Module 4 Design for Assembly IIT BOMBAY

Similar documents
Standards and Competencies

SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method

Phased Array UT Application For Boiler Tube Inspection in Manufacturing And In-Service Anandamurugan S 1, Siva Sankar Y 2

Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee

Welding Qualification/Certification

Ultrasonic Examination Of Tube To Tube Sheet Weld Joints In High Pressure Heat Exchanger For The Urea Process

WELDING FABRICATION NYS

Specifications for EA31002 U Tube Bundle for CDU 3

WELDING FABRICATION. First, download and review the General Regulations at: updates.skillsusa.org.

The end-to-end joining of coils of strip has grown in

Welded connections Welded connections are basically the same design in AISI as in AISC. Minor differences are present and outlined below.

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Engineering Policy & Procedure

stringer bead tack welds tee joint trailing electrode angle weave pattern

Application of Guided Wave Technology to Tube Inspection

MIL- B Rev NAVSEA 0900-LP

RADIOGRAPHIC EXAMINATION PROCEDURE

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

Welding 2 go. alhuzaim_af [Type the company name] 8/2/2012

Bolted Joint Types Grip Washer

Trade of Sheet Metalwork. Module 3: Thermal Processes Unit 13: MMA Butt Weld Flat Position Phase 2

NSRP All Panel Meeting

Visual Testing of Pipe Threads

SEMPEO SQA Unit Code FP38 04 Preparing and using manual flame brazing and braze welding equipment

SPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING

Ensuring Shielding adequacy in Lead shielded spent fuel transportation casks using gamma scanning

NDT KONFERANSEN ZENOVIEA VOROSCIUC

Radiographic testing: Increased detection sensitivity using optimum source to object distance

ASME B31.3 INTERPRETATIONS NO. 11

ARTICLE 28 VISUAL EXAMINATION STANDARDS

New generation of welding and inspection systems

GMAW welding and brazing of thin sheet metal using modern power sources

The Influence of a Belt Furnace on the Brazing Process

A Practical Update on Advanced Copper Alloys and On-Site Joining Methods for HVACR Systems. Educate Promote Defend Support Inspire

Introduction To NDT. BY: Omid HEIDARY

STC-205Di. Quick. Specs. For TIG, Plasma and Stick Welding A combo machine for arc welding and plasma cutting

Submerged Arc Welding Equipment

Process: DC TIG (GTAW) AC TIG (GTAW) Input Power: 230V, 1-Phase Amperage Range: A Rated Output at40 C (104 F): Maintenance and Repair

Inspection and Test Plan for Water Tube Boiler

Laser Welding System for Various 3-D Welding - Development of Coaxial Laser Welding Head -

Investment Casting Design Parameters Guide for Buyer

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)

INTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS

What is PUK? PUK 3s professional plus PUK 2 and PUK 111

Inspection Kit Alignment, Measurement & Weld Measuring Gauges Model: IK-BACT13. Welders, CWI Inspectors, Instructors

Guide to Pipe Beveling

Precision TIG 225 TIG WELDING MACHINE

NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM)

High Purity Process Piping: Harmonization of ASME Codes and Standards

PERFORMANCE CHARACTERIZATION OF AMORPHOUS SILICON DIGITAL DETECTOR ARRAYS FOR GAMMA RADIOGRAPHY

Corrosion Steel Inspection under Steel Plate Using Pulsed Eddy Current Testing

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

INSPECTION AND TEST PLAN

The Application of TOFD Technique on the Large Pressure Vessel

Module 3 Selection of Manufacturing Processes

INTERMEDIATE HEAT EXCHANGER (IHX) STP-NU-038

MAGNETC ARC OSCILLATOR MODEL : HTW-05-MG I HTW-05-MG II

StreetPrint Templates Care and Maintenance Guide

Brazing Braze Welding

SECTION VIII. ASME Boiler and Pressure Vessel Code An International Code. Div ision 1 ASME BPVC.VI I I

Digital Radiography Systems Techniques and Performance Evaluation for Space Applications

Innovation for Materials Degradation Challenges

BRAZE INSTRUCTION VIDEO

SME 2713 Manufacturing Processes. Assoc Prof Zainal Abidin Ahmad

PHASED ARRAYS FOR SMALL DIAMETER, THIN-WALLED PIPING INSPECTIONS

PRACTICAL CONSIDERATIONS AND EFFECTS OF METALLIC SCREEN FLUORESCENCE AND BACKSCATTER CONTROL IN GAMMA COMPUTED RADIOGRAPHY

Overview of V.C. Summer Hot Leg Loop A Nozzle to Pipe Dissimilar Metal Weld

MODELLING AND EXPERIMENTS FOR THE DEVELOPMENT OF A GUIDED WAVE LIQUID LEVEL SENSOR

Introduction to Manufacturing Processes

Radiographic Testing (RT) [10]

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing of fusionwelded

2.5D Finite Element Simulation Eddy Current Heat Exchanger Tube Inspection using FEMM

REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD

Goltens Miami Service GE No 3 block repair. Repaired August 2010 Clipper Caribe Houston Texas

BMM3643 Manufacturing Processes Metal Casting Processes (Sand Casting)

METAL FABRICATION MECHANICAL

Prepared by Qian Ouyang. March 2, 2013

Hand Torch or Flame Brazing Principles

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow

PENSTOCK CONDITION ASSESSMENT

BrazeTec. Selection Rules of Brazing Alloys and Fluxes

Center for Nondestructive Evaluation 304 Wilhelm Hall Iowa State University Ames, Iowa 50010

EMAT Application on Incoloy furnace Tubing Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD)

Effects of an Appropriate PCB Layout and Soldering Nozzle Design on Quality and Cost Structure in Selective Soldering Processes

Construction of Steel Penstocks using HT100 at Kannagawa Hydropower Plant

Learn more at

Metal Shaping Taught by a World Renowned Master: Fay Butler

Introduction to Fitness For Service November 10, 2016, University of Alberta, Edmonton.

TOFD Analysis Flaw Sizing and Characterization

Experimental Evaluation of Metal Composite Multi Bolt Radial Joint on Laminate Level, under uni Axial Tensile Loading

Practical Bolting and Gasketing for the Non Standard-Flanged Joint

Twin screw and barrel are the heart of extruders and play very crucial role in extruder.

Towards Real Time Diagnostics of Hybrid Welding Laser/GMAW

AWS C3.9M/C3.9:2009 An American National Standard. Specification for Resistance Brazing

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

Application Note. Soldering Guidelines for SMPS Multilayer Ceramic Capacitor Assemblies

Dec The Twisted Tube Heat Exchanger AlfaTwist. Examples of deliveries. Siljan Allards AB.

Welding-Oxy Fuel Metals Joining

Design of Machine Elements I Prof. G. Chakraborty Department of Mechanical Engineering Indian Institute of Technology Kharagpur

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Transcription:

Module 4 Design for Assembly

Lecture 8 Case Studies - IV

Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles that are outlines in the previous lectures. Name of the component / part Crevice free Tube to Tube sheet welds in Waste Heat Boiler Function of the component / part Heat exchangers are used to facilitate the process of heat transfer between the fluids. The shell and tube type heat exchangers are the most widely used for various industrial cooling applications such as in petrochemical and fertilizer plants. In such type of construction, the tubes, tube sheet and tube-to-tube sheet joints are based on principles of both mechanical as well as thermal design. Figure 4.8.1 schematically depicts a typical shell and tube heat exchanger. Figure 4.8.1 Schematic diagram of a typical shell and tube heat exchanger

The tube to tube sheet joint is the most critical joint in a heat exchanger. The applicable code of construction specifies some of the standard tube to tube sheet weld joint configurations and various tests to be performed primarily from the mechanical design considerations. For example, as per ASME Sec VIII Div-2, following are the design considerations for a typical tube to tubesheet joint in case of a heat exchanger. [a] Tubes used in the construction of heat exchangers may be considered to act as stays which support or contribute to the strength of the tube sheet [b] Tube to tube sheet joint shall be capable of transferring the applied tube loads. [c] The design of tube to tube sheet joint depends on type of joint, degree of examination, and shear load tests, if performed In a tube to tube sheet joint, Mechanical design is usually based on the shear strength of the joint and the tube thickness is based on the thermal design. Hence, tube to tube sheet is a perfect example of trade-off between thermal and mechanical design principles. Some of the conventional types of tube to tube sheet joints used in manufacturing of heat exchangers are shown in Figure 4.8.2. Figure 4.8.2 Conventional tube to tube sheet joint configurations However, over and above the requirements of standard codes, a number of additions factors needs to be considered while designing tube-to-tube sheet joint for a specific application including service conditions, manufacturability, access for inspection, equipment life and ease of repair.

Service environment Waste heat boiler is a type of heat exchanger used in fertilizer, methanol and hydrogen Plants. In reformed gas / converter gas boiler, the combinations of high pressure, high temperature and process gas composition results in higher heat fluxes in the tube inlet. This requires efficient cooling of the tubes and tube sheet, which is accomplished by keeping the tube sheet wall thickness as thin as possible. These flexible tube sheet, typically (25 to 30 mm) thick, allows good cooling by the water on the rear face and lowers the operating temperature. Boilers used in fertilizer and petrochemical process plants, which have to work at very high operating pressures require a thicker tube sheet with the thickness ranging from 300 to 500 mm e.g. synthesis loop boiler in Ammonia plant. With conventional design for the tube to tube sheet joint, high heat flux at the tube inlet causes evaporation & decomposition of water in the gap between tube & tube hole resulting in severe crevice corrosion. Crevice Corrosion It can be characterized as a localized attack on a metal surface at or immediately adjacent to the gap or crevice between two joining surfaces. Outside the gap or without the gap, both metals are resistant to corrosion. The damage is normally confined to one metal at localized area within or close to the joining surfaces. Crevice corrosion is initiated by a difference in concentration of some chemical constituents, usually oxygen, which set up an electrochemical concentration cell. Figure 4.8.3 shows a typical tube to tube sheet joint attacked by crevice corrosion. Figure 4.8.3 Tube to tube sheet joint attacked by crevice corrosion

On the contrary, providing a full penetration tube to tube sheet weld for this application will ascertain tube sheet integrity, eliminate the crevice on water side and ensure the stress in the weld to be same as that of on the tube sheet. Advantages of Crevice free design Following are considered to be advantages of crevice free joint design. Full Strength Joints without risk of crevice corrosion Volumetric Non Destructive Examination Possible Safest Joint Design (Can Be Used in Critical Service) Selection of Material Generally metals are chosen in the fabrication of Boilers. Tube and tube sheet material used for manufacturing of boilers should meet the following basic criteria. Resist high temperature H 2 attack and nitriding, Withstand design pressure and temperature, Provide sufficient ductility for forming operations, Provide easily weldability, Allow easy availability at competitive cost Typically these tube to tube sheet joints should withstand a service condition of 400 to 450 0 C temperature and 5 to 300 kg/cm2 working process. Further, the choice of a particular metal in hydrogen (H 2 ) service is based on AP1 941 that is also called the Nelson Curve [Figure 4.8.4]. Based on Nelson Curve and also considering the basic selection criteria mentioned above, Cr-Mo steels are the best suited for the given service conditions.

Figure 4.8.4 Nelson curve for use of material that would undergo H2 service conditions Selection of step-wise manufacturing processes Generally there are three different types of crevice free tube to tube sheet joints involved in manufacturing of waste heat boilers. Single side full penetration joint (Type-I) The through thickness narrow groove tube to tube sheet joint configuration is as shown in Figure 4.8.5. Figure 4.8.5 Through thickness full penetration joint

This joint design calls for large-scale development of welding technology. Factors such as limited access, difficulty of gas shielding, high degree of preheat (150 C minimum) associated with creep resistant 1 ¼ Cr ½ Mo steel and protection of weld penetration from oxidation etc.needs to be considered while selecting a suitable manufacturing (welding) procedure for producing this joint. Salient features of this type of tube to tube sheet weld is as follows Welding performed by manual GTAW process Full penetration joint welded in 12 to 15 layers Due to high thickness built up in layers, joint safety margin is very high Special GTAW torches are required for welding in narrow and deep groove using long projection of tungsten electrode. Large diameter ceramic nozzle with suitably designed gas lens is necessary for effective argon shielding inside the groove. Welding filler wire shall match the composition of tube and tube sheet material In order to account for the distortion, welding is carried out with 2 to 3 passes at a time at various portions of the tube sheet in a staggered way Procedures have been qualified to ASME Code and various customer specifications with dye penetrant test, radiography examination, macro & micro examination and hardness survey across the joint. Highly skilled welders are required for producing this joint. Lip type joint (Type-II) Here, the weld is produced at the back face of the joint as shown in Figure 4.8.6. Difficulties addressed for welding of Type-I joint are also applicable here. Figure 4.8.6 Lip type full penetration joint Here, unlike the Type-I design; the welding is completed in 2 to 4 passes depending upon the tube thickness. In the current design, the minimum leak path is very critical because of less

safety margin. With lesser margin of safety, the production of a sound joint with consistent quality and repeatability is of prime concern for satisfactory operation under severe working conditions thus necessitating the requirement for automation of these weld joints. Generally these welds are performed by automatic GTAW process with tube sheet in vertical position. Full strength Butt joint (Type-III) In this type of joint design, the joint is welded in single pass without addition of filler wire and hence the thickness of tube is limited to 4.5mm. The tube inside diameter ranges from 18 to 30 mm. The typical joint configuration is shown in Figure 4.8.7. Figure 4.8.7 Full strength butt joint Here welding is carried out by Internal Bore Welding technique from ID of the tube. The task becomes further critical due its non-accessibility since the welding has to be done at a depth of 300-500 mm from the Tube sheet face. The designer should have the full know-how of these requirements which would help him in selecting a suitable joint configuration for the given application. Selection of sequential assembly processes Many factors need to be considered while selecting the suitable assembly procedure for tube to tube sheet welding. For example, in case of Type-1 joints, channel shell is welded to the tube sheet only after completing welding of all the tube to tube sheet joints and subsequent nondestructive examinations.

In the case of Type-II joints mentioned earlier, based on the requirements for carrying out inspection of weld penetration & also to ensure proper purging of the root side, the shell course adjacent to the tube sheet is welded only after the completion of entire tube to tube sheet welding activity. Moreover, welding is done row wise as this will facilitate visual inspection from backside of the tube sheet and at the same time provide proper access for carrying out repair. However, in the case of type-iii joints, bundle layout is of fountain type. The welding sequence is selected in such a manner that there is p[roper access for purging, inspection & volumetric radiography & also for performing repair if any. The sequential assembly for Type-III joint with Internal Bore Welding is as shown below in Figure 4.8.8. Figure 4.8.8 Flow of manufacturing and assembly processes for tube to tube sheet joining

Possible defects and remedial measures Table 4.8.1 lists down the possible defects that can occur during the assembly of tube to tube sheet joints and the corresponding causes and also remedial measures for the defects. Figure 4.8.1 Possible defects, associated causes and likely remedial measures during tube to tube sheet assembly Possible Defects Cause Remedial Measures Porosity Sufficient flow of shielding and In sufficient shielding & purging gas, unclean purging gas, proper cleaning of base base material, unclean filler, etc. metal and filler wire, etc. Lack of Improper welding parameters like low Use of proper welding parameters, fusion current, high speed, unclean surface, etc. clean surface Concave / Improper welding parameters, improper arc Use of proper welding parameters, Concave length, insufficient / excess flow of shielding clean surface bead and purging gas, etc. Reduce heat input by reducing Burn Excessive heat input current, increasing speed, use of heat through sink, etc Undercut Improper welding parameters like high Use of proper welding technique and current, long arc length, high travel speed, etc welding parameters In Low amperage, tight root opening, high Use of proper welding technique and complete travel speed, short arc length, etc. welding parameters penetration Use of proper welding technique and Tungsten High amperage, poor quality of tungsten welding parameters, use of good inclusion quality tungsten electrode, etc. Crack Improper preheat temperature, high restraint, Follow recommended preheat, ensure unclean surface, base material impurity, etc. proper cleaning, etc. Crater defect Incorrect welding technique. Use of proper welding technique

Testing/ Inspections methodologies NDE/ Testing during the procedure qualification stage Generally tube to tube sheet welds are qualified as per the code of construction. For example, following are the steps involved in qualifying a tube to tube sheet welding procedure as per ASME Sec IX. Mockup welding Figure 4.8.9 depicts the details of the initial mock-up weld joints that must be produced before the final assembly is made. Figure 4.8.9 Suggested mock-up welding practices for tube to tube sheet joining Visual Examination The mockup weld joints shall be subjected to visual examination as below [Figure 4.8.10].

Figure 4.8.10 Guidelines for visual inspection of for tube to tube sheet mockup welds Liquid Penetrant Examination Subsequently, these welds shall be subjected to Liquid Penetrant test and the acceptance criteria shall be as follows [Figure 4.8.11]. Figure 4.8.11 Acceptance criteria in liquid penetrant examination of tube to tube sheet mockup welds

Macro Examination Mockup welds shall be subjected to macro-examination as per details in Figure 4.8.12. Figure 4.8.12 Guidance of macroexamination of tube to tube sheet mockup welds However, over and above the code requirements, the mockups are also subjected to various testing based on the job specification requirements like X-ray radiography and ultrasonic testing, pull out and tearing testing, crack and flaw examination, etc. Non destructive testing in production stage Production welding of tube to tube sheet is commenced only upon satisfactory qualification of the welding procedures and welding operators. Conventional tube to tube sheets are generally tested by dye penetrant examination after completion of welding. However, following are the non destructive testing that must be performed on the crevice free joints discussed here.

Type-I joints are subjected to visual examination, dye penetrant examination, air test and global hydro-test. The Type-II joints are subjected to visual examination on front and root side of weld, dye penetrant examination, air test, and global hydro test. The Type-III joints are also subjected to visual examination on front and root side of weld, dye penetrant examination, radiographic examination, air test, individual joint helium test, and individual joint hydro test and global hydro-test. Acknowledgements The help and complete support of Mr. M K Mukherjee and Mr. S. Krishnan from M/s Larsen and Tubro (Powai, Mumbai, India) are sincerely acknowledged for the preparation of the above casestudy.