This page is intentionally left blank

Similar documents
Metro - Let me know about major weekend traffic impacts

2018 District 1 Highway Construction Program

Updated: April 7, 2016

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Chapter 4a GUIDE SIGNS

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Planarization & Routing Guide

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

2007 Construction Information/Season Notes

Charlton/Oxford Route 20 Reconstruction Project

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Jackson County 2018 Traffic Summit

Precast Concrete Panels for Rapid Pavement Repair

Exit 61 I-90 Interchange Modification Justification Study

Arkansas State Highway and Transportation Department

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

TECHNICAL INFORMATION Traffic Template Catalog No. TT1

Attachment #2 PPW133-07

PHASE ONE PROJECT REPORT

2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP)

ACEC OC February 22, 2017

Future Projects. District 3 Central Minnesota. mndot.gov/d3

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

Appendix G. Visual Simulations and Illustrations

Update: July 20, 2012

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

San Antonio Wrong Way Driver Initiative

King Mill Lambert DRI# 2035 Henry County, Georgia

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

The Edward V. Lofstrom Collection M/A

Tour - Short Landscape

Plan Preparation Checklist

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

ZOO INTERCHANGE PROJECT

2012 MnDOT Greater Minnesota Construction Projects

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Minnesota Department of Transportation 2011 Greater Minnesota Construction Projects

MINUTES REGULAR COMMISSION MEETING THE PORT OF PORTLAND January 9, 2008

Appendix B: Noise Study

CTA Blue Line Forest Park Branch Feasibility/Vision Study

2015 GDOT PowerPoint. Title Page

Update on Traffic Results and Findings

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Michigan Traffic Crash Facts Historical Perspective

LAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017

I-494/Highway 62 Congestion Relief Study

Maintenance of Traffic sequence of operations including any phasing and detour maps;

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

WAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD

BOARD OF DIRECTORS MEETING MINUTES

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996

Minnesota Department of Public Safety ARMER. A resource public safety officials need to do their job

WAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

MINNESOTA DEPARTMENT OF TRANSPORTATION'S MAINTENANCE OPERATIONS RESEARCH PROGRAM

2018 Woodbury Invitational Baseball Tournament

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL

APPENDIX Q MSP 2020 Improvements EA Traffic Noise Proposed Roadway Improvements Memorandum

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets

LATITUDE CENTER TH AVENUE S KENT, WA 98032

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

CONTRACT PLANS READING

UTILITY SERVICE/REPAIR PERMIT

DESIGN PUBLIC HEARING

Survey Control Point Observations

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

%&g( %&g( ) Bridge Projects DRAFT

Sept 28, Mukhtar mook-tar Thakur

County of Sonoma Agenda Item Summary Report

Moorhead / Dilworth Fixed Route Expansion Study

TABLE OF CONTENTS 1200 PLAN PREPARATION

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

1050 Page Mill Road Office Development

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SECTION EDITION - REVISION 2. Large Guide

TYPICAL SECTION OF IMPROVEMENT

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

Some of the notable locations on the refuge to photograph at:

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Current Standard Plates including Transmittal Letters are available on the web at:

City of Massillon Site Plan Checklist

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

ABC and Innovative Bridge Construction for Minnesota Local Roads

APPENDIX A Map Exhibits

Canterbury Business Center

Locate Request Information

2008 ConnDOT Photolog Program Overview

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

Transcription:

This page is intentionally left blank

This page is intentionally left blank

MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/ 2019 District Fact Sheet Demographics District Percent Statewide Total of State Total Counties (by ATP, Area Transportation Partnership) 8 9.2% 87 Anoka, Carver, Chisago, Dakota, Hennepin, Ramsey, Scott, Washington Cities, population of more than 5,000 (by ATP) 84 56.8% 148 2017 population estimate (by ATP) 3,080,915 55.2% 5,577,487 Land area, square miles (by ATP) 3,237 4.1% 79,721 Population density (people per square mile, by ATP) 952 70 Metropolitan Planning Organizations 1 12.5% 8 Roadways Trunk highway (includes interstate) - Centerline miles 1,087 9.3% 11,733 Trunk highway (includes interstate) - Lane miles 4,089 14.0% 29,233 Interstate system - Centerline miles 258 28.3% 913 Interstate system - Lane miles 1,462 35.8% 4,085 Bridges, State-owned (10 feet or greater) 1,444 29.8% 4,839 Traffic Safety Roundabouts 35 40.2% 87 Reduced Conflict Intersections (RCIs) 29 55.8% 52 Road Weather Information System (RWIS) sites 9 9.3% 97 Dynamic variable message signs 245 66.2% 370 Traffic cameras 790 80.4% 982 Snow fence miles (permanent, native prairie, temporary) 10.3 7.7% 132.9 Toward Zero Deaths (TZD): Its mission is to move Minnesota toward zero deaths on our roads using the four E's: Education, Enforcement, Engineering and Emergency Medical and Trauma Services. Since TZD began in 2003, Minnesota has seen a 45% decline in traffic-related deaths. The incremental goal is set for 2020: 300 or fewer traffic-related deaths and 850 or fewer serious injuries. Budget and Economics Operations budget to deliver construction program: Fiscal Year 2019 (millions of dollars) 157.3 32.3% 487.2 Fiscal Year 2018 (millions of dollars) 137.8 32.7% 421.9 Avg. annual construction prog. cost, 2019-22 (millions of dollars) 412.9 42.9% 962 Average annual number of projects, 2019-22 53 29.4% 180

Non-Auto Modes District Percent Statewide Total of State Total PUBLIC TRANSIT (2017) Counties covered 8 87 Ridership - Fixed 92,704,653 100,246,594 Ridership - Dial-a-Ride 2,766,549 6,921,043 System usage: Vehicle miles traveled 64,878,858 84,818,836 RIVERS - Navigable miles 128 55.2% 232 AIRPORTS - Publicly owned that receive state funds 10 7.5% 134 RAILROADS Rail line miles 595 13.4% 4,449 Crossings - Signalized 410 1,568 Crossings - Non-signalized 223 2,437 Workforce and Facilities Full-time employees, Fiscal Year 2018 1,305 37.2% 3,505 Regional offices/headquarters/maintenance sites 3 20 Buildings square footage 1,692,599 25.5% 6,638,682 Rest areas (Class 1) 5 9.8% 51 Maintenance (five-year average, Fiscal Years 2014-18, unless otherwise stated) Average annual Snow & Ice delivery cost (thousands of dollars) 29,445 27.3% 107,783 Average annual bare lane performance (frequency in target no. of hrs.) 86% 84% Snow & Ice lane miles, Fiscal Year 2019 5,101 16.7% 30,456 Average route length (lane miles), Fiscal Year 2019 21 44 Light vehicles (pickups, vans and cars) 315 13.4% 2,344 Snow removal trucks, Fiscal Year 2019 239 30.0% 796 Average annual number of Snow & Ice events 26 29 Average annual snow accumulation (inches) 56.9 60.1 Material Use and Storage (five-year average, Fiscal Years 2014-18, unless otherwise stated) Rock salt usage (tons) 59,094 28.3% 208,565 Liquid salt brine usage (gallons) 164,614 5.9% 2,795,116 Sand usage (tons; includes sand/salt mix) 2,235 5.0% 44,821 Salt/sand storage capacity (tons), 2017 91,100 27.3% 333,300 Fuel usage, all types (gallons) 1,008,386 22.1% 4,557,560 District Items of Note Co-located Regional Transportation Management Contains law enforcement, maintenance, traffic management Center Ramp meters 493 (includes inactive and failed meters) Fiber optics for communication (miles) Approximately 550 FIRST (number of routes and territory mileage) 8-11 routes, depending on staffing; 220 miles Bus-only shoulder miles 334

District Items of Note (continued) MnPASS Express Lane Miles Approximately 72 lane miles: 28 on I-35W, 24 on I-394, 20 on 35E Transit Park & Ride facilities 106 Transit Park & Pool facilities 15 Freeway-embedded Bus Transit Stations 2 operational, 1 under construction Minneapolis-St. Paul GDP, All Industries, Calendar Year 2nd Quarter 2018 $362,904 million https://www.bea.gov/system/files/2018-11/qgdpstate1118.pdf Fortune 500 companies headquartered in MSP 17 Roadways: Annual Vehicle Miles Traveled (VMT): Miles by District Per Capita Metro District: 29,474,213,590 8,979

This page is intentionally left blank

This page is intentionally left blank

South Area 2019 Construction Projects (Dakota, Carver, and Scott County) Anoka Hennepin Ramsey Southwest LRT 1985-150 1985-149 1985-148 1918-118 1008-94 1986-46 1985-155 1982-203 1908-74 1907-114 Washington Carver 1013-90S 1013-90 1008-92 7005-121 Orange Line 1981-124AC1 1981-134 1901-184 1925-56 1910-50 2782-350 7001-127 Scott 7002-47 7001-115 Dakota 1906-70 1905-41 South, Amber Blanchard, (651) 234-7729 2019 Construction Project Trucking Impacts 0 5 10 Miles February 21, 2019

This page is intentionally left blank

MnDOT South Metro (Carver, Dakota and Scott County) 2019 construction projects Hwy 3 S.P. 1908-74 Location: Hwy 3 at Co. Rd. 26/70 th St. in Inver Grove Heights Description: Construct a roundabout; improve drainage and install lighting (Dakota County leading) Impacts: Full closure and detour Contract award date: Dec. 11, 2018 Construction timeframe: April October 2019 Current estimate: Locally funded Website: co.dakota.mn.us/transportation/plannedconstruction/cr26-hwy3 Hwy 13 S.P. 1901-184 Location: Hwy 13 at Hwy 77 in Eagan Description: Replace tower lighting system Impacts: Possible lane and shoulder closures Contract award date: Jan. 25, 2019 Construction timeframe: July September 2019 Current estimate: $1.4 million Hwy 13 S.P. 7001-115 Location: Hwy 13 from Hwy 19 in Cedar Lake Township to Hwy 21/Eagle Creek Ave. in Prior Lake Description: Resurface pavement; update concrete median; repair drainage; add turn lanes and a new signal Impacts: Full closure with detours; closure at Hwy 21 for a Scott County project S.P. 7001-127 Contract award date: Dec. 21, 2018 Construction timeframe: April June 2019 Current estimate: $7.5 million Website: mndot.gov/metro/projects/hwy13priorlake/index.html

Hwy 13 S.P. 7001-127 Location: Hwy 13 at Co. Rd. 21 in Spring Lake Township Description: Construct second left turn lane and new right turn lane; replace signal system and improve pedestrian accessibility Impacts: Full closure with detours Contract award date: June 15, 2019 Construction timeframe: July 2019 January 2020 Current estimate: $1.3 million Hwy 21 S.P. 7002-47 Location: Hwy 21 from Hwy 19 in New Prague to Hwy 169 in Jordan Description: Resurface road; repair concrete pavement; construct turn lanes, improve drainage and sidewalk accessibility Impacts: Directional closure for approximately six weeks Contract award date: June 15, 2019 Construction timeframe: July 2019 January 2020 Current estimate: $5.8 million I-35E S.P. 1982-203 Location: I-35E from Lone Oak Rd. to Pilot Knob Rd. in Eagan Description: Replace signal and modify free right turn lane at Pilot Knob Rd. Impacts: Turn lane closure on ramp to Pilot Knob Rd. Contract award date: TBD Construction timeframe: April October 2019 Current estimate: $303,000 I-35W 1981-124AC1 Location: I-35W from Cliff Rd. in Burnsville to 106th St. in Bloomington Description: Replace bridges over the Minnesota River and 106th St. Impacts: Lane and ramp closures with detours Contract award date: May 9, 2018 Construction timeframe: August 2018 November 2021 Current estimate: $130-150 million Website: mndot.gov/metro/projects/i35wbloomington/index.html

I-35W S.P. 1981-134 Location: I-35W at the Burnsville Pkwy. Description: Construct HOV Bypass on the ramp to northbound I-35W and repair concrete Impacts: Possible ramp and turn lane closures Contract award date: Dec. 21, 2018 Construction timeframe: July 2019 January2020 Current estimate: $490,000 Hwy 41 S.P. 1008-92 Location: Hwy 41 from north of Hwy 212 to Co. Rd. 14 in Chaska Description: Landscape Impacts: No traffic impacts expected Contract award date: Feb. 22, 2019 Construction timeframe: April August 2019 Current estimate: $125,000 Hwy 41 S.P. 1008-94 Location: Hwy 41 at Co. Rd. 18/Lyman Blvd. in Chaska Description: Construct roundabout (Carver County leading) Impacts: Lyman Blvd. closure and detour; temporary signal at Peavey Rd. Contract award date: Feb. 15, 2019 Construction timeframe: March September 2019 Current estimate: $710,000 Website: co.carver.mn.us/departments/public-works/projects-studies/highway-41-18-project

Hwy 52 S.P. 1905-41 Location: Hwy 52 from the south end of the Cannon River in Goodhue County to Co. Rd 86 in Randolph Township Description: Resurface concrete; repair guardrail; repair bridge joints and cable median; update railroad signal Impacts: Lane, road and ramp closures; hazardous truck detour Contract award date: July 26, 2019 Construction timeframe: September 2019 October 2020 Current estimate: $6.6 million Hwy 52 S.P. 1906-70 Location: Hwy 52 at Hwy 50 in Hampton Description: Expand park and ride lot to provide additional parking Impacts: Close park and ride during construction Contract award date: March 22, 2019 Construction timeframe: July 2019 January 2020 Current estimate: $221,000 Hwy 52 S.P. 1906-70 Location: Hwy 52 various locations from South View Blvd. in South St. Paul to Concord Blvd. in Inver Grove Heights Description: Install fiber cable and cameras Impacts: Possible off-peak lane closures Contract award date: July 27, 2018 Construction timeframe: September November 2018 Current estimate: $130,000

Hwy 55 S.P. 1910-50 Location: Hwy 55 from Hwy 61 to General Sieben Dr., and Hwy 61 from Co. Ro. 47 to 4 th St. In Hastings Description: Install ATMS and optimize signals Impacts: Possible lane and turn lane closures Contract award date: Feb. 22, 2019 Construction timeframe: April July 2019 Current estimate: $650,000 Hwy 62/Old Hwy 110 S.P. 1918-118 Location: Hwy 62/Old Hwy 110 at Hwy 149/Dodd Rd. in Mendota Heights Description: Replace signal Impacts: Possible shoulder and turn lane closures Contract award date: June 8, 2018 Construction timeframe: October November 2018 Current estimate: $390,000 Hwy 77 S.P. 1925-56 Location: Hwy 77 from Co. Rd. 32/Cliff Rd. to Co. Rd. 30/Diffley Rd. in Eagan Description: Repair bridge and ramps; update signals and guardrail; improve pedestrian accessibility Impacts: Lane and turn lane closures on Hwy 77 and Cliff Rd. over Hwy 77 Contract award date: Oct. 26, 2018 Construction timeframe: July September 2019 Current estimate: $2.2 million Hwy 169 S.P. 7005-121 Location: Hwy 169 at Chestnut Blvd. in Jackson Township Description: Construct crossovers for the new Hwy 41 interchange that will construct three bridges; replace bridge and culvert (Scott County leading) Impacts: Lane and road closures with detours Contract award date: June, 14, 2018 Construction timeframe: August 2018 November 2021 Current estimate: $15 million Website: scottcountymn.gov/1778/highways-1694178-interchange

Hwy 212 S.P. 1013-90 Location: Hwy 212 between Carver Co. Rd 41 in Benton Township and Hwy 36 in Dahlgren Township Description: Construct a reduced conflict intersection at Co. Rd. 41 and close the Co. Rd. 36 access at Hwy 212 Impacts: Single lane in both directions Contract award date: June 7, 2019 Construction timeframe: August-November 2019 Current estimate: $1 million Website: mndot.gov/metro/projects/hwy212cologne/index.html I-494 S.P. 1985-149 Location: I-494 from Hardman Ave. in South St. Paul to Blaine Ave. in Inver Grove Heights Description: Construct auxiliary lane, retaining and noise wall; repair bridge; replace lighting and update drainage Impacts: Lane and ramp closures with detours Contract award date: June 8, 2018 Construction timeframe: August 2018 November 2019 Current estimate: $15.5 million Website: mndot.gov/metro/projects/i494invergroveheights I-494 S.P. 1985-148 Location: I-494 from the Minnesota River to Hardman Ave. Description: Resurface and bridge decks over I-35E and replace joints; repair pavement between Third Ave. in South St. Paul and the east side of the Minnesota River Bridge; improve drainage and construct ponds Impacts: Multiple weekend, directional closures; lane and ramp closures with detours Contract award date: May 17, 2019 Construction timeframe: July 2019 November 2020 Current estimate: $32 million Website: mndot.gov/metro/projects/i494invergroveheights

I-494 S.P. 1985-150 Location: I-494 from Concord St. in South St. Paul to Hwy 52 in Inver Grove Heights Description: Replace lighting (tied to 1985-148) Impacts: All impacts will be associated with the 1985-148 project Contract award date: May 17, 2019 Construction timeframe: July 2019 November 2020 Current estimate: $712,000 Website: mndot.gov/metro/projects/i494invergroveheights I-494 S.P. 1985-155 Location: I-494 from Hwy 62/Old Hwy 110 in Inver Grove Heights and Sunfish Lake to west of Hwy 55 in Mendota Heights and Eagan Description: Construct crossovers prior to 1985-148 construction Impacts: Lane closures Contract award date: March 22, 2019 Construction timeframe: April-July 2019 Current estimate: $545,000 Website: mndot.gov/metro/projects/i494invergroveheights I-494 S.P. 1986-46 Location: Adjacent to I-494 from American Blvd. to Hwy 13 Description: Resurface trail Impacts: No traffic impacts expected Contract award date: May 17, 2019 Construction timeframe: July 2019-November 2020 Current estimate: $125,000 Website: mndot.gov/metro/projects/i494invergroveheights

This page is intentionally left blank