When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES

Ferroresonance Experience in UK: Simulations and Measurements

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

PREVENTING FLASHOVER NEAR A SUBSTATION BY INSTALLING LINE SURGE ARRESTERS

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment

Electromagnetic Disturbances of the Secondary Circuits in Gas Insulated Substation due to Disconnector Switching

Relay Protection of EHV Shunt Reactors Based on the Traveling Wave Principle

A Study on Ferroresonance Mitigation Techniques for Power Transformer

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

G. KOEPPL Koeppl Power Experts Switzerland

GIS Disconnector Switching Operation VFTO Study

Identification of Parameters for Coupling Capacitor Voltage Transformers

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation

Končar TMS - Bushing monitoring

NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS

Modeling for the Calculation of Overvoltages Stressing the Electronic Equipment of High Voltage Substations due to Lightning

Operation Analysis of Current Transformer with Transient Performance Analysis Using EMTP Software

Adi Mulawarman, P.E Xcel Energy Minneapolis, MN. Pratap G. Mysore, P.E Pratap Consulting Services, LLC Plymouth, MN

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

2000 Mathematics Subject Classification: 68Uxx/Subject Classification for Computer Science. 281, 242.2

VI 3 - i TABLE OF CONTENTS

High frequency transformer model for calculations of transferred overvoltages. I. UGLESIC University of Zagreb, Croatia

N. TEST TEST DESCRIPTION

Effect of Shielded Distribution Cables on Lightning-Induced Overvoltages in a Distribution System

Modeling insulation in high-voltage substations

Switching and Fault Transient Analysis of 765 kv Transmission Systems

ELECTRICAL POWER ENGINEERING

Power System Studies

A Simple Simulation Model for Analyzing Very Fast Transient Overvoltage in Gas Insulated Switchgear

University of Zagreb Faculty of Electrical Engineering and Computing

Accurate Current Measurement Transducer for Relaying Purpose

Experimental Investigations and Calculations in 6-35 kv Networks with Various Neutral Conditions

Revision of TRV Requirements for the Application of Generator Circuit-Breakers

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY

N. TEST TEST DESCRIPTION

EXPERIMENTAL INVESTIGATION OF A TRANSIENT INDUCED VOLTAGE TO AN OVERHEAD CONTROL CABLE FROM A GROUNDING CIRCUIT

Power Quality and Reliablity Centre

Transient recovery voltage analysis for various current breaking mathematical models: shunt reactor and capacitor bank de-energization study

MV network design & devices selection EXERCISE BOOK

Design of Differential Protection Scheme Using Rogowski Coil

International Journal of Engineering Technology and Scientific Innovation

Analysis of a 405 km transmission line with series compensation

Understanding and Optimizing Electromagnetic Compatibility in Switchmode Power Supplies

IEC Electrical fast transient / Burst immunity test

Electromagnetic Interference in the Substation Jose up 400/115 kv

Transient Analysis and Mitigation of Capacitor Bank Switching on a Standalone Wind Farm

A Special Ferro-resonance Phenomena on 3-phase 66kV VT-generation of 20Hz zero sequence continuous voltage

ELECTRICAL POWER TRANSMISSION TRAINER

EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation

Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation

Novità sulla IEC ; -10; -12

LIGHTNING OVERVOLTAGES AND THE QUALITY OF SUPPLY: A CASE STUDY OF A SUBSTATION

Reducing the magnetizing inrush current by means of controlled energization and de-energization of large power transformers

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Comparison of Measured Transient Overvoltages in the Collection Grid of Nysted Offshore Wind Farm with EMT Simulations

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

Research Article Survey of Induced Voltage and Current Phenomena in GIS Substation

Modeling Ferroresonance Phenomena on Voltage Transformer (VT)

Single Line Diagram of Substations

Appendix D Fault Levels

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content

A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems

A MODEL TO SIMULATE EM SWITCHING TRANSIENTS IN ELECTRIC POWER DISTRIBUTION SUBSTATIONS

University of Pennsylvania Moore School of Electrical Engineering ESE319 Electronic Circuits - Modeling and Measurement Techniques

The various factors influencing the VFTO levels in 500kV and. 750kV GIS have been discussed by developing the simulink models which

Maximum Lightning Overvoltage along a Cable due to Shielding Failure

Fast Front Transients in Transformer Connected to Gas Insulated Substations: (White+Black) Box Models and TDSF Monitoring

Accurate Modeling of Core-Type Distribution Transformers for Electromagnetic Transient Studies

Lightning performance of a HV/MV substation

THE EFFECT OF VARIOUS PARAMETERS OF CVT ON ITS PERFORMANCE, AND THEIR ROLE ON POWER QUALITY

A Study on Lightning Overvoltage Characteristics of Grounding Systems in Underground Distribution Power Cables

A3-102 PCB ROGOWSKI COILS HIGH PRECISION LOW POWER SENSORS. Ljubomir A. Kojovic * Cooper Power Systems USA

Exercises. 6 Exercises

SUPPRESSION METHODS FOR VERY FAST TRANSIENT OVER- VOLTAGES ON EQUIPMENT OF GIS

Fault indicator. Application. SPEF 3A2 C 1MRS MBG Issued: April 1999 Status: Updated Version: B/ Data subject to change without notice

Comparative Performance of Conventional Transducers & Rogowski Coil for Relaying Purpose

Distance Protection of Cross-Bonded Transmission Cable-Systems

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

BUS2000 Busbar Differential Protection System

Power System Protection Where Are We Today?

AORC Technical meeting 2014

Simplified Approach to Calculate the Back Flashover Voltage of Shielded H.V. Transmission Line Towers

Design of EMI Filters for DC-DC converter

Analysis of MOV Surge Arrester Models by using Alternative Transient Program ATP/EMTP

FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI[" FGRCTVOGPV"QH"GNGEVTKECN"GPIKPGGTKPI" VGG"246"JKIJ"XQNVCIG"GPIKPGGTKPI

Electrical Transient Interaction between Transformers and Power System. Brazilian Experience

Study of High Voltage AC Underground Cable Systems Silva, Filipe Miguel Faria da; Bak, Claus Leth; Wiechowski, Wojciech T.

Traveling Wave Fault Location Experience at Bonneville Power Administration

Insulation Co-ordination For HVDC Station

Electrical Power and Energy Systems

Simulation of Short Circuit and Lightning Transients on 110 kv Overhead and Cable Transmission Lines Using ATP-EMTP

High voltage engineering

X International Symposium on Lightning Protection

Analyzing and Modeling the Lightning Transient Effects of 400 KV Single Circuit Transmission Lines

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Transmission Line Transient Overvoltages (Travelling Waves on Power Systems)

Transcription:

Analysis of Electromagnetic Transients in Secondary Circuits due to Switching in 400 k Air-Insulated Substation I. Uglešić, B. Filipović-Grčić,. Milardić, D. Filipović-Grčić Abstract-- The paper describes the electromagnetic transients caused by disconnector switching in 400 k air-insulated substation. Transient overvoltages in the secondary circuits of capacitor voltage transformer (CT) were calculated using the EMTP-ATP software. The transfer of electromagnetic transients through substation s grounding grid was analysed in order to determine the overvoltages at the terminals of protective relays located in control (relay) room. The overvoltages in secondary circuits, caused by disconnector switchings, were recorded during the on-site testing. strike occurs between disconnector's contacts. Keywords: disconnector switching, secondary circuits, electromagnetic transients, transferred overvoltages. S I. INTRODUCTION ECONDARY equipment in H substation is highly sensitive to transient electromagnetic disturbances due to disconnector switching operations. Opening and closing of disconnector produces electromagnetic transients with a very fast rate of rise [1], [2]. These transients can be particularly harmful to microprocessor-based electronic equipment located near the H switching devices. H disconnectors have a negligible current interrupting capability ( 0.5 A) which includes the capacitive charging currents of bushing, busbars, connective leads, very short lengths of cables and of the capacitive voltage transformers (CT) [3]. A disconnector operates only after a circuit-breaker has already opened the corresponding switchyard section, which represents a capacitive load. When the slow moving contacts of a disconnector close or open, numerous pre-strikes or re-strikes occur between the contacts (Fig. 1). These highfrequency phenomena are coupled with the secondary circuits as a result of various mechanisms. Electromagnetic disturbances are transmitted to secondary circuits through stray capacitances between the high-voltage conductors and the grounding system, followed by the galvanic connection between the grounding system and the secondary circuits (Fig. 2). High-frequency transient current flowing in the grounding system generates potential differences every time when a I. Uglešić, B. Filipović-Grčić and. Milardić are with are with Faculty of Electrical Engineering and Computing, University of Zagreb, Croatia (e-mail of corresponding author: bozidar.filipovic-grcic@fer.hr). D. Filipović-Grčić is with Končar Electrical Engineering Institute, Zagreb, Croatia (e-mail: dfilipovic@koncar-institut.hr). Paper submitted to the International Conference on Power Systems Transients (IPST2013) in ancouver, Canada July 18-20, 2013. Fig. 1. oltages associated with disconnector switching: ( simple scheme of a substation; ( voltage waveform on disconnector due to opening of the contacts Fig. 2. Coupling mechanisms between high voltage and low voltage circuit In case of large secondary circuits, the potential differences are in the form of longitudinal voltages between the terminal and the enclosure of the equipment. Depending on the type of secondary circuits used and the way they are laid, differential voltages may also occur. Such a coupling mechanism has a special effect on the secondary circuits of instrument transformers, and particularly on the connected instruments, since these circuits are always directly connected to the grounding system. Another important factor which also has to be taken into account is the linking of these circuits through the internal capacitances of the instrument transformers. II. MODELLING OF 400 K SUBSTATION Fig. 3 shows a part of 400 k substation used for the

I U I analysis of the disconnector switching. Transmission line equipment that is electrically connected to the grounding system. The model of the grounding system is important in order to analyse its effects during various disturbances. Fig. 6 shows the configuration of substation grounding grid between CT and relay control/room. Capacitor voltage transformer Auxiliary busbars 400 k Control/relay room Main busbars 400 k Fig. 5. Influence of stray capacitance C PS between primary and secondary windings on CT transfer function frequency response (calculated in EMTP) =C1 =C8 Fig. 3. A part of 400 k substation used for analysis of disconnector switching Switching the transmission line bay from main to auxiliary busbar system and vice versa was analysed. In this case the CT and the auxiliary busbars represent capacitive load which is switched by disconnector in line bay. The model for the analysis of the disconnector switching in EMTP/ATP software is depicted in Fig. 4. CT in one phase was represented with the following elements [4]: two capacitors C 1 and C 2 connected in series on the primary side; compensating inductor (R C, L C, C C ); step-down transformer (primary winding R P, L P, C P ; secondary winding R S, L S, C S ); stray capacitance between primary and secondary windings C PS ; burden 4.6 A (726 Ω). Stray capacitance between primary and secondary windings has a significant influence on the transient response of the CT for frequencies above 10 khz 324.6 65.3 m (Fig. 5). The transfer of electromagnetic transients through substation s grounding grid was analysed in order to determine the overvoltages at the terminals of protective relays located in the 344 324.6 42 m control/relay room. Disturbances transferred 18 m across the grounding system can cause a malfunction of electronic 324.6 111.2 m 40 m Capacitor voltage transformer 400 k auxiliary busbars Grounding grid Control/relay room RK15A Fig. 6. Substation grounding grid between CT and control/relay room RK15A D elebit Network equivalent Cr Capacitance to ground of disconnector Otpor luka Arc resistance 150 m Fig. 4. EMTP-ATP model for analysis of disconnector switching C1=4.7 nf Auxiliary busbars 9.5 m 12 m 300 6 m Capacitance 150 to ground m of bus support insulators Cr C2=72.45 nf 0.001 C1=4.7 nf Cc=600 pf Capacitance to ground of Lcclosed Rc disconnector 50.7 H 500 U U C2=72.45 nf Cp=600 pf LC=50.7 H Connection to grounding grid Cps pf Capacitor voltage transformer Rp Lp Ls Rs CPS=100 pf 296 1 mω 6.5 H LP=6.5 H 1 mh 1 m RP=296 Ω LS=1 mh RS=1 mω CC=600 pf RC=500 Ω Segment 1: 9 m CP=600 pf Nap.trafo 15k 0.1/ P n: 1 S Segment 2: 2 m Rb=726 Ω 100 CS=100 pf Cs=100 pf 150 m

I 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.005 km 0.013 km 0.01 km The grounding mesh was represented using a JMarti frequency dependent cable model. The mutual coupling between grounding system components was taken into account by treating them as different phases of a cable. 0.011 km Connection of CT to grounding grid 0.011 km The equivalent network from the source side of disconnector was represented by a voltage source and a shortcircuit impedances. Arc resistance of 2 Ω between the disconnector's contacts was assumed in simulations. III. CALCULATION OF OEROLTAGES IN SECONDARY CIRCTS DUE TO DISCONNECTOR SWITCHING A flashover in case of 2 p.u. voltage between opening contacts of disconnector as the worst theoretical case was analysed. In real operation the flashover occurs at lower voltage differences and the corresponding overvoltages are lower. Secondary burden was 4.6 A (726 Ω). Figs. 8-11 show calculation results in case of disconnector opening. 1000 U[k] 750 500 250 0.01 km 0.006 km 0.007 km 0.006 km 0-250 0.004 km 0.004 km 0.007 km 0.007 km -500 10,00 10,01 10,02 10,03 10,04 t[ms] 10,05 (f ile Melina9.pl4; x-v ar t) v :X0013A-XX0117 Fig. 8. Overvoltage on high-voltage side of CT (C 1) U max=920.2 k factors: offsets: 1 0,00E+00-1,00E-03 0,00E+00 0.006 km 800 U [] 500 200 0.004 km 0.004 km Fig. 7. A small part of substation grounding grid modelled in EMTP-ATP The relay room RK15A is located 40 m away from CT. The parameters of grounding system are shown in Table I. TABLE I PARAMETERS OF THE GROUNDING SYSTEM IN 400 K SUBSTATION Material Copper wire Specific resistance (Ωmm 2 /m) 0.0169 Cross section (mm 2 ) 120 Soil resistivity ( m) 300 Burial depth (m) 0.8 The auxiliary busbar system was modelled with frequency dependent JMarti model [5] and bus support insulators with capacitances to the ground [6]. The electrical and geometrical parameters of the auxiliary busbar system are shown in Table II. -100-400 -700 10,00 10,01 10,02 10,03 10,04 t[ms] 10,05 (f ile Melina9.pl4; x-v ar t) v :XX0122-XX0114 Fig. 9. Overvoltage on 100/ 3 side of CT U max=669.2 ; f 330 khz Fig. 10. Current through connection of CT on grounding grid TABLE II ELECTRICAL AND GEOMETRICAL PARAMETERS OF AUXILIARY BUSBAR R in (cm) R out (cm) DC resistance (mω/km) SYSTEM Height above ground (m) Length (m) Spacing between phases (m) 10.2 11 6.285 12.66 171.4 6 Fig. 11. Grounding potential on CT connection to grounding grid (red) and in relay/control room RK15A (blue)

When closing disconnector the flashover was simulated at the voltage difference of 1 p.u. between closing contacts. Calculated overvoltage amplitudes in case of disconnector opening and closing are shown in Table III. TABLE III CALCULATION RESULTS switching operation Closing Opening U max on H side of CT (C 1 ) 613.6 k 920.2 k U max on L side of CT (C 2 ) 39.6 k 59.6 k U max on 100/ 3 side of CT 377.4 669.2 Impulse current I max on CT connection to grounding grid 691.1 A 1382 A Grounding potential on CT connection to grounding grid 719.7 1438 Grounding potential in relay/control room RK15A 150.7 300.4 Overvoltages on secondary side of CT are lower than 1.6 k which is the highest permissible value in [7]. High frequency disturbances that occur in secondary circuits could disturb the normal operation of microprocessor-based electronic equipment. Transferred overvoltages increase with the decrease of CT secondary burden. Fig. 13 shows transferred overvoltage on CT secondary for burden 1 A in case of disconnector opening. 1500 U [] 1000 500 0-500 -1000-1500 10,00 10,01 10,02 10,03 10,04 t[ms] 10,05 (f ile Melina9.pl4; x-v ar t) v :XX0122-XX0114 Fig. 13. Overvoltage on 100/ 3 side of CT in case of disconnector opening; U max=1436.5 ; f=330 khz (burden 1 A 3.33 kω) The influence of CT secondary burden on transferred overvoltage amplitudes is shown in Table I. This analysed example represents the worst case scenario. TABLE I INFLUENCE OF BURDEN ON OEROLTAGE AMPLITUDES TRANSFERRED TO CT SECONDARY CT secondary burden closing opening 1 A 772.4 1436.5 2.5 A 531.3 925.8 4.6 A 377.4 669.2 High frequency transients generate potential differences in the grounding grid and cause longitudinal overvoltages. To reduce the longitudinal voltage, shielding and multiple grounding of secondary circuits are necessary. By applying the previously described approach it is possible to estimate the overvoltage amplitudes in secondary circuits in designing process of high voltage substation. I. DISCONNECTOR SWITCHING IN 400 K SUBSTATION ON-SITE TESTING On-site test circuit for measurement of transients caused by disconnector switching in 400 k substation is shown in Fig. 14. GS2 =C1 Q21 -T1 Q0 GS1 2 Q11 -T2 Q2L3 Q1L3 Fig. 14. On-site test circuit for measurement of transients caused by disconnector switching Switching of CT T25L3 on main busbars was performed with disconnector Q2L3. CT secondary is connected to the equipment in the relay room with 66 m long measuring cable. The measurements of overvoltages in secondary circuits were conducted in the relay/control room RK403 with digital oscilloscope (500 MHz, 1 GS/s). Transients due to disconnector opening and closing were recorded. A. closing Fig. 15 shows overvoltages at the end of the measuring cable in relay room due to disconnector closing. oltage at the end of the measuring cable exceeded value of 96. Fig. 16 shows overvoltages on grounded cable sheath due to disconnector closing. Numerous flashovers between disconnector contacts (21 recorded) cause high frequency overvoltages on grounded cable sheath. B. opening T25L3 T15L3 DSO RK403 Fig. 17 shows overvoltages at the end of the measuring cable in relay room due to disconnector opening. oltage at the end of the measuring cable exceeded value of 96. Fig. 18 shows overvoltages on grounded cable sheath due to disconnector opening. Measured overvoltage amplitudes in secondary circuits are lower than 200, which is well below permissible value of 1.6 k. The dominant frequency of overvoltages is around 350 khz.

Fig. 15. Overvoltages at the end of the measuring cable in relay room due to disconnector closing; overvoltage caused by single flashover marked red on figure Fig. 17. Overvoltages at the end of the measuring cable in relay room due to disconnector opening; overvoltage caused by single flashover marked red on figure Fig. 16. Overvoltages on grounded cable sheath due to disconnector closing; overvoltage caused by single flashover marked red on figure Fig. 18. Overvoltages on grounded cable sheath due to disconnector opening; overvoltage caused by single flashover marked red on figure

. CONCLUSIONS The opening and closing of disconnector could produce electromagnetic transients with a very fast rate of rise, which in some cases could be particularly harmful to microprocessor-based electronic equipment located near the H switching devices. Special attention should be paid to overvoltages transferred to the secondary circuits. The transferred transients in the secondary circuits were estimated in the designing process of high voltage substation. The transfer of electromagnetic transients through substation s grounding grid was analysed in order to determine the overvoltages at the terminals of protective relays located in control (relay) room. Transferred overvoltages were highest in the case of lowest CT secondary burden. Stray capacitance between CT primary and secondary windings has a great influence on the transient response at high frequencies. This parameter is of primary importance in the frequency range of 10 khz 1 MHz. On-site tests performed in test operation of a real substation demonstrated that the amplitudes of measured transferred overvoltages were not critical in the case of disconnector switching the CT. I. REFERENCES [1] S. Carsimamovic, Z. Bajramovic, M. Ljevak, M. eledar, N. Halilhodzic, "Current Switching with High oltage Air ", International Conference on Power Systems Transients, Montreal, Canada, June 19-23, 2005. [2] Y. Sang-Min, K. Chul-Hwan, S. Hun-Chul, L. Young-Sik and C. Burm- Sup, "EMTP Analysis of ery Fast Transients due to Switching in a 345 k Korean Thermal Plant", The International Conference on Electrical Engineering, Hong Kong, 19-21 March, 2008. [3] IEC 62271-102 "High-voltage switchgear and controlgear - Part 102: Alternating current disconnectors and earthing switches" First edition, 2001. [4] M. Kezunovic, Lj. Kojovic,. Skendzic, C. W. Fromen, D. R. Sevcik, S. L. Nilsson, "Digital models of coupling capacitor voltage transformers for protective relay transient studies", IEEE Transactions on Power Delivery, ol. 7, No. 4, October 1992. [5] L. Prikler, H. K. Høidalen, "ATP Draw User s Manual", SEfAS TR A4790, ISBN 82-594-1358-2, Oct. 1998. [6] Ali F. Imece, D. W. Durbak, H. Elahi, S. Kolluri, A. Lux, D. Mader, T. E. McDemott, A. Morched, A. M. Mousa, R. Natarajan, L. Rugeles, and E. Tarasiewicz, "Modeling guidelines for fast front transients", Report prepared by the Fast Front Transients Task Force of the IEEE Modeling and Analysis of System Transients Working Group, IEEE Transactions on Power Delivery, ol. 11, No. 1, January 1996. [7] IEC 61869-1 "Instrument transformers - Part 1: General requirements", 2007.