UNDERBALANCED DRILLING (UBD) - A CASE STUDY IN INDIAN OFFSHORE

Similar documents
@balance Deepwater. MPD services

Well Control Considerations of MPD on Deepwater Rigs

DRILLING ENGINEERING SERVICES LOOK-AHEAD AWARENESS

PressurePro CONTROL SYSTEM

EXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT. Stavanger, October 20 th 2011

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

ECDM System. November, Security Classification: Restricted - Status: Draft

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions

SAVE WEEKS DRILLING AND COMPLETING

Multipole Sonic-While-Drilling Technology Delivers Quality Data Regardless of Mud Slowness

An Introduction to Oil & Gas Drilling and Well Operations

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion

Industry Response - Post Macondo

Subsea Chemical Storage and Injection collaboration project

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

GTSC Rig for Hands-on Training

3 Day Stuck Pipe Prevention

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Development of the RapidJet Method of Gas Well Deliquification

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

Identifying Ways to Reduce Drilling Budgets in the Low Oil Price Environment

Deepwater well design, construction & drilling operations

Anne-Grete Ellingsen, CEO GCE NODE

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

Drilling Technical Conference Deep-Tech : Exploration for Perfection

Seeing through software

Oil and Gas UK Well Integrity Guidelines

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

Technology Challenges Offshore. Anna Aabø President IRIS research

Experience, Role, and Limitations of Relief Wells

Technology Presentation

EC-Drill MPD Dual Gradient Drilling

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

PETROLEUM ENGINEERING

CJENERGY.COM COMPANY OVERVIEW EXCELLENCE DELIVERED

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

Pilot Well Academy Popina Bogdan Marian Drilling geologist engineer

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Drilling Courses

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

Digital Oil Recovery TM Questions and answers

Getting Ready for First Oil

july aug HPHT operations pose escalating challenges for operators, suppliers all drilling, all completions, all the time

Operating Cost Optimisation: Importance & Approach

Tomorrow's Energy Designed Today TECHNOVA

" The Future of Drilling R&D"

Recent advancement in well-control technology improves safety and allows cost savings for well designs

When a drilling project is commenced, two goals must be achieved:

Apr Nov POOGG Introduction to Geothermal System and Technology

Syllabus CH EN 6181 Drilling and Completions Fall 2015

Deep Water Technology A Focus on Drilling US-China Oil & Gas Industry Forum

MPD Application Process

Heidrun Inverted Gas Lift System

Company profile... 4 Our Teams... 4 E&P Software Solutions Software Technical and Software Support Training...

Geosteering Workflow Considerations of How and Why?

To attract people and capital, industry must educate the public

ADVANCED DRILLING AND WELL TECHNOLOGY

Case Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor

Tristone Capital Energie '08 Conference. May 14, 2008

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA

Reservoir Management

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

FASTER. SIMPLER. BETTER. P&A AND SLOT RECOVERY; REDEFINED.

Emerging Technology to Enhance Production From Mature Offshore Fields

Investor Relations Presentation April 30, 2013

Degree Requirements

Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges

Drilling Engineering Handbook

Casing while Drilling. Enhanced Casing Installation

Marathon Drilling Indonesia

MODULE 5 ACCOUNTING FOR EXPLORATION, DRILLING AND DEVELOPMENT COSTS

SAFER, SMARTER, GREENER

bakerhughes.com Hammerhead Ultradeepwater Integrated Completion and Production System Improve recovery and minimize risk in frontier plays

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN

OCS leasing program draft PEIS comments Attachment A

London Oil & Gas Conference 2018

This figure shows the difference in real time resolution of azimuthal resistivity data

HDD Training. HDD Construction Process. Mark Miller, PE Jon Robison, PE

Chapter 02. Casing and Tubing

Bridging the Gap Between Drilling and Completions

7 Briefing. Responsible investor

Information Revolution 2014 August Microsoft Conference Center Redmond, Washington

Schlumberger and Smith International, Inc. to Merge. March, 2010

On the Development of the Blowout Preventer PRA Model

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

Testing Services Training. Field-proven training and competency development programs

Subsea Production Water Management

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV

U.S. Department of Energy Microdrill Initiative Initial Market Evaluation

DE120 Successful Well Completion and Workover Practices:

Expro Perforation Services

4 Briefing. Responsible investor

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

Introducing Subsea Connect. Neil Saunders President & CEO, Oilfield Equipment, BHGE

Heidrun CTD Campaign #1

Transcription:

1 UNDERBALANCED DRILLING (UBD) - A CASE STUDY IN INDIAN OFFSHORE

AGENDA Drivers for UBD Technology Introduction to UBD Pilot Project in India UBD Design and Process Flow Diagram UBD Project Highlights Recommendation's for Technology Implementation Why Halliburton Question and Answer 2

Underbalance Drilling Technology Drivers for UBD Drilling Improvement Reduce mud losses Improve ROP Eliminate differential sticking Production Improvement Access residual reserves in mature fields Minimise Formation Damage Early Production Recovery (while drilling) Reduce well cleanup time Increase production rates Reservoir Characterization Testing While Drilling 3

Introduction to UBD Pilot Project Project : 6 Wells Pilot Project at ONGC Western Offshore Scope of Work : To Drill & Complete 6 Drain-holes Underbalanced Fields/Wells : 3 Wells on Heera Field & 3 Wells on Mumbai High Field Basis Of Design: Technical Feasibility & FEED Well/Platform Selection, Rig Selection And Survey Equipment, Requisite Chemicals And Personnel As Defined In SOW Base Oil as Primary Drilling Fluid (Through Drill String) Concentric Casing Gas Injection (N2) Method - 7 Tieback To Surface 4

Project Execution Timeline RigUp / Interwell / RigDown Days DRILLING & LOWER COMPLETIONS 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5

UBD Simplifie d Flow Schemati c 6

Concentric Casing N2 Injection Methodolgy N2 2 phase fluid Liquid N2 RCD 13 ⅝ x 7 1/16 5K 30 20 BOP Stack 13 ⅝ 5K 13 3/8 (Ecometer) 9 ⅝ Liquid injection N2 7 ⅝ N2 Injection N2 LINEAS DE INYECCION DE N2 N2 7

Lesson s Learnt It is critical that 7 liner is landed inside target carbonate layer to case off overlying shale & avoid borehole instability during UBD (HK#6H & N22#8H). Consider geomechanical study to assess and predict borehole stability risk: inadvertently drilling into overlying or underlying shales Encountering pinch-out/lateral stratigraphic changes Intentionally cutting through several carbonate/shale layers to optimize layer drainage It may be possible in some cases to utilize Managed Pressure Drilling (MPD) techniques to exceed shale collapse pressure while staying below fracture gradient. MPD & UBD Technologies use similar equipment and can be complementary. Top of Carbonate 2014 HALLIBURTON. ALL RIGHTS RESERVED. 8

UBD PROJECT HIGHLIGHTS First UBD project in India by any Operator. Vast scale of the project covering FEED, Engineering/ Modelling, HAZID- HAZOP, Project Planning and Execution. One of the biggest setup ever used in UBD covering 4 Phase Separation System, Nitrogen Membrane Injection through Concentric Casing, HT-400 Pump, Tank Farms, Solid Waste Management, Push Pull Machine and Lower Completions using FIV. No HSE or SQ incident during entire preparation and execution phase. 9

UBD PROJECT HIGHLIGHTS Drain Holes length in the range of 190m-250m drilled in underbalanced condition in 3 Wells of Heera Field and 2 Wells of Mumbai High field Total Operating time for Drilling Five Drain hole sections and running Lower Completion: 43 days. Average ECD maintained between 3.8 and 4.5 for UB Drilling and Completions. Able to identify water ingress real time and thus place the well Consistence and Sustainable incremental Production as per latest update 10

Recommendations for Technology Implementation Dedicated UBD Rig Offshore Reduce multiple Rig Up/Rig Down Time One time modifications required, if any Turnkey Project model comprising : Fluids Management Downhole Tools for Reservoir steering and Evaluation Bits Selection Long Term Contracts for Onshore Economic feasibility 11

Recommendations for Technology Implementation on Pilot Basis Implement UBD in Onshore assets Use Trailer Mounted Package Implement Managed Pressure Drilling (MPD) in wells with Loss/Gain Scenarios. Implement Pressurized Mud Cap Drilling (PMCD) in Exploration wells with severe Loss scenarios. $$$ Savings in terms of : High Cost Drilling Mud - eliminating Mud Losses High Day Rate of Drilling Rigs - reduce the Non-Productive Time Complete the wells in all scenarios. Smaller setup required for MPD/PMCD required 12

Job History for Optimized Pressure Drilling Services 13

14