CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

Similar documents
10930 W. Sam Houston Parkway N., Suite 900

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

Section Meetings Section Material and Equipment. None Required

REQUEST FOR QUOTATION INVITATION

Answer: Qualification statement should be provided with the bid.

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS 2019 LEGISLATIVE SESSION

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

Working Drawing Manual

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Textron/Harman Fair Fund c/o Analytics Consulting LLC P.O. Box 2011 Chanhassen, MN PROOF OF CLAIM FORM

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK

BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

TOWN OF GRAND FALLS-WINDSOR TENDER FOR SUPPLY OF BRONZE PLAQUES MEMORIAL GROUNDS CENOTAPH TENDER #

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

East Central College

SECTION SUBMITTAL PROCEDURES

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

State College of Florida, Manatee-Sarasota

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

CONVEYANCE PIPELINE AND PUMP STATION

Bid No. B14-02 Building 100 HVAC Improvements

Addendum #2: Revised Price Sheets, Added Questionnaire and Questions and Answers (Q&A)

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

Montclair, NJ ADDENDUM NO. 2. Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

WGA LOW BUDGET AGREEMENT

PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY P.O. Box East Shore Road Jamestown, Rhode Island Invitation to Bid Request for Proposals

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

The attached information contains mandatory requirements and a submission form.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

PROCEDURE FOR PROCESSING WORKING DRAWINGS

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

DEPARTMENT OF ARCHITECTURE

ADDENDUM #2 September 12, 2018

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Merrick Pet Care New Distribution Center Hereford, Texas

Request for Proposal (RFP) Nepal EGRP-RFP-FY19-P001. Raising Public Awareness of Early Grade Reading through Regional and National Radio

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Bid Advertisement in The Wylie News and NTMWD.com Website INVITATION TO BID NORTH TEXAS MUNICIPAL WATER DISTRICT DIGITAL IMAGING SERVICES

Procurement UNDP Sudan

STATE OF TEXAS Agreement of Sale COUNTY OF TARRANT

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

Procedure to Petition for Plat Review and Site Plan Review

Construction Phase Project Management and Documentation

INVITATION TO NEGOTIATE

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

SECTION ADMINISTRATIVE REQUIREMENTS

Fabrication and Supply of Cable Tray. CTI Agartala, Aligarh, Gorakhpur, Muzaffarpur, Patna

AIA Continuing Education

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

Interactive Retainer Letter

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

IN THE VANDERBURGH CIRCUIT COURT

BOARD OF COUNTY COMMISSIONERS WARREN COUNTY, OHIO 406 Justice Drive, Lebanon, Ohio warren.oh.

Efficient Tactics of Project Management

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project

SUBCONTRACTORS PROCEDURES MANUAL EXHIBIT A.15 SAMPLE MANUAL ONLY FINAL MANUAL WILL BE CUSTOMIZED FOR GREAT WOLF LODGE

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

NOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY

ADDENDUM # 01. Date: March 16, District- Wide Grease Trap Pumping Services. RFQ Number:

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

NOTICE INVITING TENDER Limited Tender on Single Bid Basis Milling Cutters. Tender Enquiry No: Due Date:

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Request for Proposal District Copy and Print Services RFP

Invitation for Bids Amendment #1

Ref No: HOlTaarangan/SMS/ /-1763 Date: 16 th Dec, 2013

Transcription:

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT: MECHANICALLY CLEANED BAR SCREEN, CONVEYANCE SYSTEM AND SCREENINGS WASHING-COMPACTION EQUIPMENT PROPOSALS DUE Monday, January 27, 2014, at 2:00 PM Local Time The purpose of this addendum is to provide clarifications requested by prospective suppliers. This addendum shall become part of the contracted documents. Acknowledge receipt of this addendum by completing the acknowledgement section at the end of this addendum and attaching the executed acknowledgement to the proposal. The following revisions have been made to the Request for Proposal (RFP) per this Addendum. 1. RFP, p. 1, Paragraph 1 Revise as shown: The City of Morro Bay/Cayucos Sanitary District (City/District) hereby issues this Request for Proposal (RFP) for equipment to be provided for improvements (Project) to the City of Morro Bay/ Cayucos Sanitary District Wastewater Treatment Plant. In submitting a Proposal, Mechanically Cleaned Bar Screen, Conveyance System, and Washer-Compaction Equipment Supplier (Supplier) acknowledges that time is of the essence and therefore agrees that Supplier shall meet all Project Milestones mutually agreed upon between Supplier and City/District. City/District Schedule Goals are identified in Section A for Supplier consideration and response. Suppliers shall be available for interviews on February 5, 2014, if requested by City/District staff. 2. RFP, p. 1, Section A Revise as shown: A. Project Milestones City/District Goals Add Supplier Interviews February 5, 2014 3. RFP, p. 3, Section E Revise submittal date to No later than 2:00 pm on Monday, January 27, 2014 4. RFP, p. 3, Section F Add the following to the list of items required for submittal by the proposers: Written exceptions to the City/District Schedule Goals (Section A) or written acknowledgement that Supplier will meet those milestones. 5. RFP, p. 4, Paragraphs F3 and F4 Revise as shown: ADDENDUM NO. 1 MB 2014-WW01 Page 1 of 3

3. The Supplier shall have a minimum of ten operating equipment installations of a similar size and type in the United States. 4. The Supplier shall have a minimum of ten years experience in the manufacturer of wastewater screening equipment. Five references from the list of installations identified in response to Section F.3 above, operating in the United States shall be provided. The location /contact person/phone-fax for the references must be submitted with the proposal. 6. RFP, p. 5, Paragraph F10 Revise as shown: 10. The City/District s schedule goals are outlined in Section A of this RFP. Supplier is asked to respond to the goals provided and note whether they can comply with each Project Milestone. Any deviations or requested modifications to the schedule should be explained. The City and Supplier shall develop a final milestone-based schedule according to the Supplier s response to the RFP and final agreement negotiations. 7. RFP, p. 5, Paragraph F12 Revise as shown: 12. Warranty information (as required in the Technical Specifications) shall be provided with the Proposal. 8. RFP, p. 5, Paragraph F13 Revise first selection criterion as shown below: Compliance with the specified requirements in the Technical Specifications and/or clear explanation for deviations (subject to City/District acceptance of deviations) 33.3% 9. RFP, p. 5, Paragraph F14 Revise as shown:: 14. Liquidated Damages: By submitting a response to this RFP, Supplier acknowledges that time is of the essence in this Contract and due to need to coordinate with installing contractor, City/District will suffer financial loss if the equipment is not furnished within the final schedule agreed upon by the Supplier and City/District. They also recognize the delays, expenses, and difficulties involved in proving in a legal or arbritration proceeding the actual loss suffered by City/District if equipment is not furnished on time. Accordingly, instead of requiring any such proof, City/District and Supplier agree that as liquidated damages for delay (but not as penalty), Supplier shall pay City/District the following sums for each day that expires after the times indicated (actual dates to be negotiated with the selected vendor): a) Receipt of first submittal of Shop Drawings and manufacturers data 500 b) Receipt of second submittal of Shop Drawings and manufacturers data 500 c) Completion of delivery of all equipment to the Point of Delivery 500 10. RFP, p. 5, Paragraph F15 Add note regarding retainage: Retainage shall be reduced to 5% if equipment is not installed within 90 days of delivery to site 11. Bid Schedule Revised Bid Form is attached. Requirement to include sales tax has been added to Items 1 and 4. Attachment: Revised Bid Schedule ADDENDUM NO. 1 MB 2014-WW01 Page 2 of 3

THE BIDDER SHALL EXECUTE AND ATTACH THE FOLLOWING CERTIFICATION TO THE PROPOSAL. BIDDER S CERTIFICATION I acknowledge receipt of the foregoing Addendum No. 1 to the RFP for Equipment for the 2014 City Of Morro Bay / Cayucos Sanitary District Wastewater Treatment Plant Improvement Project and accept all conditions contained therein: Dated: Bidder: By: ADDENDUM NO. 1 MB 2014-WW01 Page 3 of 3

BID SCHEDULE Bid Item 1 2 Description and Cost (All Items are Lump Sum) MECHANICALLY CLEANED MULTIPLE RAKE BAR SCREENS (2) AND CONVEYANCE SYSTEM(MCMRBS) INCLUDING SALES TAX OF 8.0% MCMRBS SHOP DRAWINGS PREPARATION and SUBMITTAL REVIEW (Max. 10% of Line Item 1): 3 MCMRBS ON-SITE OPERATOR TRAINING and START-UP: 4 5 SCREENINGS WASHER-COMPACTOR EQUIPMENT (SWCE) INCLUDING SALES TAX OF 8.0%: SWCE SHOP DRAWINGS PREPARATION and SUBMITTAL REVIEW (Max. 10% of Line Item 1): 6 SWCE ON-SITE OPERATOR TRAINING and START-UP: TOTAL Addendum 1 - Revised Bid Schedule Page 1 of 2

Sign Here Title Signature of Supplier Title of Supplier Corporate seal Business Address Telephone: Email: Facsimile: NOTE: If Supplier is a corporation, the legal name of the corporation shall be set forth above together with the signature of the officers authorized to sign Contracts on behalf of the corporation; if Supplier is a co-partnership, the true name of the firm shall be set forth above together with the signature of the partner or partners authorized to sign Contracts in behalf of the co-partnership; and if Supplier is an individual, his signature shall be placed above. Attach authority to sign if Joint Venture, Corporation, or Partnership and affix corporate seal in the location shown above. Addendum 1 - Revised Bid Schedule Page 2 of 2