Design Considera ons & Installa on Guidance

Similar documents
Versatrim Side-Snap Frame

Versatrac R-System Stock Extrusions, Clips and Accessories

Versatrac R-System Stock Extrusions, Clips and Accessories

Thermally Broken Framing and Door Installation

Heavy Wall Applied Stop Tube Frame and Door Installation

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

C-Series & S-Series Classic Frame with Transom (Single or Pair)

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

Heavy Wall Applied Stop Tube Frame and Door Installation

Page 1. FIG. #1 - Shower Door Assembly SHOWER & BATH ENCLOSURES BUILT TO LAST A LIFETIME HANDLE ASSEMBLIES REMOVED FOR CLARITY.

1 PREPARE HEADER AND ROUGH OPENING

Figure #1 - VSNEO Shower Door Assembly

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

Chapter 18. Interior Doors

FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

3/16 FRAMED SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Parveneer Positive Pressure Fire Rated Frames Double rabbet with T stop for 20 minutes

Installation Instructions Models: SESD180, DESD180, MESD180 1/4" Semi-Frameless Door and 3/8" In-Line Panel

Storefront Installation Guide

FIG. #1 - ASD & USD 180/280 Shower Door Assembly

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Ballistic Fiberglass Doors & Frames

ARCHITECTURAL STICK SYSTEMS

FIRE RATED DOOR AND FRAME GENERAL REQUIREMENTS

ESA-200 Fixed Sidelite

Double Swing Door With Header QCI5114

Revision Date: April 01, Paramount Enclosure

INTERIOR ALUMINUM DOORS AND FRAMES

Desk/Wall-Mount Rack

YSG 40/50/50T Window Wall System Installation Manual

L e g e n d Inline panel shower enclosure installation Instructions (400 Series)

Privacy Wall Glass Selections - Polished Edge Slider Door

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

YES 40 FS/FI Storefront System Installation Manual

IMPORTANT NOTICE WARRANTY WILL BE HONORED ONLY IF THE JAMBS HAVE BEEN INSTALLED IN ACCORDANCE WITH THESE INSTALLATION INSTRUCTIONS

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009)

4-lite Patio Door. Installation Instructions

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

Assembly Instructions

YCW 752 Outside Glazed Curtain Wall System Installation Manual

SPLIT FRAME INSTALLATION INSTRUCTIONS

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

YES 600 Thermal Clip Storefront System Installation Manual

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

ESA-100 Fixed Sidelite/Non Breakout

YWE 40 T Window Wall System Installation Manual

Mulling & Transom General Installation Instructions

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

ICU TRACKLESS SLIDING DOOR

Safety glasses Measuring tape Level Pencil Power drill Center punch Phillips screw driver Saw horse

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

ESA-300 Full Breakout

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Atrium Patio Door Field Service Manual

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

Thanks for shopping with Improvements! Wood Slat Pet Swing Gate Item #441937

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

Non-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

YES 45 TU Thermal Storefront System Installation Manual

Table of Contents F Series Frames

INSTALLATION INSTRUCTIONS

Frameless Inline Door With Return QCI5263

x2 1/4 (6mm) Floor Anchor

Office Installation Guidelines

INSTALLATION GUIDE. TRANZFORM Sound TRANZFORM Space

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Model GT 2300 ICU Manual Swing Door Unequal Panels - Smoke Rated

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Installation Instructions Window Opening Control Device. Single-Hung & Sliding Windows with No Vent Latches

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

Installation Instructions for Vista Air Vertically Folding Walls

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

YES 45 FS/FI Storefront System Installation Manual

Installation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:

INSTALLATION INSTRUCTIONS FOR A&L PRODUCTS

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

SERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation.

Swing Door Installation Manual

Installation Instructions. Oakmont Folding Doors

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Steel Reinforced Joining Guide (Horizontal / Vertical)

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

YES 45 XT High Performance Thermal Storefront System

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Chapter 9. Windows and Exterior Doors

Transcription:

Design Considera ons & Installa on Guidance LiteSpace Interior Aluminum Framing provides a slim profile for glass walls and office fronts. It is designed to be cut to length on project sites for finished, cased openings or unfinished deck-todeck applica ons. You should review the Design Considera ons sec on of this document. Read through the instruc ons before installa on. Special-Lite makes no representations regarding the products intended application and use. It shall be the sole responsibility of the user to determine suitability, use, and appropriate reinforcement and/or anchors of Special-Lite interior aluminum framing and integrated glass. These instructions are provided to help prevent installation problems caused by most common errors. They are strictly recommendations and are not intended to be a step-by-step, foolproof installation checklist suitable for every situation. There are many variations of installations not covered in these instructions that Special-Lite assumes are general construction knowledge to an experienced installer. Selection of an experienced installer is the sole responsibility of the project owner or responsible party. Failure to follow good practice in installation will void the warranty on Special-Lite products. If you have any questions about installation techniques for your particular project, please call 1-800- 821-6531 and ask for a Special-Lite Customer Service Representative. 1

Design Considera ons Before ordering and attempting installation of LiteSpace, consider all of the following guidelines to ensure correct application of this product. Opening Details LiteSpace is designed to be mounted on finished, cased openings. The opening surfaces MUST be level, plumb, and square. The opening surfaces must be clean (with no buildup of drywall or putty). When sliding doors are to be used, the header of the opening must be reinforced. See section, Sliding Door Header Reinforcement. With hinge jamb mounted to vertical intermediate mullion: Maximum door height: 8 feet (2.44 m) Maximum door weight, including glass and hardware: 140 lbs (63.5 kg) Max 25 lbs Max 25 lbs 8 140 lbs Cut to Length LiteSpace extrusions are delivered in lengths of 126 inches. Cut these extrusions to length to fit your desired opening. Standard Eleva on Limita ons Swinging Doors With hinge jamb mounted to finished wall: Max. Opening Height: 10 feet (3.05 m) Maximum door height: 10 feet (3.05 m) Maximum total door weight, including glass and hardware: 175 lbs (79.4 kg) Sliding Doors Maximum door height: 10 feet (3.05 m) Maximum door weight, including glass and hardware: 264 lbs. (120 kg) Transoms are not permitted 9 264 lbs 10 10 10 175 lbs Side-lite with Horizontal Mullion Glass weight should not exceed (22.7 kg) per section 2

Transom Glass weight should not exceed (22.7 kg) per section Should not exceed 36 (.91 meters) per section Glazing Specifica ons LiteSpace is designed for 3/8 glass but can also accommodate ¼ or ½ thick glass. The glass is secured with a vinyl bulb. You MUST pull the vinyl glazing bulb into LiteSpace extrusions before they are installed. The factory may have preinstalled your glazing bulb for an additional cost. LiteSpace uses snap-in glass jamb pockets to accommodate glass installation. These pockets must be considered during the glazing stage. The two sizes of pockets are meant to be placed opposite each other. For consistency, Special-Lite recommends using the deep pocket for the header. The deep pocket on the header or ceiling allows glass to be lifted up and set in bottom channel. Intermediate mullions between sheets of glass require special consideration. When butting glass sheets against each other, you can wet glaze or use the polycarbonate I-beam with glazing tape. When using the I-beam/glazing tape supplied by us, the glass must be beveled. Sliding Door Header Reinforcement The weight of a hanging, glass-laden door puts significant stress on the header of the opening. The header for a LiteSpace sliding door application REQUIRES reinforcement. WARNING Risk of serious injury or death. Without reinforcement, there is a high risk for falling door and glass. Reinforce metal studs with ¾ plywood (recommended). Please see below. Drop ceilings require special consideration. They should be reinforced to handle loads as much as 100 lbs per square foot in the area above the opening. Door Mute You MUST pull the door mute into LiteSpace extrusions before they are installed. The factory may have preinstalled your door mute for an additional cost. 3

LiteSpace Installa on: Ver cal Mullion Applica on Parts supplied by Special-Lite: SP-038 Base setting channel SP-040 H-channel stud SP-039 Snap-in door stop SP-002 Shallow glazing channel SP-003 Deep glazing insert channel SP-028 Hinge/latch reinforcement (factory preinstalled on butt hinges) SP-020 Sill base glass snap stop SP-035 Sill base with snap stop B-clip Mullion clip F-clip Frame vertical to base setting channel Glazing bulb (factory preinstalled or loose) Door mute (factory preinstalled or loose) Tools required: Miter saw Drill Screwdriver Screws and/or fasteners Spreader bar Measuring tape Level All glazing bulb and door mute materials must be pulled in before installation. Notching or insetting parts to leave room for clips will affect glass measurements. 4

Step 1: Install horizontal and ver cal base se ng channels on three sides of opening (see fig. 1). Step 3: Install shallow glazing channel on le side of rough opening (see fig. 2). Figure 1: Detail Drawing 1 1. Determine size of rough opening. 2. Measure and cut SP-038 to entire width of opening for header, leaving 1.75 at header. 3. Measure and cut SP-038 to desired length for hinge side of door opening, leaving 1.75 for finished floor on bottom. 4. Measure and cut SP-038 to desired length of opposite wall. 5. Secure SP-038 to finished walls. Figure 2: Detail Drawing 4 1. Measure and cut SP-002 to desired length. 2. Preload B-clip to SP-002 at header (see fig. 3). Step 2: Install horizontal H-channel stud at header. 1. Measure and cut SP-040 to entire width of opening for header. 2. Snap and secure SP-040 to SP-038 at header. Figure 3: B-clip mullion clip 5

3. Preload F-clip at bottom of SP-002 (see fig. 4). 6. Reinsert SP-028 into hinge jamb assembly. 7. Measure and cut hinge assembly at bottom to desired length, allowing space for finished floor. 8. Preload B-clip to vertical SP-040 at header. 9. Snap and secure SP-040 to SP-038. 10. Use B-clip to secure vertical SP-040 at header. 11. Countersink fasteners to reinforce attachment of vertical SP-040 to wall. Figure 4: F-clip frame vertical to base setting channel Step 5: Install ver cal H-channel stud on strike jamb side of opening (see fig. 6). 4. Snap SP-002 to vertical SP-038 on left side of rough opening. 5. Use B-clip to secure SP-002 to vertical SP-038. 6. Countersink fasteners to reinforce attachment of SP-002 to wall. Step 4: Install ver cal H-channel stud on hinge jamb side of opening (see fig. 5). Figure 6: Detail Drawing 54 Figure 5: Detail Drawing 3 1. Locate corresponding hinge jamb assembly, including SP-040, SP-028, and SP-039. 2. Remove SP-039 from hinge jamb assembly and place to side. 3. Trim top of hinge jamb assembly to achieve correct hinge location. 4. Remove SP-028 from hinge jamb assembly. 5. Trim an additional 2 off top of SP-028 to allow space for B-clip. 1. Determine size of door opening. 2. Locate corresponding strike jamb assembly, including SP-040 and SP-039. 3. Remove SP-039 from strike jamb assembly and place to side. 4. Trim top of assembly, to achieve correct strike location. 5. Measure and cut strike jamb assembly at bottom to desired length, allowing space for finished floor. 6. Locate SP-028. 7. Measure and cut SP-028 from top of SP-040 to top strike clip, subtracting 2 to make room for B-clip. 8. Measure and cut SP-028 from bottom of SP-040 to bottom strike clip. 6

9. Slide SP-028 lengths between SP-039 and SP- 040 on corresponding ends of strike jamb (see fig. 7). 3. Snap horizontal SP-039 to horizontal SP-040 at header. 4. Ensure prep location on hinge assembly (SP- 040, SP-028, and SP-039) is aligned. 5. Measure SP-039 to desired length for hinge side of door, allowing space for finished floor at bottom. 6. Cut vertical SP-039 at 45-degree angle at header. 7. Snap vertical SP-039 to vertical SP-040 on hinge side of door. 8. Repeat steps 4-6 on strike jamb side of door, ensuring that strike preps are aligned. Figure 7: SP-028 placement 10. Secure latch reinforcement. a. Ensure the bottom of SP-028 is flush with SP-040. b. Using a #29 drill bit, drill holes through SP-028 and SP-040 1 from the bottom of the strike jamb and 3 from the top of the strike jamb. c. Countersink with 82-degree countersink. d. Install #8-18 flat head screws in each hole. e. Using a #29 drill bit, drill holes through SP-028 and SP-040 1 below and 1 above strike clips. f. Repeat steps 9c-9d in each hole drilled. g. Drill through SP-028 and SP-040, countersink, and install #8-18 flat head screws every 12. 11. Preload B-clip to vertical SP-040 at header. 12. Use B-clip to secure vertical SP-040 to horizontal SP-040 at header. Step 7: Install shallow glazing channel to end of opening (see fig. 8). Figure 8: Detail Drawing 41 1. Measure and cut SP-002 to desired length. 2. Preload B-clip to SP-002 at header. 3. Preload F-clip at bottom of SP-002 at end of opening. 4. Snap SP-002 to SP-038 at end of opening. 5. Use B-clip to secure SP-002 to SP-040 at header. Step 6: Install door stops. 1. Measure SP-039 to desired width for door at header. 2. Cut both ends of horizontal SP-039 at 45-degree angle. 7

Step 8: Install horizontal deep glazing insert channel at header to le of door (see fig. 9). 2. Cut SP-038 and SP-035 to desired width. 3. Use preloaded F-clips on SP-002 on left side of sidelite and SP-040 on hinge jamb side of door to align and secure horizontal SP-038. 4. Snap SP-035 to SP-038 at floor. Step 10: Install base receiving channel and shallow glazing channel at sill to right of door (see fig. 11). Figure 9: Detail Drawing 5 1. Measure width between vertical SP-040 on strike jamb side of door and SP-002 on end of opening. 2. Cut horizontal SP-003 to desired width. 3. Snap and secure horizontal SP-003 to horizontal SP-040 at header. Step 9: Install base receiving channel and sill base with snap stop to le of door (see fig. 10). Figure 11: Detail Drawing 6 All glazing bulb and door mute materials must be pulled in before installation. 1. Measure width between SP-040 on strike jamb side of door and SP-002 on end of opening. 2. Cut SP-038 and SP-002 to desired width. 3. Use preloaded F-clips on SP-040 on strike jamb side of door and on SP-002 at end of opening to align and secure horizontal SP-038. 4. Install additional anchors every 18 on center. 5. Snap horizontal SP-002 to SP-038 at floor. Figure 10: Detail Drawing 12 All glazing bulb and door mute materials must be pulled in before installation. 1. Measure width between SP-002 on end of opening and SP-040 on hinge jamb side of door. Step 11: Install horizontal deep glazing insert channel at header to right of door. 1. Measure width between vertical SP-040 on strike jamb side of door and SP-002 on end of opening. 2. Cut horizontal SP-003 to desired width. 3. Snap and secure horizontal SP-003 to horizontal SP-040 at header. 8

Step 12: Install ver cal deep glazing insert channel to le side of sidelite. 1. Measure Daylight Opening (DLO) at sill to underside of header. 2. Trim SP-003 to desired width. 3. Notch or inset SP-003 to make room for clips. 4. Snap SP-003 to backside of strike jamb. Step 13: Install sill base with snap stop at sill to le of door. Do not install the sill base with snap stop until glass is installed. 1. Measure width between SP-002 on end of opening and SP-040 on hinge jamb side of door. 2. Cut SP-020 to desired width. 3. Slide SP-020 onto SP-035. 9