COURSE SYLLABUS SURVEYING I

Similar documents
Department of Civil and Environmental Engineering

Cleveland State University

Construction Surveying and Layout

1 Exam Prep Prov Module: Distance Measurement and Leveling Questions and Answers

Introduction to Surveying. Chapter -One-

MOREHEAD STATE UNIVERSITY

10/9/2018. Introduction to Surveying. Chapter -One-

Lesson 8: Surveying the Forest

Surveying & Measurement. Detail Survey Topographic Surveying

Suveying Lectures for CE 498

Introduction to Site Layout Annotated Instructor s Guide. Module PREREQUISITES MODULE OVERVIEW OBJECTIVES PERFORMANCE TASKS

Part II: Filed School

COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey

IF YOU WERE GIVEN the task of installing a drainage

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles

Legal Description & Site Plan Requirements and Layouts

QUANTITY SURVEYS. Introduction

Chapter 8. Electronic Survey Measurement. Dr. Maher A. El-Hallaq Lecturer of Surveying The Islamic University of Gaza

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 30S/30E/30M

CE 283 L Surveying and Geomatics - Laboratory

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

The several methods for making linear measurements are quite simple and straightforward. They are described below:

PELLISSIPPI STATE TECHNICAL COMMUNITY COLLEGE MASTER SYLLABUS. CIVIL ENGINEERING DRAWING W/LAB CID 2290 (formerly CID 2195)

CAD Mechanical Design I

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

ENVI.2030L Topographic Maps and Profiles

Question bank. Unit 1: Introduction

CM 21 Construction Graphics Course Syllabus Fall Instructor: Professor Keith Bisharat

COURSE OF STUDY UNIT PLANNING GUIDE ARCHITECTURE G RADE LEVEL: CREDITS CURT BANICKI 1 F ULL YEAR MICHAEL WEBER, ASST. PRINCIPAL JULY 2018

SURVEYING 1 CE 215 CHAPTER -3-

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS

CHAPTER 7 Total Station Surveying. CE 316 March 2012

Lab #4 Topographic Maps and Aerial Photographs

SURVEYING I CENG 383

SECTION SITE SURVEYS

Advanced Computer Aided Design COURSE OUTLINE

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.

TSA Surveying Course

PELLISSIPPI STATE COMMUNITY COLLEGE MASTER SYLLABUS AUTOCAD FOR INTERIOR DESIGN: STUDIO IV IDT 2305

PELLISSIPPI STATE TECHNICAL COMMUNITY COLLEGE MASTER SYLLABUS. ARCHITECTURAL 3D MODELING W/LAB CID 2112 (formerly CID 2115)

PART XII: TOPOGRAPHIC SURVEYS

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork

NSPS SURVEY TECHNICIAN CERTIFICATION PROGRAM LEVEL I SAMPLE EXAMINATION QUESTIONS ANSWERS & GUIDE

Math certification and ARXXX or ENTXXX (STXXX) Designing with Models, by Chris B. Mills, John Wiley & Sons, 2000 [ISBN: X]

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Hours / 100 Marks Seat No.

Alabama Standards of Practice for Surveying

Introduction to Aerial Photographs and Topographic maps (Chapter 3)

Introduction to Total Station and GPS

Construction Plan Reading Basics & Applications

PRE-LAB for: Introduction to Aerial Photographs and Topographic maps (Ch. 3)

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Hartwell Lake Application for Dry Dredging

Strengthened Technical-Vocational Education Program COURSE DESIGN

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

Kankakee Community College

Perspective. Basic Perspective For Drawing

Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition)

STATE UNIVERSITY CONSTRUCTION FUND

1. Land survey Work. 2. Civil and Structural engineering services.

CHAPTER F IVE ROBOTIC TOTAL STATION

TOTAL STATION WORKSHOP

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Decide how many topics you wish to revise at a time (let s say 10)

COURSE OUTLINE. Course Number Course Title Credits. Co- or Pre-requisite BCT110 Construction Materials & Methods

Incoming Advanced Grade 7

Ecological Restoration Drafting & Design Guidelines

coordinate system: (0, 2), (0, 0), (0, 3).

EELE 201 Circuits I. Fall 2013 (4 Credits)

ARCHITECTURE CADD Course Syllabus

PRELIMINARY PLAT CHECK LIST

Engineering Surveying -1 CE212 Chain Survey

EMT TECHNICAL GRAPHICS Lab Manual (Syllabus) Fall 08

CAD RESIDENTIAL AND COMMERCIAL DRAFTING WITH CADD 3 Semester Hours

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus

S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100

DRAFT CHAPTER 10 FIELD NOTES

Checklist for Minor Plan Modification

8.EE. Development from y = mx to y = mx + b DRAFT EduTron Corporation. Draft for NYSED NTI Use Only

IAN HUMBY TEACHING. List of Hand-Outs. Levelling

PELLISSIPPI STATE TECHNICAL COMMUNITY COLLEGE MASTER SYLLABUS. FUNDAMENTALS OF TECHNICAL DRAWING W/LAB CID 1100 (formerly CID 1104)

MAPPING YOUR STREAM. TIME REQUIRED 50 minutes in Field 50 minutes in Classroom 50 minutes Homework

Instructors Manual. for. Construction Surveying and Layout. Third Edition. Part One - Surveying Field Practices. Chapters 1-10.

Architectural Drafting (DFTG 1317) Credit: 3 semester credit hours (2 hours lecture, 4 hours lab)

CENTRAL TEXAS COLLEGE SYLLABUS FOR COMM 2303 AUDIO PRODUCTION. Semester Credit Hours: 3

COURSE OUTLINE GRAPHIC COMMUNICATIONS FOR ARCHITECTURE wk Credits Class or Lecture Lab. Work Hours Course Length

Figure Sample field notes from cross-section leveling at first three stations shown in figure NAVEDTRA 14069A 15-26

REVIEW TOPICS CEEN 2320 FINAL EXAM

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

SFR 406 Remote Sensing, Image Interpretation, and Forest Mapping Spring Semester 2015

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

1 of 6. IT 1303 ENGINEERING DRAWING Fall Instructor. Phone:

South Portland, Maine Architectural and Engineering Design

PELLISSIPPI STATE TECHNICAL COMMUNITY COLLEGE MASTER SYLLABUS ADVANCED MECHANICAL DRAWING CID 1220

Right Triangle Trigonometry (Section 4-3)

CONTRACT PLANS READING

Site Plans. City of Hopkins Inspections Division st Street South, Hopkins, MN Fax

Transcription:

Solution Manual for Surveying Fundamentals and Practices 6th Edition by Nathanson Lanzafama Emeritus Link full download: http://testbankcollection.com/download/solution-manual-forsurveying-fundamentals-and-practices-6th-edition-by-nathanson-lanzafamaemeritus/ COURSE SYLLABUS SURVEYING I PREREQUISITES: MAT 155 or equivalent (Algebra & Trigonometry) REVISED: 2005 MET 109 or equivalent (Computer Aided Drafting) COURSE ORIGINATOR: JERRY NATHANSON The first of a two-part introductory sequence in plane surveying, including the measurement of distances, elevations, angles and directions. Principles and field use of traditional and modern surveying instruments are covered in lecture and practiced in lab. Fundamental surveying computations are also covered. OBJECTIVES: Surveying is a very important aspect of civil/construction engineering technology. It serves as the link between design (office) and construction (field) activities. All civil/construction technicians must be skilled and knowledgeable in modern as well as traditional surveying theory and methods. In surveying I, students will learn how to use basic surveying equipment the steel tape and plumb bob, the level and level rod, and the total station. Students will learn to plot ground profiles and contours as well as do basic surveying computations using hand-held calculators and surveying software. MAJOR TOPICS: Measurements: Errors and mistakes, accuracy and precision. Horizontal Distances: Pacing, taping and electronic distance measurement. Vertical Distances: Differential leveling, profiles, contours. Angles/Directions: Bearings, azimuths, declination, theodolite and total stations. Horizontal Control: Traverse surveys and computations Upon completion of CIT-205, the student will be able to: 1. Keep a set of neat and legible surveying field notes in acceptable format. 2. Recognize, define and explain common surveying terms and symbols. 3. Compute accuracies for horizontal and vertical distance measurements. 1

4. Use a steel tape, plumb bob, and other accessories for measurement of horizontal distances, within a specified degree of accuracy; also compute appropriate tape corrections. 5. Explain the basic principles of electronic distance measurement (EDM); use to measure horizontal distances. 6. Set up and use an automatic level, and read a level rod; also, close a benchmark leveling circuit within a specified degree of accuracy. 7. Perform profile and/or topo (grid method) leveling surveys, and to plot the elevation data as ground profiles and/or contour lines. 8. Perform direction computations involving horizontal angles, azimuths, bearings. 9. Set up over a point and use a total station or theodolite for measurement of horizontal and vertical angles; also close the horizon at a survey station. 10. Perform a loop traverse survey; also do basic traverse computations, including closure, adjustment, station co-ordinates, and enclosed area. 11. Use appropriate COGO software to perform basic traverse computations. MAJOR LAB ASSIGNMENTS: Horizontal Distances; pacing, taping. EDM Leveling; benchmark, profile, grid-topo Angular Measurement; theodolite/total station Traversing/Computations (3 weeks) (4 weeks) (3 weeks) (4 weeks) (Specifications for the lab projects will be given in class) TEXT BOOK: Surveying Fundamentals and Practices, 5 th Edition, Nathanson, Lanzafama & Kissam, Prentice Hall., 2005. GRADE DISTRIBUTION: % of Total Letter Average Tests/Quizzes/HW 50 % A 90+ Lab Assignments 25 % B+ 85+ Final Exam 25 % B 80+ 100 % C+ 75+ C 70+ D+ 65+ D 60+ F <60 2

TESTS: Two or three class tests will be given during the semester; notice will be given at least one week before each test. Make-up tests will be given at the discretion of the instructor. The maximum make-up test grade will be 80 %. A short quiz will be given each week; no make-up quizzes will be given. A comprehensive final exam will be given at the end of the semester. LABS: Instructions for lab assignments will be given and explained in class during each lab session. The overall lab grade will be based on attendance, participation, the quality of the field book. Field book specifications will be given and explained in class. Two (2) percentage points will be deducted from the lab grade for each unexcused absence from the lab session. QUIZZES: A short quiz will be given each week at the beginning of the class, covering the previous week s classwork; no make-up quizzes will be given. HOMEWORK: Assigned problems may be collected periodically during the semester and graded on the basis od accuracy, neatness, thoroughness and timely submission. FINAL: A comprehensive final exam will be given at the end of the semester. 3

Lab 1 Measuring Horizontal Distance by Pacing Part I Calibration of Unit Pace A 200 ft. long baseline on level ground will be established with a steel tape. Range poles will be used to clearly mark the beginning and the end of the line. Calibrate your pace by walking with natural steps from one range pole to the other, counting the number of paces as you walk. Record the number of paces (and estimated decimal fraction of a pace) in your field book. Repeat this at least five times, recording the number of paces each time. Compute the average number of your paces for the 200 ft. baseline distance. Compute the length of your unit pace by dividing the average number of paces into 200 ft. Record this number of feet/pace in your field book, and memorize it for future use. Convert your unit pace from feet/pace to meters/pace and record the value in your field book. (Conversion: 1ft = 0.3048m). Part II Rough Distance Measurement by Pacing Measure, by pacing, the length of a given line assigned by your instructor. Compute the length of the line using the value of your unit pace. Do this at least twice (once forward and once back), to avoid a blunder; use the average distance as your final result. Express the distance both in feet and meters. Obtain the true length of the line from your instructor, and determine your degree of accuracy for the distance measurement; it should be at least 1/50. Record all results in your field book (a sample form of notes will be available for your reference.) Several other lines may also be assigned for pacing. Reference: Sec. 1-6 (pg 23-25), Sec. 204 (pg45-48), Sec. 4-1 (pg 102-104) Surveying Practice 4

5

TEST 1 NAME: DATE: 5 pts. 1. NAME THREE TYPES OF SURVEYS AND THEIR PURPOSE A. B. C. 20pts. 2. A FARMER PURCHASES A PARCEL OF LAND DESCRIBED AS FOLLOWS: ANSWER THE FOLLOWING: A. IF THE LAND IS VALUED AT $3500.00 PER HECTARE, WHAT PRICE DID THE FARMER PAY FOR THE PARCEL? B. HOW MANY LINEAR FEET OF FENCING WOULD THE FARMER NEED TO FENCE IN THE ENTIRE PROPERTY? 6

10 pts. 3. A SURVEY CREW MEASURED THE PERIMETER OF A 4 SIDED PARCEL OF LAND WHICH IS 100 X 150. THEY USED A 100 FT. STEEL TAPE. THE TEMPERATURE WAS RECORDED TO BE 88 F, RESULTING IN A.01 CORRECTION PER 100 MEASURED. THE CREW S HORIZONTAL MEASUREMENTS WERE AS FOLLOWS: COMPUTE THE CORRECTED DISTANCE OF EACH LEG MEASURED, THE TOTAL ERROR OF CLOSURE AND THE RELATIVE ACCURACY OF THE SURVEY. 20 pts. 4. GIVEN THE FOLLOWING TUNNEL SECTION COMPUTE THE VOLUME OF EXCAVATION FOR A 300 LONG SECTIN IN CUBIC FEET AND CUBIC YARDS. 7

8

QUIZ 1 NAME: DATE: 10 pts. 1. What is the purpose of a control survey? 12 pts. 2. List two types of traverses and describe their use: 10 pts. 3. In a loop traverse the sum of the interior angles should equal what value if there are 8 stations? 20 pts. 4. Why do surveyors witness control points? Descript two methods of witnessing. 18 pts. 5. What are the basic steps to balance and close a traverse? 10 pts. 6. In an adjusted traverse the sum of the latitudes and departures should equal what value? 20 pts. 7. List (2) two common methods for balancing a traverse and indicate what assumptions they make concerning field procedures. 9

Lab 1 CONSTRUCTION LAYOUT LAB EXCERCISE OBJECTIVE: Establish line and grade stakes so that a contractor can properly install the utility vaults shown on the attached plan. EQUIPMENT: Total Station Prism Pole with Reflector Recon Data Collector Wooden stakes Hammer PROCEDURE: 1. Using the data obtained from the Topographic Survey (building corner co-ordinates) determine the coordinates of the corners of the vaults. (each crew will do one vault) 2. Enter the co-ordinates for the vaults into the data collector using the insert point routine. 3. Set the total station in a location in close proximity to your vault and using the resection route and the control points previously established, determine the location of the instrument. Backsight one of the control points to fix your orientation. 4. Using the co-ordinates of the vault set stakes 5-0 off each corner of the structure. 5. Once all the stakes are set determine the elevations on top of the stakes. 6. Prepare a cut-sheet for the contractor. 10

Lab 2 TOPOGRAPHIC MAPPING PROJECT OBJECTIVE: The basic objective of this project is to learn the field procedures used in topographic surveying, to be able to reduce field data for plotting, and be able to draw a topographic map. Students will work in a group in the field, and will individually prepare the topographic map from the group s data. PROCEDURE: 1. An area of the campus will be assigned for a topographic survey. Use the control points established from the semester s first lab. (Traverse Closure). 2. Collect the data using the total station and Recon data collector. In addition to sufficient shots for plotting and interpolating contour lines you should also locate nearby buildings, walkways, trees, fences and utilities. A rough sketch should be drawn in the field book indicating traverse points used and starting benchmark. 3. Down load data to TDS software program and obtain co-ordinate and elevation listing of each data point. 4. Using the co-ordinates plot the data points on a sheet of graph paper at a scale of 1 =20 or 1 =30 depending upon the size of the area surveyed. 5. Once all the data points are plotted connect building lines, fence lines, etc, also plot trees and ground elevations. Interpolate contours at 1 foot intervals. 6. Final map should have a north arrow, title block, graphic scale and legend of line types and symbols used. 11

12

13