Electrical IP Red Seal Practice Exam

Similar documents
Wisconsin Contractors Institute Continuing Education

CONTINUING EDUC ATION

SECTION TRANSFORMERS

Page Electric Utility Service Specifications

American Electrical Institute

Journeyman's Practice Exam

Quality Control Checklist - Design Drawings

Variable Transformers Product Design & Engineering Data

Article 225: Outside Branch Circuits And Feeders

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

Preface...x Chapter 1 Electrical Fundamentals

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

SECTION PANELBOARDS

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Customer Connection Guide Updates Effective May 2017

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

ECET 211 Electrical Machines and Controls

Electrical Wiring: Commercial, Seventh Canadian Edition

SECTION MECHANICAL IDENTIFICATION

B. Manufacturers: Square-D, G.E. or Westinghosue.

SECTION EQUIPMENT WIRING

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012

SECTION DISTRIBUTION SWITCHBOARDS

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

SECTION DISTRIBUTION SWITCHBOARDS

NEC 2014 Code Changes

Article 250 Grounding & Bonding

Power Processor - Series 700F 10KVA to 150KVA

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

Electrical Measurement Safety. Sponsored By:

Industrial Electrician Level 3

and cured to reduce hot spots and seal out moisture. The assembly shall be installed on vibration-absorbing pads.

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

SINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL

Installation Instructions

Electrical Construction Technology

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

Installation requirements

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Short Circuit Current Calculations

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

POWER SERVICE DETAILS

Single-Family Dwelling Submittal Requirements

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

Catalog 200 Contactors up to 115 A Motor Starters up to 55 kw 03/2009

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

Installation Instructions

Top wiring permanent magnet latching For non-motor loads, lighting, heating NEMA sizes to 300 A 2-, 3-, and 4-pole configurations

Electrical Description

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

Construction Electrician/Industrial Electrician/Power Electrician Common Core Level 2

Cable Hanging Instruction Manual

2014 NEC Changes Part 1

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

3Ø Short-Circuit Calculations

TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY. Test Code: 5171 Version: 01

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate.

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL

ELECTRIC CURRENTS AND CIRCUITS By: Richard D. Beard P.E.

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

Hours / 100 Marks Seat No.

FINAL - EST Electrical Service Technician Answer Schedule

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

Installation Instructions. Materials Needed. Parts Included. Tools You Will Need

Creating Electrical Designs

TRANSFORMERS INTRODUCTION

SPECIFICATION FOR HORIZONTAL AIRFLOW OUTDOOR RESISTIVE LOAD BANK

HPS Universal BUCK-BOOST TRANSFORMERS

Open Type Without Enclosure

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET

Residential Construction Checklist Single and Two Family Construction

INDEX. Micro-ohmmeter MH-10 Page 3. MI (5, 10, 15, 20 kv) Page 4 Mega-ohmmeter MD (5 kv) Page 4

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

PRODUCT SPECIFICATION FOR A 15 AND 75 kva, THREE PHASE MODULAR POWER DISTRIBUTION SYSTEM WITH REGULATION AND CONDITIONING (Varian)

Open Type Without Enclosure

IM /2016 REV03 POWERTEC 305S, 365S, 425S, 505S

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

Liquid-Filled Transformers

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

DIVISION 26 ELECTRICAL SECTION ELECTRICAL

General Installation Instructions LED

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

ELECTRICIAN S THEORY EXAMINATION 15 November 2014 QUESTION AND ANSWER BOOKLET

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

Distribution/Substation Transformer

Transcription:

Electrical IP Red Seal Practice Exam PRACTICE EXAM-3 1. What size 2 pole breaker must you use on a 3HP, 115V single phase motor? A. 40A B. 50A C. 80A. D. 100A. 2. An electrical equipment approved for use in hazardous location is marked with temperature code of T2C. What is the maximum surface temperature it can withstand? A. 100ºC B. 160ºC C. 230ºC D. 260ºC 3. What must be the marking on an approved emergency lighting installed in a dwelling unit? A. IEEE B. UL C. CSA. D. NEMA. 4. What must be the current rating of a thermostat rated to operate at the line voltage? A. 100% of the sum of current ratings of all the equipments it controls. B. 125% of the sum of current ratings of all the equipments it controls. C. 200% of the sum of current ratings of all the equipments it controls. D. 300% of the sum of current ratings of all the equipments it controls. 5. In a commercial garage, entire area up to and including mm above floor is considered as class1 zone 2 location. A. 25mm B. 50mm C. 100mm D. 150mm 6. What is the maximum amperage of a teck 90 cable installed in a box? A. 100A B. 125A C. 150A D. 200A 7. What PPE (personal protection equipment) is not required when using a hand saw? A. Safety glasses. B. Gloves. C. Steel toed boots. D. Coveralls. 8. If line voltage is 4KV, in a star connected transformer, what is the phase voltage? A. 8.0 KV. B. 6.93 KV. C. 4.0 KV. D. 2.3KV. PDF processed with CutePDF evaluation edition www.cutepdf.com

9. At what location, caution tape and pylons can be used? A. Elevators. B. Stairwells. C. Windows. D. Open trenches 10. Which motor has best starting torque? A. Squirrel cage induction motor. B. Series connected motor. C. Wound rotor motor. D. Split phase capacitor start motor. 11. Who should an electrician contact in an event of conflict between electrical and plumbing drawings? A. Your supervisor B. The Electrical Inspector. C. The architect D. The General contractor. 12. Nurse call station is characterized as: A. Class 1 circuit B. Class 2 circuit C. Open circuit D. Closed circuit 13. An electrician cannot install a telephone jack in which of the following locations? A In a bathroom B. In the kitchen. C. In the living room D. In the bedroom 14. What is the minimum headroom clearance required at a location where consumer service box needs to be installed? A. 1 meter. B. 1.5 meters. C. 2 meters. D. 2.5 meters. 15. What is the minimum space required between dry type open ventilated transformer mounted on a concrete wall? A. 6 mm. B. 12mm. C. 24mm. D. 32mm. 16. What type of circuit conductors are permitted to be installed in the same raceway carrying conductive fibre optic cable? A. Class 2 circuit conductors B. Class 1 circuit conductors C. Low voltage circuit conductors D. High voltage circuit conductors

17. What is the minimum separation between communication conductors with a non-conducting jacket and a pool? A. 0.75m B. l m C. 1.5m D. 2m 18. How many more #14AWG conductors can be installed in a device box, 3ʺ x 2ʺ x 3ʺ that uses 8 wire connectors? A. 5 B. 6 C. 7 D. 8 19. If you had 3 transformers hooked up in delta connection rated at 300 KVA for the whole assembly and one transformer was taken out. What would be the KVA or the remainder? A. 100 kva B. 173 kva C. 200 kva D. 300 kva 20. What is the multiplication factor used while calculating conductor size for supplying a capacitor? A. 100% B. 125% C. 135% D. 150% 21. When used in class 2 circuits, what is the minimum size of extra low voltage conductor that can be laid in a raceway? A. #16AWG. B. #19 AWG. C. #22 AWG. D. #24 AWG. 22. FCC cable cannot be installed in which of the following locations? A. under carpet square not exceeding 750mm B. in dry location C. on hard smooth continuous surface made of concrete D. in dwelling units 23. What percentage fill (%) is used to install power conductors used in auxiliary gutters? A. 100%. B. 75%. C. 40%. D. 20%. 24. Where would the MSDS sheet be placed if a new container shows up on site? A. Attach the sheet to new container. B. Place sheet in MSDS book. C. Supervisor s desk. D. Manager's office

25. What type of test is performed to test the insulation of conductors? A Hi pot. B. Voltmeter. C. Ammeter. D.Wattmeter. 26. Where the records would be kept on a GFCI inspection in a building? A. Attach record to GFCI. B. Electrical maintenance log. C. Security desk log book. D. Maintenance log book. 27. How are exit lights switched? A. A manual switch. B. An emergency pull station. C. Automatically on failure of emergency power supply. D. Automatic transfer switch that energizes on failure of normal power source. 28. What type of enclosure is required in a location where occasional temporary submersion is necessary? A. Type 1 B. Type 2 C. Type 5 D. Type 6P 29. Where must a switch be mounted in a finished basement that has no other exit? A. Top of the stairs. B. Bottom of stairs. C. Entrance to basement. D. In utility room next to electrical panel. 30. In figure below, how many circuit breakers protect equipment from source to motor CM 10? A. 1 B. 2 SOURCE C. 3 D. 4 31. If a 3-phase motor is rotating in the wrong direction how would an electrician fix it? A. interchange black and green conductors B. interchange red and black conductors C. interchange red and white conductors D. interchange blue and white conductors

32. When would you install the receptacle cover plates in a dwelling unit? A. After installation of baseboard B. After final coat of paint C. Before installation of baseboard D. After inspection 33. What is the expansion that will happen of a RPVC conduit that is 30m long and is installed in an area where temperature change will be from -45º C to +35ºC? A. 110.3mm. B. 124.8mm C. 221.3 mm. D. 353.4mm. 34. What must be done with a battery in an emergency supply system? A. Keep maintained and fully charged. B. Be maintained at not less than 75% of full charge. C. Be maintained at 50% of full charge. D. No need to keep fully charged all the time. 35. What must be done when EMT is run through a fire wall? A. Must be grounded on both sides. B. Must slope upwards into room with most hazards. C. Must be smoke proof. D. Must be sealed. 36. If an electrician replaces a NEMA starter with an IEC starter, what type of time delay fuse would he use? A. Type D. B. Type P C. Type J D. Type R 37. What must be done when communication cables are run through a wall that is rated for fire protection? A. Shall be installed in rigid steel or aluminum conduit. B. Shall be properly closed or sealed in accordance with National Building Code. C. Shall not be run through firewalls. D. Must be sloped upwards into the room requiring fire protection. 38. What size of conductor is needed to supply a10a load placed 7.lm away and source voltage is 6V? The voltage drop allowed in this installation is 5%. A. #8 AWG. B. #l0 AWG. C. #12 AWG. D. #14 AWG. 39. What can't you use when mounting a control panel on concrete? A. Concrete nails. B. Concrete screws C. Wooden plug and screws D. Steel bolts

40. In summer, what does a condenser do in air condition mode? A. Controls the expansion of the refrigerant. B. Exposes the cool refrigerant to the air in the heat exchanger. C. Compresses the refrigerant. D. Cools the hot compressed refrigerant vapor. 41. New magnetic overload keeps tripping how do you fix the problem? A. Replace with lower value overloads. B. Replace with higher value overload s. C. Adjust new overloads settings. D. Run without overloads. 42. How is a low voltage thermostat wired with a hot air furnace? A. In series with coil. B. In parallel to the coil. C. In parallel to the gas valve. D. In series with fan. 43. When bonding ground rods using CAD welding what is the last material on top? A. Bonding cable. B. Welding mold. C. The ignition compound. D. Welding compound. 44. Diagram below, three fuses protect a star connected motor. Line to line voltage is 480 volts, if fuse #3 blows what will the reading be of meter on line #3? A. 0 volts B. 277 volts. C. 480 volts D. 825 volts 45. What are the minimum cover requirements for a NMSC installed under a driveway of a dwelling unit when circuit voltage is 600V? A. 150mm B. 450mm C. 600mm D. 900mm

PRACTICE EXAM 3 - ANSWERS 1. C T45 34AxT29 34x2.5 85 T13 80A 2. C Rule 18-052-(2)(b) 3. C Trade knowledge 4. A Rule 62-120(1) 5. B Rule 20-102(1) 6. D Rule 12-3022(7), 4-010(3) 7. D 8. D 4KV/ 3=2.3KV 9. D 10. B 11. A 12. B Rule 16-000 1(b) 13. A Rule 60-400(2) 14. C Rule 6-206(1)(c)(iv) 15. A Rule 26-248 (3)(A) 16. A Rule 56-202(1) 17. B Rule 68-056,T61 18. B Rule 12-3034, T23 19. B 300/ 3=173 KVA 20. C Rule 26-208 (1) 21. B Rule 16-210-(4)(b) 22. D Rule 12-804,12-806(c) 23. D Rule 12-1904 (1) 24. B Trade knowledge 25. A 26. B 27. D 28. D Rule 2-400(1), Table 65 29. A 30. C 31. B 32. B 33. B L=LR x α x t=130x0.052x80=124.8mm 34. A Rule 46-104b 35. D Rule 2-128 36. A Rule 14-200(2) 37. B Rule 60-310 and 2-132 38. A Table D4 39. C 40. D 41. C 42. A 43. C 44. B 45. D Rule 12-012, Table 53 46. A 47. A Rule 14-612 48. A 49. A 50. A Rule 28-308 51. B 52. B Rule 30-404 53. D Rule 36-302 (a) 54. B 55. A 56. A PDF processed with CutePDF evaluation edition www.cutepdf.com