Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Similar documents
Oil and Gas UK Well Integrity Guidelines

An Introduction to Oil & Gas Drilling and Well Operations

IWCF Well Control Level 5. Celle Drilling Conference 2017

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

UK Onshore Well Integrity

GTSC Rig for Hands-on Training

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

4 Briefing. Responsible investor

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

Keeping Your House in order?

AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999.

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

Industry Response - Post Macondo

Stewardship. Expectations. SE-06 Production Optimisation Implementation Guide

Industry & Govt Changes Post Macondo

Spill Prevention and Spill Response. Canada-Newfoundland and Labrador Offshore Petroleum Board

Means-, Management- or Performance-Based Regulation

/ Petroleum Engineering Services

Subsea Intervention: Is It Worth It? Drummond Lawson

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

MIDDLE EAST WELL INTEGRITY WHITEPAPER

Macondo Blowout Lessons Learned for Prevention and Mitigation

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

Well Abandonment & Field Decommissioning. Product Catalogue Destini Oil Service 1

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

Intervention/Decommissioning

This document is a preview generated by EVS

Guidelines for the design, installation and management of small bore tubing assemblies

7 Briefing. Responsible investor

Learning from the Causes of Failures of Offshore Riser Emergency Shutdown Valves

Subsea Services. Providing the full scope of services, from installation to abandonment

AADE Houston Chapter. Group. 26 January 2011

We ll Get You There. Petroxin Petroleum Solutions 2016

Deepwater well design, construction & drilling operations

Cautionary Note. Forward-Looking Statements

Effective Implementation of Subsea Integrity Management

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions

Regulations on decommissioning and plugging

OBSERVATORY SERVICING AND MAINTENANCE

SAFER, SMARTER, GREENER

MONTARA DEVELOPMENT PROJECT The Montara development project is located in the Timor Sea approx 650 km west of Darwin. PTTEP owns and operates 100 per

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

Title: Introducing Well Integrity Management Processes at 'Brownfield' Development Stage. Author Name: James King Author Company: Qatar Petroleum

Brent Charlie Ultra Late Life. A Journey in Optimising for Platform Decommissioning

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

OCS leasing program draft PEIS comments Attachment A

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

Designing Subsea Wells for Abandonment & Suspension

Case Histories of Life Cycle Well Integrity Management Using iwit Software

Well Abandonment Services. Plug into a New Approach

Well Integrity Life Cycle Management for Subsea Field Development A Regulator s Perspective

SUBSEA 101. Find more Subsea 101 case studies online

ISO INTERNATIONAL STANDARD

Capability Presentation. Subsea Sampling Richard Barr Thursday 8 February

Interspill UK Response Readiness. Mick Borwell Environmental Issues Director Oil & Gas UK

ACCREDITATIONS AND ASSOCIATION MEMBERSHIPS

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

subsea annulus management call for proposals

Transcript of extended interview Health and Safety Executive energy policy team: Tony Almond and Trevor Sexty

Heidrun Inverted Gas Lift System

Send your directly to

Lessons Learned from the US Chemical Safety and Hazard Investigations Board. presented at

CJENERGY.COM COMPANY OVERVIEW EXCELLENCE DELIVERED

Chapter 02. Casing and Tubing

Wells Expert Committee Bulletin

SUPERIOR AT-A-GLANCE A WORLD OF EXPERTISE IN YOUR PART OF THE WORLD.

City and Guilds: Permitted Reference Materials (Electrotech) Version 2.3 (October 2013)

This document is a preview generated by EVS

Potential Hazards of Horizontal Drilling and Recovery of Natural Gas & Oil from Tight Shale Formations in Areas of Historical Oil & Gas Development

Understanding the human factor in high risk industries. Dr Tom Reader

ISO/TR TECHNICAL REPORT

@balance Deepwater. MPD services

February 23, Re: EO & Well Control and Blowout Preventer Rule. Via Electronic Transmittal. Dear Mr. Whiteman:

Bureau of Safety and Environmental Enforcement. [Docket ID: BSEE ; 15XE1700DX EEEE EX1SF0000.DAQ000]

Risk Based; Approach in UK:

Integrity Management of Offshore Assets

Personalized Service, Industry Expertise. Franklin Howard

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

August 6, Re: Blowout Preventer Systems and Well Control Revisions, 1014 AA39. Via electronic submission to:

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

DRIVING PSM PERFORMANCE BEYOND KPI METRICS

ER responsibility matrix (RACI) & Source Control ER Plan (SCERP)

MASTER'S THESIS! Number of pages: 91! Regulations, NCS, Producing Wells, Plugged!! Wells!

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Delivering the Well Cost Reduction challenge

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC.

Subsea Lift. Inwell and caisson lifting systems

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

Montara Blowout What went wrong? What are the lessons for industry and regulators? Jane Cutler Chief Executive Officer October 2010

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

PETROLEUM ENGINEERING

Newfoundland Offshore Area Petroleum Production and Conservation Regulations SOR/ CANADA-NEWFOUNDLAND ATLANTIC ACCORD IMPLEMENTATION ACT

Slug wrenches - yes or no? Simple, efficient and cheap or simply not good enough?

Transcription:

Well Life Cycle Integrity IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Contents Agenda UK goal setting Regulations UK wells guidelines Principles of well integrity UK well integrity guidelines content and development since 2012 What s new in issue 4 of the UK well integrity guidelines

Contents UK goal setting Regulation Regulation 13: General duty The well-operator shall ensure that a well is so designed, modified, commissioned, constructed, equipped, operated, maintained, suspended and abandoned that a) so far as is reasonably practicable, there can be no unplanned escape of fluids from the well; and b) risks to the health and safety of persons from it or anything in it, or in strata to which it is connected, are as low as is reasonably practicable.

UK wells guidelines Well life cycle integrity issue 4 February 2019 Well decommissioning issue 6 June 2018 Competency of wells personnel issue 2 August 2017 Competency of well examiners issue 2 August 2017 Well examination issue 2 August 2017 Onshore shale gas wells issue 4 December 2016 High pressure high temperature wells issue 1 October 2016 Qualification of materials for the abandonment of wells issue 2 October 2015 Offshore blowout preventer systems issue 2 May 2014 Relief well planning for offshore wells issue 2 March 2013

Principles of well integrity Well integrity is defined to be the application of technical, operational and organisational solutions to reduce the risk of uncontrolled release of formation fluids throughout the life cycle of a well. There should be at least two well barriers available throughout the well life cycle. The removal, or degradation, of a well barrier should be carefully considered to ensure that well integrity risks remain ALARP Example well barrier schematic using software from wellbarrier.com Duty holders should provide an effective management system and ensure that personnel are competent in the tasks they are required to do. A vital part of the competence is the ability to recognise significant changes and to ensure programmes are modified to deal with these changes. The human element is very important in all aspects of well integrity.

UK well integrity guidelines content & development since 2012 GENERAL 1. Summary 2. Key regulatory requirements for well integrity 3. Process safety and the well integrity management system 4. Well integrity, barriers, BOPs and well control:- o Pressure testing o Risk assessment o Management of change o Appendices:- o Background to the guidelines o Divestment information o Reference documents Well design & operations planning Drilling Well testing Completion Commissioning Operate & maintain Intervention & workover Abandonment Special cases

What s new in issue 4 (1 of 4) General Updates throughout References to recent guidance and publications. Considerations for gas storage wells. Address findings from HSE Inspections. Regulatory Guidance (Chapter 2) New section on onshore environmental regulation. Where there is a relevant Best Available Techniques (BAT) conclusion under the Environmental Permitting Regulations 2016 [Ref 141] or IED Regulations, following these guidelines will generally provide a demonstration that BAT have been applied New section covering considerations from Maximising Economic Recovery Legislation. Well integrity management strategy (Chapter 3) Updated to describe process safety considerations for well integrity based on IOGP reports, included potential key performance indicators. Southern California Aliso Canyon wellsite on 17 th December 2015 following the release of 96,000 metric tons of methane from well SS-25, subsidence craters from attempts to plug the well ex Earthworks.

What s new in issue 4 (2 of 4) Well integrity barriers and well control (Chapter 4) New section on structural integrity covering conductors. New guidance on the use of PTFE tape. Updated to reference API S53 4 th Edition and include UK specific guidance from the BOP Guidelines. This will allow Oil and Gas UK to retire the current BOP Guidelines. Well Design and Operations Planning (Chapter 5) Added guidance on aquifer isolation. Removed guidance on site surveys and referenced IOGP Report No. 373-18-1 Guidelines for the conduct of offshore drilling hazard site surveys. Examples of conductor failure 2018

What s new in issue 4 (3 of 4) Operate and maintain (Chapter 10) Removed section on late life wells and incorporated considerations throughout the document. Added guidance on well stock performance review based on BSI ISO 16530-1 well integrity life cycle governance. Added a section on risk assessment. Added guidance on annulus valves where if there is sustained casing pressure. Added guidance to escalate approval level required for repeat deferrals of remedials 2018: 420psi sustained casing pressure on annulus valve. Grease fitting ejected and 92.3kg of gas released. Note fitting partially made up due to PTFE tape.

What s new in issue 4 (4 of 4) Intervention/Workover (Chapter 11) Added guidance on the use of a secondary potential barrier to effect a repair. Appendix 1 Updated to summarise work done on issue 4. Appendix 2 Removed the guidance on well status descriptors that is now covered under WONS and replaced with guidance on the information that an operator should hold on their wellstock and transfer on divestment. 2018: wireline cable used for production logging in a gas well. The cable dried out and gas leaked past the pressure control equipment. Wire and tools downhole.