Jack-up barges for rig-less interventions

Similar documents
Coiled-tubing operations and basic tools

The EDR Aerial Photo Decade Package

The EDR Aerial Photo Decade Package

The EDR Aerial Photo Decade Package

Appendix B: Historic Aerial Photographs

Results Briefing Fourth Financial Quarter, 2012* Analyst & Investor Update 20 th December 2012

Draugen Infill: Optimizing late life production with Subsea Processing

Swiber Holdings Limited

HELIX ENERGY SOLUTIONS

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

A Rebirth in the North Sea or simply a False Dawn

Wood Group Investor Briefing Q1 2016

bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries

Reversing candles. Three black crows. Exhibit 13.0 The three black crows pattern

Opportunities and Challenges in Deepwater West Africa Projects

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Well Abandonment Services. Plug into a New Approach

Brent Charlie Ultra Late Life. A Journey in Optimising for Platform Decommissioning

Offshore Drilling Rigs

For personal use only

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

The W.I.S.E. Generator System

EURASIA DRILLING COMPANY LTD

MERMAID MARITIME PUBLIC COMPANY LIMITED READY FOR THE RISING TIDE FACT SHEET

Disruptors in the Automotive Aftermarket

Transferring knowledge from operations to the design and optimization of work systems: bridging the offshore/onshore gap

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation

Recommended Practice for Flexible Pipe

E3X-DRT21/SRT21/CIF11

A Step Change in Activity

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED)

POWER SYSTEM FREQUENCY AND TIME ERROR MONITORING

Investor Relations Presentation April 30, 2013

TN LPC1800, LPC4300, MxMEMMAP, memory map. Document information

Exploring Growth in the Liftboat Market

Ordering Information. Ratchet Relay G4Q. Plug-in Models. Model Number Legend

Intervention/Decommissioning

IRRIGATION 810-T PLUS TRANSMITTER GUIDE

Integrated Energy Services Data Pack. 25 June 2013

FRESCO WHITEPAPER

Simonson Design Lab, Inc. Design Agreement

GTSC Rig for Hands-on Training

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

Aker Solutions Next Generation Control Systems Fornebu, April 26, 2017 Einar Winther-Larssen Product Manager All Electric and New Concepts

Husky Energy East Coast Update

Gas Well Deliquification Workshop. David J Southern, P. Eng. Control Microsystems, Inc. Gas Well Deliquification Workshop

WELLVANTAGE REMOTE OPERATIONS DEEPWATER

Swiber Holdings Limited 1Q FY08 Results Briefing

The Right Place. The Right Time. The Right People. Production and Maintenance. and Maintenance. G&G and Petroleum Engineering

2010 Annual Results Presentation. March 2011

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

Compact subsea gas compression solution for maximized recovery

Maximising Well Intervention Efficiency in the Gulf of Mexico: A New Best Practice Model

User s Manual. CONTROL STATION COMBINER Broad Band Short Haul MHz. Document Number: INS

B (bottom) Package type descriptive code. VFBGA176 Package style descriptive code

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

Provided by. RESEARCH ON INTERNATIONAL MARKETS We deliver the facts you make the decisions

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

HUSTLER 7' & 8' POOL TABLE ASSEMBLY INSTRUCTIONS

Global Jackup Rig Market

Gas Storage and Oil & Gas Exploration in County Antrim

CSM_G7S-_-E_DS_E_7_1

HEAVY DUTY COPPER CABLE LUGS

IHS CHEMICAL Toluene Methylation Process by GT-TolAlk SM Technology

Market Briefing: S&P 500 Bull & Bear Markets & Corrections

27 August 2015 SUBSEA JOINT VENTURE WITH CHIYODA CORPORATION

Brazil Shareholder visit 2016 Re-shaping Shell, to create a world-class investment case

Contents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14

CORPORATE PRESENTATION 1Q2014 ANALYST BRIEFING

Page 1 of 18. SunRail System Installation Instructions

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

Ordering Information. Stepping Relay Unit G9B. Model Number Legend

VCS+SOCIALCARBON Project Development Process

Marine Subsea AS presentation Pareto Conference, Oslo

The Ziebel MagLev downhole pump

CAPETANO OIL LIMITED (+233) (+233)

CLIENT GUIDE TO MEASURED BUILDING SURVEYS

G7K. Latching Relay. Compact Mechanical Lock Latching Relays with Manual Buttons. Model Number Structure. Ordering Information

Oil & Gas Industry Competitiveness Assessment

Date: Paul Spaanderman, Abstract: Not know at this time. Decision Discussion Information Other <specify>

AM / FM RADIO TRANSMITTER KEYFOBS

Automation Breakout Session

SOT Package summary

Simple Business Plan. for SUCCESSFUL. Online Marketing. of your offline business. Workbook & Checklist. By Theresa Delgado of

THE ROSEN MARKET TIMING LETTER

BT-4000 LIGHT WORKOVER UNIT

Britcham Brasil X Seminário Internacional de Energia

Perenco UK Ltd. SNS Decommissioning

00108/00110 INSTRUCTION MANUAL

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

ACID STIMULATION CASE STUDY

While you wait. write down one question we ll collect them in a moment and address some of them later. Repsol Sinopec Resources UK

Efficiency of Time Comparing with Modular Rigs for Workover Operation

International development

Voluntary Carbon Standard

AN MIFARE Plus Card Coil Design. Application note COMPANY PUBLIC. Rev April Document information

ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) FOR PRINOS OFFSHORE DEVELOPMENT PROJECT

Transcription:

Subsurface INVESTMENT OPPORTUNITY: Jackup barges for rigless interventions

Executive summary To bring locally operated jackup barges to Qatari waters would provide additional deck space, crane capacity, and accommodation for: Coiled tubing operations Well testing and stimulations Accommodation during shutdowns and maintenance campaigns. Currently, lowspec drilling rigs are also used to accommodate this demand, however, with rig rates expected to increase from 2019 on, this creates an opportunity for more costeffective jackup barges. On average, the demand for jackup barges is expected to reach QAR 50M/yr in 201923, with little capex investment required if an existing barge is relocated. It is forecasted that at least one jackup barge can be kept fully utilized throughout the year. More maintenance campaigns are expected to become economical if jackup barges are shared between operators and utilization rates are kept high. Performancebased bonuses and support with lowcost logistics and utilities may be provided. 2

Detailed opportunity description Jackup barges for rigless interventions Text Accommodation jackup barge Localization opportunity Business scope A jackup barge is a selfelevating platform with long support legs that can be selfpropelled or towed into position. Compared to a jackup rig, a barge does not have drilling equipment on board (e.g., derrick). Currently, lowspec jackup rigs are also used for coiled tubing operations, well stimulation and testing, and maintenance jobs, however, their rates are expected to increase from 2019 on, creating an opportunity for jackup barges. Simple jackup barges are more cost effective than rigs and can provide the needed deck space and equipment for these operations. Relocating an existing jackup barge to Qatari waters Refurbishment and mob/demob costs to make the barge suitable for: Well services: stimulation services, running and retrieving tubing, coiled tubing operations, e line/slickline etc. Installation of temporary well testing equipment: flare booms and burners, test separators, choke manifolds, surge tanks, etc. Additional accommodation for well interventions, well test, or shutdown crew Crew for managing daily barge operations (e.g., crane operators, roustabouts) Out of scope Purchasing of a new jackup barge Ownership and operation of temporary equipment (e.g., well testing equipment) Capital intensity Low (QAR 010M) Medium (QAR 1050M) High (QAR 50M+) 3

Market size Estimated spend (Qatar only) on jackup barges, QAR M Historic Forecast Also includes drilling rigs used for well testing and interventions 15 20 20 25 50 90 40 30 2013 14 15 16 17 18 19 20 21 22 2023 Estimated jackup barge activity, days Accomodation 1 180 550 180 Well testing 50 100 130 100 10 40 Coiled Tubing 80 80 120 140 80 390 430 420 Key highlights Between 2013 and 2017, the demand for jackup barges/rigs for rigless interventions and related services such as well testing and stimulation, coiled tubing operations, and accommodation has more than doubled. Currently, jackup barges are present in Qatar and in the region, but are not always locally owned or operated. With the exception of 2020, at least 330 days of jackup barge/rig activity have been forecasted for each year from 2019 to 2023, and spend on barges alone is expected to reach at least QAR 40M/yr. This implies that there is an opportunity for at least one jackup barge to be kept fully utilized throughout the year. Additional potential could come from more intervention and maintenance campaigns to become economical if jackup barges are shared between operators and utilization rates are kept high. Relevant stakeholders (2017) Top 3 buyers Other demand TOP 3 BUYERS : 4

Disclaimer The material, data, charts and pieces of information contained in this document ( Information ) is for general information purposes only and should not be construed as an investment or commercial advice or as a recommendation whatsoever. The user of the Information ( User ) is responsible for independently verifying the Information and shall make his own determination as to how suitable the Information is for his own usage and intent. User should not rely upon the Information as a basis for making any business or investment decisions. Whilst Qatar Petroleum endeavours to provide and keep the Information up to date and correct, Qatar Petroleum makes no representations or warranty of any kind, express or implied about the content, completeness, accuracy, quality, reliability or suitability with respect to the Information for any purpose. Qatar Petroleum expressly disclaims liability for errors and/or omissions in the Information contained in this document and shall in no event be liable for damages resulting from the use or reliance of User upon the Information. Any reliance the User of the Information places on such Information is strictly at User s own risk. 5