World ATM Congress AERON Spotlight Theatre

Similar documents
ELSA Study and Recommendations. November 2016

VDL Mode 2 Measurement, Analysis and Simulation Campaign

VDL 2 Capacity Planning through Advanced Simulations

Centralised Services 7-2 Network Infrastructure Performance Monitoring and Analysis Service

Portable Test Equipment

Final Project Report. Abstract. Document information

Preparatory paper: food for thought

Future Aeronautical Communication System - FCI

Broadband VHF Aeronautical Communications System Based on MC-CDMA (B-VHF)

ESA Iris Programme Analysis & definition of the Satellite System Operations. Briefing 28 July

LDACS1 Overview and Current Status

Integrated CNS: Time for a conceptual change?

ARTES 10 Phase 1 workplan of activities.

PROJECT FINAL REPORT Publishable Summary

Commission hearing on the preparation for RP3

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION

Air Traffic Soft. Management. Ultimate System. Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space

Towards a new VDL strategy. Some key issues. The way forward

WIDE AREA MULTILATERATION system

Contextual note SESAR Solution description form for deployment planning

Regional and Inter-Regional Seminar and Workshop on Search and Rescue

SESAR EXPLORATORY RESEARCH. Dr. Stella Tkatchova 21/07/2015

ADS-B RELATED DEVELOPMENTS BY AN Conf/11 AND APANPIRG & OBJECTIVE OF AND PROGRESS BY ADS-B TASK FORCE

SwiftBroadband Oceanic Safety Implementation and Trials

Rockwell Collins ADS-B Perspective Bangkok March 2005

ANTARES System Design Iris Public Event, 4-5 February 2013 University of Salzburg Unipark, Salzsburg

RADIO SPECTRUM COMMITTEE

Performance Based Surveillance & New Sensors technology

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

ATM INDRA ADS-B SYSTEM AUTOMATIC DEPENDANT SURVEILLANCE BROADCAST JULY -2014

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October Agenda Item 7: Aeronautical air-ground and air-to-air communications

Air Traffic Controllers use StarCaster ATIS software to create, update and verify the contents of ATIS messages

SESAR Single European Sky ATM Research

INITIATIVES FOR IMPROVEMENT OF HF COMMUNICATION IN INDIAN AIRSPACE (Presented by India)

Workshop on ICAO Flight Plan Provision 2012 FPL

ETSI TS V1.1.1 ( ) Technical Specification

A EUROCONTROL View on the Research Needs & the Network of Centres of Excellence

Critical Communications State of the Play

COMMUNICATIONS PANEL (CP) FIRST MEETING

Informal paper. An Overview of ADS. - Principles, Drivers, Activities, Technology and Standards - 1 June 1999, v1.0 EUROCONTROL

ENGINEERS, TECHNICIANS, ICT EXPERTS

GOLD/PBCS/Data Link Monitoring Activities Workshop Dakar, Senegal, Sept 11-15, Status of ADS-C /CPDLC implementation in ASECNA Airspace

White paper. Long Term HSPA Evolution Mobile broadband evolution beyond 3GPP Release 10

UK Interface Requirement 2060

Airspace User Forum 2012

Comment Version:

Final Project Report. Abstract. Document information

ANNUAL STATUS REPORT 2017

Réf : FM / BB/ 11 Edition : 2.0 Rév. : Date : 29/08/11 Page : 1

Brussels, 19 May 2011 COUNCIL THE EUROPEAN UNION 10301/11 TELECOM 72 AUDIO 15 TRANS 148 AVIATION 142 ESPACE 31 MI 265 COMPET 194 RECH 118 ENV 369

RADIO SPECTRUM COMMITTEE

Satcom for Railway Communications - Benefits in a Bearer Flexible Scenario

Final Project Report. Abstract. Document information

Integration of surveillance in the ACC automation system

ICAO SARPS AND GUIDANCE DOCUMENTS ON SURVEILLANCE SYSTEMS

UNMANNED AIRCRAFT SYSTEMS STUDY GROUP (UASSG)

Ageing Well in the Information Society

B-VHF Operational Concept

Next Generation Air. Surveillance Sector. Federal Aviation Administration Transportation. By: Rick Castaldo Date: June 19, 2007

An Introduction to Airline Communication Types

Scoping Paper for. Horizon 2020 work programme Societal Challenge 4: Smart, Green and Integrated Transport

CS7-2 NIPS/SUR-RF. Edition Number : 2.10 Edition Date : 18 November 2014 Status : Released Issue Intended for : EUROCONTROL Stakeholders

Radio frequencies designated for enhanced road safety in Europe - C-Roads position on the usage of the 5.9 GHz band

Assessment of VDL Mode 4 Frequency, Capacity and Performances

WHITEPAPER. A comparison of TETRA and GSM-R for railway communications

Space in the next MFF Commision proposals

16502/14 GT/nj 1 DG G 3 C

SwiftBroadband Technical workshop

ESA GOVSATCOM Precursor Outline Proposals

Final Project Report. Abstract. Document information. ADS-B 1090 Higher Performance Study. Project Number Deliverable ID

Final Project Report. Abstract. Document information

Introduction to PBN and RNP

HORIZON Leadership in Enabling and Industrial Technologies (LEIT)

REGULATORY APPROACH FOR THE 2 ND PHASE OF THE AIR-GROUND VOICE CHANNEL SPACING

Research Infrastructures and Innovation

Robotics: from FP7 to Horizon Libor Král, Head of Unit Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission

Final Project Report. Abstract. Document information

Home platforms and services: On the need for synergies between research and Standardisation

ADS-B Introduction / Tutorial

Use of Satellite-based Technologies to Enhance safety and efficiency in ATC and Airport Operation

Subject: Aeronautical Telecommunications Aeronautical Radio Frequency Spectrum Utilization

GomSpace Presentation to Hytek Workshop

NAV. Status and the road ahead

Air traffic management. a guide to global surveillance

AERONAUTICAL COMMUNICATIONS PANEL (ACP)

Roadmap for European Universities in Energy December 2016

ADS-B Surveillance Specifications for first iteration

AERONAUTICAL COMMUNICATIONS PANEL (ACP)

EC UA Aviation Conference, Windhoek, Namibia, April 2 & 3, 2009

EOSC Governance Development Forum 6 April 2017 Per Öster

Volume 2 - Telesat's Solution Ka-band Application APPENDIX 4. Corporate Profiles of COM DEV and EMS Technologies

Public Workshop on Optimising the Use of the Radio Spectrum by the Public Sector in the EU. Applications and Technologies

AIREON SPACE-BASED ADS-B

SPACE-BASED SOLUTIONS & ANALYTICS

NMR Infrastructures. in Europe. Lucia Banci Sco1

Surveillance Strategy

GA and NextGen How technologies like WAAS and ADS-B will change your flying! Presented By Claire Kultgen

Second Iteration Baseline Report/Matrix

Solving the Problems of Cellular Capacity Constraints, Outages and Technology Upgrades with. Portable Telescoping Masts

Transcription:

World ATM Congress AERON Spotlight Theatre European datalink recovery plan ACSP View Madrid, 7/03/2017 Copyright SITAONAIR 2016

Agenda 1. Background 2. VDLm2 Multifrequency 3. SITAONAIR s Plans 4. Next Steps 5. Conclusion Copyright SITAONAIR 2016 2

Agenda 1. Background 2. VDLm2 Multifrequency 3. SITAONAIR s Plans 4. Next Steps 5. Conclusion Copyright SITAONAIR 2016 3

Background 2014: Provider Aborts reach 20% peaks in MUAC airspace Performance issues degrades the ATN/VDLm2 service European Commission Workshops EASA Study Issues 10 Recommendations SESAR JU study «ELSA» Copyright SITAONAIR 2016 4

From EASA to ELSA Under the mandate of the European Commission, late in 2013, EASA began an investigation into the observed performance issues of VDL/2. The report was published in April 2014. EASA made 10 recommandations, among which: o o o Implement VDLm2 Multi-Frequency The overall locations of VHF ground stations (VGSs) should be designed according to the intended service coverage (airport surface, TMA, en route). This would mean selecting the appropriate frequencies and adjusting the emitting power of the VGSs according to the required service coverage. There should be a technical trade-off analysis of the constraints and benefits arising from a distributed infrastructure compared to a fully managed infrastructure up to a fully centralized model Following the EASA report, the European Commission requested the SJU to analyze and prepare the inclusion of the EASA recommended actions in the SESAR Work Program. Contract granted to the ELSA (Enhanced Large Scale ATN trial) Consortium Copyright SITAONAIR 2016 5 5 IANS 25 May 2016 SITA 2016

ELSA Consortium Copyright SITAONAIR 2016 6

ELSA Recommandations on VDLm2 MF Ground Network 1. Improve the VHF Ground Station (VGS) network and fix the ground system issues Use a dedicated channel for transmissions at the airport in regions with high traffic levels in en-route. Use alternative communication means for AOC in the airport domain to off-load the frequencies used for CPDLC. 2. Progressively implement additional VDL2 frequencies in accordance with the traffic level. 3. Optimise the en-route VGS network coverage. 4. Ensure the availability of a fifth VDL2 frequency (at a minimum). 5. Use the CSC as common control channel only, unless traffic level is very low. 6. Implement ELSA recommended protocol optimization: limit AVLC frame size. 7. Start implementing the transition roadmap to the MF VDL2 target technical solution: Introduction of alternate channels using reserved frequencies, addition of frequencies, and transition to one managed MF VDL2 network per Service area Copyright SITAONAIR 2016 7

Model B and Model D - Model B: short and middle term o CSC: Shared Channel o o 2 frequencies reserved for each of SITA and ARINC Dedicated frequencies for Ground and En-route areas - Model D: long term o All shared frequencies o Dual GSIF in each frequency Copyright SITAONAIR 2016 8

SDM CEF2016 The EC mandated the SDM to implement the recommendations of the ELSA study SDM nominated as European Data Link Project Manager CEF2016: The SDM channels more than 300 MEUR from INEA European funds to the data link project The EC nominated SDM as Data Link Program Manager in Europe An important consortium of s and CSPs, lead by ENAIRE and ENAV, is submitting a very important Implementation Project, comprising: Path 1: Stream 1: Migrate countries from ELSA Model A to ELSA Model B led by ENAIRE Stream 2: Migrate countries (Italy) from ELSA Model C to Model C with MF led by ENAV Path 2 led by ENAV: study future deployment of ELSA Model D Copyright SITAONAIR 2016 9

Agenda 1. Background 2. VDLm2 Multifrequency 3. SITAONAIR s Plans 4. Next Steps 5. Conclusion Copyright SITAONAIR 2016 10

VDLm2 Multi-Frequency SITAONAIR is deploying a Model-B VHF infrastructure since 2014 2009-2010: Multi- Frequency validation exercises with Eurocontrol 2014: Multi-Frequency operational at CDG Results: - CU on CSC improved - Excellent CU on ground channel f=csc f=alt1 f=csc f=alt1 f=alt2 136.975 MHz VDL 2 CSC VGC#1 VGC#2 Ground network ` CVME prototype 136.875 MHz ATN router ADLT Copyright SITAONAIR 2016 11 IANS 28 Oct 2016 SITA 2016

SITA MF Deployment Impact on CSC CU - CDG CDG F5 F4 Copyright SITAONAIR 2016 12

Two Multi-Frequency Mechanisms FSL: Frequency Support List 2. Alternate Freq Availability Broadcast to Acf t on CSC Air FSL 1. Frequency Support List Parameters 3. Aircraft on the Gd tunes to ground frequency Gd FSL Copyright SITAONAIR 2016 13

Two Multi-Frequency Mechanisms Autotune 1. The CVME manages frequencies 2. The Aircraft is signalled, on the CSC, to tune to another frequency «Tune to Ground» 3. The Aircraft on the ground tunes to the ground frequency Copyright SITAONAIR 2016 14

Agenda 1. Background 2. VDLm2 Multifrequency 3. SITAONAIR s Plans 4. Next Steps 5. Conclusion Copyright SITAONAIR 2016 15

SITAONAIR s MF Plans Implement Model B SITAONAIR has already deployed a Model A infrastructure across Europe Model B is proven to address the performance issues Current initial deployment with only FSL already delivers significant improvements Model B makes it possible for CSPs to control the key frequency resource, and hence to commit on performance Copyright SITAONAIR 2016 16

SITAONAIR Current network In the CSC Frequency (136.975) Copyright SITAONAIR 2016 17

SITAONAIR Current network In the Terminal Frequency (136.875) 18 Copyright SITAONAIR 2016 18 IANS 28 Oct 2016 SITA 2016

Current SITA MF Plans En-Route Coverage (136.775) 19 Copyright SITAONAIR 2016 19 IANS 28 Oct 2016 SITA 2016

Current SITA MF Plans En-Route Coverage (136.775) 2 nd layer 20 Copyright SITAONAIR 2016 20 IANS 28 Oct 2016 SITA 2016

Agenda 1. Background 2. VDLm2 Multifrequency 3. SITAONAIR s Plans 4. Next Steps 5. Conclusion Copyright SITAONAIR 2016 21

SITAONAIR deploys Model B according to CEF2016 SITAONAIR fosters close involvement s who are customers of the SITAONAIR ATN/VDLm2 Service SITAONAIR deploys the Model B infrastructure SITAONAIR includes the Model B costs in the CEF2016 co-funding model SITAONAIR upgrades the service provision contract to the s who are VHF partners VHF partners own and operate their VHF infrastructure SITAONAIR informs about the required update to implement Model B The partner includes the Model B costs in the CEF2016 cofunding model Copyright SITAONAIR 2016 22

SITAONAIR contributes to SDM CEF2016 Implementation Projects No Title Leadership Task 1 Project Management ENAIRE Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Stream 1: Model B A/G network design G/G network design Support systems design Interfaces design Infrastructure deployment Operational acceptance CSPs ARINC + SITA ENAIRE, ARINC + SITA SITA + ARINC CSPs SITA + ARINC CSPs ARINC + SITA Number Title Leadership Contributors Task 1 Project Management ENAV ENAIRE Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Stream 2: Model C/MF MF upgrade: A/G network design MF upgrade: G/G network design MF upgrade: Support system design MF upgrade: Interfaces Design MF upgrade: infrastructure deployment MF upgrade: operational acceptance MF upgrade: Operational transition ENAV ENAV ENAV ENAV ENAV ENAV ENAV s DCAC, HCAA, MATS, ARINC, SITA CSPs, s DCAC, HCAA, MATS, SITA, ARINC s DCAC, HCAA, MATS s DCAC, HCAA, MATS, ARINC, SITA s DCAC, HCAA, MATS, CSPs, s DCAC, HCAA, MATS, SITA, ARINC CSPs, s DCAC, HCAA, MATS, Task 8 Task 9 Operational Transition Analysis of the future evolution to the long-term model or model "D" Task 9 Task 10 Analysis of the future evolution to model D Coordination with Path 1 Stream 1 Implementation initiative ENAV ENAV CSPs, s DCAC, HCAA, MATS, ARINC, SITA CSPs, s DCAC, MATS, ARINC, SITA Copyright SITAONAIR 2016 23

SITAONAIR contributes to Path 2: Model D SITAONAIR supports Pan-European data-link service provider SITAONAIR supports empowerment for Data Link in Europe Model D, as addressed in the ELSA study, is at this stage a technical recommendation on the management of VFH frequencies Non technical aspects are essential and need to be fully investigated Investment Protection Cost/Benefit Analysis Scalability to evolving needs Co-existence of AOC and airlines requirements for competition s are best placed to define and exercise the governance model Copyright SITAONAIR 2016 24

Agenda 1. Background 2. VDLm2 Multifrequency 3. SITAONAIR s Plans 4. Next Steps 5. Conclusion Copyright SITAONAIR 2016 25

Conclusion SITAONAIR is determined to support effective and performant data link suitable for ATC purpose SITAONAIR is a key partner for s SITAONAIR already covered Europe with a Model A VHF infrastructure SITAONAIR upgrades its VHF infrastructure to Model B infrastructure Upgrade its own infrastructure to support customers Help partners to upgrade their own infrastructure SITAONAIR is a key contributor to SDM CEF2016 Implementation projects SITAONAIR supports endeavor to define and develop a Pan-European data link governance model Copyright SITAONAIR 2016 26

Thank you Patrick Geurts Senior Manager, ATM Business Development SITAONAIR Brussels Office 2, av. des Olympiades B-1140 Brussels, Belgium SITAONAIR Geneva HQ 71, av. Louis Casaï, PO Box 42 1216 Cointrin, Geneva, Switzerland Simply connect to www.sitaonair.aero Copyright SITAONAIR 2016 27