Bald Eagle and Osprey Nest Survey Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Similar documents
FINAL Bald Eagle and Osprey Nest Survey Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

BALD EAGLE MANAGEMENT 2014 ANNUAL REPORT

Step-by-Step Instructions for Documenting Compliance on the Bald Eagle Form For WSDOT s On-Call Consultants

BALD EAGLE NIGHT ROOST SURVEYS

Bucks Creek Hydroelectric Project, FERC Project No. 619 Revised Study Plan

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2011 ANNUAL REPORT

Bald Eagle Annual Report February 1, 2016

Rocky Reach Wildlife Forum 2017 Wildlife Monitoring Proposal FINAL

BALD EAGLE MANAGEMENT 2012 ANNUAL REPORT

Priest Rapids Hydroelectric Project No Annual Report for the Bald Eagle Perch/Roost Protection Plan Pursuant FERC Article 414

Work Plan for Pre-Construction Avian and Bat Surveys

Mystic Lake Hydroelectric Project FERC Project Number Year Bald Eagle Monitoring Summary Report Public

Bald Eagle Wintering Activity Rocky Reach Reservoir

Golden Eagle (Aquila chrysaetos) Management Indicator Species Assessment Ochoco National Forest

PSE Avian Protection Program -Hydro -Wind -Distribution/Transmission -Substations. Mel Walters, Program Manager Consulting Natural Resource Scientist

OSPREY NEST STRUCTURES 2013 ANNUAL REPORT

A.11 BALD EAGLE (HALIAEETUS. Species Distribution and Status

LOON FLOATING NEST PLATFORMS 2014 ANNUAL REPORT

PLAN B Natural Heritage

Mixed Conifer Working Group Meeting February 17, 2011 Wildlife Habitat Management Considerations

REVISED DRAFT - 8/21/00 BIOLOGICAL OPINION ON THE OPERATION OF THE MISSOURI RIVER MAIN STEM RESERVOIR SYSTEM,

BALD EAGLE MANAGEMENT PLAN

Bald Eagles Productivity Summary Lake Clark National Park and Preserve Cook Inlet Coastline

Wisconsin Bald Eagle and Osprey Nest Surveys 2015

Bald Eagle Wintering Activity Rocky Reach Reservoir

Peregrine Falcon Falco peregrinus

W-S3: EAGLE AND RAPTOR NEST STUDY - DRAFT

Species Conclusions Table

McKay Creek National Wildlife Refuge BCS number: 48-19

Wisconsin Bald Eagle and Osprey Nest Surveys 2016

Susitna-Watana Hydroelectric Project (FERC No ) Waterbird Migration, Breeding, and Habitat Use Study Plan Section 10.15

Youngs Creek Hydroelectric Project FERC No

ARTIFICIAL NEST STRUCTURES AND GRASSLAND RAPTORS

Discussion of California Condors and Habitat Conservation Planning in the Tehachapi Wind Resource Area. Friday - April 7, 2017 Mojave, CA

United States Department of the Interior

Study Surveys of Eagles and Other Raptors

RRWF Members, Please let Von or I know if you have any questions. Kelly A. Cordell-Stine Wildlife Biologist Chelan County PUD (509)

Montana Bald Eagle Management Guidelines: An Addendum to Montana Bald Eagle Management Plan (1994)

Sauvie Island Wildlife Area BCS number: 47-28

FINAL TECHNICAL REPORT

Project. License. e Article

Riparian Raptors Potentially Impacted by USACE Reservoir Operations

Long-term monitoring of Hummingbirds in Southwest Idaho in the Boise National Forest Annual Report

Chokecherry and Sierra Madre Wind Energy Project

APPENDIX A Vernal Field Office Best Management Practices for Raptors and Associated Habitats

Post Point Heron Colony

Survey Protocol for the Yellow-billed Cuckoo Western Distinct Population Segment

PROJECT: Bald Eagle Monitoring, REPORTING DATE: January 2011

Grey County Natural Heritage System Study

Surveys were planned for Nov Dec of 2015 as outlined in the RRWHMP and for January of 2016, as outlined in the RRWHMP.

AVISTA CORPORATION ' FEDERAL STORAGE CLAIM A-1

1313 Sherman Street, Room 618 Denver, Colorado Phone (303) FAX (303) wildlife.state.co.us parks.state.co.

Tiered Species Habitats (Terrestrial and Aquatic)

Memorandum. Introduction

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

Range expansion of barred owls into Redwood National and State Parks: Management implications and consequences for threatened northern spotted owls

Attachment C. Implementation Schedule for Technical Study Plans as of December 31, Aquatic Resources

Mexican Spotted Owl Monitoring and Inventory from in the Lincoln National Forest, New Mexico

Golden Eagle (Aquila chrysaetos)

Re: Addendum to Response to Public Comments for the Proposed Geoduck Farm in Dana Passage

Northern Spotted Owl and Barred Owl Population Dynamics. Contributors: Evan Johnson Adam Bucher

APPENDIX A BIOLOGICAL ASSESSMENT. TCEF Research Project for LEWIS AND CLARK NATIONAL FOREST PREPARED BY

Subject: Technical Memorandum Number 3 Summary of Field Surveys for Bata (Chiroptera)

Eagle Observation Surveys Arkwright Summit Wind Project Chautauqua County, New York

Wildlife Habitat Monitoring and Information and Education Program Progress Report

Results of Nesting Bird Survey in Support of Fiscalini Ranch Forest Test Plots, Cambria, California

Marbled Murrelet Effectiveness Monitoring, Northwest Forest Plan

Harlequin Ducks in Idaho Ecology, Distribution, Monitoring & Conservation

2011 Wood River Wetland Yellow Rail (Coturnicops neveboracensis noveboracensis) Survey Report

David Allen Manuwal papers, circa

USFWS Migratory Bird Program

Marbled Murrelet Effectiveness Monitoring, Northwest Forest Plan

CDOW Recommended Stipulations for Oil and Gas Within the State of Colorado

The California Condor is North America s Largest Land bird. 10 feet. Condors can fly 150 miles in a single day

ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES

Ferruginous Hawk Buteo regalis

Wood Stork Aerial Survey Trip Report. Lake Murray and Saluda River August 27, Aircraft: Fixed-Wing Cessna 210 Survey Duration: hrs

Listed Birds along the Stony Brook Corridor Impacted by BMS Zoning Change

Preliminary Environmental Site Assessment Report

The Western Section of The Wildlife Society and Wildlife Research Institute Western Raptor Symposium February 8-9, 2011 Riverside, California

SPECIES ACTION PLAN. Rhinolophus ferrumequinum 1 INTRODUCTION 2 CURRENT STATUS 3 CURRENT FACTORS AFFECTING 4 CURRENT ACTION

Working with others to conserve, protect, and enhance fish, wildlife, plants, and their habitats for the continuing benefit of the American people.

The following protocols should begin as soon as feasible after identification of a diurnal roost (ideally that night):

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

Title Marsh Bird Habitat Restoration and Management on Private and Public land in Arkansas Mississippi Alluvial Valley

Current Monitoring and Management of Tricolored Blackbirds 1

WISCONSIN BIRD CONSERVATION INITIATIVE IMPORTANT BIRD AREAS PROGRAM

VOLUME IIA APPENDIX 3D. U.S. Fish and Wildlife Meeting Notes for Migratory Bird Conservation Plan

Crater Lake National Park Habitats

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

THE STATUS AND DISTRIBUTION OF BREEDING BALD EAGLES (HALIAEETUS LEUCOCEPHALUS) IN ALABAMA, M. Keith Hudson and Thomas M.

THE ROLE OF SCIENCE IN WESTERN GRAY SQUIRREL ENHANCEMENT IN OAK WOODLANDS OF SOUTH PUGET SOUND

Roberts Bank Terminal 2 Project Field Studies Information Sheet

ATTACHMENT 14 NORTHEAST-POCONO RELIABILITY PROJECT AGENCY COORDINATION

CHARLES H. WILLEY PHOTO 4 WILDLIFE J OURNAL

LOON FLOATING NEST PLATFORM PLAN

APPENDIX G. Biological Resources Reports

RECENT CHANGES TO THE ILLINOIS SMCRA THREATENED AND ENDANGERED SPECIES (T&E) REQUIREMENTS

Angela Boyer, U.S. Fish and Wildlife Service

Barn Owl and Screech Owl Research and Management

Transcription:

Revised Bald Eagle and Osprey Nest Survey Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by EES Consulting 1155 North State Street Suite 700 Bellingham, Washington 98225 360.734.5915 phone, 360.734.5918 fax August 22, 2005

TABLE OF CONTENTS Section Title Page 1.0 INTRODUCTION... 1 1.1 Study Plan Goals and Objectives... 1 2.0 AGENCY AND TRIBE RESOURCE MANAGEMENT GOALS AND OBJECTIVES. 1 2.1 WDFW Resource Management Goals and Objectives... 1 2.2 USDA Forest Service Resource Management Goals and Objectives... 2 3.0 EXISTING INFORMATION AND NEED FOR ADDITIONAL INFORMATION... 2 3.1 Existing Information... 2 3.2 Need for Additional Information... 3 4.0 NEXUS BETWEEN PROJECT OPERATIONS AND EFFECTS ON RESOURCES... 3 5.0 STUDY AREA AND METHODS... 3 5.1 Study Area... 3 5.2 Methodology... 4 5.3 Products... 4 5.4 Consistency with Generally Accepted Scientific Practice... 4 6.0 CONSULTATION WITH AGENCIES, TRIBES AND OTHER STAKEHOLDERS... 4 7.0 PROGRESS REPORTS, INFORMATION SHARING, AND TECHNICAL REVIEW.. 5 8.0 SCHEDULE... 5 9.0 LEVEL OF EFFORT AND COST... 5 10.0 LITERATURE CITED... 5 i

1.0 INTRODUCTION Energy Northwest s Packwood Lake Hydroelectric Project, FERC No. 2244, received its initial license in 1960. The majority of the Project is located within the Gifford Pinchot National Forest and consists of an intake canal, a concrete drop structure (dam) and intake building on Lake Creek located about 424 feet downstream from the outlet of Packwood Lake, a 21,691-foot system of concrete pipe and tunnels, a 5,621-foot penstock, a surge tank, and powerhouse with a 26,125 kw turbine generator. The source of water for the Project, Packwood Lake, is a natural lake situated at an elevation of approximately 2,857 feet above mean sea level (MSL), about 1,800 feet above the powerhouse. Water discharged from the Project is released to the Cowlitz River via a tailrace channel. Power from the Project is delivered over an 8,009-foot, 69 kv transmission line to the Packwood substation. 1.1 Study Plan Goals and Objectives This study will document the presence, number, status and location of bald eagle and osprey nest locations in the proximity of Packwood Lake, and record incidental observations of bald eagle and osprey during survey effort. 2.0 AGENCY AND TRIBE RESOURCE MANAGEMENT GOALS AND OBJECTIVES The Washington Department of Fish and Wildlife (WDFW), and USDA Forest Service requested the Bald Eagle and Osprey studies. Their resource management goals and objectives were stated in their study requests and are provided below. 2.1 WDFW Resource Management Goals and Objectives WDFW identified the following management objectives for bald eagles and osprey habitat along shorelines in their study request. Protect nest sites, perch trees, roost trees, and foraging habitat within all WDFW Priority Habitat and Species (PHS) breeding areas, communal night roosts, and regular concentration areas, as well as areas mapped as potential breeding habitat. This includes restricting timber harvests, road building, human development and recreational disturbances. Protect individual large (> 4 ft dbh) live trees and snags within 328 ft. (100 m) of the shoreline. If clearcuts are proposed adjacent to the roost, the border of the clearcut next to the roost should be designed with an evenly fluctuated edge as opposed to a straight edge, to reduce wind throw. WDFW management objectives for these two species include: Continue to work with landowners to develop site-specific management plans for nesting territories and communal night roosts. Under Washington State Bald Eagle Protection Rules, 1

a cooperative site management plan is developed whenever activities that alter habitat are proposed near a verified nest territory or communal roost. Encourage landowners to retain old-growth habitat, and individual large live trees and snags within areas used, or likely to be used by eagles. Assist landowners in conducting habitat enhancement projects to create late-successional conditions in areas used, or likely to be used by eagles. Develop agreements with landowners to limit recreational activities near breeding areas, night roosts and concentration areas. Continue conducting surveys to assess occupancy of nest sites and nest productivity. Encourage timberland owners to close roads around eagle habitat during critical times of the year. 2.2 USDA Forest Service Resource Management Goals and Objectives The Forest Service management goals for wildlife species on National Forest Lands come from a variety of sources, including the National Forest Management Act, as amended, the Endangered Species Act of 1974, as amended, the Forest Service Manual, and forest planning documents. The Gifford Pinchot National Forest Land and Resource Management Plan as amended by the Northwest Forest Plan (1995), provides management direction for all National Forest System lands and their associated resources directly affected, or in the vicinity of, the Packwood Lake Hydroelectric project. Page 2-71 states that 1) All project areas affected by management activities will be reviewed for Sensitive, Threatened, or Endangered plant and animal species and, 2) A Biological Evaluation will be conducted before ground disturbing activities occur which may affect Sensitive species. The goal for Sensitive species (Forest Service Manual 2600) is to prevent them from trending to federal listing as Threatened or Endangered species and a loss of viability. 3.0 EXISTING INFORMATION AND NEED FOR ADDITIONAL INFORMATION 3.1 Existing Information The bald eagle (Haliaeetus leucocephalus) is currently state and federally listed as threatened and has recently been recommended for downlisting due to increasing numbers throughout the Western United States. Important habitat elements for the bald eagle are usually found within older, uneven-aged forests containing suitable nesting, perching, and roosting trees adjacent to suitable feeding areas (Anthony et al. 1982). Within western forested areas, nests are usually located near the top of dominant or co-dominant trees generally with commanding views of feeding grounds; habitual roosting and perching trees are also members of the forest overstory. Currently, regular small concentration areas, perch trees in breeding areas and communal roosting trees are managed as priority habitats by Washington Department of Fish and Wildlife (WDFW 2004). Suitable nesting, perching and roosting trees are almost exclusively located adjacent to open water bodies with nearly all of the active nests in Washington (97%) located within 1000 m of a lake or reservoir shoreline (Stinson et al. 2001). 2

There are no known bald eagle nests in the vicinity of Packwood Lake at present, although this may be due to the lack of any formal, comprehensive survey effort. The lake appears to offer ideal bald eagle nesting habitat, and the observations of immature birds in late summer may indicate that nesting may, in fact, be occurring. Osprey (Pandion haliaetus) is currently a monitor species in Washington State with status intended for the protection of nesting locations (WDFW 2004). The osprey is not federally listed, although the Gifford Pinchot Land and Resource Management Plan, as amended by the Northwest Forest Plan (1995), does reference the osprey and prescribe a protective buffer of approximately 660 feet around each identified nest site. There are two identified nest sites in the vicinity of Packwood Lake, but only one of these has been monitored on an intermittent and opportunistic basis. Due to the lack of comprehensive survey effort, there is the potential that other active nests may exist. Ospreys roost and nest on poles or snags; they build massive and conspicuous stick nests immediately adjacent to fish-bearing waters (Henny et al. 1978). Ospreys feed almost exclusively on live fish captured at or near the water s surface (Bent 1937). Individual pairs show variation in the ability to tolerate human activity (Van Daele and Van Daele 1982). Water bodies such as Packwood Lake usually provide excellent foraging opportunities for piscivorous (fish-eating) birds such as bald eagle and osprey. Bald eagle records at Packwood Lake indicate birds have been observed using the shoreline habitat for both foraging and roosting activities and birds have been observed recently along the Cowlitz River near the confluence with Lake Creek (personal observation). While there are no breeding records at Packwood Lake for bald eagle, nesting habitat appears to exist and immature birds have been observed in the area. As with bald eagles, Packwood Lake offers suitable nesting habitat for osprey and two nest sites have been documented with only one monitored infrequently. 3.2 Need for Additional Information Additional information for these two species is required as no documentation currently exists of the presence, number, status and location of bald eagle and osprey nest locations in the proximity of Packwood Lake. 4.0 NEXUS BETWEEN PROJECT OPERATIONS AND EFFECTS ON RESOURCES Impacts to the threatened bald eagle must be displayed and evaluated in the required Biological Assessment for the project, and the nesting survey data would be an integral part of the analysis process for this species. 5.0 STUDY AREA AND METHODS 5.1 Study Area The study area includes the shoreline of Packwood Lake and an area extending a distance approximately 1,000 ft upslope perpendicular to the shoreline. The area may be locally 3

expanded if there are indications of nesting activity at a greater distance but still in close proximity to Packwood Lake. 5.2 Methodology A bald eagle and osprey nest survey will be conducted by aerial helicopter survey at Packwood Lake by an experienced biologist. The desired observation altitude is 600 ft above the ground, averaged for local topography. Surveys will not be conducted during severe inclement weather due to safety concerns. Timing of surveys will follow suggested breeding chronology (Watson and Rodrick 2001): Incubation/Early Nestling Period (first two weeks of April). Previous to this period, breeding pairs will have established territories and built or repaired nests. Pairs should be tending nests in the form of incubating or caring for nestlings. If nests are located, an additional survey will be conducted during late Nestling/Fledging Period (best period June 10-25). During this period the number of nestlings approaching fledgling stage can be determined for active nests. If bald eagle or osprey nests are located, recorded data will include: observer notes of the survey, nest location, status, and any response to observer; photographs of the nest; and the position of the nest will be recorded. A hand-held GPS unit will be used to identify location. A dense forest canopy may require that nest locations be estimated and plotted on a map using triangulation techniques. If the nest is determined to be active, the nest will be documented using a nesting form, photographed and position recorded. Energy Northwest and the agencies believe one year of aerial survey effort is sufficient to meet the study objectives. 5.3 Products Survey results will be summarized in a report presented to the agencies, tribes and stakeholders. Energy Northwest will consult with WDFW and the Forest Service regarding the release of information on the exact location of any active nest sites in order to protect their integrity. 5.4 Consistency with Generally Accepted Scientific Practice The proposed methods are consistent with scientifically accepted protocol (Watson and Rodrick 2001; Pendleton et. al. 1987). The level of effort is similar to that completed for other similar projects that do not propose an operational change. 6.0 CONSULTATION WITH AGENCIES, TRIBES AND OTHER STAKEHOLDERS Energy Northwest initiated consultation with the Forest Service in December 2003, and with other agencies and the tribes in 2004. Energy Northwest expects agency and tribal staff, and other interested stakeholders to participate in meetings with stakeholders to discuss, revise and 4

finalize the proposed study plan. Stakeholder representatives will also be invited to provide information for the study and technical reviews of the draft report. 7.0 PROGRESS REPORTS, INFORMATION SHARING, AND TECHNICAL REVIEW A draft report will be distributed mid-september 2006. Energy Northwest will consult with WDFW, USFWS, and USFS regarding the release of information on the exact location of any active nest sites in order to protect their integrity. 8.0 SCHEDULE Surveys will be initiated in April of 2006 with a draft report issued by mid-september 2006. If active nests are identified, late Nestling/Fledging surveys will be scheduled for early June through early July 2006, with the best period June 10-25. 9.0 LEVEL OF EFFORT AND COST The anticipated level of effort is one person day to complete the initial aerial survey. An additional survey in summer to determine productivity (one or two person/days) is necessary if nests are identified. Additional time is needed to prepare a draft and final report. The estimated cost for this study (based on one year of field studies) is $7,115, which includes two days of follow up field surveys to determine nest productivity. 10.0 LITERATURE CITED Anthony, R. G., R. L. Knight, G. T. Allen, B. R. McClelland, and J. I. Hodges. 1982. Habitat use by nesting and roosting bald eagles in the Pacific Northwest. Trans. N. Am. Wildl. Nat. Res. Conf. 47:332-342. In: USFWS. 1986. Recovery Plan for the Pacific Bald Eagle. Bent, A.C. 1937. Life histories of North American birds of prey, Part 1. U.S. National Museum Publication 167. Washington, D.C. Henny, C.J., J.A. Collins, and W.J. Deibert. 1978. Osprey distribution, abundance, and status in western North America: II. The Oregon population. Murrelet 59(1) 14-25. Pendleton, B.A., B.A. Millsap, K.W. Cline, D.M. Bird. 1987. Raptor management techniques manual. Scientific and Technical Series No. 10. National Wildlife Federation. Washington D.C. Stinson, D. W., J. W. Watson, and K. R. McAllister. 2001. Washington State status report for the bald eagle. Washington Department of Fish and Wildlife, Olympia, WA, USA. 92 pp. U.S. Fish and Wildlife Service (USFWS). 1986. Recovery Plan for the Pacific Bald Eagle. U.S. Fish and Wildlife Service, Portland, Oregon. 160 pp. 5

USDA Forest Service. 2005. Letter from Gifford Pinchot Forest Supervisor to FERC. March 11 2005. Comments on PAD and Scoping Document 1 and Study Requests Packwood Lake Project 2244-012. Van Daele, L.J. and H.A. Van Daele. 1982. Factors affecting the productivity of ospreys nesting in west-central Idaho. Condor 84:292-299. Watson, J. W. and E. A. Rodrick. 2001. Washington Department of Fish and Wildlife s Priority Habitat and Species Management Recommendations Volume IV: Birds-Bald Eagle. Washington Department of Fish and Wildlife, Olympia, WA. 20 pp. WDFW. 2005. Letter filed with FERC (March 9, 2005) comments on PAD and study requests for Packwood Project. WDFW. 2004. Priority habitat and species (PHS) list. Located at: http://wdfw.wa.gov/hab/phsvert.htm#birds. Accessed April 11, 2005. WDFW. 2004. Washington State Monitor List. Located at: http://wdfw.wa.gov/wlm/diversty/soc/state_monitor.htm. Accessed April 11, 2005. 6