Special Notice # N R-S002 - Frequently Asked Questions #1

Similar documents
DARPA BAA (MOABB) Frequently Asked Questions

ONR BAA Affordable Electronically Scanned Array Technology for Next Generation Naval Platforms. Questions & Answers 3/21/07

HR001118S0020 Millimeter-Wave Digital Arrays (MIDAS) Frequently Asked Questions (FAQ) March 12, 2018

HR001118S0020 Millimeter-Wave Digital Arrays (MIDAS) Frequently Asked Questions (FAQ) February 12, 2018

Amendment 0002 Special Notice N SN-0006 Future X-Band Radar (FXR) Industry Day

Foundations Required for Novel Compute (FRANC) BAA Frequently Asked Questions (FAQ) Updated: October 24, 2017

HR001117S0024. Dynamic Range-enhanced Electronics and Materials (DREaM) Frequently Asked Questions. May 11 th, 2017

DARPA-BAA Next Generation Social Science (NGS2) Frequently Asked Questions (FAQs) as of 3/25/16

Millimeter Wave Digital Arrays (MIDAS)

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions

NET SENTRIC SURVEILLANCE BAA Questions and Answers 2 April 2007

Demonstration System Development for Advanced Shipboard Desalination FNC

Measurement of Digital Transmission Systems Operating under Section March 23, 2005

Special Notice 12-SN Basic and Applied Research in Sea-Based Aviation Aircraft Science and Technology. Amendment 0006.

HR001117S0014 Nascent Light Matter Interactions Frequently Asked Questions (FAQs) as of 12/14/17

Holography Transmitter Design Bill Shillue 2000-Oct-03

MPT, Inc. The Right Solution With A Lower Risk At The Right Time.

DARPA/MTO BAA HR001117S0043 Frequently Asked Questions Updated October 3, 2017

Dynamic Range-enhanced Electronics and Materials (DREaM)

High Speed Data Downlink for NSF Space Weather CubeSats

A new picosecond Laser pulse generation method.

According to this the work in the BRIDLE project was structured in the following work packages:

Project: IEEE P Working Group for Wireless Personal Area Networks N

DARPA-BAA Next Generation Social Science (NGS2) Frequently Asked Questions (FAQs) as of 3/30/16

Autonomy Test & Evaluation Verification & Validation (ATEVV) Challenge Area

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

Shared Investment. Shared Success. ReMAP Call for Proposals by Expression of Interest

An Introduction to Spectrum Analyzer. An Introduction to Spectrum Analyzer

Ultra-sensitive, room-temperature THz detector using nonlinear parametric upconversion

Riser Lifecycle Monitoring System (RLMS) for Integrity Management

ONR Special Notice N R-SN01

Atomic Magnetometry for Biological Imaging In Earth s Native Terrain (AMBIIENT) Proposers Day

Understanding DARPA - How to be Successful - Peter J. Delfyett CREOL, The College of Optics and Photonics

Don M Boroson MIT Lincoln Laboratory. 28 August MIT Lincoln Laboratory

Transistor-Based Microwave Heaters

MWA Antenna Description as Supplied by Reeve

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space. FY 2011 Total Estimate. FY 2011 OCO Estimate

A Product Development Flow for 5G/LTE Envelope Tracking Power Amplifiers, Part 2

SodiumStar 20/2 High Power cw Tunable Guide Star Laser

FIBER OPTICS. Prof. R.K. Shevgaonkar. Department of Electrical Engineering. Indian Institute of Technology, Bombay. Lecture: 26

Application Interest Group (AIG) Process Overview. Dr. Robert C. Pfahl Director of Roadmapping

Radar observables: Target range Target angles (azimuth & elevation) Target size (radar cross section) Target speed (Doppler) Target features (imaging)

SPEC. Intelligent EW Systems for Complex Spectrum Operations ADEP. ADEP Product Descriptions

Lecture 2. Introduction to Optical. Ivan Avrutsky, ECE 5870 Optical Communication Networks, Lecture 2. Slide 1

PREPARATORY ACTION ON DEFENCE RESEARCH

Innovative ultra-broadband ubiquitous Wireless communications through terahertz transceivers ibrow

Optically reconfigurable balanced dipole antenna

Optical Delay Line Application Note

Addressing the Challenges of Radar and EW System Design and Test using a Model-Based Platform

The DARPA 100Gb/s RF Backbone Program

FAST TRACK WORKSHOP OBJECTIVES

Boost Your Skills with On-Site Courses Tailored to Your Needs

The Old Cat and Mouse Game Continues

NEW APPROACH TO DESIGN DIGITALLY TUNABLE OPTICAL FILTER SYSTEM FOR WAVELENGTH SELEC- TIVE SWITCHING BASED OPTICAL NETWORKS

Designing for Femtosecond Pulses

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space

Small Arms Weapons & Fire Control Demonstration Project

Active Antennas: The Next Step in Radio and Antenna Evolution

DPD Toolkit: Overview

MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Electrical Engineering and Computer Science

The world s first collaborative machine-intelligence competition to overcome spectrum scarcity

Integrated Microwave Assemblies

PERFORMANCE CONSIDERATIONS FOR PULSED ANTENNA MEASUREMENTS

Office of Naval Research. BAA , Undersea Cooperative Cueing and Intervention (UC2I) Amendment 3

Heterogeneously Integrated Microwave Signal Generators with Narrow- Linewidth Lasers

Disruption Opportunity Special Notice DARPA-SN Imaging Through Almost Anything, Anywhere (ITA3)

Weaponizing the Spectrum

Networked Targeting Technology

Optical Measurements in 100 and 400 Gb/s Networks: Will Coherent Receivers Take Over? Fred Heismann

Explanation of Experiments and Need for Experimental License for use of Several Frequency Bands for Lab and Factory Missile Communications Testing

OFC SYSTEMS Performance & Simulations. BC Choudhary NITTTR, Sector 26, Chandigarh

Safety Information (Attach ed at the upper cover of t his product) Safety Warning (Attached on the output fiber isolato r & collimator) Figure 1 Laser

High brightness semiconductor lasers M.L. Osowski, W. Hu, R.M. Lammert, T. Liu, Y. Ma, S.W. Oh, C. Panja, P.T. Rudy, T. Stakelon and J.E.

A NEW APPROACH TO DESIGN DIGITALLY TUNABLE OPTICAL FILTER SYSTEM FOR DWDM OPTICAL NETWORKS

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Transitioning Technology to Naval Ships. Dr. Norbert Doerry Technical Director, SEA 05 Technology Group SEA05TD

PHOTONIC INTEGRATED CIRCUITS FOR PHASED-ARRAY BEAMFORMING

Sub-Millimeter RF Receiver. Sub-Millimeter 19Receiver. balanced using Polarization Vectors. Intrel Service Company

Spontaneous Hyper Emission: Title of Talk

Performance Analysis of OFDM FSO System using ODSB, OSSB and OVSB modulation scheme by employing Spatial Diversity

R. J. Jones College of Optical Sciences OPTI 511L Fall 2017

o Conclusion and future work. 2

PHASE TO AMPLITUDE MODULATION CONVERSION USING BRILLOUIN SELECTIVE SIDEBAND AMPLIFICATION. Steve Yao

WHITE PAPER. Spearheading the Evolution of Lightwave Transmission Systems

High Average Power Cryogenic Lasers Will Enable New Applications

Coherent power combination of two Masteroscillator-power-amplifier. semiconductor lasers using optical phase lock loops

EISCAT Scientific Association Technical Specification and Requirements for Antenna Unit V 2.0

RADAR Simplified. Wideband & Ultra-wideband radar solutions for HF, VHF, UHF & SHF bands

Broadband Beamforming of Terahertz Pulses with a Single-Chip 4 2 Array in Silicon

FLASH II. FLASH II: a second undulator line and future test bed for FEL development.

AMPLIFIERS, ANTENNAS, MULTIPLIERS, SOURCES, WAVEGUIDE PRODUCTS MILLIMETER-WAVE COMPONENTS FERRITE PRODUCTS AND SUB-SYSTEMS

VITA 49 VITA Radio Transport (VRT) A Spectrum Language for Software Defined Radios

Instruction manual for T3DS software. Tool for THz Time-Domain Spectroscopy. Release 4.0

Photonic Generation of Millimeter-Wave Signals With Tunable Phase Shift

Keysight Technologies Using a Wide-band Tunable Laser for Optical Filter Measurements

Downloaded from 1. THE FOLLOWING PAGES OF MIL-STD-462D HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED:

September 17, Proposer s Day questions

Low Cost Conformal Transmit/Receive SATCOM Antenna for Military Patrol Aircraft

Optiva RF-Over-Fiber Design Tool User s Guide. Revision 1.0 March 27, 2015

GaN is Finally Here for Commercial RF Applications!

Transcription:

Special Notice # N00014-19-R-S002 - Frequently Asked Questions #1 General and Contracting Questions 1. Q: Would you please describe CONOPS more? A: The CONOPS described in the Special Notice and at the Industry Day was notional only to inform the theme of the call. There are no specific CONOPS targeted with this technology development effort. 2. Q: What is the estimated TRL at the beginning and at the end of the effort? A: Anticipated TRL would be 2-3 in the beginning and TRL 3-4 at the end. However, these TRL numbers are estimates meant to indicate research activity should be beyond basic research but not yet to full system implementation. 3. Q: If we propose technology based on some of the DARPA ongoing programs, can we assume ONR can facilitate time access to those technologies? A: No, ONR will not be facilitating access. ONR encourages proposers to seek access to the best available technologies. 4. Q: Is ONR interested in proposals based on restricted IP Data Rights? A: ONR is interested in developing technological advantage; proposals having restricted IP Data Rights will not be disqualified. 5. Q: What is ONRs expectation of IP ownership for any IP developed under this effort? A: Government Rights are expected for technology developed under government funding. Government rights do not impact commercial rights generally. 6. Q: Who built the conventional SRAM ASIC described on Industry Day? Are more details available? A: Please see the Industry Day slides for the reference to source material. 7. Q: Does the Special Notice have target category, 6.1, 6.2 or higher? Are there export control requirements? Since we are from a university, is fundamental research activities encouraged to respond this BAA? A: Yes, the funding has a category of 6.2 so it is focused on applied research, not basic research. Export control requirements would be dependent on the effort proposed. It is up to the proposer to make sure proposals are consistent with any export or security regulations. 8. Question: Can Government lead topics responding to the technical areas? Answer: Research topics may be led by industry/academia via BAA or Government via Research Call.

9. Question: Is the EW Industry Day on 13 Nov only for this program or for all EW related programs? Also, when will presentation slides, materials, and Q&A information be available publicly? Answer: The EW Industry Day is related strictly to the Special Notice call. The slides are posted publicly. 10. Q: Are there any specific opportunities for small businesses at the Industry Day meeting? A: There are no opportunities specific to small businesses related to this Special Notice. Funding and Timeline 11. Q: How many awards are expected? What is typical size of award? A: The number of awards will depend on the quality and quantity of proposals received. Historically, awards have ranged from $0.5M - $4M total award value over 3 years of performance. For exceptional proposals, ONR has exceeded these numbers on occasion (<10% of awards). 12. Q: $8-10M per year, is that total or per TA? How are the funds divided between the TAs? A: The $8-10M per year funding is across all TA s. The funds do not have a defined split between TA s. The distribution will be dependent on the quantity and quality of proposals received. 13. Q: Will there be any gap between Base/Option 1 or Option 1/Option 2 to allow for possible down select? If so, should any accommodation be made in the tech or cost proposal? A: ONR will seek to minimize any execution gaps related to contractual options. To that end, technology milestones are recommended to precede the end of a period of performance by approximately 1 month. 14. Q: Will ONR be willing to work with other government organizations with respect to matching funds? A: Yes, ONR is willing to accept funds from other government agencies as long as it is the correct funding: RDT&E 6.2-6.3 funding. Additionally, ONR can coordinate internally if other ONR activities are supportive of proposed efforts. 15. Q: For the parallel government research laboratory call, is the budget and timeline the same? (i.e: 12-36-month performance, 8-10M a year, and 25/30 over 3 years?) A: The notional timeline and available funding is the same. Efforts should be structured based on the proposed effort. 16. Q: Can the program accommodate 4 years of performance under the current RFP (request for proposal)? A: A 1-3 year PoP is requested but there is flexibility with timing if a program is structured with well-defined milestones along the way that represent proposal options (i.e. different schedules are possible but there should be well defined experiments to understand progress).

17. Q: Some potential vendors may be eligible for SBIR reach back which is structured on a 12, 12, 12 schedule. Should those vendors mention if they are eligible and what the alternative schedule would be if they did it on a 12,12,12 schedule? A: Yes, ONR is open to leveraging other funding sources. The 6,12,18 schedule is notional and will be most relevant to those who will be considered for funding decisions at ONR. Teaming 18. Q: How would a government agency partnering with an industrial and academic institution apply for this special notice? A: The team should submit one paper naming all people. Arranging for funding of successful proposals can be handled at the conclusion of the process. 19. Q: Is there a preferred method for industry to collaborate with a DoD lab or FFRDC to jointly pursue research on this Special Notice? A: No, there is not a preferred approach for teaming. 20. Q: If a University is partnering with a Navy Warfare Center or Lab, do we need to submit separate white papers? A: No, if you are teaming, submit one white paper and list all team members. 21. Q: Is teaming with industry a must or strongly recommended? A: No, teaming should be consistent with the technical effort. 22. Q: Will the names of the industry day participants be made available? If so, how? A: We will be sending an email out to all those who registered for Industry Day with the exception of those who have opted out of this teaming list. 23. Q: Is there any plan or initiative for ONR to facilitate two or more companies to work together? A: ONR will not be formally facilitating joint activities. Industry Day was provided as a forum for proposers to interact and proposers are encouraged to build teams on their own. 24. Q: Based on ONR s contracting capability and your experience, what guidance can you provide on how to setup a team that includes Government, industry, and/or academia? A: For a team that includes mixed performers, there are multiple possible solutions and I would just recommend providing a clear management plan. From a practical perspective, we would anticipate directly funding a government lab separately from a contractor unless there's a management reason to follow a different path. However, those details can be resolved in contracting.

Technical Clarification 25. Q: Regarding TA2: there is a paragraph in the BAA about partial demonstration that was not covered [at Industry Day], can you elaborate? A: The description of a partial demonstration is intended to reinforce the notion that the Notice is seeking scalable demonstrations, not complete system instantiations. 26. Q: With regards to the 10 db improvement quoted in the BAA for TA-2A and TA-2B, what is understood to be the reference state-of-the-art design over which 10 db improvement is desired? Specifically, what is the assumed RF power source (total power, efficiency, bandwidth, etc.) and the antenna architecture (active vs. passive phased array, mechanically-steered dish, etc.) for this baseline reference? A: We are not defining a specific EIRP or a reference baseline architecture for this topic. It is up to the proposers to make the case for where current technology is and how their proposed concept approaches 10 db of improvement relative to their defined state of the art baseline. 27. Q: For TA 2A and 2B, what do you consider the current SOA in peak and average power for devices that fit in the specified volumes? A: Proposer are requested to define state of the art for their proposed solution space. 28. Q: TA 2 - Is it acceptable for proposals to target a portion of an overall system solution that improves power handling by 10DB? A: Yes. 29. Q: TA 2 Will you consider applications for other small form factor or SWAP limited platforms apart from arrays? A: Yes. 30. Q: On TA 2, can solutions be proposed that apply below L or above X-Bond? A: The Special Notice is targeting L-X bands, other bands may be addressed in combination with these frequencies. 31. Q: For TA2, is there clarifying detail for the inclusion of magnetrons in TA2 as a specific technology of interest? A: The reference to the magnetron was intended to motivate rethinking the delivery of pulsed, high peak powers or CW powers from small form factors and allow for consideration of out of the box solutions, rather than just limiting the solution space to making better phased arrays. Magnetrons were used as an example of a potential solution but not a recommended or prescriptive solution. 32. Q: For TA2, for a tunable (as opposed to instantaneous) bandwidth solution, is there a requirement on tuning speed? A: No specification defined. 33. Q: For TA2, are there noise are linearity specifications? A: No specification defined. 34. Q: For the platforms of TA 2A and 2B, what are the respective prime powers available?

A: This Special Notice is not targeting development for a specific system; it is seeking technology innovation broadly applicable to distributed RF sources. Hence there is no prime power specification. 35. Q: For TA 2A and 2B, do the target volumes apply only to the transmitter (amplifier + power supply) or do they include the receiver, techniques generator, etc.? A: The Special Notice has focused TA2 on the complete signal emission challenges only in the targeted size. Proposed efforts do not have to encompass the complete solution but should provide a description of how a complete solution would be realized. 36. Q: For TA2, are the proposed concepts for a disposable system or for a fixed or recoverable system? A: This Special Notice is not targeting development for a specific system, it is seeking technology innovation broadly applicable to distributed RF sources. 37. Q: For TA3, are there any requirements about polarization (e.g., linear, circular, dual-linear, etc.), and scanning speed of the radiated beams? Are there any requirements about the number of scanned beams (e.g., one beam or multiple beams)? If an emitter with multiple scanned beams is desired, will both beams radiate the same waveform or is it desired that each beam support a different waveform? A: There are no specific requirements on polarization, scanning, number of beams, or concurrent waveforms, but proposers should address how their concept is relevant to general EW system capabilities. 38. Q: For TA3.A, what wall plug efficiency are you seeking? A: Wall plug efficiency should be comparable to, or better than, State of the Art. 39. Q: Is beam steering a necessary part of a response to TA 3A? A: No, complete solutions including beam steering are not required for TA3. A. However, a description of the expected pathway to realize the complete system is recommended. 40. Q: How is TA3 different from last year s call? A: TA3 is focused on novel solutions for high-power/high-efficiency multi-spectral sources that can enable extremely low-swap systems. TA3.A is specifically focused on the multi-spectral laser source, power and cooling requirements and it can be assumed that steering is performed by another subsystem. Last year's call had a section that was specifically focused on multispectral optical non-mechanical beam steering (NMBS). NMBS is still an area of interest, but is not the focus of TA3. 41. Q: Is semiconductor technology the only laser technology derived for TA3 A/B or are others possible (e.g. diode lasers and specialty fiber amplifiers?) A: No, other laser technologies are equally possible subject to the metrics of the Special Notice. 42. Q: Are there specific wavelength intervals, within the UVA bond (315-400mm), which are of special interest? (in case the whole bond can t be covered?) How far apart shall the emission wavelengths be?

A: The Special Notice is not targeting specific wavelengths or separations, but it is seeking to enable multiple wavelength sources distributed across as much of the UVA band as possible. 43. Q: For TA 3B, if a single device cannot deliver output power greater than 10 Watts and beam combining is needed is incoherent beam combining sufficient or coherent combining necessary? A: Either beam combining approach is acceptable subject to the metrics of the BAA. 44. Q: TA 3 Once we meet all of the BAA specs, will frequency agile sources (tunable or optical frequency comb) be considered within the scope of TA3? A: Yes. 45. Q: Is frequency doubling a viable approach for TA3? A: Any technical approach to achieve the desired optical output is permissible, however approaches involving frequency doubling, and the inclusion of free space of optics in general, may need to address the effects of a military relevant environment (e.g., shock, vibration and extreme temperature variations) on the proposed system's performance and reliability 46. Q: For TA3.B is there a beam quality spec (M^2=?) targeted? A: The stated desire of TA3.B is to couple the laser output into a 100 micron core fiber, which provides an extremely lenient M^2 requirement. However, solutions that provide the potential for a high brightness output (i.e. low M^2) would be preferred due to their usefulness to multiple applications. 47. Q: For TA4, are millimeter-wave proposals of interest? A: There are no particular areas of technology interest for area 4 (those are defined in technical areas 1-3). Technical Area 4 is reserved for opportunities with quantitatively ground breaking impact. 48. Q: For the Technical Area 4, are the topics about very high speed wireless communications at THz carrier frequency or phase synchronization technique with high accuracy for very large arrays within the scope? A: There are no particular areas of technology interest for area 4 (those are defined in technical areas 1-3). However, it is required to document how proposed technologies provides a 1000X improvement over state of the art in a figure of merit of the proposer s choosing.