Circuit Reliability Review

Similar documents
Circuit Reliability Review

CRITICAL ISSUES WORST PERFORMING FEEDER PORTFOLIO

A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection. Steve T. Watt, Shankar V. Achanta, and Peter Selejan

ELECTRICITY NETWORKS ACCESS CODE SERVICE STANDARD PERFORMANCE REPORT for the year ended 30 June 2016

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

Electricity Networks Access Code 2004 Services Standard Performance Report for the year ended 30 June September 2018

Leslie J. Anderson Supervising Attorney Public Service Commission of West Virginia 201 Brooks St. PO Box 812 Charleston, WV Dear Ms.

Module 11a. Initiating Cause Code Form 4.X RELIABILITY ACCOUNTABILITY

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF RUSSEL D. JOHNSON

Please provide the working group whitepaper Worst Performing Feeders prepared by Canadian Electricity Association Analytics.

Automated Power System Waveform Analytics for Improved Visibility, Situational Awareness, and Operational Efficiency

Reliability and Power Quality Indices for Premium Power Contracts

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

Power Quality Monitoring and Analytics for Transmission and Distribution Systems

Improving Distribution Circuit Performance without Circuit Rebuilds. John Lauletta, CEO

Oil and Gas Operations in an Urban Environment: Challenges and Opportunities

actionable information and using that information to

Power Quality Overview

Towards a digital grid: Insights to prepare for the future October 2013

THE TOP 100 CITIES PRIMED FOR SMART CITY INNOVATION

Symposium: Urban Energy innovation

#SMARTer2030. ICT Solutions for 21 st Century Challenges

District of Columbia Power Line Undergrounding (DC PLUG) Initiative

Distribution Fault Location

TECHNOLOGICAL SOLUTIONS FOR A SUSTAINABLE FUTURE Building Smart Cities

T-68 Protecting Your Equipment through Power Quality Solutions

Southern California Edison EPIC Overview

Advanced Monitoring Tools to Improve Distribution System Visibility and Reduce Faults and Outages

Glossary of Terms Black Sky Event: Blue Sky Operations: Federal Communications Commission (FCC): Grey Sky Operations:

Measurement tools at heart of Smart Grid need calibration to ensure reliability

Spatial Representation and Analysis of Distribution Outage Information

ELECTRIC TRANSMISSION (ET) Guideline G0104

I. KEPCO Introduction

Quality Regulation in German Distribution Networks New Impulse for Live Working

Warm Up. Ray Huang and Douglas Li P.6

Solving the Problems of Cellular Capacity Constraints, Outages and Technology Upgrades with. Portable Telescoping Masts

DISTRIBUTION SYSTEM RELIABILITY ENHANCEMENT

Our increasingly digital world offers opportunities to transform the systems and services we rely on every day. For their take on the potential power

Minimizing Plant Interruption Caused by Line Disturbances Using Active Voltage Conditioners

BIM, CIM, IOT: the rapid rise of the new urban digitalism.

Utility Licence Annual Technical Report

A Guide to Going Off the Grid

Transmission Availability Data Systems Frequently Asked Questions

MOBILIZE AND MAXIMIZE THE POTENTIAL OF P25 DIGITAL LMR

Application of DFA Technology for Improved Reliability and Operations

In a challenging environment, GE businesses are poised to perform with rigor and to capture new growth. Technology Infrastructure, Energy

National Grid Performance Report

Online Assessment of Capacitor Banks Using Circuit Health Monitoring Technology

Webinar: A Northwest Vision for 2040 Water Infrastructure. Innovative Pathways, Smarter Spending, Better Outcomes

EE 741 Spring Electric Power Distribution Systems An Overview

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets

A Guide To Going Off The Grid

Self Healing Single Phase Looped Network AUTOMATED RECONFIGURATION FOR POWER OUTAGE MANAGEMENT. Team Members

GUIDELINES FOR THE MONITORING OF POWER QUALITY STANDARDS FOR DISTRIBUTION UTILITIES

Voltage Sags Evaluating Methods, Power Quality and Voltage Sags Assessment regarding Voltage Dip Immunity of Equipment

ECE 528 Understanding Power Quality

Blackout Theory. EE8725 Apoorva Mysore Nataraja

Welcome to the ISO. Demand Response / Energy Efficiency Roadmap Workshop. May 13, California ISO Internal Use Only

Public Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011

Adaptive Control Regulates Consistency of Flash Weld Process While Reducing Power Consumption

DOST OUTCOME STATEMENTS

Power transformers. Shunt reactors Proven history for future success

SIPROTEC 5 Application Note

SMART CABLE GUARD A TOOL FOR ON-LINE MONITORING AND LOCATION OF PD S AND FAULTS IN MV CABLES ITS APPLICATION AND BUSINESS CASE

EUGENE WATER & ELECTRIC BOARD REGULAR SESSION EWEB BOARD ROOM 500 EAST 4TH AVENUE October 2, :30 P.M.

Renewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA

SATELLITE MONITORING OF REMOTE PV-SYSTEMS

Radio System Replacement Project

Development of a Prototype of a GSM based Underground Cable Fault Detector

Agilent 8761A/B Microwave Switches

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control

Evolving Grid 700 MHz Field Area Network (FAN) Case Study. April 2018

NASA Ground and Launch Systems Processing Technology Area Roadmap

MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M.

EH27401 Communication and Control in Electric Power Systems Lecture 2. Lars Nordström

RECOMMENDATION ITU-R M * Definition of availability for radiocommunication circuits in the mobile-satellite service

Digital Disruption in the North American Gas and Power Markets

2014 Energy Storage RFO Energy Storage Systems for Distribution Substation Investment Deferral

Nevada Shared Radio System Update. WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11

Transmission Availability Data System 2008 Automatic Outage Metrics and Data Report Region: RFC

The standards you can expect. The level of service that we provide and what you're entitled to if we don't.

Optimal distribution protection design: quality of solution and computational analysis

Transmission Availability Data System Definitions

Ojai Reeves Road MESH re installation

Smart Grid Smarter Protection: Lessons Learned

Reliability Assessment of Distribution Systems Incorporating Feeder Restoration Actions

TEAMS Competition 2014

View #5 is also a good mix of front and side elevations, and very similar to view #4. However, the wall at the right obscures the rear of the

Transformation of Power Distribution

Smart Wires. Distributed Series Reactance for Grid Power Flow Control. IEEE PES Chapter Meeting - Jackson, MS August 8, 2012

European Wind Energy Technology Roadmap

News Release STV PROMOTES SAM YU TO SENIOR VICE PRESIDENT FOR IMMEDIATE RELEASE

Cyber-Physical Systems, Power Grid, and Engineering Education NSF Perspective

Wireless Technologies Provide Effective Data Communications to the Solar Power Industry

Philip C. Stouffer Jason A. Zoller. LSU School of Renewable Natural Resources Final Report 30 June 2006

Model-based Systems Engineering Mission Formulation and Implementation

Envision America. Rob Phocas Office of Sustainability City of Charlotte. Monday, March 6, 2017

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

HORIZON 2020 The new Framework Programme for Research and Innovation

Transcription:

Circuit Reliability Review Los Alamitos January 2018

Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and sustainable future that meets the needs and expectations of our customers. We are investing more than $13 billion in the power distribution grid over three years (2017-19). Our main investment goal is to increase power reliability through significant upgrades. The investments include: Upgrading cables, poles, switches and transformers Updating the grid so it can accommodate new technologies, such as smart inverters that will allow for the twoway flow of solar energy Adapting the power system to accommodate future California policy related to energy storage, electric transportation and renewable energy Providing enhanced automation and monitoring devices to allow us to better respond to changes on the grid Our investments in local communities will help ensure that customers receive safe, reliable, and affordable electricity now and in the future. Learn more at edison.com/innovation 2

Understanding Your Reliability Report As your electric utility, we want you to always have power when you need it. To get there, we constantly track and monitor electric outages across our service territory, and we measure our system reliability from this data. The two metrics we rely on are common in the electric utility industry: the System Average Interruption Duration Index (SAIDI) and the System Average Interruption Frequency Index (SAIFI). Both are described in more detail on the next page. Replacing and upgrading our infrastructure will help SCE maintain or improve SAIDI and SAIFI measurements. This report provides historical reliability data for the circuits that serve your jurisdiction and our proposed infrastructure upgrades for the current year. To view other reliability reports, visit sce.com>outage Center>Maintaining Reliable Service 3

Reliability Metrics MOMENTARY OUTAGES: OUTAGES LASTING 5 MINUTES OR LESS SUSTAINED OUTAGES: OUTAGES LASTING LONGER THAN 5 MINUTES MAIFI: o The number of times the average customer is interrupted by Momentary outages each year. SAIFI: o The number of times the average customer is interrupted by Sustained outages each year. SAIDI: o The cumulative amount of time the average customer is interrupted by Sustained outages each year. 4

Cities in the LONG BEACH District CityList1 ARTESIA CERRITOS HAWAIIAN GARDENS LAKEWOOD LONG BEACH LOS ALAMITOS LOS ANGELES ROSSMOOR SIGNAL HILL 5

* Exclusions are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature. **In the columns showing Rank, lower numbers indicate poorer performance. 6

Overview of Los Alamitos CircuitList1 There are 16 circuits that serve Los Alamitos 1 Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers BLACKHAWK(12KV) 2,732 - - - CLAIR(12KV) 263 - - - CLAUDIA(12KV) 2,088 - - - COMANCHE(12KV) 2,294 - - - FELA(12KV) 951 - - - GARNSEY(12KV) 1,499 - - - HALIBUT(12KV) 796 - - - JACQUE(12KV) 2,378 - - - KATELLA(12KV) 1,211 - - - NOOTKA(12KV) 2,283 - - - PRIDA(12KV) 1,873 - - - RADFORD(12KV) 1,866 - - - RAVENNA(12KV) 2,094 - - - ROSSMOOR(12KV) 2,240 - - - SIOUX(12KV) 1,688 - - - THORPE(12KV) 867 - - - Grand Total 27,123 7

Reliability History of Circuits Serving Los Alamitos (No Exclusions) BarChart 2014 2015 2016 2017 SAIDI (average minutes of sustained interruptions) 160.0 140.0 120.0 100.0 80.0 60.0 40.0 20.0 33.9 112.1 114.8 70.0 134.5 139.7 85.1 83.1 Los Alamitos 0.0 SAIFI (average frequency of sustained interruptions) 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 0.3 1.0 0.6 0.9 1.0 1.1 0.6 1.2 SCE SYSTEMWIDE ** Exclusions are days which utilities are allowed to MAIFI (average frequency of momentary interruptions) 2.0 1.5 1.0 0.5 0.9 1.4 1.4 0.5 1.4 1.6 0.8 1.8 remove from their metrics because the outages on those days were caused by acts of nature. **Data is as of 02/20/2018, data can be slightly different due to outage data validation process 0.0 8

Causes of Repair Outages in Los Alamitos 2017 SAIDIChart Contributions to SAIDI by Outage Cause 3rd Party 2.2% Equipment Failure e.g., in-service failure of transformer, switch, or conductors Vegetation/Animal e.g., tree branch, rodent, or bird causing a short circuit between conductors Other e.g., patrolled but no cause found Operations e.g., urgent maintenance w/o 3-day notice 3 rd Party e.g., balloon, car hit pole, dig-in Vegetation /Animal 7.7% Other 9.6% Weather /Fire /Earthquake 20.0% Operation 23.9% Equipment Failure 36.5% 3rd Party Equipment Failure Operation Other Vegetation /Animal Weather /Fire /Earthquake SAIDI = the cumulative amount of time the average customer is interrupted by sustained outages each year. 9

Causes of Repair Outages in Los Alamitos 2017 SAIFIChart Contributions to SAIFI by Outage Cause 3rd Party 5.2% Equipment Failure e.g., in-service failure of transformer, switch, or conductors Vegetation/Animal e.g., tree branch, rodent, or bird causing a short circuit between conductors Other e.g., patrolled but no cause found Operations e.g., urgent maintenance w/o 3-day notice 3 rd Party e.g., balloon, car hit pole, dig-in Weather /Fire /Earthquake 26.0% Vegetation /Animal 17.5% Operation 22.8% Equipment Failure 25.4% 3rd Party Equipment Failure Operation Other Vegetation /Animal Weather /Fire /Earthquake Other 3.2% SAIFI = the number of times the average customer is interrupted by sustained outages each year 10

11

12

Back-up Slides Reliability Histories of Circuits Serving Los Alamitos Updated through Dec 2017

Average Reliability of 16 Circuits Serving Los Alamitos CitySummary 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI 16 Circuits Serving Los Alamitos -- Total Customers: 27,123 33.9 0.3 0.9 70.0 0.6 0.5 85.1 1.0 1.4 42.7 0.3 0.4 7.7 0.1 0.3 14.0 0.1 0.0 18.7 0.1 0.1 83.1 0.6 0.8 3rd Party 15% 16% 9% 32% 51% 31% 7% 10% 24% 4% 11% 25% - - 43% - - 2% 5% 30% Equipment Failure 58% 66% 0% 34% 13% 56% 56% 36% 25% 0% 0% - 84% 82% 13% 52% 10% 100% 88% 89% 100% 36% 25% 14% Operation 12% 7% 23% 18% 24% 2% 18% 26% 3% 38% 30% 23% 16% 18% 19% 7% 23% - 8% 5% - 24% 23% 19% Other 1% 0% 16% 8% 5% - 18% 28% 26% 19% 7% 15% - - 25% - - 10% 3% 18% Vegetation/Animal - - 49% 1% 1% 12% 0% 0% 19% - - 40% 67% - 4% 6% - 8% 17% - Weather/Fire/Earthquake 14% 11% 2% 8% 6% - 0% 0% 4% 39% 53% 37% - 20% 26% 18% SCE SYSTEMWIDE 112.1 1.0 1.4 114.8 0.9 1.4 134.5 1.1 1.6 42.6 0.3 0.5 23.6 0.2 0.4 29.2 0.2 0.4 44.3 0.4 0.5 139.7 1.2 1.8 Notes: No outages are excluded from the metrics. Outage Causes: Other: e.g., patrolled but no cause could be found Operations: e.g., urgent maintenance w/o 3-day notice to customers 3 rd Party: e.g., balloons, car hit pole, dig-in Vegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductors SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by sustained (longer than 5 minutes) outages. SAIFI (interruptions) = the number of times the average customer is interrupted by sustained outages. MAIFI (interruptions) = the number of times the average customer is interrupted by momentary " (lasting 5 minutes or less) outages. 14

Reliability Histories for Individual Circuits Serving Los Alamitos - 1 of 4 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI BLACKHAWK(12KV) - Customers: 2,732 54.7 1.0-34.9 0.1-74.0 1.1 2.0 - - CircuitHistory 56.1 1.0-2.1 0.0-58.3 1.0-3rd Party - - - 1 - Equipment Failure 100% 100% - 19% 13% - 11% 3% - - 100% 100% - 4% 1% - Operation 0% 0% - 81% 87% - - - Other - - 89% 97% 50% - - - Vegetation/Animal 50% - - 100% 100% 96% 99% - Weather/Fire/Earthquake CLAIR(12KV) - Customers: 263 30.5 0.1 1.0 110.4 1.0 1.0 43.1 0.1 2.9 - - - 3rd Party - - - 100% 100% - - - Equipment Failure 13% 2% - - - 100% 40% 16% 51% - - - Operation 5% 38% - - Other 81% 60% - - Vegetation/Animal - - 100% - Weather/Fire/Earthquake - - 60% 84% 49% - - - CLAUDIA(12KV) - Customers: 2,088 45.9 0.4 1.0 28.8 1.1-73.5 1.0 1.0 190.4 1.0 1.1 - - 10.2 0.1-200.6 1.1 1.1 3rd Party 60% 64% 100% 31% 92% - 11% 1% 100% - - - Equipment Failure - - - 67% 7% - - - Operation - - - 2% 1% - 89% 99% - 100% 100% 100% - 95% 93% 100% Other Vegetation/Animal - - 100% 100% - 5% 7% - Weather/Fire/Earthquake 40% 36% - - COMANCHE(12KV) - Customers: 2,294 65.6 0.3 2.0 89.9 0.2-50.1 1.0 4.0 18.2 0.1 0.0 - - 69.9 0.8 0.8 88.1 1.0 0.8 3rd Party 25% - - - Equipment Failure 50% 36% - 100% 99% - 100% 100% 100% 79% 85% 99% Operation 50% 64% - 0% 1% 100% 100% 100% - 21% 15% 1% Other - - 50% - - - 100% 100% 50% - - - Vegetation/Animal - - 50% - 25% - - - Weather/Fire/Earthquake 15

Reliability Histories for Individual Circuits Serving Los Alamitos - 2 of 4 CircuitHistory 2 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI 2017 FELA(12KV) - Customers: 951 50.6 0.1-333.2 1.6-42.4 0.1 2.0 3.1 0.0 140.8 0.3 0.0 - - - 143.8 0.4 0.0 3rd Party Equipment Failure 100% 100% - 28% 8% - 100% 100% - 19% 43% 95% 71% 100% - - - 93% 70% 100% Operation - - - 7% 8% - - - 50% - - 5% 29% 5% 28% - Other - - - 32% 37% 81% 57% - - 2% 2% - Vegetation/Animal Weather/Fire/Earthquake - - - 33% 47% - - - 50% - - - GARNSEY(12KV) - Customers: 1,499 178.0 2.0 0.9 213.3 1.2 2.0 1.3 0.0-143.4 0.4 2.0-143.4 0.4 2.0 3rd Party 26% 49% 0% 58% 22% 84% - - Equipment Failure - - - 20% 12% - - - Operation 3% 2% - 22% 66% 16% 100% 100% Other - 100% 100% 50% - 100% 100% 50% Vegetation/Animal Weather/Fire/Earthquake 71% 49% 100% 50% - - - 50% HALIBUT(12KV) - Customers: 796 - - 1.0 81.0 1.0-93.5 0.1 3rd Party Equipment Failure - - - 100% 100% - 86% 84% Operation Other Vegetation/Animal - - 100% - - - 14% 16% Weather/Fire/Earthquake JACQUE(12KV) - Customers: 2,378 7.2 0.0 2.0 42.1 1.1-94.3 1.3 1.9 0.9 0.0-12.1 0.0-3.4 0.0 16.4 0.1-3rd Party - - - 21% 88% - 11% 14% 100% - - - Equipment Failure 76% 43% - 55% 7% - 12% 5% - 100% 100% - 94% 50% - 100% 100% 96% 59% - Operation 24% 57% 100% 2% 1% - 77% 81% 6% 50% - - - 4% 41% - Other Vegetation/Animal - - - 21% 5% - - - Weather/Fire/Earthquake 16

Reliability Histories for Individual Circuits Serving Los Alamitos - 3 of 4 CircuitHistory 3 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI KATELLA(12KV) - Customers: 1,211 1.4 0.0 1.0 218.3 0.4 1.4 112.4 1.9 0.0 - - - 78.5 1.1 1.0 1.1 0.0 79.5 1.1 1.0 3rd Party - - - 95% 94% 100% - - Equipment Failure - - - 5% 6% - 93% 53% 100% - - - 97% 98% 100% 100% 100% 97% 98% 100% Operation 100% 100% 7% 47% 3% 2% - - - 3% 2% - Other - - 100% - Vegetation/Animal Weather/Fire/Earthquake NOOTKA(12KV) - Customers: 2,283 3.9 0.0 1.0 51.4 1.0 1.0 67.3 1.3-195.2 1.9 1.0 5.7 0.0 38.1 0.1-238.9 2.0 1.0 3rd Party - - - 98% 100% - 91% 97% Equipment Failure - - 4% 1% - - 100% 100% - 16% 7% - Operation 100% 100% 5% 3% 100% 100% - - - 2% 2% - Other Vegetation/Animal - - 100% 2% 0% 100% - - Weather/Fire/Earthquake - 100% 100% 100% - 82% 91% 100% PRIDA(12KV) - Customers: 1,873 - - 1.0 46.5 0.8 0.8 1.2 0.0 2.9 0.0 - - - 2.9 0.0-3rd Party - - - 93% 97% 100% - - Equipment Failure - - - 7% 3% - 100% 100% 25% 6% - - - 25% 6% - Operation - - 100% 0% 0% - - - 75% 94% - - - 75% 94% - Other Vegetation/Animal Weather/Fire/Earthquake RADFORD(12KV) - Customers: 1,866 105.5 0.2 1.0 30.1 0.1 2.4 289.3 2.3 3.6 - - - 36.3 0.1-22.8 0.0 59.2 0.1-3rd Party 35% 58% - - Equipment Failure 65% 42% - 95% 92% 100% 87% 98% 100% - - - 82% 50% - 100% 100% 89% 67% - Operation - - - 5% 8% - 13% 2% 18% 50% - - - 11% 33% - Other Vegetation/Animal - - 100% - Weather/Fire/Earthquake 17

Reliability Histories for Individual Circuits Serving Los Alamitos - 4 of 4 CircuitHistory 4 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI RAVENNA(12KV) - Customers: 2,094 4.3 0.1 1.5 - - 1.0 87.3 0.7 - - 1.0 - - - 18.5 0.1-18.5 0.1 1.0 3rd Party 100% 100% 100% 100% Equipment Failure - 100% 90% 22% Operation - - 10% 78% - - 100% 100% - 100% 100% - Other Vegetation/Animal - - 100% - Weather/Fire/Earthquake ROSSMOOR(12KV) - Customers: 2,240 2.4 0.0 1.0 37.6 0.1-106.6 1.1 - - 1.0 - - - 67.9 0.1-67.9 0.1 1.0 3rd Party Equipment Failure 52% 65% 1% 7% 5% - 99% 99% - - 100% 100% - 100% 100% - Operation 48% 35% - 93% 95% - - - Other - - 1% 1% - - 100% 100% Vegetation/Animal - - 99% - Weather/Fire/Earthquake SIOUX(12KV) - Customers: 1,688 43.6 1.0-51.8 1.0-60.6 1.2 2.1 28.6 0.5 0.9 - - 1.0 - - 28.6 0.5 1.9 3rd Party - 100% 100% 100% - 100% 100% 49% Equipment Failure 96% 99% - 8% 1% - 5% 0% Operation 4% 1% - 92% 99% - 100% 51% Other - - 95% 100% 55% - - - Vegetation/Animal 45% - - - Weather/Fire/Earthquake THORPE(12KV) - Customers: 867 2.6 0.0 1.0 6.3 0.8 - - 1.0 - - 2.0 46.7 1.1-46.9 0.1-93.7 1.1 3.0 3rd Party - - - 100% - - 100% 100% Equipment Failure - - - 48% 9% - 100% 100% - 74% 14% - Operation 100% 100% - 100% 100% - - 52% 91% 26% 86% - Other Vegetation/Animal - - 100% - Weather/Fire/Earthquake 18