TITANIFEROUS-VANADIUM-MAGNETITE PROJECT SOUTHWEST GREENLAND

Similar documents
For personal use only

For personal use only

AURA ENERGY EXPANDS FOOTPRINT ON URANIUM MINERALISATION IN MAURITANIA HIPPOLYTE MINERALISATION EXTENDS INTO NEW TENEMENT

HIGHLIGHTS THIS QUARTER

EMP Approval to Drill Next Dome Complex

For personal use only

For personal use only

THE COUNTDOWN TO KARLAWINDA Building a new mid-tier gold producer

For personal use only

1. Provision of supporting information to attribute the category of Inferred Mineral Resource to the Kodu Deposit estimate.

RIU Sydney Resources Roundup 8-10 May 2012

BISIE PROJECT UPDATE AND ALPHAMIN APPOINTS CHAIRMAN TO THE BOARD

A Tanzanian Graphite Company

For personal use only

For personal use only

Option to Acquire 12km Gold System - Moba Gold Project. March April 2016 ACN

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES FOR THE MARTHA PROJECT AT WAIHI

MAYOKO-MOUSSONDJI DEVELOPMENT PLAN SUBMITTED TO REPUBLIC OF CONGO GOVERNMENT

KEY MANAGEMENT APPOINTMENTS MADE AS DALGARANGA PROGRESSES TOWARDS DEVELOPMENT

T3 Mine Feasibility Study Update

New Nevada Exploration Farm-in & JV Project

For personal use only

For personal use only

Transforming into a premier base metals company

VULCAN RESOURCES PRESENTS TO THE FENNOSCANDIAN EXPLORATION AND MINING CONFERENCE

For personal use only

MEDIA RELEASE OCEANAGOLD INTERSECTS SIGNIFICANT HIGH-GRADE MINERALISATION ON MARTHA AND EMPIRE VEINS AT WAIHI

ASX ANNOUNCEMENT 24 September Aurora Tank Gold. Drilling has Commenced

ASX:STM Noosa Mining and Exploration Conference; July 2018

HORN ISLAND PROJECT UPDATE

High Grade Gold, Copper, Lead and Zinc samples at Liberty - Indee Project

HIGH GRADE INTERCEPTS FROM LISEIWI PROSPECT, BLOCK 14

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES AT WAIHI IN NEW ZEALAND

ORCA GOLD S ROBUST INITIAL RESOURCE AND SUCCESSFUL EXPLORATION SUPPORT PRELIMINARY ECONOMIC ASSESSMENT AT BLOCK 14 NEW CFO APPOINTMENT

First Pass Sampling on Vranje-South Project Defines Li-B Anomalies

A T H L O N E M A R C H 2 0 TH

UXA Resources Ltd November 2015 High Grade Uranium Ready to Drill David Walker Managing Director

Southern Cross Goldfields Ltd

FIRST GOLD POUR AT LEONORA GOLD PROJECT

ASIAN MINERAL RESOURCES CONTINUES STRONG OPERATIONAL PERFORMANCE; STRONG EM CONDUCTORS IDENTIFIED AT KINGSNAKE EXPLORATION PROSPECT

Mount Peake Vanadium Project:

Castlemaine Goldfields Limited. AGM Presentation by Matthew Gill MD & CEO. April

QUARTERLY ACTIVITIES REPORT for Bandanna Energy Limited and wholly owned subsidiaries ( Bandanna ) THREE MONTHS to 30 June 2012

THE PILBARA AUSTRALIA S NEXT SIGNIFICANT GOLD REGION

April Developing Zinc, Gold & Silver Projects in Nevada and Ontario

Rex Presentation. SA Explorers Conference. Steven Olsen. Website: Phone:

For personal use only

OFF-TAKE MOU SIGNED WITH MAJOR CHINESE FERTILISER GROUP

"By facsimile" (09)

Excellent Metallurgical Recovery Results & Update on Priority Drilling at Great Western Gold Project

COMPLETION OF WORK PROGRAM UNDER CONCESSION AGREEMENTS FOR THE LUBLIN COAL PROJECT

Resources and Energy Group (REZ) is pleased to enclose a brief presentation on the Radio Gold Mine Project.

By SveMin, FinnMin and Norsk Bergindustri

July Developing Zinc, Gold & Silver Projects in Nevada and Ontario

Heatherdale Resources Ltd. Building shareholder value by developing premium deposits in Alaska

For personal use only

For personal use only

Scoping Study Commences on Nyanzaga Gold Project in Tanzania

Moberly Sand Development Re-examination and Opportunity

ECHO RESOURCES LIMITED

Haunted Stream Drill Results.

Annual General Meeting Chairman s Address

GEOPHYSICAL REPORT on the ZIP 1 MINERAL CLAIM ATLIN M.D.

Savannah Resources Plc. Additional Mining Lease Application Submitted Heavy Mineral Sands Project Mozambique

Emerging Mid-Tier Copper Producer

For personal use only

Investor Presentation. Kevin Joyce Managing Director

For personal use only

Emerging Mid-Tier Copper Producer

For personal use only

Stratagem EH4 Geometrics, Inc.

Quarterly Activities Report for Quarter Ended 31 March 2010

The Road to Production

INTERNATIONAL REPORTING STANDARDS WITH PARTICULAR REFERENCE TO SAMPLING TECHNIQUES AND DATA

Gold and Silver Exploration in Peru, March 2018

Asia-Pacific Focus AWAK MAS GOLD PROJECT TRANSFORMED! - Fast track to production

AMK ACKRF

equatorial resources

September 2017 PGM:TSX-V

Realising the Vision APRIL 2016

Acquisition of a Highly Prospective Gold Project Côte d Ivoire, West Africa

Copper To The World 2018

For personal use only

For personal use only

Guidance on design of work programmes for minerals prospecting, exploration and mining permits

TRANSFORMING THE WA GOLD PROJECT, GHANA

Pasinex Announces Maiden High-Grade Zinc Resource in Turkey

The Stars Project New Porphyry Discovery in B.C. October, Drilling in Progress TSX.V:MLG EXPLORING OPPORTUNITY DISCOVERY

Emerging Giant. Turnagain Project. Over 2 million tonnes of 18% Ni Concentrate 27 year mine life. Hard Creek Nickel Corporation

AMK ACKRF

Golden Predator Intersects 39.6 m of 13.3 g/t Gold at the 3 Aces Project

Drilling commences at Sertão following review of historical data

Forward-Looking Information

For personal use only

Carrapateena project update. Myles Johnston, General Manager Carrapateena

TSX-V: WHN

PNG Mining & Petroleum Investment Conference MMJV EXPLORATION. Bernard Kavanamur. December 2010

CARRICK GOLD LIMITED

Gold exploration in Kyrgyzstan

Precious Metals and Gold Exploration and Development in Indonesia

Transcription:

TITANIFEROUS-VANADIUM-MAGNETITE PROJECT SOUTHWEST GREENLAND HUNTER MINERALS PTY LTD 25 th November 2010

DISCLAIMER This presentation does not purport to be all inclusive nor to contain all information which its recipients may require in order to make an informed assessment of the Gardar TVM Project in Greenland.

Gardar Project Area

GARDAR REGION OF SOUTHWEST GREENLAND

The Gardar South & North TVM Deposits Lopolithic bodies Now in grabens Very consistent mineral layering

The port town of Narsaq 70km east of the Gardar Project site

Narsarsuaq international airport located 100km from the Gardar Project site

TOTAL MAGNETIC INTENSITY Airborne Geophysical Survey

TOTAL MAGNETIC FIELD 3D IMAGE Digitus International Ltd 16 th August 2010 Report

Diamond drill hole located in the centre of the TVM Gardar South deposit

GARDAR SOUTH IN-GROUND RESOURCES Gardar South is a 117m wide graben-faulted lopolith which is comagmatic with Gardar North Extends for a total of 6.45km (allowance made for the fjord) 190m average thickness In-ground inferred resource 591 million tonnes Testwork by Xstrata Process Support, Canada identified at an economical grind of 125microns and 0.8A gauss magnetic intensity gave the following concentrate grades from Gardar South: FeO 62.7% TiO 2 19.2% V 2 O 5 0.32% S 0.09% P 191ppm Si 1.75% Al 1.92%

Exploration staff standing in the centre of the outcropping Gardar North TVM deposit

GARDAR NORTH IN-GROUND RESOURCES Gardar North (Southwest Portion) is a 175m wide graben-faulted lopolith Total exposed strike length: 4.3km Average thickness of the mineralisation in four core drill holes: 148m vertical In-ground inferred resource 447.8 million tonnes Testwork by Xstrata Process Support, Canada identified at an economical grind of 125microns and 0.8A gauss magnetic intensity gave the following concentrate grades from Gardar North: SW portion FeO 62.5% TiO 2 19.0% V 2 O 5 0.32% S 0.06% P 160ppm Si 1.98% Al 1.55%

GARDAR NORTH IN-GROUND RESOURCES Gardar North (Northeast Portion) Width 179m Strike length: 4.2km Thickness 112m Higher grade TVM only In-ground inferred resource 319.4 million tonnes NOTE: Testwork has not yet been carried out on Gardar North - Northeast Portion. The composition of the TVM mineralisation indicates that a similar magnetic concentrate grade could be obtained from Gardar North Northeast Portion.

GARDAR TOTAL IN-GROUND INFERRED RESOURCES 1.18 BILLION TONNES CAN BE INFERRED AT THE GARDAR PROJECT FROM THE WORK TO DATE. At this time, no assessment of JORC compliance of these in-ground inferred resource calculations has yet been made and therefore the conclusions in this document should not be utilized to make statements in public listed markets at this time.

METAL CONTENT Based on a total of 421Mt magnetic concentrate TITANIUM Concentrate Grade 11.4% Ti (19.1% TiO 2 ) Ti METAL CONTENT (based on recovery of 70% of metal content) 37Mt VANADIUM Concentrate Grade 0.18%V (0.32% V 2 O 5 ) V METAL CONTENT (based on recovery of 60% of metal content) 0.50Mt

ANALOGUE DEPOSITS DEPOSIT RESOURCE CONCENTRATE GRADES FeO% TiO 2 % V 2 O 5 % Gardar Hunter 1.18Bt (in-ground) 62.6 19.1 0.32 Mapochs Evraz/Highveld 232Mt (proven) 69.0 13.0 14.0 1.69 Balla Balla Atlas/Aurox 473Mt (in-ground) 55.3 13.8 0.62

SCOPING STUDIES RECOMMENDED FOR INPUT TO PROJECT FEASIBILITY DRILL PROGRAMME TO PERMIT CALCULATION OF JORC COMPLIANT RESOURCES - Estimated cost $2.5m USD MINE SITE STUDIES - Including baseline environmental studies and reports WHARF SITE i - Isortoq inlet site fixed or floating wharf POWER REQUIREMENTS AND SITES - Potential site on Hunter Minerals ELA MARKET EVALUATION - Early production of magnetic concentrate on site for shipping - Further processing on site when feasible

SHIPPING LINES TO VARIOUS PORTS

FURTHER CONTACT Dr John Ferguson PO Box 6126 Queanbeyan, NSW2620 AUSTRALIA Tel: +61 62382358 Email: fergusonjohn@bigpond.com Mr John Rowntree Hunter Minerals Pty Limited PO Box 6153 Kangaroo Valley, NSW 2577 AUSTRALIA Tel: +61 4465 1095 Email: quadrant@shoalhaven.net.au