Applying the ADQ Implementing Rule Engaging the Originators

Similar documents
Human Integration in the Life-cycle of Aviation Systems HILAS

Preparatory paper: food for thought

CS7-2 NIPS/SUR-RF. Edition Number : 2.10 Edition Date : 18 November 2014 Status : Released Issue Intended for : EUROCONTROL Stakeholders

Commission hearing on the preparation for RP3

A EUROCONTROL View on the Research Needs & the Network of Centres of Excellence

ENGINEERS, TECHNICIANS, ICT EXPERTS

An Interoperability Assessment Model for CNS/ATM Systems

ESA Iris Programme Analysis & definition of the Satellite System Operations. Briefing 28 July

Simulated SWIM services in ATM

25 th Workshop of the EURORDIS Round Table of Companies (ERTC)

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

A-SMGCS WORKSHOP EUROCONTROL IANS, NOVEMBER 2015

ARTES 10 Phase 1 workplan of activities.

SwiftBroadband Safety Frequency Management

Centralised Services 7-2 Network Infrastructure Performance Monitoring and Analysis Service

LIVING LAB OF GLOBAL CHANGE RESEARCH

Engaging UK Climate Service Providers a series of workshops in November 2014

Urban Air Mobility. Vassilis AGOURIDAS. Airbus

International Programmes & GNSS Monitoring

PROJECT FINAL REPORT Publishable Summary

Radar Operation Simulator & Editor

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146

Identification number : Jean-Louis MARTINAUD. 1, Place Samuel de Champlain PARIS LA DEFENSE Cedex. Address

Smart Cities Member States Initiative

)XWXUH FKDOOHQJHV IRU WKH WRXULVP VHFWRU

In-Country Shared Value Creation The Case of Ghana

CHIPS Technology Roadmap February 2012 VERSION 1.0

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION RECOMMENDATION

Governemental cooperation with aerospace stakeholders - French example in the suborbital field

EUROCONTROL Guidelines on 8.33 khz Channel Spacing for Military Operators

ARTES 1 ROLLING WORKPLAN 2010

Mobilisation and Mutual Learning (MML) Action Plans on Societal Challenges

CEPT has conducted a number of studies and has produced a number of deliverables related to the use of MFCN in the 1400 MHz band, as listed below.

Aeronautics Supply Chain in Greece Public Private partnership. The missing link Professor Vassilis KOSTOPOULOS

Contextual note SESAR Solution description form for deployment planning

OMCL Network of the Council of Europe GENERAL DOCUMENT

Conformity Assessment Task Force. Minutes First Meeting 30 March 2004

RECOMMENDATIONS LDAC CONFERENCE ON EXTERNAL DIMENSION OF THE CFP LAS PALMAS DE GRAN CANARIA, September 2015

An ecosystem to accelerate the uptake of innovation in materials technology

A Malaysian Technical Cooperation Programme (MTCP) ISLAMIC MARKETS PROGRAMME. Strengthening the Wellbeing of Societies

Contribution of IAEA, FNRBA and ANNuR as Networking in Developing and Maintaining Capacity Building for a nuclear power programme: comparative study.

EMMA2 Operational Concept

RESEARCH AND INNOVATION STRATEGY. ANZPAA National Institute of Forensic Science

SESAR EXPLORATORY RESEARCH. Dr. Stella Tkatchova 21/07/2015

EASA Strategy, the European Plan for Aviation Safety (EPAS) and EASA Advisory Bodies: an opportunity for UN WFP operators

Towards a systemic approach to unlock the transformative power of service innovation

Centralised Impact Assessment of EU Co-Funded Projects. Angus Hunter PLATFORM Annual Event 2016 Ljubljana, 6 October 2016

Final Project Report. Abstract. Document information

Guide to Water-Related Collective Action. CEO Water Mandate Mumbai Working Session March 7, 2012

WHY IS INNOVATION IN AIR NAVIGATION SERVICES SO DIFFICULT IN EUROPE? A STUDY IDENTIFYING CURRENT OBSTACLES AND POTENTIAL ICT-ENABLERS

Chemicals Risk Management and Critical Raw Materials

Final Project Report. Abstract. Document information

Co-operative Programme on Decommissioning Projects CPD. Jean-Guy Nokhamzon CEA/DEN/DPA

Introduction to PBN and RNP

The Space Economy and Space Innovation in 2016

SAMARA Satellite communication system for Atm service

Rockwell Collins ADS-B Perspective Bangkok March 2005

CONFORMITY ASSESSMENT TASK FORCE

EUROPEAN GNSS APPLICATIONS IN H2020

Offshore Grid Development in the North Seas ENTSO-E views

REPORT ON THE FIRST MEETING OF EASA DRAFTING GROUP MDM 032 Held in Cologne on 16 March 2006

Public consultation on Europeana

Triennial Review of the Medicines and Healthcare Products Regulatory Agency. Call for Evidence

We appreciate your feedback

Country Profile: Israel

DriveSweden KRABAT POLICY LAB. Maria Schnurr, RISE Viktoria VICTA Innovation Bazaar 8 February 2018

THESIS PRESENTATION. Gabriele Goebel-Heise 5617A011-4

Air Traffic Soft. Management. Ultimate System. Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space

Home platforms and services: On the need for synergies between research and Standardisation

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM SD SPECIALIZED DISCLOSURE REPORT FACEBOOK, INC.

Future use of the band MHz

BUILDING CAPACITIES: ENTREPRENEURIAL LEARNING AND SME SKILLS

Comments from CEN CENELEC on COM(2010) 245 of 19 May 2010 on "A Digital Agenda for Europe"

Most important aerospace outcomes of the WRC-15

ELSA Study and Recommendations. November 2016

Deviational analyses for validating regulations on real systems

BalticSatApps. Speeding up Copernicus Innovation for the BSR Environment and Security

Research Infrastructures and Innovation

Lund Revisited. Next steps in tackling Societal Challenges

Surveillance Strategy

The Impact of Digital Economy on SMEs and Ways to Measure It.

Stakeholders Acting Together On the ethical impact assessment of Research and Innovation

Multi-level third space for systemic urban research and innovation

Convergence and Differentiation within the Framework of European Scientific and Technical Cooperation on HTA

New ITS Project Proposed INOGATE Work Program for Sustainable Energy (Component C)

GUIDELINE DOCUMENT FOR FUNDING APPLICATION

AAL2BUSINESS Towards successful commercialization of AAL solutions

Enpr EMA. Enpr-EMA. European Network of Paediatric Research at the European Medicines Agency

A New Platform for escience and data research into the European Ecosystem.

ASSEMBLY - 35TH SESSION

Aeronautical Spectrum and Frequency Management Solutions.

IATA Proprietary. Checkpoint of the Future. .A Risk-based Approach to. Passenger Screening. ICAO Regional Seminar on Aviation Security May 2012

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

Digital Preservation Strategy Implementation roadmaps

APPENDICES 1 to 12 to draft Commission Regulation (EU) No / on the licensing and medical certification of air traffic controllers

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

Getting the evidence: Using research in policy making

Performance Based Surveillance & New Sensors technology

Terms of Reference. Call for Experts in the field of Foresight and ICT

Building Collaborative Networks for Innovation

Transcription:

Applying the ADQ Implementing Rule Engaging the s Session 5 Stakeholder Views and Implementation Requirements Roland Baumann

Overview Introduction Paving the Way for Change Applying the ADQ IR in Switzerland Origination Issues related to ADQ IR The Way Forward Conclusions page 2

Introduction Aeronautical Data Quality has been an important topic addressed again and again in the last years. ICAO has numerously made States aware of their responsibilities and requires them to publish all the identified differences. The SES Certification created a major momentum to address the aeronautical data quality issues of States in a systematic way. page 3

ADQ IR Paving the Way for Change The European Commission recognised the impact of insufficient quality of aeronautical information in their rulemaking considerations for SES. With the introduction of SES it became evident that it was necessary to support States in their effort to improve the quality of aeronautical information in a more coordinated manner. The ADQ IR is paving the way for change in the way aeronautical information is produced, moved and made available (especially with the envisaged transformation from paper to digital). page 4

What's changing with the ADQ IR? The ADQ IR is providing the framework to allow customers to expect quality assured aeronautical information and this very soon! page 5

Agency Support for the ADQ Initiative In the light of ADQ Eurocontrol provided a number of supporting initiatives to get the ball rolling, e.g. the CHAIN Programme. In the activities of Eurcontrol's CHAIN Programme already a limited engagement of originating parties started to surface early A first response to this problem was to organise regional events with the goal to increase the number of participating originators (only partially achieved) page 6

audit requirements Applying ADQ IR in Switzerland Global ICAO Regional European Commission National State Audits FOCA Regulator ANSP skyguide / AISP service requirements Origination Aeronautical Information AIS/AIM Service Provision Management Upstream Data Chain page 7

Applying the ADQ IR in Switzerland Due to the engagement in regulatory monitoring skyguide (ANSP) was aware of the envisaged changes from the ADQ IR earlier then most of the other affected parties (especially the originators). skyguide initiated pre-analysis workshops together with FOCA (regulator) to analyse the impacts of the ADQ IR and develop a first potential roadmap for implementation. The current regulatory framework does not allow skyguide to fully engage all originating parties. page 8

Analysing the Impacts of the ADQ IR Approach applied by skyguide in collaboration with FOCA ADQ IR Impact Analysis Identify the legal requirements from the European Commission in terms of identifying the changes identifying show stoppers developing a generic course of action by considering the following aspects information and IT aspects organisational aspects legal aspects ADQ IR Action Plan Prepare and document results of the ADQ IR Impact Analysis in terms of Planning (e.g. roadmap) resources (e.g. 5yfp) developing an action plan for implementation by considering the changes in terms of people (e.g. training) procedures (e.g. processes) platform (e.g. data platform) page 9

The Origination Problem Today (1) Upstream responsible source for required data as defined by the State manage aeronautical information Downstream authoritative provider of required information as defined by the State no provide data yes authorise collect data process integrate validate exchange check if relevant provide information products publications initiate/check tomorrow today provide data originator skyguide page 10

The Origination Problem Today (2) A lot of originators in Switzerland are not yet fully aware of their role and responsibilities in terms of the ADQ IR for providing their data. Today skyguide is making up for a number of the origination problems by providing workarounds in collection process but this doesn't solve the issues which need to be addressed at national level. It has become clear that FOCA needs to lead the implementation of the ADQ IR as a number of adaptations of the regulatory frame work of the State are required to support the implementation. page 11

A Further Issue: New s Services Admin Surveyor AD EAD Airport Mapping AIS ATC Obstacles Terrain?? Jeppesen Charts Manuals Environment LH Systems Airspaces ATM Others FMS Routes Procedures Digital Flight Bag Origination AIM Provision page 12

A Challenge for Data Origination: etod AISP Aeronautical Information Provision Data Service Provider Data Origination Aeronautical, Information Integration Terrain & Obstacle Data Provision Application Integration Provision of data AISP and/or designated organisation Airlines, etc. End-Use page 13

audit requirements Current Status in Switzerland Global ICAO Regional European Commission National State Audits FOCA Regulator skyguide ANSP (ANSP/AISP) / AISP service requirements Origination Aeronautical Information AIS/AIM Service Provision Management Upstream Data Chain page 14

The Way Foreward s are not yet fully aware that the implementation of the ADQ IR will affect their capital expenditure decisions. The implementation of the ADQ IR within the State is a process of change and requires engagement of the State to adapt the accompanying regulatory framework at the national level. The State needs to engage all actors covered by the ADQ IR, especially the originators which are insufficiently aware of their responsibilities to provide quality assured data. page 15

Conclusions The Implementation of the ADQ IR requires a stronger engagement of the State by by taking the lead for the implementation of the ADQ IR at the State level by adapting the regulatory framework at the national level by covering all involved parties including originators by initiating more originator awareness at the national level page 16

Overview Thank you! page 17