MATERIALS DIVISION MEMORANDUM

Similar documents
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

Jointed Precast Concrete Pavement

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Appendix D Answers To Chapter Review Questions

(AMMA) American Maritime Modernization Association

14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE

Jacksonville District Master

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

Standard Specifications

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

To Develop a Quality Control/Quality Assurance Plan For Hot Mix Asphalt. AASHTO PP qq

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

SECTION SUBMITTAL PROCEDURES

Michael F. Praul, P.E. Senior Concrete Engineer FHWA Office of Asset Management, Pavements, and Construction Module 2

PROCEDURE FOR PROCESSING WORKING DRAWINGS

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

Chapter 1 General Design Information

TRAFFIC ENGINEERING DIVISION

SECTION OPERATION AND MAINTENANCE DATA

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

SECTION SUBMITTALS

Update: July 20, 2012

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Project No.: VTRC 06-R22 March Period Covered: Contract No.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

3400 Tectura Designs Precast Concrete

Working Drawing Manual

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Corvus Gold, Drills g/t Gold, West Zone Stepout Hole, Mother Lode Project, Nevada

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

1. Architectural precast concrete cladding units.

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS

JVI Vector Connector

Street Acceptance Guidelines

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

PUBLICATION 213. Think Safety First

Working Drawing Procedure

Residential Room Addition / Remodel Submittal Requirement Checklist

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

PRECAST CONCRETE SOUND WALL PRODUCTS

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

SOUTH AFRICAN NATIONAL STANDARD

SECTION SUBMITTAL PROCEDURES

East Central College

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1

Product Guide Verizon Delaware LLC. Section 31 Delaware LLC Original Sheet 1. Connection With Certain Facilities of Others

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

FACTS YOU NEED TO KNOW ABOUT WATERTIGHT PRECAST MANHOLES

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.

Special Provision No. 904S14 October OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows:

Operating Standards Attachment to Development Application

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Section Meetings Section Material and Equipment. None Required

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

CVO/169897A OCTOBER 29, GROUT

SECTION 39 - MANHOLES TABLE OF CONTENTS

IMPERIAL VALLEY COLLEGE. Hazard Communication Program

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

2. Wood grounds, nailers, blocking, miscellaneous framing, sleepers, etc.

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SEI Certification Program Manual

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

FAST TRACK WORKSHOP OBJECTIVES

This specification describes the general requirements for Engineering Services provided to Vale.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Cooke Precast Concrete

SECTION PRECAST CONCRETE STRUCTURES

ROLE STATEMENT MERCER HUMAN RESOURCE CONSULTING

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

DNVGL-CP-0212 Edition March 2016

SECTION III SUBMITTALS AND APPROVALS

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

HMA Acceptance Specifications Assessing Contractor Risk

BPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Transcription:

MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete and Concrete Pipe Quality Control/Quality Assurance Programs SPECIFIC SUBJECT: Sections 204.22(c), 204.26(d) and Minimum Acceptance Sampling Requirements NUMBER: MD328-10 DATE: January 4, 2010 DIRECTED TO: District Administrators SIGNATURE: Charles A. Babish, PE State Materials Engineer Signature on original copy of memorandum This memorandum updates the Precast Concrete and Concrete Pipe Quality Assurance Programs to reflect operational changes resulting from restructuring of the VDOT Materials Division and District Materials Sections. Replace 204.22(c) Miscellaneous Precast Units, paragraph 3 with: In order to supply miscellaneous precast concrete products to a VDOT project, the precast concrete producer must be on the Materials Division Approved List No. 34. To qualify for placement on this list, tthe precast concrete producer may qualify for placement on this list in either of the following ways: 1. The precast concrete producer shall submit a Quality Control (QC) Plan defining its routine business quality control practices. The QC plan is submitted to the responsible Materials Section as coordinated by the Materials Division Central Office Physical Laboratory Quality Assurance Section. After review for completeness and conformance of the producer s QC plan to the Quality Control Plan Checklist as found in Appendix H of this chapter, a plant visit will be made to evaluate the producer s conformance to its QC Plan. If during the inspection deficiencies are noted, this will be documented in a report with a follow-up visit scheduled. If no deficiencies are found, the precast concrete producer is probationarily approved. 2. Alternatively, a plant can be probationarily approved if they have a current National Precast Concrete Association, Architectural Precast Association or other plant certification approved by the Quality Assurance Engineer and submit an abbreviated QC plan. The QC plan shall include at a minimum proof of certification, plant contact 1

information and address, raw materials used, patching materials used, type of precast units made, testing frequencies and an example shipping ticket. This document is submitted to the Materials Division Central Office Quality Assurance Section. The miscellaneous precast concrete producer will be added to the Approved List No. 34 with a p to denote that the facility is probationarily approved. Each approved facility must have at least one Precast Concrete technician on staff responsible for ensuring that the Quality Control Plan is being followed. To qualify as a Precast Concrete Technician one has either a) current VDOT Concrete Plant and Field Certifications or b) a National Precast Concrete Association Production and Quality School Level I Technician certification and an American Concrete Institute s Concrete Field Testing Technician Grade I certification. VDOT specifications and policies over-ride other plant certifications or specifications denoted in the third-party plant certification. Whenuntil one or more successful projects have been completed demonstrating conformance to the QC plan and that a quality product has been consistently supplied., the probationary status will be removed. If problems are encountered during the production and supply within this probationary period, then additional projects may be necessary for the producer to work out QC Plan conformance issues. The miscellaneous precast concrete producer will be added to the Approved List No. 34 with a p to denote that the facility is probationarily approved. Once the probationary period has been successfully completed, the p will be removed. The Department will continue to monitor the producer s facility to ensure conformance to the QC plan and project specifications. Annually, the Department will review the updated QC plan submitted by the producer and update the Approved List with the latest review date. The approving/revoking authority is the District Materials Engineer Central Office Quality Assurance Materials Engineer. for plants located in their respective district or Concrete Programs Engineer in Central Office for plants located outside of the state, and not covered by a district. Appeals may be submitted to the State Materials Engineer for final disposition. Replace Section 204.22(c)(1) Testing, paragraph 1 with: (1) Testing The producer shall perform the following minimum quality control procedures, and the statement "We certify that these items have been tested and conform to the VDOT Precast Concrete Products Quality Assurance Program" shall be on each shipping document and signed by a responsible company representative. The shipping document should also contain the following information: The plant name, location, telephone number, document number, contractor s name, and project number. One additional copy of the shipping document shall be provided to the monitoring Central Office Materials Quality Assurance Section for distribution to the District receiving District the product. Replace Section 204.22(c)(2) Test facilities, paragraph one with: 2

Producer facilities, equipment and testing personnel shall be adequate to conduct the applicable tests outlined in AASHTO T280, and shall require Department approval. Quality Control procedures shall be performed by or under the direction of a Precast Hydraulic Cement Concrete Plant and Field Technician. To qualify as a Precast Concrete Technician one has either a) current VDOT Concrete Plant and Field certifications or b) a National Precast Concrete Association Production and Quality School Level I Technician certification and an American Concrete Institute s Concrete Field Testing Technician Grade I certification. 3

Replace Section 204.22(c)(4) Records, paragraph four with: In addition to date and other required markings, the plant identification and letters QC or NPCA Certified Plant shall be affixed to each piece of products. Such markings shall be evidence that the required QC procedures have been performed. Replace Section 204.22(c)(5) Monitoring with: The producer s production and testing facilities, processes, records, and product will be monitored weekly, or as deemed necessary depending on project-related work by the Department. A checklist of items to be inspected is provided in Appendix E. (Precast Concrete Plant Monitor Report) The checklist must be completed in its entirety each quarter. The weekly monitoring effort should emphasize inspection of one or two of the items on the list. Shipment of samples to the District or Central Office laboratory for testing shall be in accordance with Sec. 203, using Form TL-10 or Form TL-13, as outlined in Sec. 800. Replace Section 204.22(6) Annual Quality Testing with: Annual Quality testing will be performed as deemed necessary by the Department for establishing quality of raw materials. The tests may be performed on the aggregates, cement, mineral admixtures, and all types and sizes of reinforcing materials. Replace Section 204.26(d) paragraph 3 with: In order to supply concrete pipe products to a VDOT project, the concrete pipe producer must be on the Materials Division Approved List No. 26. To qualify for placement on this list, tthe concrete pipe producer may qualify for placement on this list in either of the following ways: 1. The concrete pipe producer shall submit a Quality Control (QC) Plan defining its routine business quality control practices. The QC plan is submitted to the responsible Materials Section as coordinated by the Materials Division Central Office Physical Laboratory Quality Assurance Section. After review for completeness and conformance of the producer s QC plan to the Quality Control Plan Checklist as found in Appendix H of this chapter, a plant visit will be made to evaluate the producer s conformance to its QC Plan. If during the inspection deficiencies are noted, this will be documented in a report with a follow-up visit scheduled. If no deficiencies are found, the precast concrete producer is probationarily approved. 2. Alternatively, a plant can be probationarily approved if they have a current American Concrete Pipe Association or other plant certification approved by the QA Engineerand submit an abbreviated QC plan. The QC plan shall include at a minimum proof of certification, plant contact information and address, raw materials used, patching materials used, testing frequencies and an example shipping ticket. This 4

document is submitted to the Materials Division Central Office Quality Assurance Section. The concrete pipe producer will be added to the Approved List No. 26 with a p to denote that the facility is probationarily approved. Each approved facility shall have at least one VDOT certified Precast Concrete technician on staff responsible for ensuring that the Quality Control Plan is being followed. VDOT specifications and policies over-ride other plant certifications or specifications denoted in the third-party plant certification. Whenuntil one or more successful projects have been completed demonstrating conformance to the QC plan and that a quality product has been consistently supplied., the probationary status will be removed. If problems are encountered during the production and supply within this probationary period, then additional projects may be necessary for the producer to work out QC Plan conformance issues. The concrete pipe producer will be added to the Approved List No. 26 with a p to denote that the facility is probationarily approved. Once the probationary period has been successfully completed, the p will be removed. The Department will continue to monitor the producer s facility to ensure conformance to the QC plan and project specifications. Annually, the Department will review the updated QC plan submitted by the producer and update the Approved List with the latest review date. The approving/revoking authority is the District Materials Engineer Central Office Quality Assurance Materials Engineer. for plants located in their respective district or Concrete Programs Engineer in Central Office for plants located outside of the state, and not covered by a district. Appeals may be submitted to the State Materials Engineer for final disposition. Replace Section 204.26(d)(2) Test Facilities paragraph 1 with: Producer facilities, equipment and testing personnel shall be adequate to conduct the tests outlined in AASHTO T280, and shall require Department approval. Quality Control Procedures shall be performed under the direction of a VDOT certified Precast Hydraulic Cement Concrete Plant and Field Technician. Replace Section 204.26(d)(4) Records paragraph 1 with: All testing and inspection documentation shall be maintained at the producing plant for at least twofive years, and shall be made available to Department personnel at their request. Replace Section 204.26(d)(4) Records paragraph 4 with: In addition to date and other required markings, Tthe plant identification and letters Q.C. or QCast shall be affixed to each piece pipe and end section. Such markings shall be evidence that the required Q.C. procedures have been performed. 5

Replace Section 204.26(d)(5) Monitoring with: The producers production and testing facilities, processes, records and product will be monitored weekly, by the Department. Checklist of items to be inspected is included as Aappendix HA. The checklist must be completed in its entirety each quarter. The weekly monitoring effort should be confined to inspection of one or two of the items on the list. One size and class of pipe should be selected for three-edged bearing test per month, the sample should be taken at random, the test witnessed for load test compliance, and noted on the monitoring checklist, size, load, crack width, etc. The load shall not be taken to ultimate strength, if the sample pipe passes D-Crack Load criteria. Under the table entitled Minimum Acceptance Sampling Requirements, replace Item 22.(c) Miscellaneous Precast Units.. RATE OF SAMPLING Three (3) cylinders from one casting selected on random basis, or two (2) cores per lot size, to Regional or Central Office Laboratory. On temporary barriers shipped from project, Contractor provides certification that units have been inspected and QC approved when initially shipped. 6

CY: Commissioner Chief Engineer Division Administrators Residency Administrators District Materials Engineers District Construction Engineers District Maintenance Engineers Area Construction Engineers Virginia Asphalt Association Virginia Transportation Research Council Virginia Ready-Mixed Concrete Association Precast Concrete Association of Virginia Virginia Transportation Construction Alliance Virginia Dept. of Minority Business Enterprise Federal Highway Administration American Concrete Paving Association NE Chapter, Southern Region Old Dominion Highway Contractors Association 7