From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

Similar documents
Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

An Introduction to Oil & Gas Drilling and Well Operations

/ Petroleum Engineering Services

Well Abandonment Services. Plug into a New Approach

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

Join a winning team and engineer your future with Expro

subsea annulus management call for proposals

Subsea Intervention: Is It Worth It? Drummond Lawson

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

Designing Subsea Wells for Abandonment & Suspension

Oil and Gas UK Well Integrity Guidelines

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

We ll Get You There. Petroxin Petroleum Solutions 2016

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

ENGINEERING SERVICES CONSULTANCY

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Expro Perforation Services

GTSC Rig for Hands-on Training

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

HELIX ENERGY SOLUTIONS

Testing Services Training. Field-proven training and competency development programs

COILED TUBING & E-COIL SERVICES COIL DRILLING TECHNOLOGIES

MARS. Multiple application reinjection system

Be a Differentiator in Management of Well Integrity and Risk for Deepwater O&G Wells

Shell Subsea Experience

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

IWCF Well Control Level 5. Celle Drilling Conference 2017

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

Acquisition of GEODynamics. December 13, 2017

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

Meeting the Decommissioning Challenge. Addressing the cost and safety issues of abandoning wells

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

Tomorrow's Energy Designed Today TECHNOVA

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

Contents. Our vision. Our values. Safety performance. Global service structure. Technology and innovation. Our capabilities.

Welltec Pareto Offshore Conference September 4, 2013

4 Briefing. Responsible investor

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Maximising Well Intervention Efficiency in the Gulf of Mexico: A New Best Practice Model

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

Industry Response - Post Macondo

MIDDLE EAST WELL INTEGRITY WHITEPAPER

FASTER. SIMPLER. BETTER. P&A AND SLOT RECOVERY; REDEFINED.

Well Abandonment & Field Decommissioning. Product Catalogue Destini Oil Service 1

Marginal Project Development

Fluids.

Well Integrity Life Cycle Management for Subsea Field Development A Regulator s Perspective

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

COILED TUBING DESIGN & OPERATIONS

Deepwater well design, construction & drilling operations

Meters. Surveillance on demand.

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

Experience, Role, and Limitations of Relief Wells

Gaining an improved insight into subsea production

Brent Charlie Ultra Late Life. A Journey in Optimising for Platform Decommissioning

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

SAFER, SMARTER, GREENER

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

Emergency Pipeline Repair Solutions and Future Contingency Planning

CJENERGY.COM COMPANY OVERVIEW EXCELLENCE DELIVERED

PRODUCTION OmniWell SUBSEA PERMANENT RESERVOIR MONITORING SYSTEM Acquire real-time data for more informed reservoir decisions and enhanced production

Emerging Subsea Networks

EFD Workshop - Well Integrity

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Taking a broader view

Efficiency of Time Comparing with Modular Rigs for Workover Operation

SUBSEA 101. Find more Subsea 101 case studies online

Driving down the costs of decommissioning through technology. Malcolm Banks & Susi Wiseman Offshore Decommissioning Conference, November 2017

Initial Drilling Program Update

SUBSEA CONTROLS & COMMUNICATIONS SOLUTIONS

In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV

scinnovation-global.com Innovative Engineering Robust Solutions

Cathodic Protection & Monitoring

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

ACTEON FLS - DECOMMISSIONING

Efficiency of Time Comparing With Modular Rigs for Work-Over Operation

Macondo Blowout Lessons Learned for Prevention and Mitigation

Personalized Service, Industry Expertise. Franklin Howard

WELLBORE ABANDONMENT CHALLENGES & OPERATIONS A-1, A-2, A-3, A-5, A-6, DEEP MENSA A-4 (PREVIOUSLY ABANDONED)

2009 Half Year Results Summary

Hunting PLC Annual Results 2010

Horizontal and Multilateral Wells

Advanced Well Completion Design

Coiled-tubing operations and basic tools

Comprehensive Plug and Abandonment Systems

Keeping Your House in order?

ENGINEERING INNOVATION

Intervention/Decommissioning

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

ACID STIMULATION CASE STUDY

Lifting Engineering. Capability & Experience

DrillWell Drilling and Well Centre for Improved Recovery

Conference Agenda. May 24, pm: Pre-conference Networking Drinks Reception and pre-registration

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

Quad 204 Schiehallion Field Restarting a brownfield subsea development

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Transcription:

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

LATE-LIFE RESERVOIR MANAGEMENT All oil and gas fields will reach the end of their lifecycle. Ageing wells present complex issues and it is vital to effectively plan the late-life asset operations to realise the economic potential of the asset prior to full decommissioning. Expro provides remedial well operations that are necessary to optimise or enhance production, prior to abandonment. Candidate well selection Production optimisation Well abandonment design We support our clients in providing the right information, at the right time, to make their production enhancement, intervention and abandonment decisions. Expro regularly assists clients in determining the economics of well operation, including information relating to revenue generation and operating costs. Production forecasting Well integrity assessment and remedial well operations Well maintenance and interventions Reservoir monitoring and data acquisition Working with customers, Expro maximises the production from wells in later life, revitalising them to overcome system limitations. This requires a comprehensive understanding of reservoir, wellbore and surface process facilities and pipelines. Our service combines Expro s wealth of experience in providing: Subsurface and reservoir engineering Production technology Surface process engineering Well intervention and remediation Temporary late-life modular production facilities Expro understand our client s challenges associated with reentry and abandonment of an ageing well. This includes safety, environmental and legislative requirements to permanently isolate the reservoir, wellbore and remediate the well location. We will design a tailor-made plan that ensures minimum cost and maximum operational efficiency: Well integrity assessment Regulatory consents and applications Well abandonment programme creation Time and cost estimates Scoped evaluation of solutions and economics

WELL INVESTIGATION AND PREPARATION Knowledge of the well integrity status gained through rigless well intervention removes uncertainty in the planning process, creating efficiencies and cost reduction in the final abandonment execution. Expro can deliver this information using fit for purpose solutions prior to mobilisation of expensive equipment, which can then be used in order to decide the correct campaign approach for the field. Well integrity management Up to date integrity status of the well stock can be used to decide the appropriate campaign approach for the field. SafeWells well integrity data management system Tubing evaluation/tubing caliper surveys Downhole video and camera services Wellhead maintenance and leak detection services Well integrity consulting and engineering Wellbore access Engineering risk can be mitigated and solutions developed through well intervention. Determine ability to set barriers and intervene in the well safely Determine suitability for thrutubing abandonment Ranking of project abandonment candidates Rig or rigless, slickline and electric line services Heavy duty wireline fishing Explosive services, radial cutting and tubing punches Wellsite supervision of intervention operations Suspension plugs, cement and verification Once access is proven, the existing cement can be logged and plugs can be set to isolate the reservoir. Cement bond logging to verify cement competency Set plugs prior to permanent abandonment CaTS - temporarily abandon subsea wells with monitored suspension plugs, creating efficiency and eliminating steps on subsequent program

PERMANENT RESERVOIR ABANDONMENT We understand the challenges associated with re-entry and abandonment of an ageing well and meeting the safety, environmental and legislative requirements to permanently isolate the reservoir, wellbore and remediate the well location. Technology development and collaboration is part of Expro s well abandonment approach. This is demonstrated through our long-term working relationships with technology partners, allowing us to deliver a truly world-class, fully integrated decommissioning service solution. Reservoir isolation Involves restoring the cap rock where all permeable zones penetrated by the well are isolated by permanent barriers, typically mechanical bridge plugs are set and topped by cement plugs. Barrier verification is required before final abandonment. Industry leading subsea landing strings for safe wellbore access. Tubular/casing string integrity checks, caliper, cement bond logging Low cost Installation of permanent barriers using slickline Containment of hydrocarbons at surface Independent (direction of flow) barrier verification Wellbore and wellhead remediation Intermediate well abandonment may require annuli between casing strings to be tested for integrity, and remediated if required prior to placement of permanent barriers within the wellbore. Xmas tree, wellhead removal and re-certification Barrier verification, tubular/ casing string integrity checks Tubular/casing selective perforating Remediation perf and wash, perf and squeeze or milling Tubular/casing cutting and removal Installation of permanent barriers Hydrocarbon free facility Prior to final decommissioning the facility must be made safe and hydrocarbon free. Facilities and pipelines are flushed in preparation for deconstruction activities and once the site is clear there is the final requirement to monitor the site. Hydrocarbon handled through temporary mobile production equipment Facilities/flow lines flushed and isolated from wells Facility/pipeline deconstruction Site remediation and monitoring: CaTS, Expro s wireless communications technology makes it possible to monitor the pressure and temperature in suspended or permanently abandoned wells

abandonment@exprogroup.com exprogroup.com