8x8 Spa Breeze Pergola Assembly Manual Outdoor Living Today

Similar documents
8X10 Breeze Pergola Assembly Manual Outdoor Living Today

12X20 Breeze Pergola Assembly Manual Outdoor Living Today

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

10ft X 16ft Breeze Pergola Assembly Manual. Outdoor Living Today. Revision 6 March 20th,2012

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

Cedar Picnic Table - Model 24 Assembly Manual

6X3 Patio Garden Shed Assembly Manual

6X3 Oscar Shed Assembly Manual

9 ft Naramata Spa Shelter Assembly Manual Outdoor Living Today

Assembly Manual. Retractable Canopy for 12X16 Breeze Pergola. Outdoor Living Today. Revision 4 May 28th/ 2012

Grand Garden Chalet 6X3 Assembly Manual - Costco

Grand Garden Chalet 6X3 Assembly Manual

8x4 SpaceSaver Garden Shed Assembly Manual

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

10ft Octagon Bayside Gazebo Assembly Manual

Garden Chalet 4X2 Assembly Manual

12ft Octagon Bayside Gazebo Assembly Manual

Potting Bench Assembly Manual Outdoor Living Today

8x4 SpaceSaver Garden Shed Bevel Model Assembly Manual Revision #18 March 9th, 2017

8x4 SpaceSaver Garden Shed - Double Door - Bevel Model Assembly Manual Revision #18 January 3rd, 2018

Grand Garden Chalet 6X3 Assembly Manual

Screen Kit For Octagon Gazebo Assembly Manual

Assembly Manual. OLM Retractable Canopy for 12X16 Breeze Pergola by Outdoor Living Today. Revision #12 October 4, 2017

8 X12 Raised Garden Bed Assembly Manual Licensed under US PATENTS 7,424,787; 7,490,435

12x8 Cabana Garden Shed Assembly Manual

9x6 Cabana Assembly Manual

8x12 SpaceMaker Garden Shed Assembly Manual Revision #20 June 27th, 2017

6 X3 Raised Garden Bed Assembly Manual

8x12 SpaceMaker Garden Shed Assembly Manual

8x12 Santa Rosa Assembly Manual

9x9 Penthouse Garden Shed Assembly Manual

8x8 Sunshed Garden Shed Assembly Manual

8x8 Sunshed Garden Shed Assembly Manual Revision #9 June 11th, 2012

8x12 Santa Rosa Assembly Manual

12x12 SunShed Garden Shed

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

12x12 SunShed Garden Shed

Osprey Platform Assembly Guide. Menunkatuck Audubon Society. Rev 1.0

Double Beam Freestanding Pergola Installation Guide

10x10 Trellis Pergola

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

ATLANTIS RAIL Contact Information

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

Installation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer.

The Devonshire Arbor 85 in

Shetland Stalls Installation Instructions

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

Spiral Slide

10 x 10 Flat Top Two Tone Pergola

Best Barns USA Assembly Book

FENCE INSTALLATION GUIDE 6 HIGH FENCE

ASSEMBLY INSTRUCTIONS SS2010. BASE SIZE: 2.020m x 1.020m

Flex Fence Instruction Manual

10x10 Trellis Pergola

FENCE INSTALLATION GUIDE 8 HIGH WALLS

Best Barns USA Assembly Book

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG)

Installation Manual For ToddPod Outdoor Shower Enclosures

Lodge II Pergola. Manual and Installation Instructions. Please read these instructions before removing parts from crate

NEVADA ASSEMBLY INSTRUCTIONS

Best Barns USA Assembly Book

COMPOSITE RAILING INSTALLATION

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

Best Barns USA Assembly Book

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

The Newport Arbor ASSEMBLY INSTRUCTIONS. Material You Will Need (Not Included) 4 in x 4 in x 4 ft Pressure Treated Lumber (4)

Oval Vinyl Gazebo. Assembly Manual

SECTION 19: Endwood Fusion Welded Gate Installation Guide

10 Octagon Cedar Gazebo Assembly Instructions

5 5 8 " 60" 53 8 " " 7" 5 1 2" 7" " FIVE MODELS TO MEET YOUR DESIGN REQUIREMENTS.

Best Barns USA Assembly Book Revised November 3, 2016

PRO-RIB FENCE PANELS INSTALLATION GUIDELINES. Virtually Maintenance Free Available in 24 Colors Custom Heights Available by the Inch

Dundalk LeisureCraft Cedar Pod Sauna Assembly Instructions

Best Barns USA Assembly Book

Best Barns USA Assembly Book

Wooden Rectangle Pergola Assembly Manual

ASSEMBLY INSTRUCTIONS SS2520. BASE SIZE: 2.520m x 2.020m

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

Best Barns USA Assembly Book

Sonoma Outdoor Kitchen Pergola. Assembly Instructions

Best Barns USA Assembly Book

176 S. New Holland Road Gordonville, PA Tel: Fax: Summit Tower

IDAHO ASSEMBLY INSTRUCTIONS. BASE SIZE: 1.800m x 1.200m

Model #SH & CH SH Pine CH Naturaline

Oxford Stalls Installation Instructions

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Best Barns USA Assembly Book

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

TV WALL MOUNT ASSEMBLY GUIDE RF-TVMLPT01V2

12 x 12 Flat Top Pergola

Best Barns USA Assembly Book

Assembly Instructions

Artisan Vinyl Pergola

176 S. New Holland Road Gordonville, PA Tel: Fax: Castle Loft

ASSEMBLY GUIDE. Barcelona Pergola. 12 X16 (365CMx487CM) VER /01/19

ROUND TOP RV SHELTER

Transcription:

8x8 Spa Breeze Pergola Assembly Manual Outdoor Living Today Revision 3. Feb 18th/2015 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building permit office to determine the correct hardware in your area. If you plan to paint or stain your Pergola before assembly, be sure to scribe or mark the top edge of Joist where Stub Joists and Ladder Blockings are pre-marked. Painting or staining may cover up markings making it more difficult to align components later. Customers agree to hold Outdoor Living Manufacturing Ltd. and any Authorized Dealers free of any liability for improper installation, maintenance and repair of any Outdoor Living Today products. In the event of a missing or broken piece, simply call the Outdoor Living Today Customer Support Line @ 1-888-658-1658 within 30 days of the delivery of your purchase. It is our commitment to you to courier replacement parts, free of charge, within 10 business days of this notification. Replacement parts will not be provided free of charge after the 30 day grace period. Page 1

3 LADDER SECTIONS Packing Check List 8 x 8 Spa Breeze Pergola Check Off Parts When Unpacking from Pallet F D B D E C G H 90 INSIDE POST TO POST FRONT I A 90 SIDE 101 OUTSIDE POST TO POST L Thank you for purchasing one of our Spa Breeze Pergola s. Please take the time to identify all the parts prior to assembly. Parts Lists: Finished Size T W L Qty. A - Posts 5 3/8 5 3/8 108 4 B - Girder (deep notch on top) 1 1/2 5 1/2 119 2 C - Girder (deep notch on bottom) 1 1/2 5 1/2 119 2 D - Joist (shallow notch on bottom) 1 1/2 5 1/2 119 8 E - Stub Joist 1 1/2 5 1/2 14 1/2 12 F - Ladder Blocking 1 1/2 5 1/2 18 5/8 18 G - Left Corner Brackets 1 1/2 5 1/2 34 3/4 4 H Right Corner Brackets 1 1/2 5 1/2 34 3/4 4 I - Corner Bracket Post Mount 3/4 4 1/2 10 1/2 8 Post Skirting Kits - 4 Kits / Each includes: J - Post Skirtings with Cleat 1 1/2 9 10 2 K - Post Skirtings- Dado Cut 1 1/2 9 10 2 L- Post Skirting Caps 1 1/2 2 1/2 10 5/8 4 K J Specifications: Wood Species - Western Red Cedar Grade - Architectural Knotty or Better Posts - Laminated Western Red Cedar Lag Screws and Washers - Zinc Plated 4, 2 1/2 & 2 Screws - Magna Guard 2 Screws for Brackets - Stainless Steel 2 Finishing Nails - Stainless Steel Overall Outside Dimensions: 119 x 119 x 108 high Height (Ground to Bottom Girder) - 95 1/2 Post Mounts - Not Included with Kit Recommended Post Mount Simpson Strong Tie - ABU66 Page 2

8x8 SPA BREEZE PERGOLA HARDWARE PACKAGE Hardware Kit (Provided) Note: screws and nails shown actual size. 2 Stainless 2 Square Drive Bit 2 SS Finishing Nail 3 Lag Screw and Washer (16 each) 2 1/2 4 Wooden Dowel (8) Tools Required (Not Provided) Hammer Screw Gun/Drill Tape Measure Wood Clamp 9/16 Wrench Level Pliers Ladder 1/8 & 1/4 Drill Bits Safety Equipment Required (Not Provided) Safety Glasses Work Gloves Page 3

Laying Out Your Footprint Center to Center 95 5/8 Inside Diagonal 127 1/2 Inside Post to Post 90 1/4 To determine the proper placement of your Posts and Footings, refer to footprint detail illustration on the left. Outside Post to Post measurements for the 8 x8 x Spa Breeze Pergola is 101 x 101. Take diagonal measurements in both directions to confirm square. Mark out center to center post locations on the ground. Pouring Your Forms Outside Post to Post 101 1. Dig large enough hole (use measurements above) and deep enough to be below the frost line. Typical Post Footing for New Construction. 5 3/8 x 5 3/8 Post (Included) 2. Place 2 of crushed gravel in the bottom of hole. 3. Cut Sonotube to proper length. Measure and cut tubes for each hole individually, as hole depths are likely to vary by a few inches. 4. Set the tube in hole. Use a level to ensure that tube is plumb in the hole and level at the top. Backfill by shoveling dirt into the hole around the outside of the tube. Post Mount Bracket with Hardware (Not included). Use Simpson ABU66 or similar hardware such as a Carport Bracket. 5. Pour concrete into the sonotube. Set post mount bracket into the pier tops as you pour the concrete. Confirm center to center location for post mount brackets when pouring concrete. Redi Mix Concrete (Not Included). Example 8 diameter - 3ft deep = 1 cubic ft. 1 1/2-80 lb bags per footing. Sonotube Form. (Not included). Can be 6, 8 or 10 diameter and 2 to 4ft deep depending on geographic location. Page 4

Important - Western Red Cedar Lumber and Timbers will have surface splitting that occurs as lumber seasons and drys to the moisture content in your area. Splitting or checking, as it is referred to, can be 1/8 to 1/4 wide and can run several feet. This does not diminish the structural integrity of the material in any way. Girder (B) Deep Notch Up Measure 101 Outside to Outside Post Deep Notch facing up and inside flush with post. 8 13.5 B 1. On flat level ground, lag screw the Girder with Deep Notch On Top - 1 1/2 x 5 1/2 x 119 (Part B) to two Posts - 5 3/8 x 5 3/8 x 109 (Part A) approximately 8 from top of posts with 2-3 long Lag Screws and Washers. Complete 2 sets of girder/post assembly s. Note; Pilot hole a shallow hole into post with 1/4 drill bit. Holes for lag screws. A Lag screws/ washers. Important- You will require the assistance of 2 helpers to support the posts up to Step 7. Girder facing out. 2. Lift up a completed post/ girder Assembly slowly and carefully. Make sure girder is facing outward. Page 5

3. If Post Mount Hardware is installed, position bottom of posts in hardware. ABU66 bracket shown. 4. Secure post to post hardware with appropriate hardware such as bolts, lag bolts or a sufficient number of screws.(hardware Not Supplied) Lift, position and attach the second post/girder assembly to post hardware. C 5. Locate Girder with Deep Notch on Bottom (C) and lift up between both completed post/ girder assembly s. Deep notch facing down. Page 5

(C) Girder C Girder 6. Carefully lower (Part C) Girder with Deep Notch Facing Down - 1 1/2 x 5 1/2 x 119 down into notch of (B) girders. Be careful not to twist the girder when positioning down into place. Lag screw girder to post. Drill shallow pilot hole first with 1/4 bit. Note; Pilot hole post first with 1/4 drill bit. (C) Girder Use 2 washers and lag screws. 7. Lift, position and lag screw the second (C) girder to posts. Pre-marked for stub joist placement. Shallow notches facing down. D 8. On level ground, position 1 Joist - 1 1/2 x 5 1/2 x 119 (Part D) and 8 Stub Joists - 1 1/2 x 5 1/2 x 14 1/2 (Part E). Joists are pre-marked on top edge for stub joist and blocking positioning. Make sure to flush bottom of stub joist with bottom of joist. When complete, more important to have a nice fit on bottom rather than top. E Flush bottom of stub with bottom of joist. Page 6

9. With stub joists positioned correctly on joist, attach each stub joist with 2-2 1/2 screws. Stub joists should be flush with top and bottom of joist with all notches facing down. There are two joist / stub joist assembly s, complete both now. Completed Joist / Stub Joist connections. 2-2 1/2 screws. 10. Carefully lift up completed joist / stub joist assembly and fit notches onto girder. 1-4 screw. Joist (D) 4 long screws 11. Attach all stub joists and joist to girder with 1-4 screw per piece. Complete both Assembly s Note: Drill 1/8 pilot holes in joists and stub joists to make it easier to screw in 4 screws. Page 7

D F 12. On a flat surface, position Ladder Blocking (F) where marked on top edge of joist (D) and screw with 2-2 1/2 screws per end. Ladder blocking should be flush with top and bottom of joist with all notches facing down. D 2-2 1/2 screws per blocking end. Make sure to flush bottom of blocking with bottom of joist. When complete, more important to have a nice fit on bottom rather than top since you will be looking up while under the pergola. Joist is pre-marked for blocking placement. Completed Ladder Section. 13. Complete all three ladder sections on the ground prior to moving to Step 14. 14. Carefully lift up one of the ladder sections between girders. You will require a helper to assist in lifting ladder sections. Page 8

Notch slips onto girder. 5 1/2 7 15. Carefully slide joist notches of ladder section onto girder. Try to align notches so they fall into place all at once. With notches of ladder section all sitting correctly on girder, slide section approximately 7 from post. Check alignment of opposite end of ladder section. 16. Set all remaining ladder sections in place on girder spacing each approximately 5 1/2 apart. 17. With all ladder sections in place, check once more for equal spacing. When satisfied with ladder section positioning, attach to girders with 4-4 screws per ladder. Screw from top edge of joist down into girder. Pilot hole again with 1/8 bit first to help with screwing. Pilot hole joist first and secure with 4 screws/ ladder section. 5 1/2 Page 9

18. There are 4 Left (G) and 4 Right Sided Corner Brackets (H). Corner Bracket Post Mounts - 3/4 x 4 1/2 x 10 1/2 (Part I) must be attached to the bottom end of each corner bracket before attaching to posts. (H) Right Side Corner Bracket. Slide dowel into drilled hole. Hole. Wooden Dowel. (I) Corner Bracket Post Mount. 19. To assist you with bracket and post mount alignment, both the end of the bracket and post mount have been drilled for a Wooden Dowel. Wooden dowels are found in the Hardware Kit Bag. Insert a wooden dowel in end of corner bracket first and then push post mount onto dowel until bracket and post mount are flush together. Align post mount parallel with bracket. Important:- Drill pilot holes to prevent wood from splitting. Bracket and post mount aligned parallel with each other. 2-2 1/2 screws. 20. With bracket and post mount correctly aligned, screw post mount to bracket with 2-2 1/2 screws. Important- Drill 1/8 pilot holes in post mounts and bracket to prevent wood from splitting! Complete all remaining brackets / post mount connections. Page 10

4 screws countersunk 1/2 below surface. Bracket spacer flush with bottom of girder. Important- Posts may need to be aligned so they are true and square to mount corner brackets correctly. Use a Level to determine correct post position. Left sided corner bracket. 21. Lift completed left sided corner bracket up and align bottom of bracket spacer flush with bottom of girder. At bottom of corner bracket, align post mount evenly and tight against post. When correctly aligned, secure at top with 2-4 screws. To secure post mount, use 6-2 Stainless Steel Screws. Note, post mount and top of bracket are pre-drilled. Right sided corner bracket. 22. Align and attach a right sided corner bracket on post as per Step 21. Make sure both brackets are aligned on post at the same height before attaching. Align corner bracket on post at same height. 23. Complete remaining left and right sided corner bracket attachments. Page 11

Post Skirting Caps (L) Post Skirtings with Dado Cut (K) Post Skirtings with Cleat (J) Post mount bolts. 24. Locate all Post Skirting pieces. Position 2 post skirtings around the base of post as shown above. Use 1 Post Skirting with Cleat - 1 1/2 x 9 x 10 (Part J) and a Post Skirting with Dado Cut - 1 1/2 x 9 x 10 (Part K) initially. Cleat piece should be aligned opposite post mount hardware and dado piece aligned with post mount bolts (hardware). Dado cut. 2 screw. Dado cut skirting. Skirting with cleat. 2 1/2 screw. Same height. 25. With your helpers assistance, screw Part J & K pieces together with 2-2 screws at pre-drilled locations. Make sure pieces are aligned on edges and top and bottom. Cleated skirting piece are pre-drilled. Complete remaining skirting pieces around the post. Position skirting unit evenly around post. Secure to post by screwing 1-2 1/2 screw into the center of each cleated skirting piece (J). small gap. 2 SS Nails. 26. Position Post Skirting Caps - 1 1/2 x 2 1/2 x 10 5/8 (Part L) on top of skirting unit and against post. Do a dry run first to confirm fit. There will be a small gap between post and inside of cap. Attach caps down into skirting tops with 3-2 Stainless Steel Finishing Nails per piece. Complete remaining post skirtings. Page 12

Congratulations on building your 8x8 Spa Breeze Pergola Note; Our Pergolas are shipped as an unfinished product. If exposed to the elements, the western red cedar lumber will weather to a silvery-gray color. If you prefer to keep the cedar lumber looking closer to the original color, we suggest that you treat the wood with a good oil base wood stain. You may also wish to paint your new pergola rather than stain it. In both cases we recommend that you consult with a paint and stain dealer in your area. We value your feedback and would like to hear back from you on how well we are doing in the following areas: 1. Customer Service 2. On Time Shipping 3. Motor Freight Delivery 4. Quality of Materials 5. Assembly Manual 6. Overall Satisfaction. Please call, write or email us at: Outdoor Living Today Canadian Address 9393 287th Street Maple Ridge, British Columbia Canada V2W 1L1 United States Address P.O. Box 96 Sumas, Washington USA 98295 The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials. No material may be modified, edited or taken out of context such that its use creates a false or misleading statement or impression as to the positions, statements or actions. Toll Line: 1.888.658.1658 Fax: 1.604.462.5333 sales@outdoorlivingtoday.com Page 13