Big Kahuna Assembly Instructions

Similar documents
6 th and 7 th Grade Advisory Plans (Week 16)

PhotoVu Digital Picture Frame Service & Repair Guide

Note: If using fusible web adhesive to secure stars, prewash all fabric but do NOT use fabric softener.

DynaRound Hatch Guard System Installation Instructions

INFINITY ALUMINUM INSTALLATION GUIDE

STRONGHOLD IRON INSTALLATION GUIDE

Cyrus Redblock. Kit Inventory

Colourful Stitches. Quick Summer Medallion. 45 x 45 Gyleen X. Fitzgerald Quick Summer Medallion.

Dice Box. Kit Inventory. Other Items Needed o Glue I use a craft type tacky glue such as Aleenes Tacky Glue which can be found at craft stores like

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

ASSEMBLE ALUMINUM TOOLBOX

Design and fabricate a lamp using the given electrical component.

Installing a Squeak-Free Nascor Floor System

For as long as there have been people trying to find their way, there have been stars to guide them. Stars dance in the heavens weather we see them

To receive a service letter, please scan the Volunteer Log and it to:

Dragon Chest. Kit Inventory. Other Items Needed o

SINGER FUTURA TM Holiday Banner

ANTIOCH UNIVERSITY VIRTIUAL WRITING CENTER

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467

I SEWING I MACH_N! E CABINET I CA "

Take Along Sewing Tote

Set up and use your Beats X earphones

Zintra Acoustic Textures Cutting and Installation Instructions for ½ panels

A Quick & Dirty Guide to Revising your Novel

INSTALLATION INSTRUCTIONS

I I I I. Assembly Instructions:

60min Tinkerb t games

Tube Change for PANalytical X-Pert Pro

BigMouth

INSTALLATION INSTRUCTIONS

Cascading Skirt Pattern

WiFi Lab C. Equipment Needs:

IWorknow: I Initial and Date each section below as it is completed:

m LUCASEY SLELCD COMPANY Important! Please read all warnings and cautions before installing the mount. SLELCD DETAILED INSTRUCTIONS Page 1 of 6

Mpressive Threadz Studio

INSTALLATION INSTRUCTIONS

21 st Century Shooting

Original Recipe. Original Recipe can be found at

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities.

Owner's Manual & Assembly Instructions. Model No.

Owner's Manual & Assembly Instructions

Using the Laser Cutter

c2b: slip two stitches onto cable needle and hold behind work. Knit the following two stitches, then knit the two stitches from the cable needle.

Elementary. Week 3. November 18/19, 2017

Build a Gopher Tortoise Burrow. Instructions

Meet the Science Expert

Improv Piecing and Matchstick Quilting By Kelly Nagel, Sulky of America

What your Board Should look like!

Art of Work Look & See: Who do you want to be? Utah Museum of Fine Arts Educator Resources and Lesson Plans Fall 2016

Super ABC Plug-in kit for Pacman or Ms Pacman

INSTRUCTION BOOKLET (PUZZLES BY NIKOLA ZIVANOVIC)

CUSTOMER PORTAL. Floorplan Management

Session 8. MAKING DECISIONS Steps 1 & 2 of Do It!

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

Some Safety Warnings

MSU Extension Publication Archive. Scroll down to view the publication.

Pencil Drawing. Hard 2H H F HB B 2B 4B 6B Soft

Art of Work Look & See: Who do you want to be? Utah Museum of Fine Arts Educator Resources and Lesson Plans Fall 2016

Building and Installing Bumblebee Houses

Don't let anyone rush you. Take careful notes of everything you see, and go over the notes again before you leave.

Fitting instructions for all. Sita balcony outlets, extension units and accessoires

Freading for Kindle Fire Using the SlideME app.

Hearst Elementary School Classroom Supply Lists

SISTEMA ELEVATÓRIO ETV 460A

REP Design LLC. Southington, CT (860)

Welcome to the Digital Humanities Fall School!!

Samples from

INSTRUCTIONS FOR USE PLEGRIDY (PLEGG-rih-dee) (peginterferon beta-1a) Injection, for Subcutaneous Use Single-Use Prefilled Pen 125 mcg

Dance Savvy Workshop Template

The Mathematics of the Rubik s Cube

Township of Derry. Dauphin County, Pennsylvania. Residential Deck Addition Submittal Guide and Construction Fact Sheet

Planning Guide. Create a "wish list" for your new project, and then number the items in order of importance.

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

Security Exercise 12

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

Automated Meters Frequently Asked Questions

Consciousness Shifting

Notes on using an external GNSS receiver with smart phone mapping app

Sacramento CA - Insane Inflatable 5K Logistics EVENT ID:

National Curriculum Programme of Study:

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

Amor Come. Build. Hope. Single House (01-18) 1

Lab3 Audio Amplifier (Sep 25)

Double Axis Square Turned Bowl

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Operating Instructions

DEAD MAN S DOUBLOONS. Rules v1.2

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

SolarEdge Built-in Revenue Grade Meter Troubleshooting

Art I Woodside High School Ms. Julie Marten Course Syllabus

Foam Rocket. Rocket Activity. Objective Students will learn about rocket stability and trajectory with rubber band-powered foam rockets.

Using the Register of Swiss Surnames

TABLE OF CONTENTS. Getting Started. pg 3. Initial Start up... pg 4. Setting Quilt Block and Panto Designs.. pg 5. Home Button pg 6

Great Guitars! SKILLS/OBJECTIVES o To understand how sound is created o To understand frequency and its relationship to wave shape o To make guitars

Photoshop Elements 7 Intermediate: Layout & Design

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range

Pre-Installation Preparation Job Aid

Drawing Canvas Word 2007

SVT Tab and Service Visibility Tool Job Aid

Transcription:

Big Kahuna Assembly Instructins Thank yu fr purchasing a d-it-yurself pergla kit frm Average Je s Pergla Dept. We appreciate yur business, and we are here t help yu in any way pssible. Read this entire Instructin sheet befre beginning s yu can get a feel fr what yu will be ding. If yu take yur time and fllw these instructins yu can d it. We have faith in yu! If yu are installing this kit n a cncrete pati, we advise that yu use a 6X6 Galvanized pst base n each pst secured with ½ red head cncrete anchrs which can be purchased frm us r yur lcal hardware stre. Yu will need sme additinal tls fr this. Ask yur hardware salesman r give us a call fr instructins n hw t install them. If yu have any questins we are nly an email r phne call away. Questins? Call: 1-877-563-0002 Ext. 2 Email: Supprt@pergladept.cm

Kit Cmpnents Helper Tls Needed: Hammer Ladder Screw gun (with square drive bit supplied with kit) Pst Hle Digger (If psts will be ging in grund) ¾ Wrench Level Tape measure 6X6 Galvanized pst bases if ging n cncrete Installatin Steps

Step 1- Remve the wrapping frm the utside f the crate Step 2- Lay ut all parts next t where yu will be installing the pergla. Step 3- Place all fur beams n the grund (with the x s facing up) exactly where yu wuld like the pergla t stand like s:! Step 4- Slide tw rafters dwn nt the tw utermst X marks n the beams and get a screw started thrugh the tp f the rafter in the predrilled hles. Screw them in just enugh t hld the rafter in place. Yu may have t mve the back beam arund a little t get it int place. Make sure yu have the rafter n tp f the same mark n bth beams. The X marks lk like this: lxl Step 5- Step back and take a lk t see hw square everything lks. Take a tape measure and hk it n the utside tip f the rafters, and pull the tape t the ppsite crner. Write dwn the measurement. Then hk it n the ther crner and pull t the ppsite crner like this:

Mve the back beam frm side t side until yu have the same measurement bth ways. When yu have the same measurement, it is perfectly square. Helpful Hint: This is dne easier if yu and yur helper bth have a tape measure and pull them acrss at the same time. Step 6- Nw yu can see where yu have t dig yur hles fr each pst. (Or munt yur pst bases if yu re n cncrete.) Lk at the tp f the beam just inside the first rafter where it says pst. If yu are n cncrete, make a mark n the grund directly in the center f the lines where it says pst n all fur crners. If yu are n grass r dirt, stick the flags that are prvided with the kit int the grund n all crners where it says pst. Step 7- Unscrew and take the rafters ff f the beams and mve everything ut f the way. Nw yu shuld be left with fur marks where yur hles r pst bases will g. Step 8- Dig 2 r 4 ft ft deep hles (depending n the depth desired) r install yur pst bases directly ver tp f all 4 f yur markers. Step 9- Lye the fur psts n the grund with the bttms at the edge f each hle, with the tps facing away frm each ther. Like This:

Step 10- Lay ne beam dwn n the grund near the tp f the psts. Slide the psts up and nt the beam between the lines n the beam where it says pst. Step 11-Set the ther beam n tp sandwiching the pst in between the tw beams. Step 12- Place 1 washer n each ½ blt. Lift up the beam assembly enugh t fit the blts between the grund and the beam and insert the blts int the hles frm the bttm. Helpful Hint: Yu may want t use a blck f wd t place n the grund under the blt s yu can push the beam dwn t get the blt t cme up thrugh the hle. Place a washer and nut n each f the blts and make them snug but d nt tighten them dwn yet. Nw yu shuld have this: Step 13- With ne persn n each side, tilt the assembly up and drp the psts int the psthles (r int the pst bases if n cncrete). Have yur helper hld the assembly plumb. (Fr sme f the Bigger size perglas this step may require mre help) Refill the hles arund the psts with dirt r dry cncrete. If yu are using cncrete, d nt water it in yet. Check fr level acrss the tp f the beam and n the sides f the psts. If yu are installing the pergla n tp f a cncrete pati with pst bases, yu will need t prp the assembly up s that it des nt fall. The crate that the kit came in wrks well fr this purpse. Once yu have the bttm f the psts in the pst bases, put ne nail n each side t hld them in place. Step 14- Repeat step 15 fr the ther beam and pst assembly. Step 15- Mve yur stepladder in between the tw sides. Take ne f the rafters and slide it nt the utermst X mark n the beams just like yu did n the grund. Nw mve t the ppsite side and slide anther rafter int psitin n the utermst X mark. Nw yur helper shuld be able t let g f the assembly. Step 16- Install all f the remaining rafters n the remaining X marks and secure them t the beam with 3 deck screws thrugh the predrilled hles. (If n cncrete, nw is the time t finish securing the psts t the bases.)

Step 17- Place the tp slats int psitin in the layut lines acrss the tp f the rafters n the lines labeled with an S and screw them dwn t the rafters. Start n ne side and make yur way acrss t the ther side screwing every ther rafter. Stagger yur screw pattern as pictured belw: Make sure every tp slat is screwed dwn n bth end rafters as pictured. Als make sure yu have the same verhang n all f the tp slats. Be careful screwing the screws in because stainless steel is a sft metal and they strip VERY EASILY! Push dwn hard while screwing them in. There are extra screws in every kit just incase yu strip sme, but if yu need mre yu shuld be able t find them at any lcal hardware stre. Step 18- Check the entire unit fr level and plumb and tighten dwn nuts. Step 19- Install the Angle Braces. Fur f the Angles will g up in between the beams and the ther fur will attach t the inside edge f the utside rafters. I knw this sunds cnfusing, but just take a lk at the picture belw and it will all make sense. T install the first fur angles, slide the crner braces, with the lng side twards the tp, up in between the tw pieces f wd that make up the beam. Get it flush with the tp f the beam and push the bttm side against the pst. Make sure everything is nice and flush t the pst and t the tp f the beam. Screw in tw 3 deck screws thrugh the angle brace int the pst thrugh the predrilled hles, then screw the tp thrugh the face f the beam int the angle with 4-3 deck screws. (There are n predrilled hles in the face f the beam) Repeat fr three mre angle braces. Then, with the next fur angles, place the angle against the pst with the lng side up against the inside f the first rafter. Screw int the pst thrugh the predrilled hles at the bttm end that is against the pst. Screw 4 screws thrugh the tp f the angle and int the rafter bard. Repeat fr the rest f the angle braces. This is what the angles shuld lk like when installed crrectly:

Step 20- Water in the cncrete r dirt. Be sure nt t push the unit arund while the cncrete is curing (abut 24 hurs). Yu re Dne! Thanks again fr yur business. We really d appreciate ur custmers and their feedback n ways t imprve ur prducts. S after yu ve cmpleted putting yur kit tgether, sit dwn, have a cld drink, and drp us a line via email t tell us what yu think abut ur prducts. Any feedback n hw we can make ur kits easier t install will be very helpful. Pictures are always welcme! Dn t frget t check back ften fr new utdr living structure kits cming sn! Pst Base Installatin: Place the pst bases n the cncrete in the exact psitin where they will be installed. Find the center f the hle n the bttm f the base and drill int the cncrete with a 5/8 cncrete drill bit at least 4 deep. Place the washer and nut n the cncrete anchr, place the flared end int the hle in the cncrete, and hammer it dwn until it is against the pst base. Tighten dwn with a 3 4 wrench until it is snug. Questins? Call: 1-877-563-0002 Ext. 2 Email: Supprt@pergladept.cm