SECTION SUBMITTAL PROCEDURES

Similar documents
SECTION ADMINISTRATIVE REQUIREMENTS

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

East Central College

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

Section Meetings Section Material and Equipment. None Required

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SUBMITTAL PROCEDURES

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION SUBMITTAL PROCEDURES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SUBMITTAL PROCEDURES

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SUBMITTAL PROCEDURES

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

Answer: Qualification statement should be provided with the bid.

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SECTION OPERATION AND MAINTENANCE DATA

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

submittals 1s e c t i o n

What Are Submittals?

Construction Phase Project Management and Documentation

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

Working Drawing Manual

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Jacksonville District Master

A. Section includes administrative and procedural requirements for project record documents, including the following:

SECTION PROJECT MANAGEMENT AND COORDINATION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

01100 SUMMARY OF WORK

AIA Continuing Education

FAST TRACK WORKSHOP OBJECTIVES

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

PROCEDURE FOR PROCESSING WORKING DRAWINGS

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

1. ASME A Scheme for the Identification of Piping Systems.

Section Project Closeout

SECTION SUBMITTALS

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION III SUBMITTALS AND APPROVALS

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

SECTION OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT

Booster Pumping Station 115 Booster Pump Procurement

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

Working Drawing Procedure

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

1. Land survey Work. 2. Civil and Structural engineering services.

Merrick Pet Care New Distribution Center Hereford, Texas

Design and Construction Responsibilities for Architectural Precast Concrete

UNIFIED FACILITIES GUIDE SPECIFICATIONS

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7)

SECTION CONSTRUCTION PHOTOGRAPHS AND VIDEO RECORDING

UNIFIED FACILITIES GUIDE SPECIFICATIONS

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

Facility Services Subgroup Preface for Divisions 21` through 28

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

TAB B-9 RECORD DRAWINGS

REQUEST FOR PROPOSALS

Clark County Fire Prevention Las Vegas Nevada

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

UDS OVERVIEW Uniform Drawing System

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

This specification describes the general requirements for Engineering Services provided to Vale.

Transcription:

SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates. 8. Manufacturer's instructions. 9. Manufacturer's field reports. 10. Construction progress schedules. 11. Proposed products list. 12. Erection drawings. 13. Construction photographs. 1.2 SUBMITTAL PROCEDURES A. Submit number of copies Contractor requires, plus two copies Engineer will retain. B. Deliver to Engineer at business address. C. For each submittal for review, allow 15 days excluding delivery time to and from Contractor. D. Transmit each submittal with Engineer accepted form. E. Sequentially number transmittal forms. Mark revised submittals with original number and sequential alphabetic suffix. F. Identify Project, Contractor, subcontractor and supplier, pertinent drawing and detail number, and specification Section number appropriate to submittal. G. Apply Contractor's stamp signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with requirements of the Work and Contract Documents. H. Schedule submittals to expedite Project. Coordinate submission of related items. I. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work. J. Allow space on submittals for Contractor and Engineer review stamps. K. When revised for resubmission, identify changes made since previous submission. L. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements. M. Submittals not requested will not be recognized or processed. Standard Details and Specifications 01 33 00-1

1.3 PRODUCT DATA A. Product Data: Submit to Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents. B. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project. C. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances. 1.4 SHOP DRAWINGS A. Shop Drawings: Submit to Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents. B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances. C. When required by individual specification sections, provide shop drawings signed and sealed by professional engineer responsible for designing components shown on shop drawings. 1. Include signed and sealed calculations to support design. 2. Submit drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction. 3. Make revisions and provide additional information when required by authorities having jurisdiction. D. Submit number of copies described in SUBMITTAL PROCEDURES article. 1.5 SAMPLES A. Samples: Submit to Engineer for review for limited purpose of checking for conformance with information B. Submit number of samples specified in individual specification sections; Engineer will retain one sample. C. Samples For Selection as Specified in Product Sections: 1. Submit to Engineer for aesthetic, color, or finish selection. 2. Submit samples of finishes from full range of manufacturers' standard colors, in custom colors selected, textures, and patterns for Engineer selection. D. Submit samples to illustrate functional and aesthetic characteristics of Products with integral parts and attachment devices. Coordinate sample submittals for interfacing work. E. Include identification on each sample with full Project information. F. Reviewed samples which may be used in the Work are indicated in individual specification sections. Standard Details and Specifications 01 33 00-2

G. Samples will not be used for testing purposes unless specifically stated in specification section. H. After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes described in Section 01 70 00 - Execution and Closeout Requirements. 1.6 DESIGN DATA A. Submit for Engineer's knowledge as contract administrator or for Owner. B. Submit for information for limited purpose of assessing conformance with information 1.7 TEST REPORTS A. Submit for Engineer's knowledge as contract administrator or for Owner. B. Submit test reports for information for limited purpose of assessing conformance with information 1.8 CERTIFICATES A. When specified in individual specification Sections, submit certification by manufacturer, installation/application subcontractor, or Contractor to Engineer. B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate. C. Certificates may be recent or previous test results on material or Product but must be acceptable to Engineer. 1.9 MANUFACTURER'S INSTRUCTIONS A. When specified in individual specification Sections, submit printed instructions for delivery, storage, assembly, installation, startup, adjusting, and finishing to Engineer for delivery to Owner. B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation. 1.10 MANUFACTURER'S FIELD REPORTS A. Submit reports for Engineer's knowledge as contract administrator or for Owner. B. Submit report within 72 hours of observation to Engineer for information. C. Submit for information for limited purpose of assessing conformance with information 1.11 CONSTRUCTION PROGRESS SCHEDULES A. Submit initial schedules within 15 days after date established in Notice to Proceed. After review, resubmit required revised data within 10 days. Standard Details and Specifications 01 33 00-3

B. Submit revised Progress Schedules with each Progress Meeting or Application for Payment, but not less than monthly. C. Distribute copies of reviewed schedules to Project site file, subcontractors, suppliers, and other concerned parties. D. Instruct recipients to promptly report, in writing, problems anticipated by projections indicated in schedules. E. Submit computer generated Gantt chart with separate line for each major portion of Work or operation, identifying first work day of each week. F. Show complete sequence of construction by activity, identifying Work of separate stages and other logically grouped activities. Indicate early and late start, early and late finish, float dates, and duration. G. Indicate estimated percentage of completion for each item of Work at each submission. H. Submit separate schedule of submittal dates for shop drawings, product data, and samples. Indicate dates reviewed submittals will be required from Engineer. Indicate decision dates for selection of finishes. I. Indicate delivery dates for Owner furnished products and products identified under Allowances if required. J. Revisions To Schedules: 1. Indicate progress of each activity to date of submittal, and projected completion date of each activity. 2. Identify activities modified since previous submittal, major changes in scope, and other identifiable changes. 3. Prepare narrative report to define problem areas, anticipated delays, and impact on Schedule. Report corrective action taken, or proposed, and its effect, including effect of changes on schedules of separate contractors. 1.12 PROPOSED PRODUCTS LIST A. Within 15 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product. B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards. 1.13 ERECTION DRAWINGS A. Submit drawings for Engineer's knowledge as contract administrator or for Owner. B. Submit for information for limited purpose of assessing conformance with information C. Data indicating inappropriate or unacceptable Work may be subject to action by Engineer or Owner. 1.14 CONSTRUCTION PHOTOGRAPHS A. Provide photographs of site and construction throughout progress of Work produced by an experienced photographer, acceptable to Engineer. Standard Details and Specifications 01 33 00-4

B. Submit photographs monthly or to show milestones of Work. C. Photographs: Two prints; color, glossy; 8 x 10 inch size; mounted on 8-1/2 x 11 inch soft card stock, with left edge binding margin for three-hole punch. D. Take three photographs from differing directions for each section of work indicating relative progress of the Work, three days maximum prior to submitting. E. Take photographs as evidence of existing project conditions. F. Identify each print on front. Identify name of Project, contract number, phase orientation of view, date and time of view, name and address of photographer, and photographer's numbered identification of exposure. G. Deliver negatives to Owner with project record documents. Catalog and index negatives in chronological sequence; include typed table of contents. PART 2 PRODUCTS - Not Used PART 3 EXECUTION - Not Used END OF SECTION Standard Details and Specifications 01 33 00-5