NWP of 10 Enclosure

Similar documents
NWP Page 1 of 13 Enclosure 1

I FIG URE I. Location and general topography for the CarMax project in Salem, Oregon (USGS Salem East, Oregon. Quadrangle, 1969, photo revised 1986)

NWP of 9 Enclosure

Figure 1 Site Location Map Joint Permit Application: The Ridge at South Cooper Mountain West Hills Land Development. Project Site WASHINGTON COUNTY

Porter County Plan Commission

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

Corps No. NWP Page 1 of 9

Information for File # RMM

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Grading, Erosion and Sediment Control (GESC) Checklist

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

Lab #4 Topographic Maps and Aerial Photographs

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)

Map and Drawing Standards for the South Pacific Division Regulatory Program

Conceptual, Preliminary and Final Site Plan Review in Holladay City

City of Massillon Site Plan Checklist

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

Hartwell Lake Application for Dry Dredging

Minor Site Plan Application and Checklist Land Disturbing Activities

ENVI.2030L Topographic Maps and Profiles

PLANNING AND DEVELOPMENT

SPECIAL PUBLIC NOTICE

Essential Skills: Reading and Interpreting Maps and Plans

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

Land Use & Development Application

Phone Number: Address:

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

List of Figures. List of Forms

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

SPECIAL PUBLIC NOTICE

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

A. Dewatering observation wells are part of dewatering allowance.

Subdivision Application Checklist

PRE-LAB for: Introduction to Aerial Photographs and Topographic maps (Ch. 3)

Site Plan/Building Permit Review

STATE UNIVERSITY CONSTRUCTION FUND

CONCEPT REVIEW GUIDELINES

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

CHAPTER 11. Plan Standards

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

CITY OF MERCER ISLAND

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

Town of Apex, North Carolina

COPYRIGHTED MATERIAL. Contours and Form DEFINITION

CITY OF MUSKEGO DRAFTING STANDARDS

Application for Site Plan Review

Introduction to Aerial Photographs and Topographic maps (Chapter 3)

Last Name: First Name: M.I:

Project Name: County File No.: Checked by: For: Date:

VICINITY MAP LOCATION MAP GRAPHIC SCALES

Town of Skowhegan Application For Development Review

Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition)

MILL HILL ARTS VILLAGE

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

Legal Description & Site Plan Requirements and Layouts

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

NWP Page 1 of 14 Public Notice Figures

1. The topographic map below shows a depression contour line on Earth's surface.

Technical Memorandum ECO-7

Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

BACKGROUND INFORMATION

ADMINISTRATIVE DESIGN REVIEW Information

PRELIMINARY PLAT CHECK LIST

IF YOU WERE GIVEN the task of installing a drainage

1.1 GENERAL RECORD DRAWING REQUIREMENTS

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID)

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

Natural Resource Inventory/Forest Stand Delineation(NRI/FSD) and Forest Conservation Plan Exemption

DECK PERMIT APPLICATION PACKET

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

Site Development Permit Submittal Requirements

TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03

Module 2: Mapping Topic 3 Content: Topographic Maps Presentation Notes. Topographic Maps

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

RE: Engineered Riffle Concepts for Sodom Dam Removal Grade Control Elements

Applying for a Site Development Review

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

APPLICATION FOR SITE PREPARATION PERMIT

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Transcription:

#6301 4/16/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 Project Site General Location and Topography Reed Pit Expansion - Marion County, Oregon United States Geological Survey (USGS), Gervais, Oregon, 7.5 Quadrangle, 2017 United States Geological Survey (USGS), Mission Bottom, Oregon, 7.5 Quadrangle, 2017 (viewer/nationalmap.gov/basic) 1 NWP-2018-370 1 of 10 Enclosure

#6301 4/16/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 Project Site Tax Lot Map Reed Pit Expansion - Marion County, Oregon The Oregon Map (ormap.net) 2 NWP-2018-370 2 of 10 Enclosure

#6301 4/16/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 Project Site Aerial Photo Reed Pit Expansion - Marion County, Oregon GoogleEarth, 2018 3 NWP-2018-370 3 of 10 Enclosure

Continues Beyond Wetland D (1.32 ac) Continues Beyond (4.85 ac) Farm Access Road Wetland H (0.01 ac) Wetland I (0.03 ac) Wetland G (0.01 ac) Wetland F (0.003 ac) Existing Quarry Pond (30.11 ac) Wetland E (0.01 ac) Wetland B (0.59 ac) Wetland C (0.94 ac) Continues Beyond Continues Beyond LEGEND (72.44 ac) Wetland (Site Total 7.70 ac) Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Potentially Non-Jurisdictional Areas (0.06 ac) Existing Quarry Pond (30.11 ac) Existing Conditions 4 5-14-2018 Phone: (503) 570-0800 Fax (503) 570-0855 X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig4 ExistCond.dwg, 6/28/2018 1:46:34 PM, DWG To PDF.pc3 NWP-2018-370 4 of 10 Enclosure

Proposed Temporary Diversion Discharge Point Proposed Silt Fence Wetland D Permanent Impact / Removal (4.31 ac/ 1,200,000 cy) A Proposed Silt Fence Construction Access and Staging A' Proposed Farm Access Road Wetland H Proposed Mitigation Area See Figure 6 Wetland I Excavation Area Wetland G SEE 5B Wetland F Existing Quarry Pond Wetland E Proposed Silt Fence Wetland B Permanent Impact / Fill (0.18 ac / 900cy) Proposed SEE 5A Temporary Diversion Pipe Follows Center of Road Wetland C Proposed Farm Access Road NOTE: For Cross Section A-A' See Figure 5C. LEGEND (72.44 ac) Wetland (Site Total 7.70 ac) Potentially Non-Jurisdictional Areas (0.06 ac) Wetland Impact Site Total (4.60 ac) Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Existing Quarry Pond (30.11 ac) Site Plan Overview and Sheet Index 5 6-13-2018 Phone: (503) 570-0800 Fax (503) 570-0855 X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig5 SitePlan OV.dwg, 6/28/2018 3:19:14 PM, DWG To PDF.pc3 NWP-2018-370 5 of 10 Enclosure

Existing Quarry Pond Excavation Area Proposed Limit of Excavation Proposed Sediment Fence Proposed Temporary Diversion Dam (Temporary Impact 0.01 ac/ 85 cy fill) Proposed Farm Access Road Proposed Temporary Diversion Pipe (Impact 0.10 ac/ 850 cy fill) Proposed Limit of Fill for 2:1 Side Slopes Proposed Sediment Fence LEGEND Proposed Two 12-inch Culverts Wetland Wetland Impact Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Phone: (503) 570-0800 Fax (503) 570-0855 Wetland Impact and Stream Diversion Detail 5A 5-14-2018 X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig5A StreamDivers.dwg, 6/28/2018 1:56:21 PM, DWG To PDF.pc3 NWP-2018-370 6 of 10 Enclosure

Wetland B (Impact 0.18 ac/ 900 cy fill) Proposed Farm Access Road Existing Quarry Pond LEGEND Wetland Wetland Impact Topographic contours provided by Eagle Digital Imaging. Contour interval is 2 feet. Bathymetric contours provided by Northwest Hydro Inc. Bathymetric contour interval is 10 feet. Phone: (503) 570-0800 Fax (503) 570-0855 Wetland Impact Detail 5B 5-14-2018 X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig5B SitePlan.dwg, 6/28/2018 1:57:21 PM, DWG To PDF.pc3 NWP-2018-370 7 of 10 Enclosure

NWP-2018-370 8 of 10 Enclosure Water Proposed to Mine Previously Mined Previously Mined Fill Temporary Drainage Diversion Pipe Limit of Mine Excavation Wetlands Overburden Water Gravel in this area will not be removed Gravel to be removed Cross Section A-A' Not to Scale Phone: (503) 570-0800 Fax (503) 570-0855 Typical Quarry Excavation Detail 5C 5-14-2018

LEGEND Existing Wetland Proposed Wetland Creation (7.08 ac) Proposed Upland Buffer (1.73 ac) Habitat Structures Direction of Flow Wetland D B B' Existing Quarry Pond NOTES: See Figure 6A for Mitigation Section B-B' See Figure 6B for Mitigation Plant List See Figure 6C For Habitat Structure Details Wetland B Wetland C Phone: (503) 570-0800 Fax (503) 570-0855 Wetland Mitigation Plan 6 6-13-2018 X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig6 MitPlan.dwg, 8/16/2018 9:30:02 AM, DWG To PDF.pc3 NWP-2018-370 9 of 10 Enclosure

NWP-2018-370 10 of 10 Enclosure Proposed Wetland Mitigation Area 120 110 100 90 80 70 60 50 40 3:1 Match Existing Grade at Elevation 122' Water Surface (Elevation = 105') Existing Grade Proposed Wetland Surface Elevation = 105' Wetland Mitigation Cross Section B-B' Wetland Mitigation Cross-Section B-B' Phone: (503) 570-0800 Fax (503) 570-0855 X:\Project Directories\6300\6301 Reed Pit Expansion\AutoCAD\Plot Dwg\JPA Figures\Fig6A Mitigation-Xsect.dwg, 6/21/2018 11:42:12 AM, DWG To PDF.pc3 130 120 110 100 90 80 70 60 50 40 6A 6-13-2018