MV network design & devices selection EXERCISE BOOK

Similar documents
3-phase short-circuit current (Isc) at any point within a LV installation

Three-phase short-circuit current (Isc) calculation at any point within a LV installation using impedance method

TABLE OF CONTENT

Impact Assessment Generator Form

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS

ELECTRICAL POWER TRANSMISSION TRAINER

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

, ,54 A

Earth Fault Protection

Protection of Electrical Networks. Christophe Prévé

POWER SYSTEM ANALYSIS TADP 641 SETTING EXAMPLE FOR OVERCURRENT RELAYS

ET 51 - Electrician Theory Examination Marking Schedule

Chapter G Sizing and protection of conductors

Notes 1: Introduction to Distribution Systems

The Upgradabilty of Conventional Three Phase Delta/Star Networks

Impedance protection on power transformer.

WHITE PAPER. Medium Voltage On-Site Generation Overview. BY MIKE KIRCHNER Technical Support Manager at Generac Power Systems

Predicting the Voltage Sag Performance of Electricity Distribution Networks

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Connection Impact Assessment Application

Embedded Generation Connection Application Form

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

Conventional Paper-II-2011 Part-1A

ELECTRICIAN S THEORY EXAMINATION 15 November 2014 QUESTION AND ANSWER BOOKLET

AGN 005 Fault Currents and Short Circuit Decrement Curves

1. general. 1.1 methodology and definitions. methodology

Bus Protection Fundamentals

LIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION

CONTENTS. 1. Introduction Generating Stations 9 40

How to maximize reliability using an alternative distribution system for critical loads

Safety through proper system Grounding and Ground Fault Protection

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements

PROTECTION of electricity distribution networks

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)

Embedded Generation Connection Application Form

Chapter 6. WIRING SYSTEMS Safe Electrical Design

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.

FINAL - ET 60 - Electrician Theory Examination Marking Schedule

How To Ground Electronic Equipment In Southern Company? Imagination at work

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content

Standard Prices for Generators 2010

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours

Integration between the MV protection and control unit REF542 and the LV protection trip unit PR123: selectivity and earth fault 1SDC007402G0201

Chapter N Characteristics of particular sources and loads

Functional Range. IWE - Earth Fault Relay. C&S Protection & Control Ltd.

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering)

Connection Impact Assessment Application Form

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Short-Circuit Current Calculations

Substation Preventive Maintenance

Short Circuit Current Calculations

FERRORESONANCE SIMULATION STUDIES USING EMTP

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8]

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Level 6 Graduate Diploma in Engineering Electrical Energy Systems

Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection

Busbars and lines are important elements

Electrical Protection System Design and Operation

Power Quality and Reliablity Centre

The Advantages and Application of Three Winding Transformers

Line protection with transformer in the protection zone

thepower to protect the power to protect i-gard LITERATURE Low and medium voltage

Chapter L Power factor correction and harmonic filtering

Protective earthing, protective conductor and automatic disconnection in case of a fault (Fault protection)

In Class Examples (ICE)

Embedded Generation Connection Application Form

La protection sélective des réseaux électriques

Utility Interconnection and System Protection

MINISTRY OF ELECTRICITY

Conventional Paper-II-2013

Maintenance/Connection/Installation Service life C/O cyclesx1000

Ecodial Advance Calculation. Technical help

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Single Line Diagram of Substations

Fatima Michael college of Engineering and Technology

Discipline Electrical Testing Issue Date Certificate Number T-2837 Valid Until Last Amended on - Page 1 of 6 LOCATION 1

2 Grounding of power supply system neutral

ELECTRICAL POWER ENGINEERING

MEDIUM VOLTAGE PRODUCT. PARAMETERS GUIDE How to specify the indoor instrument transformers correctly

ELE-CMOS-E-2001 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Index. b back-flashover 245 biomass 207 breakers 74 buchholz protection 235 busbar sectionalizer 193 business enterprises 18

MV/LV transformer substations: theory and examples of short-circuit calculation

DPF-MAC Auto power factor controller

Tab 8 Surge Arresters

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

High voltage engineering

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM

Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC)

Unit 27 Three-Phase Circuits

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers

Design a Power System Simulator Model and Implement the Generator and Motor Controlling

Generator Advanced Concepts

Problems connected with Commissioning of Power Transformers

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

TS RES - OUTSTANDING ISSUES

Circuit breakers for direct current applications

Chapter B Connection to the MV utility distribution network

Transcription:

MV network design & devices selection EXERCISE BOOK

EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester and MV equipment 05 - Calculation of MV cable cross-section 06 - Calculation of Isc 07 - CTs for MV metering 08 - CTs for MV protection 09 - Earth-fault relay settings 10 - Capacitors MV network design & devices selection - Aug 2008 2

Exercise 1: MV substation architectures Define: 1. Type of LV or MV metering 2. Architecture and choice of cubicles 3. Type and rating of fuse that protects the transformer Consumer substation on energy supplier loop: 20kV 1 800kVA transformer with 20kV/400V secondary Short-circuit power 250 MVA MV network design & devices selection - Aug 2008 3

Exercise 2: MV substation architectures Define: 1. Type of LV or MV metering 2. Architecture and choice of cubicles Consumer substation on energy supplier loop: 15kV 2500kVA transformer with 400V secondary, 3-phase Short-circuit power 350 MVA MV network design & devices selection - Aug 2008 4

Exercise 3: C13-200 MV substation Use the data below to define: 1. the flow diagram of the MV part of the installation 2. the subtransmission substation diagram, indicating: types of cubicles fuse ratings An industrial MV consumer is supplied directly with 20kV (24KV, 125kV impulse; Isc = 12.5kA) The power distribution system is a loop. In case of interruption, a radial feeder powers the entire installation (the system must automatically switch back to the loop if power is restored to the loop) The plant includes 1 B1 2000kVA non-priority loop supplying different substations 1 T1 250kVA non-priority transformer 1 B2 2000kVA priority loop 1 T2 800kVA priority transformer The plant also has a 380V/20kV diesel genset to back up priority loads. MV network design & devices selection - Aug 2008 5

Exercise 4: Max. distance between surge arrester and MV equipment (optional, for information purposes) Max. distance between transformer MV terminals and surge arrester? 20KV transformer protected by MV surge arrester Residual voltage of surge arrester 75KV D in m MV network design & devices selection - Aug 2008 6

Exercise 5: Calculation of MV cable cross-section 1 Us rated operating voltage 15 kv 2 Type of insulating material PR 3 Type of conductor ALU 4 Type of cable (single or 3-wire) 3 5 Ir rated operating current 210 A 6 Operating state (discontinuous or continuous) DISC 7 Installation method column 1or2 K1 Buried 8 Ambiant temperature on ground K2 25 C 9 Type of ground K3 Damp 10 Proximity K4 Alone 11 Isc upstream 18 ka 12 Tripping time 0.4 MV network design & devices selection - Aug 2008 7

Exercise 5 Verification Formula to be used to verify the thermal withstand of cables in case of short-circuit Isc S = k t Isc = in Amperes t = in seconds k = factor for type of cable S = cross-section in mm 2 MV network design & devices selection - Aug 2008 8

Exercise 6: Calculation of Isc Calculation of short-circuit currents in a MV network Questions 1. Determine the breaking capacity of circuit breakers CB1 to CB7 2. Determine the minimum cross-section of cables linking substations A-B and A-C, given that only one transformer is supplied in each substation 3. Determine the breaking capacity and making capacity of circuit breakers CB8 to CB11 Data Power supply: 63kV Short-circuit power: 2000MVA Network impedance 63kV (can be calculated directly for 10kV) Network configuration: The network includes 2 transformers and 1 AC generator in parallel Each of the satellite substations includes 2 transformers, but a single transformer is sufficient to power the loads We find the Isc from the network «upstream with the 2 transformers in parallel» and add the Isc from the AC generator The (PR)ALU cables are buried directly in dry calcareous ground at 20 C, with nothing nearby For substation B, provision should be made for 2 cables in parallel 9

Upstream network 63kV Short-circuit power 2000 MVA calculation of Isc 15 MVA Usc =10% T1 T2 G1 20 MVA Usc =10% G 15 MVA Usc Sub =15% Usc Trans= 20% CB1 D2 CB3 10KV busbar 10KV busbar 10KV busbar Substation A CB4 CB5 CB6 CB7 15 MVA Usc=10% T4 T5 15 MVA Usc=10% In each substation 1 single transformer in operation 0.5 km Substation C CB18 3KV CB19 CB8 1 km Substation B CB9 CB10 T8 5 MVA CB11 T9 5 MVA 10 MVA T6 CB12 T7 CB13 10 MVA CB16 3KV CB17 3KV 10

Location or observation point R X Z Isc BC MC = BC*2.5 Upstream network, downstream view 15 MVA TR 20 MVA TR 2 TRs and 15 MVA genset in parallel TRs in series with network 15 MVA genset in subtransient 15 MVA genset in transient Values at busbar in transient Values at busbar in subtransient Cable of substation B Busbar input, substation B, transient Busbar input, substation B, subtrans. Upstream, downstream view, substation B, subtransient 10 MVA TR substation B Series upstream network + TR10 sub. Series upstream network + TR10 trans. Reminders: Resistivity of copper: ρ = 22.5 10-3 Ω. mm 2 /m Resistivity of aluminium: ρ = 36 10-3 Ω. mm 2 /m 11

Calculation of short-circuit currents Upstream network impedances: Impedance viewed downstream of transformers: 10 KV Short-circuit power = 2000 MVA Application of relative impedance formula: 15 MVA transformer impedance 15 MVA 20MVA transformer impedance 20 MVA 12

15 MVA genset impedance 1 - Transient (Usc = 20%) 15 MVA G 2 - Subtransient (Usc = 15%) Impedance of 2 transformers in parallel Impedance of 2 transfos in // + network in series T1 Upstream network 63KV Short-circuit power 2000 MVA T2 CB1 CB2 Substation A 13

Upstream network 63KV Short-circuit power 2000 MVA 15 MVA Usc =10% T1 T2 G1 20 MVA Usc =10% G 15 MVA Usc Sub =15% Usc Trans= 20% 10KV busbar CB1 CB2 D3 Substation A 10KV busbar 10KV busbar CB4 CB5 CB6 CB7 Impedance of 2 transfos // + network + genset 1 - transient (Usc = 20%) 2 - subtransient (Usc = 15%) 14

Calculation of Isc, breaking capacity and making capacity Breaking capacity of circuit breakers CB4 to CB7 (transient) Making capacity of CB4 to CB7 as asymmetrical peak kâ (2.5) and subtransient Breaking capacity of CB3 (genset circuit breaker) Making capacity of CB3 as peak kâ (genset circuit breaker) 15

Breaking capacity of CB1 (15 MVA transformer) (Ik3 to be considered = Ik3 20 MVA transf. + Ik3 genset transf.) Impedance of upstream network + 20 MVA transformer Parallel connection network + transformer and genset in transient Making capacity of CB1 (15 MVA transfomer) Parallel connection network + transformer and genset in subtransient Making capacity of CB1 as peak kâ (15 MVA transformer circuit breaker) 16

Upstream network 63KV Short-circuit power 2000 MVA Example for comparison 15 MVA Usc =10% T1 T2 G1 20 MVA Usc =10% G 15 MVA Usc Sub =15% Usc Trans= 20% 10KV busbar CB1 CB2 CB3 10KV busbar 10KV busbar Substation A CB4 CB5 CB6 CB7 Breaking capacity of CB2 (20 MVA transformer) Impedance of network + 15 MVA transformer T1 Parallel connection network + transformer and genset in transient Making capacity of CB2 (20 MVA transformer) Parallel connection network + transformer and genset in subtransient Making capacity of CB2 as peak kâ (20 MVA transformer circuit breaker) 17

Simplified version of calculations for substation A Direct calculation of impedance Z and cumulative total of resulting Ik3 Impedance of upstream network Upstream network 63KV Short-circuit power 2000 MVA Impedance of 15 and 20 MVA transformer in // Impedance of network + 2 TR in // Ik3 of network + TR in // T1 CB1 T2 CB2 Impedance of network + T1 Substation A Impedance of network + T2 Ik3 supplied by (network + T1) Ik3 supplied by (network + T2) 18

GE current Isc GE transient Isc GE subtransient Breaking capacity of CB1 (15 MVA transformer circuit breaker): Breaking capacity of CB2 (20 MVA transformer circuit breaker): Making capacity of CB1 (15 MVA transformer circuit breaker): Making capacity of CB2 (20 MVA transformer circuit breaker): Breaking capacity CB4 to CB7 (global Ik3): (network + 2 TR + GE) Making capacity CB4 to CB7: (network + 2 TR + GE) 19

Choice of cables for substations B and C (detailed method) Single-pole AI PR cables, buried directly in dry, calcareous ground, temperature 20 C, continuous operation, Substation B: Operational current Ir: Substation A 10KV busbar CB6 1 km Substation B 2 cables in // imposed Installation mode factor = Temperature factor = Proximity factor = Ground factor = Chosen theoretical currents: CB8 T6 10 MVA CB12 3KV CB9 T7 10 MVA CB13 Substation C: Operational current Ir: Installation mode factor = Temperature factor = Proximity factor = Ground factor = Chosen theoretical currents: cables to substation C: per phase Substation A CB10 T8 5 MVA CB16 CB7 0,5 km Substation C 10KV busbar CB11 T9 5 MVA CB17 3KV 20

Verification of short-circuit current withstand of cables Upstream protection circuit breaker tripping time: 0.4 sec. Permissible temperature rise in cables: 160 (+90 =250 ) Calculation of short-circuit currents in substations B and C Impedance of the 2 cables of substation B Impedance of the cable of substation C 21

Short-circuit currents with 10 kv in substation B Calculation of impedance in substation B, transient. Substation A 10KV busbar CB6 short-circuit current and breaking capacity CB8 and CB9: 1 km Substation B Calculation of impedance in substation B, subtransient. CB8 T6 10 MVA CB12 CB9 T7 10 MVA CB13 short-circuit current and making capacity CB8 and CB9: 3KV 22

Short-circuit currents with 10 kv in substation C Calculation of impedance in substation C, transient, 185 mm 2 cable Substation A 10KV busbar CB7 0.5 km Substation C short-circuit current and breaking capacity CB10 and CB11: Calculation of impedance in substation C, subtransient. CB10 T8 5 MVA CB16 CB11 T9 5 MVA CB17 3KV short-circuit current and making capacity CB10 and CB11: 23

Calculation of short-circuit currents with 3 kv in substation B Reminder of values with 10 kv in substation B: - Transient Substation A 10KV busbar CB6 - Subtransient: Application of relative impedance formula: R (downstream) = R (upstream) 1) Impedance, Ik3 and breaking capacity in transient U U 2 2 (secondary) (primary) CB8 T6 10 MVA 1 km Substation B CB9 T7 10 MVA Impedance of transformer CB12 CB13 Isc and breaking capacity of CB12 and CB13 3KV 2) Impedance,I k3 and making capcity in subtransient Isc and making capacity of CB12 and CB13 24

Calculation of short-circuit currents with 3 kv in substation C Reminder of values with 10 kv in substation C: - Transient 10KV busbar CB7 - Subtransient: Application of relative impedance formula: 0.5 km Substation C U R (downstream) = R (upstream) U 1) Impedance, Ik3 and breaking capacity in transient 2 2 (secondary) (primary) CB10 T8 5 MVA CB16 CB11 T9 5 MVA CB17 Impedance of transformer 3KV Isc and breaking capacity of CB16 and CB17 2) Impedance, Isc and making capacity in subtransient Isc and making capacity of CB16 and CB17 25

Exercise 7: CTs for MV metering Determine the characteristics of the CT to be used according to the following data: U= 5.5 KV Predicted active power P = 760 KW p.f. = 0.93 Isc 8.5 KA Power consumed by meter 2.5 VA Meter input 5A CT line < > meter = 20m (total 2 ways) in 6mm² 26

Exercise 8: CTs for MV protection Definition of CTs? U= 6 KV Large motor feeder 2500 KW p.f. 0.9 efficiency 0.94 Starting current 6 x In Isc 8.5 KA Power consumed by protection relay 1.8 VA Relay input 5A Line 42m (total 2 ways) in 6mm² 27

Exercise 9: Earth-fault relay settings 1. Position the earth fault protection devices in the diagram so as to have discrimination. 2. Calculate the capacitive currents generated when faults occur. 3. The protection setting range starts at 2 A. 3.1. To what should IL be limited by the earth fault resistance in order to protect 90% of the star winding of the motor or motors? 3.2. is the value compatible with: 2.Ic<IL? 3.3. what is the continuous permissible current for the earth fault resistance (zero-sequence generator)? 3.4. if the protection of motor 9.2 does not work: - what back-up protection is there? - what is its pick-up setting? - what happens with the earth fault resistance? (zero-sequence generator) 3.5. what are the settings for the zero-sequence generator? 4. Length of the double 9.2 power supply cable - can 90% of the motor winding still be protected? - what solutions do you propose? - case of delta motor? 28

Capacitive current of connections upon network earth fault Conn. Cable Nb. of cables Length Linear capacity Ic in // per phase km µf/km A 1 1*240 2 0.1 0,5 2 1*240 1 0.1 0.5 3 3*70 1 0.05 0.3 4 3*70 1 0.05 0.3 5 3*70 1 0.2 0.3 6 3*95 1 0.2 0.35 7 3*95 1 0.2 0.35 8 1*150 1 0.15 0.41 9.1 3*95 1 0.2 0.35 9.2 3*95 1 1 0.35 9 3*95 2 0.5 0.35 Ic = 3 V C n L ω TOTAL Operating voltage U=5.5 kv L = length of trunking in km n = number of cables in // per phase V = ph-to-neutral voltage in V C = linear capacity of cable in F/km ω = pulsation in rad/s 29

Earth-fault relay settings G Gh 1 X X 2 RGh X X 3 4 5 X 6 X 7 X 8 X 9 X 9.1 X 9.2 M M M M M 30

Exercise 10: Capacitors A transfomer with power = 630 kva (410 V) supplies a load with active power P 1 = 250 kw with an average p.f. of 0.75. There is a plan to double the installation and this will call for additional active power P 2 : 250 kw with p.f. = 0.75. QUESTIONS: 1) Without power factor correction, determine the apparent power at the transformer terminals. What do you notice? 2) Calculate the maximum reactive power that the 630 kva transformer can supply for this project. 3) Calculate the total active power to be supplied to the load before power factor correction. 4) Determine the minimum power of the capacitor bank to be installed. 5) What is the p.f. value (transformer load 100%) 6) A decision is made to raise the p.f. to 0.92. What is the minimum power of the capacitor bank to be installed? 7) Determine the rating of the circuit breaker to be installed. 31