PREFOAM - PERMANENT STADIUM SEATING RISER SYSTEM FOR FLOOR MONTED SEATING PART 1 GENERAL DESCRIPTION

Similar documents
A. Extent of structural precast concrete work is shown on drawings and in schedules.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION METAL FABRICATIONS

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

SECTION SHEET METAL FLASHING AND TRIM

Design and Construction Standards SECTION ATHLETIC LOCKERS

C. HMMA 863: Guide Specifications for Detention Security Hollow Metal Doors and Frames

Copyright 2017 AIA MasterSpec Premium 05/17 PRODUCT MASTERSPEC LICENSED BY ARCOM TO WEREVER PRODUCTS, INC.

Product Guide Specification

SECTION BULLET- RESISTANT DOORS

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

1.1 RELATED DOCUMENTS

Section 914. JOINT AND WATERPROOFING MATERIALS

INSTALLATION INSTRUCTIONS

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

Slate Shingle Specifications

SHEET METAL FLASHING AND TRIM Christ on the Mountain

Product Guide Specification

A. ASTM D Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

SECTION MANUFACTURED CASEWORK

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

ALUMINUM PIPE GUIDERAIL 01/01/

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION HOLLOW METAL DOORS AND FRAMES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

A. It is preferred that all submittals to be submitted electronically in PDF format.

A. Product Data: For each electrical identification product indicated.

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube

SECTION PRE-MANUFACTURED CABINETS

SECTION SAND CUSHION TERRAZZO FLOORING

SECTION ROUGH CARPENTRY

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

SECTION COMMON WORK RESULTS FOR HVAC

SECTION COUNTERTOPS ecox PART 1 GENERAL

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

AIA Specification. Section Slate Shingles PART 1 GENERAL

HOLLOW METAL DOORS AND FRAMES

SECTION ROOF ACCESSORIES. Display hidden notes to specifier. (Don't know how? Click Here)

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

SECTION CABLE TRAYS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION Display Case Door Series 1301-CM

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

Extra Wide Designer Lockers Series Installation Instructions

AESS Documents prepared by CISC ad hoc committee

Project: # Solano Community College District

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

STEEL PIPE GUIDERAIL 01/01/

NX7 SERIES 5-1/2 HANDRAIL

Slope Floor. Measurement Methods

St. Monica Food Pantry

NAIMA. Insulation Between (filling) Purlins and Over Purlins. What Does Metal Building Insulation Do? Installation Instructions for New Construction

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE:

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

SECTION MASONRY ANCHORAGE AND REINFORCEMENT. Display hidden notes to specifier. (Don't know how? Click Here)

INSTALLATION INSTRUCTIONS

SECTION INTERIOR FINISH CARPENTRY

SECTION INTERIOR SIGNAGE

SECTION ELECTRICAL IDENTIFICATION

PART MATERIALS. Section Fencing Materials. Description

B. See Division 05 Section "Pipe and Tube Railings" for metal pipe and tube railings.

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

Engineering Services Program

1. CONNOLLY KEYJOINT 1. PRODUCT NAME 2. SUPPLIER 3. PRODUCT DESCRIPTION 4. KEY FEATURES 5. FIXING INSTRUCTIONS 6. SPECIFICATIONS 7.

VERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING VERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING

AXIOM Classic Trim. Assembly and Installation Instructions

A. Provide all finish carpentry needed for a complete and proper installation.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

SECTION TRAFFIC SIGNAGE

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

3400 Tectura Designs Precast Concrete

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

SECTION ARCHITECTURAL PRECAST CONCRETE

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

Transcription:

PREFOAM - PERMANENT STADIUM SEATING RISER SYSTEM FOR FLOOR MONTED SEATING PART 1 GENERAL DESCRIPTION 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections and manufacturer s shop drawings apply to this section. 1.2 SUMMARY A. Provide PREFOAM EPS Geofoam blocks that have been factory fabricated to fit project dimensions minimizing field cutting and site generated waste. B. Provide PREFOAM permenant metal riser system to provide selfsupporing framework for concrete floor slabs. C. This Section includes the following: 1. Straight Riser system for standard floor mount seating; 2. Radius Riser system for radius platforms; 3. Intermediate step forms. D. Related Sections include the following: 1. Division 3 Section Cast-in-Place Concrete for concrete feinforcing and slabs poured on top of permanent riser forms. 2. Division 5 for miscellaneous metal screws and power actuated fasteners. 1.3 PERFORMANCE REQUIREMENTS A. Structural Performance: concrete platforms shall be continuously supported on Expanded Polystyrene Blocks (EPS). EPS blocks shall be EPS 15 with a minimum density of 0.90pcf and a minimum compressive resistance of 3.6psi at 1% deformation. EPS blocks shall be attached together using an approved Polystyrene adhesive. System must be capable of withstanding design loads as required by the governing Building Code. 1.4 SUBMITTALS A. Shop Drawings: Show layout and dimensions of each permanent riser platform area. Indicate location, size, and gauge of riser and step forms. Provide cross section of each platform area indicating height and depth of each tier. Provide plan view of each layer of EPS with each part identified and dimensioned. 1.5 DELIVERY, STORAGE, AND HANDLING A. Protect cold formed metal parts from corrosion, deformation, and other damage during delivery, storage, and handling. B. Store cold formed metal parts, protect with a waterproof covering, and ventilate to avoid condensation. PREFOAM Permanent Stadium Seating Riser System Standard System for Floor Mounted Seats 1

C. Protect EPS Block as follows: 1. Do not expose to sunlight, except to extent necessary for period of installation and concealment; 2. Protect against ignition at all times; 3. Do not deliver EPS materials to project site before installation time; 4. Complete installation and concealment of EPS materials as rapidly as possible in each area of construction. PART 2 - PRODUCTS 2.1 MANUFACTURER/DISTRIBUTER A. Available Manufacturer s: Subject to compliance with requirements, manufacturer's offering PREFOAM cold-formed metal framing and EPS and assembly methods that may be incorporated into the work include the following: Stadium Seating Enterprises, Inc. 9325 Sky Park Ct., Ste. 250 San Diego, CA 92123 Phone: 844.776.3626 Attention: Taylor Moson taylormoson@stadiumseating.com www.stadiumseating.com 2.2 MATERIALS A. Steel Sheet: ASTM-A569 Hot-rolled Steel, ASTM-A366 Cold-rolled steel or ASTM- A621 Hot-rolled Pickeled and & Oiled Steel. B. Molded, Rigid Cellular Polystyrene EPS Geofoam Blocks: Comply with manufacturer's requirements, ASTM D6817 for EPS-15 and the following: 1. Minimum density: 0.90 pounds per cubic foot; 2. Flame-Spread and Smoke-Developed Indexes: 20 and 450 or less, respectively, per ASTM E 84; 3. Minimum Compressive Resistance: at 1% deformation = 3.6 psi per ASTM D6817; 4. Flexural Strength: 25-30 psi per ASTM C203; 5. Tensile Strength: 16-23 psi per ASTM D1623; 6. Shear Strength: 280-320 psi; 7. Blocks shall contain no CFC's, HCFC's, HFC's, or formaldehyde 2.3 METAL RISERS FOR STANDARD FLOOR MOUNT SEATING A. Steel Risers for Straight or Radius Rows: Manufacturer's standard Z and C-shaped cold rolled formed steel riser, drilled connector brackets and retainer straps, and as follows: 1. Minimum Uncoated-Steel Thickness: 16 GA; PREFOAM Permanent Stadium Seating Riser System Standard System for Floor Mounted Seats 2

2. Height: As indicated on Shop Drawings; 3. Length: As indicated on Shop drawings. 2.4 CONNECTING HARDWARE: A. Manufacturer's standard 16 GA formed steel connector brackets, retainer straps, anchor cheats and associated parts parts for connecting risers end-to-end and securing riers to Geofoam as shown on shop drawings in place ready for concrete pour.. 1. Retainer Straps: Fabricated to attach to inside face of riser forms with ½ self tapping screws and slotted to accept anchor cleats. Length: As indicated on shop drawings. 2. Connector Plates: Fabricated to attach to inside face of riser forms with ½ self tapping screws and join adjacent risers end to end without need for cutting or welding. 3. Anchor Cleats: Fabricated to anchor retainer straps to Geofoam and secure bottom edge of riser plate to Geofoam. B. Step Forms: Manufacturer's standard 16 Gauge steel formed step forms as follows: 1. Height, Width, and Depth: As indicated on shop drawings. 2.5 FABRICATION A. Fabricate 16 GA risers factory precut to fit all riser deminsions. B. Fabricate 16 GA retainer straps. cleats, connector plates factory precut for installation. C. Fabricate EPS blocks, square, and true to dimension. 1. Factory cut block for delivery to jobsite and installation without the need for excessive field cutting. 2. Retrofit Projects with preexisting sloped floors, fabricate block with slope consistent to existing floor slope; 3. Ramp areas, fabricate block with slope consistent with ramp slope requirements. D. Marking and Identification: Individual EPS blocks shall be marked as follows: 1. Auditorium/Section number identification; 2. Layer I.D. code identification corresponding to shop drawing layout and EPS Schedule. PART 3 - EXECUTION EXAMINATION A. Examine supporting substrates and abutting structural framing for compliance with requirements for installation tolerances and other conditions affecting performance. Proceed with installation only after PREFOAM Permanent Stadium Seating Riser System Standard System for Floor Mounted Seats 3

unsatisfactory conditions have been corrected. 3.1 GENERAL INSTALLATION A. Install system in compliance with Architects plans and installation/shop drawings as prepared by Stadium Seating Enterprises, Inc. B. On retrofit projects with a preexisting sloped floor; Contractor to fill in any depressions or other conditions that would cause a compount slope to the floor surface. Floor must be sloped in only one back to front slope; C. PREFOAM EPS Installation: Install blocks in layers and locations as specified on shop drawings. Hold dimensions on shop drawings and Architect's plans. 1. Place non-solvent based adhesive between each layer of EPS to tack in place during assembly; 2. Rip and attach 5/8 Type X Fire Rated Gyp Board to full height of foam at the face of EPS block at each level with non-solvent adheisive. D. Metal Riser Installation: Install metal risers plumb and square for straight rows and/or field score and bend to required radius. 1. Starting from the left and right sides of each row, connect risers endto-end with connector brackets; 2. Field score top and bottom flange of riser to bend to shape for radius platforms as required; 3. Insert expanding connector plate in the middle of the row and adjust length of the riser to the exact field dimension for that row; 4. Push end cleat into EPS foam blocks at proper distance to hold riser straight and true; 5. Push cleats into slots on retainers to further anchor retainers into EPS foam block; 6. Secure retainer straps to risers with #10, pan head self-tapping screws; 7. Install foam cleats along the bottom risers to anchor risers to EPS. Note: Steel riser components should not require any field cutting. All risers are factory precut and delivered to the jobsit ready for installation. Note: Steel riser components should not require any field cutting if field dimensions are consistent with shop drawings. All risers are factory precut and delivered to the jobsit ready for installation. E. Step Form Installation: Install step forms in locations shown on shop drawings. 1. Screw step forms to each other (double step form) and to metal riser face with self-tapping sheet metal screws. 2. Place EPS filler foam into step form as void filler for concrete pour. NOTE: Do not weld risers or cut risers with torch in the same room as installed or stored EPS. Protect EPS against ignition at all times. PREFOAM Permanent Stadium Seating Riser System Standard System for Floor Mounted Seats 4

END OF SECTION PREFOAM Permanent Stadium Seating Riser System Standard System for Floor Mounted Seats 5