INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

Similar documents
FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

Installation Guide for Architectural Wood Hinged Windows

Installation Guide for Andersen Architectural Clad Hinged Windows

Installation Guide for Andersen Architectural Clad Awning Windows

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors

Installation Guide for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Installation Guide for Andersen Frenchwood Patio Door Sidelights and Transoms

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

Installation Guide. for Andersen 400 Series Tilt-Wash Picture Windows with Stormwatch Protection (High-Performance Impact Resistant Glass)

Installation Guide for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Tools required by installer: Materials required by installer:

Steel Reinforced Joining Guide (Horizontal / Vertical)

Installation Guide for Andersen 400 Series Gliding Windows

STACKING MULTI-SLIDE DOOR SYSTEM

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Read guide from beginning to end before starting installation. Read and follow all warnings and cautions during unit installation.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

VISTALUXE CASEMENT, AWNING, & PICTURE WINDOW

Transom Joining. for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Eagle clad double-hung window installation instructions

for Andersen Frenchwood Hinged and Outswing Patio Doors, Sidelights, and Transoms

Follow instructions from foam, sealant and flashing manufacturer regarding material application and compatibility with this product.

Read guide from beginning to end before starting installation. Read and follow all warnings and cautions during unit installation.

Non-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Window with Nail fin (New construction)

Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors

Sun Windows General Information New Construction Hinged Door Installation Instructions

Integrity Polygon and Round Top Installation and Finishing Instructions

Installation Instructions for E-Series 2 or 4-Panel Gliding and French Gliding Patio Doors

window installation Guide wood FRaMinG New Construction

Non-Reinforced Joining Guide (Horizontal/Vertical)

Installation of Fiberglass Windows

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Flashing Materials. Rough Opening Preparation

Non-Reinforced Joining Guide (1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products

for Andersen 400 Series Woodwright Transom over 400 Series Woodwright Double-Hung or 400 Series Woodwright Picture Window

POCKETING MULTI-SLIDE DOOR SYSTEM

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

Assembled Patio Door Installation Guide 2-Panel Patio Door with Non-Welded Frame

Panel Assembly and Installation

I n s t a l l a t i o n I n s t r u c t i o n s

Vinyl Windows and Doors Manufactured by Pella Corporation

1-Way Vertical Joining (Pages 2-22) 1-Way Horizontal Joining (Pages 23-44)

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Sash Replacement Guide for Andersen 400 Series Tilt-Wash Transom Windows

All Window Installation Instruction

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Sash Replacement Guide for Andersen Impact Resistant Casement Windows

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

3/4" LVL Reinforced Joining Guide

HR175 Sash Replacement Kit Installation Instructions

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

STERLING DOUBLE HUNG & STUDIO WINDOWS

Wood Hinged Patio Door Installation Instructions

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Fixed Upper Sash Replacement Guide for Andersen 400 Series Woodwright Springline Single-Hung Windows

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Vinyl Windows and Doors

Installation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit

Norwood Windows Permaglass Fiberglass Products Installation Instruction

Vinyl Windows and Doors

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Curtain Wall Installation Guide

Pocket Door Installation Instructions

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR

HERITAGE CASEMENT BOW & BAY WINDOW

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

How To Install Windows: Nail-Fin Application

UNIT 5: EXTERIOR DOORS AND WINDOWS

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG, CASEMENT, AWNING INTO EXISTING CASEMENT FRAME USING FRAME SCREWS

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

Vinyl Windows and Doors Manufactured by VPI Quality Windows

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

Transcription:

WOOD PIVOTING CIRCLE/ OVAL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to these instructions will VOID any warranty, written or implied. The installer is responsible for consulting the contractor, structural engineer, architect, or consumer, for proper installation according to local codes and/or ordinances. WARNING Every assembly and installation is different from Parrett Windows & Doors. Parrett strongly recommends consultation with a Parrett supplier or an experienced contractor, architect, or structural engineer prior to the assembly and installation of any Parrett product. PARRETT HAS NO RESPONSIBILITY IN REGARD TO POST MANUFACTURED ASSEMBLY AND INSTALLATION OF PARRETT PRODUCTS. CAUTION Factory applied exterior Brickmould and casing DO NOT take the place of standard window flashing. Each unit must be properly flashed and sealed with silicone for protection against water and air infiltration. WARNING TO INSTALLER Using ladders and/or scaffolding and working at elevated levels can be very dangerous. Follow the manufacturer s instructions for all equipment used in order for safe operation. Please use extreme caution when working around window or door openings. Falling from opening may result in injury or death. Improper use of hand/power tools could result in injury and/or product damage. Again, follow manufacturer s instructions for safe operation of equipment. ALWAYS WEAR SAFETY GLASSES. Windows and doors can be very heavy and improper lifting techniques can result in serious injury. Use safe lifting techniques and a reasonable number of people with enough strength to lift, carry, and install any Parrett window and door products to avoid injury and/or damage to any product. ITEMS REQUIRED BY INSTALLER Safety Glasses Tape Measure Level Hammer Putty Knife Carpenter s Square Caulk Gun Phillips Screwdriver Power Drill 3/16 Drill Bit Foam Backer Rod UV Resistant Exterior Sealant Shims 9 Adhesive Backed Rubber Membrane Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI 54425 (800)541-9527 www.parrettwindows.com [1]

1. Jamb Preparation Remove any diagonal bracing or other packaging from unit exterior only. Place unit exterior side down on a clean flat work surface. Remove all remaining bracing and packing from unit making sure to not damage the unit. Remove any loose items. Extension jamb will be factory applied unless ordered loose. Identifying the exterior of the jamb can vary depending on your configuration. Standard units will have a sloping edge on only one side of the sill and any exterior casing applied. This side is your exterior. On designs without the sloping sill other identifiers should be used such as; exterior color/ finish, operation direction/ configuration, metal cladding, or wood species when species differs from interior to exterior. WARNING- DO NOT unlock or open unit until it is secured into the opening. Opening the unit outside uninstalled can twist or otherwise distort the frame resulting in poor performance upon installation. 2. Opening Preparation The side and head rough framing should be at least as wide as the supplied jamb frame. A proper rough opening should provide ½ of unobstructed clearance greater than the overall unit dimensions. The square of the rough opening should be checked before starting to install the unit. Check the square by cross measuring from the lower left corner to the upper right corner then from the upper left corner to the lower right corner. These measurements must be within 1/8 tolerance of each other. Adjustments to the opening should be made at this point to correct any problems. Check to make sure the opening is plumb and level. The sill MUST be level before starting the installation. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI 54425 (800)541-9527 www.parrettwindows.com [2]

Special jamb preparation is needed in the rough opening for oval and circle units. Extra diagonal framing should be placed in the corners of a rectangular/ square opening to provide more contact/ mounting surface to properly shim and fasten the units. The exterior sheeting should also extend to cover this area. Be sure the framing and sheeting provide the required ½ of clearance around the unit jamb. CAUTION Factory applied exterior Brickmould and casing DO NOT take the place of standard window flashing. Each unit must be properly flashed and sealed with silicone for protection against water and air infiltration. WARNING- UV resistant exterior sealant must be used and be compatible with all materials it comes in contact with. Follow sealant manufacturer s instructions regarding surface cleaning, preparation, application, and temperature requirements when applying sealant. Failure to do so may result in water infiltration, property or product damage. Cut rubber membrane 12 longer than the width of the opening. Starting 6 from the bottom of the opening at one side, apply the membrane onto the frame face so that at least 4 of the membrane just out to the exterior. Continue along the bottom of the opening until you reach the other side. Then continue 6 up the other side of the opening. Be sure to keep a minimum of 4 sticking to the exterior the entire distance. Starting in the center, fold the membrane down onto the exterior sheeting. Continue to smooth the membrane down as you work towards the sides. Depending on the type of membrane, you may or may not need to make relief cuts or use roofing nails to transition from the bottom to the side. Make sure to fold the membrane on the side to the exterior sheeting as on the bottom. ** A sheet metal sill pan may be used in place of the rubber membrane. Follow local code or instruction provided by the manufacturer. Be sure metal is properly treated/ coated to withstand weather exposure. Apply 3 heavy beads of caulk (½ is sufficient) along the length of the bottom opening. With one bead near the interior edge, one bead on the exterior edge, and one bead down the center. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI 54425 (800)541-9527 www.parrettwindows.com [3]

At the ends of the bottom opening, apply a patch of caulk the entire depth of the sill at least wide enough to cover the ends of the side jamb, or approximately 2 depending on design. On units with factory applied casing, apply a heavy bead of caulk (½ is sufficient) on the exterior sheeting of the opening approximately ½ from the opening. MASONRY OPENINGS Special opening preparation is needed for masonry openings. Secure a wood buck frame into the opening at least the same depth as the jamb. The buck thickness should be thick enough to be used in the securing of the unit into the frame (standard 2x treated framing is sufficient) and still provide sufficient clearance to install the unit. The framing must be sealed between the framing and the opening and a cap bead of sealant applied to the seam on the exterior. Once this buck framing is installed, continue with installation as instructed here. 3. Jamb Installation WARNING- UV resistant exterior sealant must be used and be compatible with all materials it comes in contact with. Follow sealant manufacturer s instructions regarding surface cleaning, preparation, application, and temperature requirements when applying sealant. Failure to do so may result in water infiltration, property or product damage. NOTE-Metal fasteners and other hardware components may corrode when exposed to preservative treaded or fire retardant lumber. Failure to use appropriate materials for installation may cause component failure resulting in injury, property or product damage. DO NOT install wood products directly in contact with masonry or concrete openings. Apply a proper finish or barrier (i.e. tar paper or ice/ water membrane) between all wood and masonry/ concrete surfaces. Failure to do so may result in water infiltration, property or product damage. Rotate installation clips into position before placing unit into opening. If clips are not applied install clips 4 from jamb ends and 12 on center. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI 54425 (800)541-9527 www.parrettwindows.com [4]

On units with factory applied casing or brickmould apply a heavy bead of caulk (3/8 is sufficient) to the back side of the casing near the outer edge. Place ¼ shims at the bottom of the opening near the sides. Units with installation clips should have shims placed as near the clips as possible. Lift jamb into opening. Center the unit in opening side to side. Secure temporarily with clamps to prevent from falling out of opening. Shim along the bottom of the unit as needed to keep the jamb level. Starting on one side, plumb and shim the side jamb. Plumb should be checked both side to side and front to back on the side jamb. DO NOT fully secure the side jamb until the unit is checked for square. Check for square by measuring diagonally from the upper left corner to the lower right corner. Then measure from the lower left corner to the upper right corner. When compared, these two measurements should vary by no more than 1/16. Shimming the top over left or right will adjust if out of square. Once the entire side is plumb and the unit is square, shim into place to hold the position. Shim the head as necessary to keep the head straight and level. WARNING- DO NOT fasten the jamb through any factory applied finish that will have contact with the elements. Installing fasteners through a factory finish will VOID any warranty written or implied on the finish and life of the unit. When fastener must be placed through a factory finish, the holes must be sealed with a compatible weatherproof sealant. 4. Securing Unit into Opening On units with installation clips, bend the clips around to the interior and fasten with a minimum of a #10 x 1 fastener. On units with factory applied casing or brickmould, use a minimum of 3 finishing nails to fasten the unit through the casing to the exterior framing every 12. Recheck unit for square and plumb. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI 54425 (800)541-9527 www.parrettwindows.com [5]

NOTE- Parrett recommends the use of both installation clips and exterior casing as a means to secure the unit into the opening. If both are not able to be used, placing fasteners through the jamb is required. Use fasteners long enough to protrude through the jamb and shims with a minimum of 1 ¼ of penetration into the opening framing. Predrill holes 3/16 holes into jamb and place shims at the hole positions so fasteners will go through and hold them in place. 5. Check Operation Operate unit to verify smooth performance. Operating circle and oval units generally do not provide any hardware adjustment. These units are factory pre-fit into the jambs. If any problem exists in the operation of the unit double check the installation. Make sure none of the installation fasteners are interfering with the sash travel, hinges, locking hardware, or weatherstripping. Due to the design of the pivoting hinge, tight pivoting can be experienced when the jamb is shimmed too narrow OR too wide. Measure the width and height to make sure the jamb is shimmed properly. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI 54425 (800)541-9527 www.parrettwindows.com [6]

6. Finishing Installation Seal the voids between the jamb and opening on the head and sides by inserting backer rod or other insulation. DO NOT use standard expanding foam. Only use LOW expanding foam. Over packing of insulation or the use of standard expanding foam can distort the jamb enough to hamper operation performance. On the exterior side where no casing has been applied, cover the void against the backer with silicone to seal the jamb to the opening. When applying trim and casing make sure all fasteners are of proper length to prevent interference with the unit s operation. All exterior trim, casing, wall, sheeting, or other finishing materials should be properly caulked with a UV safe sealant exterior sealant. WARNING- UV resistant exterior sealant must be used and be compatible with all materials it comes in contact with. Follow sealant manufacturer s instructions regarding surface cleaning, preparation, application, and temperature requirements when applying sealant. Failure to do so may result in water infiltration, property or product damage. Refer to Parrett s Care and Maintenance Instructions for all cleaning and maintenance. For finishing instructions refer to Parrett s Homeowner s Manual at www.parrettwindows.com or contact customer service at (800) 541-9527. Parrett will not under any circumstances be responsible for installation, repainting, refinishing, or other similar activities necessary to completing any replacement. It is the customer s responsibility for installation, finishing, cleaning, maintenance, re-painting, refinishing, or other similar activities necessary to maintain the performance of each product. Troubleshooting NOTE- All units have sash factory pre-fitted and adjusted. The hinge hardware provides for some adjustment in the field or during installation. If major adjustment seems to be needed, double check installed jambs for plumb, level, flat, and straightness. Extra shimming may be needed to keep jambs within tolerance. If after verification of these key points you still find the unit operation unsatisfactory please call for assistance at (800) 541-9527 from 8:00 a.m. to 5:00 p.m. Central time or e-mail info@parrettwindows.com Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI 54425 (800)541-9527 www.parrettwindows.com [7]