ENC Status Regions F & G

Similar documents
The Present Status of Small Scale ENC Coverage with Respect to the Allocation of cells to Usage Bands 1 (Overview) and 2 (General).

1 st MEETING OF THE IHO COUNCIL

United States-Canada Hydrographic Commission (USCHC) Meeting

USE OF THE RCDS MODE OF ECDIS (Submissions by Australia and Norway to IMO MSC/78)

UNITED KINGDOM NATIONAL REPORT

BSICCWG Report to the BSHC 23 rd Conference

Paper for Consideration by S-100WG3. Report on S-100 Sea trial of KHOA

MEDITERRANEAN AND BLACK SEAS HYDROGRAPHIC COMMISSION XVI CONFERENCE CONTRIBUTION BY CROATIA

SPAIN NATIONAL REPORT/ ეროვნული ანგარიში.

DEVELOPMENT OF A DEFINITION FOR MSPS AND CONSIDERATION FOR THE HARMONIZATION OF THE FORMAT AND STRUCTURE OF MSPS

MSI Self Assessment NAVAREA II. Submitted by France / SHOM SUMMARY

Appendix: References and glossary

NHC 59th meeting Agenda item NHC59-9A April 14-15, 2015 Reykjavik - Iceland. New national ENC service for leisure craft users

56 th NHC Meeting May 21-23, 2012 Copenhagen, Denmark. Draft Minutes. [May 23, 2012]

Meeting 3 10 August 2011 Agenda Item 3.2. MSI Self Assessment NAVAREA X. Submitted by Australia SUMMARY

National Report of Finland

MBSHC (Mediterranean and Black Seas Hydrographic Commission) XVII. conference, Greece Jun. 2011

UNITED KINGDOM NATIONAL REPORT

The ship RV Timba repairs are now almost complete and it is expected that come September 2014 the ship will be fully operational.

REPORT. Technical Visit THE ISLAMIC REPUBLIC OF IRAN February 2007

ROUTEING OF SHIPS, SHIP REPORTING AND RELATED MATTERS. New traffic separation schemes and two-way routes in Norra Kvarken

WWNWS10/2/1-I Meeting July 2018 Agenda Item 2.I. MSI Self Assessment NAVAREA I. Submitted by United Kingdom SUMMARY

UNITED KINGDOM NATIONAL REPORT

MESOAMERICAN AND CARIBBEAN HYDROGRAPHIC COMMISSION 11 th Meeting, Paramaribo, Suriname, Novembro NATIONAL REPORT BRAZIL

... Salient Ocean Issues that have arisen during 2002

TEPZZ A T EP A2 (19) (11) EP A2 (12) EUROPEAN PATENT APPLICATION. (51) Int Cl.: H02K 11/04 ( )

EP A2 (19) (11) EP A2 (12) EUROPEAN PATENT APPLICATION. (43) Date of publication: Bulletin 2011/11

NEW AND AMENDED TRAFFIC SEPARATION SCHEMES

FP7 PEOPLE PROGRAMME. Update FP7. Programme Committee Meeting 12 March 2015

MesoAmerican - Caribbean Sea Hydrographic Commission. International Hydrographic Organization DRAFT AGENDA DAY 1

SPAIN NATIONAL REPORT. TO THE 12th MEETING OF THE EASTERN ATLANTIC HYDROGRAPHIC COMMISSION (EAtHC)

ADVOCACY WORKING GROUP Work Plan

Helping Build Your Capacity in Nautical Charting & Hydrography

Nordic Hydrographic Commission 60th Conference - Stavanger - Norway April New national ENC service for leisure craft users

United States Coast Guard Office of Navigation Systems

TEPZZ 67ZZ A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION

Myanmar Naval Hydrographic Centre. National Report for 13 th North Indian Ocean Hydrographic Commission Meeting

ERS/ENVISAT ASAR Data Products and Services

PRODUCTS AND SERVICES FOR THE MARITIME COMMUNITY. Ed Martin, Chief Customer Affairs Branch Navigation Services Division Monday, 27 October, 2008

Production of Electronic Chart using updated survey data for EL-Arish harbor

3 BANKNOTES AND COINS 3.1 THE CIRCULATION OF EURO BANKNOTES AND COINS AND THE HANDLING OF CURRENCY

TEPZZ 7 Z_ 4A T EP A2 (19) (11) EP A2 (12) EUROPEAN PATENT APPLICATION. (51) Int Cl.: G06F 3/0488 ( ) G06F 3/0482 (2013.

MSI Self Assessment - NAVAREA II CPRNW II Submitted by: France

There is also need to acquire equipment such as GPS, Echo-Sounder and update data acquisition and processing software among other requirements.

e-navigation Progress and trends: the IHO perspective

MONTHLY MEETING REPORTS JANUARY 2018

IMO. Resolution A.977(24) Adopted on 1 December 2005 (Agenda item 9) SHIPS ROUTEING

World-Wide Navigational Warning Service Sub-Committee WWNWS-5 Monaco, 1-4 October S-100 Basics Background Brief

TEPZZ A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION. (51) Int Cl.: G01S 7/40 ( ) G01S 13/78 (2006.

HF Weather Broadcasting. How much longer will it last? Russell Levin, US Coast Guard

Podiceps nigricollis nigricollis Europe/South & West Europe & North Africa

TEPZZ _74 6 A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION

TEPZZ 5496_6A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION. (51) Int Cl.: H02J 3/38 ( ) H02M 7/493 (2007.

SECTION III NM 24/15 MARINE INFORMATION

The Notices to Mariners (NMs) listed below apply to the latest edition of SC5622 (3 rd Edition) published on 4 th January 2018.

FOREWORD. IHO S-100 Working Group

NEW ZEALAND CHARTING AND NOTICES TO MARINERS

TEPZZ A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION. (51) Int Cl.: B66B 1/34 ( )

ISO/TC268/SC1 Smart Community Infrastructures

SECTION III NM 41/14 MARINE INFORMATION

A guideline for establishing feature and symbol standard management system for national HOs

BookletChart. Port-au-Prince (Haiti) NGA Chart A reduced-scale NGA nautical chart for small boaters

IHO S-100 FRAMEWORK - BASELINE STANDARD FOR E- NAVIGATION MARITIME SERVICES

NR Physical Layer Design: NR MIMO

SECTION III NM 32/13 MARINE INFORMATION NOAA CHART NEW EDITIONS AND THEIR AVAILABILITY

ECDIS ENC Accuracy. Contents. Introduction LOSS PREVENTION BRIEFING FOR NORTH MEMBER SHIPS / MAY Introduction... 1

MPA Baseline Program. Annual Progress Report

Harmonisation of the Vertical Reference Systems. of nautical charts around the Baltic Sea

NOAA Navigation Services Update

SECTION III NM 39/13 MARINE INFORMATION NGA CHART NEW EDITIONS AND THEIR AVAILABILITY

Agenda (draft) 3 Minutes of NIPWG5 JS Amendments to the minutes JS 3.2 Review of Action Items from NIPWG5 JS

Gas Pipeline Construction

SECTION III NM 4/16 MARINE INFORMATION

ESA Climate Change Initiative- Soil Moisture (CCI SM): Serving our users lessons for Copernicus Climate Change Service

TEPZZ 9746 A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION. (51) Int Cl.: A41F 1/00 ( )

Meeting 9 4 August 2017 Agenda Item 3.2. MSI Self Assessment NAVAREA I. Submitted by United Kingdom SUMMARY

IMO/IHO World-wide Navigational Warning Service (WWNWS)

TEPZZ 7545 A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION. (43) Date of publication: Bulletin 2014/29

National Report of Finland

Hydrographic Services and Standards Committee. Report of the. Docs: HSSC A. ICPC activities affecting HSSC

TEPZZ 5Z 8 9B_T EP B1 (19) (11) EP B1 (12) EUROPEAN PATENT SPECIFICATION. (51) Int Cl.: H04W 52/14 ( )

REGIONAL HYDROGRAPHIC COMMISSIONS CAPACITY BUILDING NSHC NHC BSHC USCHC USCHC EAtHC MBSHC RSAHC EAHC MACHC NIOHC SWPHC SEPHC (SWAtHC) SAIHC SWPHC HCA

TEPZZ A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION. (51) Int Cl.: H02J 17/00 ( )

NAUTICAL CHARTING IN SMALLER COUNTRIES WITH SHORT COASTLINE - TROUBLES AND ADVANTAGES

Preparation of requirements. Part I Notification principles and time schedule

TEPZZ 8 5ZA_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION

SECTION III NM 40/17 MARINE INFORMATION

Corrupt Beacon IDs. SAR Controllers Training February Sam Baker Science Systems and Applications, Inc.

17 th CHRIS Meeting Rostock, Germany, 5-9 September Report of IHO-IEC Harmonization Group on Marine Information Objects (HGMIO

I want to thank Admiral La Rosa and the Italian navy for hosting again this very important symposium.

Korea s Strategy for e-navigation. SMART-Navigation. Presented by. Bu Young, Kim. 28 May Ministry of Oceans and Fisheries Republic of Korea

Catching opportunities: the BLUEMED Initiative

PAPUA NEW GUINEA HYDROGRAPHIC SERVICE

Maritime Administration of Latvia Hydrographic Service National Report to Baltic Sea Hydrographic Commission

MEOSAR Performance Overview. SAR Controllers Training March 2016 Mickey Fitzmaurice NOAA Senior Systems Engineer

Navigation Systems Division

SECTION III NM 35/10 MARINE INFORMATION NOAA CHART NEW EDITIONS AND THEIR AVAILABILITY

International Partnership for Nuclear Disarmament Verification Phase II

The European Frequencies Shortage and what we are doing about it RFF- 8.33

Dating your Ampeg. Question: When was my Ampeg built?

Transcription:

ENC Status Regions F & G -31Jan-2Feb 2017

REGION F ICC WG STATUS OF THE ENC SCHEME 2

ENC UB 1 STATUS (OVERVIEW) SOURCE: PRIMAR.ORG (2017) NO1A3000 IT100360 HR100010 UA1F0005 UA1F0006 TR100010 GR1OVER1 IT100340 IT100350 TR100030 3

ENC UB 2 STATUS (GENERAL) SOURCE: ENC COVERAGE CATALOGUE (2017) 4

ENC UB 3 STATUS (COASTAL) SOURCE: ENC COVERAGE CATALOGUE (2017) 5

ENC UB 4/5/6 STATUS SOURCE: ENC COVERAGE CATALOGUE (2017) 6

OVERLAP CHECKER HITS COMPARISON Based on Primar Overlap Checker Hits of March 2015 and January 2017. 1 Hit = 1 line in POC s result table OO = Own Overlap Region F 2015 2017 UB1-2-3 91 93 UB4-5-6 119 56 Total 210 149 OO 80 (38%) 39 (26%) 7

ENC RELATED MBSHC19 ACTION STATUS MBSHC19/27 UB1 overlaps, HR, GR, IT and TR to liaise with each other under the coordination of IT and to report back to RCC on the resolution of those overlapping cases by the end of the year. Italy reported back to the RCC that the dialogue initiated with the Parties has not led to resolve any UB1 overlaps so far MBSHC19/29 Focusing the work of ICCWG on the approval of UB4-5-6, as an alternative to move forward on the approval of ENC schemes in the region Pending. Validation of those ENC schemes jeopardized by high amount of overlap cases (38% of total overlaps) 8

STATUS OF REGION F ENC SCHEME SUMMARY Persistency of UB1 overlapping cases Actual disparate UB1 scheme in contradiction with well-established small scale INT chart scheme, Obvious domino effect with the resolution of UB2/3 overlapping cases. UB 4-5-6: many overlaps A Region F ICCWG side meeting is being scheduled alongside to the 1 st IHO Assembly. 9

REGION G ICC WG STATUS OF THE ENC SCHEME 10

ENC UB 1 STATUS (OVERVIEW) SOURCE: PRIMAR OVERLAP CHECKER GB104114 PT111101 FR166230 IT100340 IT100360 Oct 2016: FR/PT/RENCs dialogue to resolve an overlap between FR166230 and PT111101. GB104115 FR166240 IT100360 FR cells clipped and issued at the end of 2016 accordingly. 1 pending overlap between PT111101 and GB104114 GB104216 GB104209 GB104215 11

ENC UB 2 STATUS (GENERAL) SOURCE: PRIMAR.ORG (2017) Oct 2016: FR/ES/RENCs dialogue to resolve an overlap between FR272110 and ES201080. Edge matching with FR cell undertaken by ES. 12

ENC UB 3/4/5 STATUS SOURCE: ENC ONLINE CATALOGUE (2017) Oct 2016: Some persistent localized gaps in UB3/4/5/6 coverage 13

OVERLAP CHECKER HITS COMPARISON Based on Primar Overlap Checker Hits of March 2015 and January 2017. 1 Hit = 1 line in POC s result table OO = Own Overlap Region G 2015 2017 UB1-2-3 5 2 UB4-5-6 4 0 Total 9 2 OO 4 (44%) 0 14

ENC RELATED EATHC14 ACTION STATUS EAtHC14/11: INT & ENC Chart producers to check the consistency of the existing set of ENC with NOAA s list of cruise ship port coverage gaps and NGA s list of noncovered ports. To provide the regional charting coordinator with a set of proposals to complete large scales ENC schemes. (Pending) EAtHC14/18: Regional G ICCWG to validate ENC schemes for UB1/2/3 and report back to the IHO Secretariat. (Pending) 15

STATUS OF REGION G ENC SCHEME SUMMARY UB1 and UB2 coverage considered as completed. The 2 POC hits refers to a single edge matching overlap between PT111101 and GB104114, NW corner of the region. UB3 coverage with persistent gaps over Northwest coast of Africa (MA,MR,CV). Effort to complete UB4/5/6 coverages based on NOAA s list of cruise ship port coverage gaps and NGA s list of non-covered ports (@EAtHC14/11). 16

THE WENDWG IS INVITED TO: Take note of that report. Need for closer RENC/RCC cooperation to monitor ENC schemes : RENC to seek for RCC recommendations iaw WEND principles prior to new ENC release GE310300 released (5th EDTN) although corresponding GE11 is not an INT chart! Use of INT numbers in cell names. 17

Merci!