INTRODUCTION. EqunioxRoof.com. Pro Tip

Similar documents
Dura-Lock Roof System

Installation Guidelines

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Assembly Instructions 10 X 10 Aluminum Roof Support

Installation Guidelines

How To Measure Your Finished Opening

Assembly Instructions 10 X 10 Aluminum Frame Building

Installation Manual for Metal Emperor Lockers

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

10x10 Trellis Pergola

ALL SEASON PATIO COVER

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

Installation Guide Contemporary Alfresco V1.3 LU

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Trak-Slider Instructions

Solara Adjustable Patio Cover Installation Instructions

Cabinet Mount Lifter Instructions

(2) 12mm x 40mm Bolt Plate (long) pictured w/plastic retainer. (6) 12mm x 40mm Bolt Plate (short) Support Bracket Driver/left Front

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

METRIC BOlTS. Size Grade Torque 8mm ft/lbs. 10mm ft/lbs. 12mm ft/lbs. 14mm ft/lbs. 16mm ft/lbs.

START HERE BEFORE YOU BEGIN FIG 1 STEP 2

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Santa Fe Cover INSTALLATION GUIDE. Alumawood TM Newport with MAXX Panel TM Installation Guide

INSTALLING YOUR NEW SPRING LIFT ARM KIT

installation guide

JK Front Crusher Flares

Precision Steel Car s 100 T Steel Coil Car

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

8 x 8 Flat Top Pergola

Installation Instructions for Vista Air Vertically Folding Walls

HD installation guide

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Basic steps to time the Gammill quilting machine s rotary sewing hook

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

AUTOMATIC ADVANCE MANUAL

Revision Date: April 01, Paramount Enclosure

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

MODULAR BUMPER INSTALLATION MANUAL

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

UNIT No FRAMELESS PIVOT SHOWER DOOR

INSTALLATION INSTRUCTIONS

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

INSTALLATION INSTRUCTIONS KK-K9-C12-K CHEVY IMPALA

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

10 x 10 Flat Top Two Tone Pergola

10x10 Trellis Pergola

INOVO 2-LITE SLIDING PATIO DOOR

Driver/Left Top. Support Bracket

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

VACUSEAL MODEL 300 & 400

INSTALLATION INSTRUCTIONS

All American Mower Blade Sharpener Mulching Blade Model Patent Pending

INSTALLATION INSTRUCTIONS

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

Franklin Mills Stackable Movable Lateral Instructions

Note: This assembly instruction will cover all configurations of Alloy adjustable height double bases.

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

8 x 8 Flat Top Pergola

JK Rear Inner Fenders

10 x 10 Arch Top Pergola

TYGER GUARD. Parts List BEFORE INSTALLATION WARNING TG-GD6D /7. Tyger Guard. Tube Brackets (Bull Bar) passenger or driver side

INSTALLATION INSTRUCTIONS KK-K9-F14-K K9 KIT FOR FORD EXPEDITION

Installation Instructions

Installation Manual for the Rockmeister Roof Ladder

10 x 10 Flat Top Pergola

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

The Mirage Pergola ASSEMBLY GUIDE. OPTIONAL ACCESSORY Bolt Down Bracket Kit. Ver 3/2009

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

*Patent Pending. *Trademarked. Series II. Glass Conversion Kit. (888) One-Products (888)

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

REGENCY TIMBER BUILDINGS

PACKING LIST MACO V-5000

Installation Instructions - Model V4JSD 1

Series 1100 Aluminum Door Canopy

BASIC INSTALLATION GUIDE FOR THE PATIO ENCLOSURE

8mm x 25mm "Z" Bolt Plates. (2) Tube Spacers. (2) 12mm Bolt Plates w/ Nut

Before Assembling the Storage Wall

INSTALLATION & OWNER S MANUAL

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

00108/00110 INSTRUCTION MANUAL

Sliding Door Kit

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

P SERIES. and MASON CORPORATION

Transcription:

INSTALLATION MANUAL

INTRODUCTION The Equinox Louvered Roof System is designed to be installed in an aluminum frame. All these sections are 1/8" thick extruded aluminum. All engineering for this system is based on using these sections. Roll-formed thin-wall aluminum sections are not interchangeable with extruded aluminum sections. Our standard louver lengths are 8', 10', 12' and 14'. Please find below the inside and outside frame dimension chart. Louver OD ID 8' 95" 91" 10' 119" 115" 12' 143" 139" 14' 167" 163" The reason for these sizes is that our standard beam lengths are 16', 20', and 24'. If building a 10' x 20' louvered roof, the outside frame dimension will be 119'. This allows two side beams to be cut out of a 20' length, thereby using our materials efficiently. The outside dimension is 1" under 10'. The same is true for the 8',12' and 14' louvers. The outside of the frame should be 1" under 8, 12 and 14'. If your application doesn t suit the louver size, just frame to the site requirements, cut and cap the louvers to fit. Or, you can order a custom size to fit your job. Louvers can be installed into any open space regardless of the wall/frame material. For installations falling outside the scope of the Standard Engineering Package. We suggest the 2 X 8 beam be used in wood applications due to wood imperfections. EqunioxRoof.com 1

MEASURING The louvers are approximately 8" wide. This should be taken into account when calculating the width of the frame. If possible, you want the first and last louver to end within 1" of the inside of the frame. If the job calls for a certain width to match the concrete or the house, that s okay. Just center the louvers in the space between the beams, and place a flashing from the frame to the louver to fill the gap. You will never have more than a 4" gap on each side, because at that point you can fit another louver in. Use the measuring chart for calculating the optimum width. Or, layout the pivot strips end to end on the ground, to determine how many louvers will fit within the framework. Measuring Chart Louvers Opening Louvers Opening Louvers Opening Louvers Opening 5 41 13 104 21 167 29 230 6 49 14 112 22 175 30 238 7 57 15 120 23 183 31 246 8 65 16 128 24 191 32 254 9 73 17 136 25 199 33 262 10 81 18 144 26 207 34 269 11 89 19 152 27 214 35 277 12 96 20 159 28 222 36 285 2

FRAMING After you ve determined the frame size, cut your beams to length. Your side beams should be notched so that they cover the open ends of the front and back beams. Insert channel should be approximately 7.5" long, with four holes in the center for attaching to the beam. Attach the insert channel flush with end of the beam and attach with 4 each #14 x 3/4" Tek screws inside the frame. Slide the insert channel inside the notched beam. 3

FRAMING CONTINUED This will make for a nice finish. If you are mounting on the fascia, remove the gutter if there is one. Now pre-drill the back beam with 1/4" holes. If you want, you can hide them behind the pivot strip if you put your holes one inch down from the top of the beam. You will need 4" or 5" screws to mount it in this manner. You can also pre-drill the center of the beam with a 1/4" hole and open it up to 7/8" inches with a multi bit, and fasten through the back wall of the beam using a 3" screw. You can then cap that hole with a plug. With a wall mount situation, you can pre-drill the bottom 3" of the beam and cover the hole with the gutter. Cut your internal brackets (insert channel) 7½" long. Pre-drill them and mount them flush with the end of the beam. Now mount the back beam. Mount additional beams if needed, then assemble the rest of the framework. 4

GUTTERS To install the gutters, cut the back gutter to the inside measurements between the side beams and notch out the face of the gutter five and five-eighths inches. Mount the gutter by screwing it onto the back beam. Repeat the procedure for the front beam. Use 1 #10x3/8 Tek screw every 16 Measure between the front and rear beams to get the side gutter measurement. Deduct 3/8 of an inch from that measurement to ensure that the gutter clears the flanges of the front and rear gutters. Measure 5 1/4" along the face of the side gutters and mark. Follow the picture instructions to make a flap that will bend around the corner when you put the gutters together. Put silicone sealant in the bottom of the front and rear gutters before putting the side gutters in place. 1 tube of silicone sealant for every 20 of gutter is suggested. 5

GUTTERS CONTINUED Put side gutters in place and silicone behind the flap before screwing it in place. Seal everything with silicone including the corners where the beams join, and the top where the beams join. Now seal the top edge of the gutter to the beam. Use your finger for best results.. PIVOT STRIPS Installing the pivot strip is the next step. Put a mark 2" down from top of beam, the factory end must be at least 1 away from the side beam to allow clearance for the louvers. Center the pivot strip between the inside opening so that the louvers will have the same gap on both sides. The pivot strip must have factory ends butted together to ensure proper spacing of the louvers. Screw pivot strip in place with #10 X 5/8 Tek screw in the pre-punched pivot strip holes. The lowest the Pivot strip can be mounted is 2. This allows clearance for the louver blades to swing freely above the gutter lip. You can mount the Pivot strip higher all the way up to as high as where the fastening screws will just hit the beam. This allows you to add additional slope or pitch into the roof for better water drainage. If you do this, be sure when installing the motor, that the top of the motor backing plate is at the same height as the TOP of the Pivot Strip. 6

MOTOR Determine motor placement near the center of the job and cut out a gap in the pivot strip 5 5/8" wide. Remove the length bar holding pins on each pivot pocket on either side of the motor, this will make the louvers installed on either side of the motor easier to drop in. Do this only on the motor side of the pivot strip. This gap must be centered between the louver pockets in the pivot strip. Do this with an angle grinder. Mount the motor in the center of this gap with the bottom of the motor resting on the bottom of the gutter. Once the pivot strip is mounted on the two opposing beams and the gutters are all sealed Or so the top of the motor backing plate is even with the TOP of the Pivot Strip, wire up the motors. When blades close, the link bar nibs on the end-caps should be on the top-side and the 1" water sealing edge should be facing down in the direction you want the roof to close. Determine which way you want the louvers to open. We recommend opening them to the south if they are running in the east/west direction, or opening them to the west if they are running in the north/south direction. There really is no right orientation. Place end cap on louver end with the nibs up, note position of louver splash guard. You can consolidate steps in the assembly process. For example, you can mount the gutters, pivot strips and motor on the Front and Back Beams before mounting to house. This allows you to work with the materials at ground level rather than off of 7

ASSEMBLY Put in at least 3 louvers before installing the link bar. Make sure they are all oriented the same way and link the leading edge of the louvers. Roll the louver blades into the pivot strip pockets by rotating them in one direction until they drop on one side. Then, rotate them the opposite direction until they drop on the other side. Press the link bar push nuts on, using a box-end wrench or a push nut driver. The two louvers next to the motor have to be notched so that they will clear the motor and electrical connections. Cut off the trailing-edge up-stand, and cut a 1 notch out of the louver with the angle grinder as shown. When installing the two louvers next to the motor, roll in the far end first, ensuring that it is in its pocket. Then roll in the side next to the motor. You may have to operate the motor to get the louver to move past the motor arm and sit correctly in the pocket. 8

LINK BAR The link bar that will be attached to the motor arm needs to have a hole drilled out for the bolt which connects it to the motor arm. It should be a 3/8" hole and centered between the punched-out holes that connect to the louvers. Drill the hole at the same height as the punched out holes. The link bar needs to be positioned so that the holes are on the bottom face. When you connect the link bar to the motor arm, the link bar must go in front of the motor arm. If placed in back, it will hinder the motor s movement and prevent the roof from opening and closing fully. If you have to remove the motor arm, undo the stainless steel hex-bolt in the center. When you replace it, be sure to put Lock-Tight on it so it doesn t loosen during operation. When everything is complete, open and close the roof several times to verify that everything is operating properly. CUTTING DOWN LOUVER BLADES The louvers are made of Aluminum Extrusions and will cut cleanly with a standard De-Walt fine cross-cut contractor s blade. 9

ELECTRICAL CONNECTION Reference manufacturer s installation instruction for receiver and remote connections details 10

Amerimax PERRIS VALLEY, CA 28921 US Highway 74 Romoland, CA 92585 P: 800.448.4033 F: 800.448.8391