation/ safety Assembly court & lunch shelter Relocated hard courts Classroom Building & courtyard Athletic courtyard & shade structure Epanded parking lot & drop-off Alternate Concept 2 4.0

LEGEND Eisting Building (No Work) New Construction High Modernization Medium Modernization Low Modernization New Admin, MPR, Food Service, Library & Classroom Bldg "P" Structure Above Building Number Indicates Portable Indicates Uncertified High level modernization to achieve daylighting & improve circulation/ safety Assembly court & lunch shelter Athletic courtyard & shade structure Relocated hard courts Epanded parking lot & drop-off Alternate Concept 3 5.0

Alternate Concept 2 Alternate Concept 1 Project Scope: Alt 1: Alt 2: Alt 3: - High level Bldg 1 modernization - High level Bldg 1 modernization - New Classroom Bldg - New Classroom Bldg - High level Bldg 1 modernization, including partial removal - Improved hardscape/ landscape at level transition - Improved hardscape/ landscape at level transition - Enhanced courtyards with shade/lunch shelters - Enhanced courtyards with shade/lunch shelters - Epanded parking lot & relocated hard courts - Epanded parking lot/ drop-off & relocated hard courts - Formalized drop-off - New Admin, MPR, Food Service, Library & Classroom Bldg - Enhanced courtyards with shade/lunch shelters - Epanded parking lot/ drop-off & relocated hard courts Alternate Concept 3 Summary 6.0

Description Quantity Unit Count Total Unit Cost Total Cost Los Cerritos MS (Alternate Concept 1) New Classroom Building 4,300 SF 1 4,300 $360.00 $ 1,548,000.00 Eisting Bldgs - Modernization (high) 80,365 SF 1 80,365 $270.00 $ 21,698,550.00 Eisting Bldgs - Modernization (medium) 12,000 SF 1 12,000 $126.00 $ 1,512,000.00 Eisting Bldgs - Modernization (light) 12,017 SF 1 12,017 $13.00 $ 156,221.00 Lunch Shelter 1,870 SF 1 1,870 $138.00 $ 258,060.00 Assembly Court 11,460 SF 1 11,460 $8.00 $ 91,680.00 Hardscape/Landscape 16,865 SF 1 16,865 $5.00 $ 84,325.00 Shade Structure 940 SF 1 940 $80.00 $ 75,200.00 Hard Courts 18,195 SF 1 18,195 $3.00 $ 54,585.00 Parking/Drop-off Reconfiguration AC Paving 12,145 SF 1 12,145 $12.00 $ 145,740.00 Drop-off Lane 572 LF 1 572 $780.00 $ 446,160.00 Total Construction Cost $ 26,070,521.00 Total Project Cost $ 36,498,729.40 Description Quantity Unit Count Total Unit Cost Total Cost Los Cerritos MS (Alternate Concept 2) New Classroom Building 9,600 SF 1 9,600 $360.00 $ 3,456,000.00 Eisting Bldgs - Modernization (high) 80,365 SF 1 80,365 $270.00 $ 21,698,550.00 Eisting Bldgs - Modernization (light) 11,057 SF 1 11,057 $13.00 $ 143,741.00 Building Demolition 12,960 SF 1 12,960 $20.00 $ 259,200.00 Lunch Shelter 1,870 SF 1 1,870 $138.00 $ 258,060.00 Assembly Court 14,450 SF 1 14,450 $8.00 $ 115,600.00 Hardscape/Landscape 6,835 SF 1 6,835 $5.00 $ 34,175.00 Shade Structure 2,810 SF 1 2,810 $80.00 $ 224,800.00 Hard Courts 15,060 SF 1 15,060 $3.00 $ 45,180.00 Athletic Courtyard 10,380 SF 1 10,380 $3.00 $ 31,140.00 Parking/Drop-off Reconfiguration AC Paving 23,735 SF 1 23,735 $12.00 $ 284,820.00 Drop-off Lane 500 LF 1 500 $780.00 $ 390,000.00 Total Construction Cost $ 26,941,266.00 Total Project Cost $ 37,717,772.40 Los Cerritos MS (Alternate Concept 3) New Admin./MPR/Food Service/Classroom Bldg. 48,300 SF 1 48,300 $360.00 $ 17,388,000.00 Eisting Bldgs - Modernization (high) 54,284 SF 1 54,284 $270.00 $ 14,656,680.00 Eisting Bldgs - Modernization (light) 11,057 SF 1 11,057 $13.00 $ 143,741.00 Building Demolition 31,460 SF 1 31,460 $20.00 $ 629,200.00 Lunch Shelter 3,920 SF 1 3,920 $138.00 $ 540,960.00 Assembly Court 16,950 SF 1 16,950 $8.00 $ 135,600.00 Hardscape/Landscape 6,500 SF 1 6,500 $5.00 $ 32,500.00 Shade Structure 2,810 SF 1 2,810 $80.00 $ 224,800.00 Hard Courts 15,060 SF 1 15,060 $3.00 $ 45,180.00 Athletic Courtyard 10,380 SF 1 10,380 $3.00 $ 31,140.00 Parking/Drop-off Reconfiguration AC Paving 38,140 SF 1 38,140 $12.00 $ 457,680.00 Drop-off Lane 625 LF 1 625 $780.00 $ 487,500.00 Total Construction Cost $ 34,772,981.00 Total Project Cost $ 48,682,173.40 Cost Evaluations 7.0