FT ETSI STANDARDS FOR PUBLIC COMMENT

Similar documents
I (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) EUROPEAN PUBLICATIONS

The following ETSI documents are issued under the. Comments are welcome and should be addressed to the named contact to arrive by 16 July 2013.

ETSI documents published or circulated for vote/comment in January 2017

ETSI documents published or circulated for vote/comment in November 2018

ETSI documents published or circulated for vote/comment in October 2017

I (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) EUROPEAN PUBLICATIONS

ETSI documents published or circulated for vote/comment in January 2018

FT ETSI STANDARDS FOR PUBLIC COMMENT

ETSI documents published or circulated for vote/comment in December 2018

ETSI documents published or circulated for vote/comment in March 2016

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

ETSI documents published or circulated for vote/comment in March 2017

ETSI documents published or circulated for vote/comment in February 2016

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005


Public Interfaces. January 2006

3GPP: Evolution of Air Interface and IP Network for IMT-Advanced. Francois COURAU TSG RAN Chairman Alcatel-Lucent

ARIB STD-T104. LTE-Advanced System ARIB STANDARD. ARIB STD-T104 Ver March 18, Association of Radio Industries and Businesses (ARIB)

ETSI TR V1.2.1 ( )

Ackrediteringens omfattning/scope of accreditation

Technical Specification

Long Term Evolution (LTE)

3GPP TS V ( )

3GPP TS V ( )

Background: Cellular network technology

<Technical Report> Number of pages: 20. XGP Forum Document TWG TR

LTE systems: overview

ETSI TS V9.1.0 ( )

ETSI TS V ( )

References. What is UMTS? UMTS Architecture

UMTS: Universal Mobile Telecommunications System

American National Standard for Methods of Measurement. Frequency allocations and radio treaty matters; general rules and regulations

ETSI TS V ( )

CHAPTER 2 WCDMA NETWORK

ETSI TS V4.5.1 ( )

IE047: TETRA Radio Telecoms System

LTE Aida Botonjić. Aida Botonjić Tieto 1

LTE Long Term Evolution. Dibuz Sarolta

LTE System Architecture Evolution

ZUR KRITIK VORGELEGTE ENTWÜRFE PROJETS MIS À L'ENQUÊTE

RECOMMENDATION ITU-R F Radio interface standards for broadband wireless access systems in the fixed service operating below 66 GHz

New and updated standards 2013

IMT-2000/UMTS delivering full BWA

LTE Network Architecture, Interfaces and Radio Access

3GPP TS V ( )

MNA Mobile Radio Networks Mobile Network Architectures

ETSI TS V ( )

Mobile Communication Services on Aircraft Publication date: May /34/EC Notification number: 2014/67/UK

3GPP TS V8.9.0 ( )

3GPP TS V6.0.0 ( )

ARIB STD-T V10.5.0

Draft ETSI EN V1.1.1 ( )

3GPP TS V ( )

CS 6956 Wireless & Mobile Networks April 1 st 2015

Lecture overview. UMTS concept UTRA FDD TDD

3GPP TS V8.8.0 ( )

Multicast in the Mobile Environment and 3G

ETSI TS V8.7.0 ( ) Technical Specification

PERFORMANCE ANALYSIS OF ADAPTIVE ANTENNA SYSTEM

TECHNICAL REPORT Electromagnetic compatibility and Radio spectrum Matters (ERM); Using the ETSI EN series of EMC standards

TELECOMMUNICATION STANDARDIZATION SECTOR

ETSI TS V9.1.1 ( ) Technical Specification

Alternative Frequency Selection of Long Term Evolution (LTE) Technology in Indonesia

ETSI TS V ( ) Technical Specification

WCDMA System Overview

ETSI TS V6.0.0 ( )

LTE Review. EPS Architecture Protocol Architecture Air Interface DL Scheduling EMM, ECM, RRC States QoS, QCIs & EPS Bearers

3GPP TS V ( )

ETSI TS V ( )

ETSI TS V8.1.0 ( ) Technical Specification

3GPP TS V6.1.0 ( )

MAPS for LCS System. LoCation Services Simulation in 2G, 3G, and 4G. Presenters:

ETSI EN V1.5.1 ( )

ETSI TR V1.1.1 ( )

WCDMA UMTS Radio Access for Third Generation Mobile Communications Third Edition

«GUIDE ON APPLICABLE STANDARDS»

Dimensioning, configuration and deployment of Radio Access Networks. part 1: General considerations. Agenda

APPLICATION PROGRAMMING: MOBILE COMPUTING [ INEA00112W ] Marek Piasecki PhD Wireless Telecommunication

Unit 0: Brief history, present and future of the wireless communications

Radio Performance of 4G-LTE Terminal. Daiwei Zhou

ETSI TS V8.2.0 ( ) Technical Specification

IMT-2000 members UTRA-TDD and UTRA-FDD

ETSI EN V1.2.1 ( )

Overview of some standardization activities on Cognitive Radio

(Publication of titles and references of harmonised standards under Union harmonisation legislation) (Text with EEA relevance) (2017/C 149/02)

K E Y N O T E S P E E C H. Deputy General Manager / Keysight Technologies

ETSI TS V (20

Outline / Wireless Networks and Applications Lecture 18: Cellular: 1G, 2G, and 3G. Advanced Mobile Phone Service (AMPS)

ETSI EN V1.1.1 ( )

Long Term Evolution (LTE) and 5th Generation Mobile Networks (5G) CS-539 Mobile Networks and Computing

ETSI TS V ( )

3GPP TS V8.0.0 ( )

3GPP TS V ( )

TECHNICAL SPECIFICATION

ETSI EN V5.2.1 ( ) Harmonized European Standard

TECHNOLOGY CHOICES NEIL HORDEN CHIEF CONSULTANT FEDERAL ENGINEERING, INC. August 13, Copyright 2017 by Federal Engineering, Inc.

ETSI TR V1.2.1 ( )

ETSI TS V ( )

ETSI TS V1.5.1 ( ) Technical Specification

CHAPTER 14 4 TH GENERATION SYSTEMS AND LONG TERM EVOLUTION

Transcription:

FT ETSI STANDARDS FOR PUBLIC COMMENT The following ETSI documents are issued under the Public Enquiry PE20120705. Comments are welcome and should be addressed to the named contact to arrive by 31 May 2012. EN 319 401: April 2012 Infrastructures (ESI). General Policy Requirements for Trust Service Providers supporting Electronic Signatures Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635021 DC (ETSI) The following ETSI documents are issued under the Public Enquiry PE20120731. Comments are welcome and should be addressed to the named contact to arrive by 26 June 2012. EN 319 411-2: April 2012 (Version 1.0.0) Infrastructures (ESI). Policy and security requirements for Trust Service Providers issuing certificates. Part 2. Policy requirements for certification authorities issuing qualified certificates Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635027 DC (ETSI) EN 319 411-3: April 2012 (Version 1.0.0) Infrastructures (ESI). Policy and security requirements for Trust Service Providers issuing certificates. Part 3. Policy requirements for Certification Authorities issuing public key certificates Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635028 DC (ETSI) The following ETSI documents are issued under the Public Enquiry PE20120804. Comments are welcome and should be addressed to the named contact to arrive by 02 July 2012. EN 301 489-50: April 2012 ElectroMagnetic Compatibility (EMC) standard for radio equipment and services. Part 50. Specific conditions for Cellular Communication Base Station (BS), repeater and ancillary equipment Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635032 DC (ETSI) TCT/ERM/EM The following ETSI documents are issued under the Public Enquiry PE20120816. Comments are welcome and should be addressed to the named contact to arrive by 12 July 2012. EN 319 412-5: April 2012 (Version 1.0.0) Infrastructures (ESI). Profiles for Trust Service Providers issuing certificates. Part 5. Extension for Qualified Certificate profile Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635044 DC (ETSI) The following ETSI documents are issued under the Public Enquiry PE20120818. Comments are welcome and should be addressed to the named contact to arrive by 16 July 2012. EN 301 908-2: April 2012 (Version 5.3.1) IMT cellular networks. Harmonized EN covering the essential requirements of article 3.2 of the R&TTE Directive. Part 2. CDMA Direct Spread (UTRA FDD) User Equipment (UE) Contact: Steve Green Email: steve.green@ofcom.org.uk reference 12/635046 DC (ETSI) TCT/ERM/TF I (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) EUROPEAN PUBLICATIONS EN 300 175-1: April 2012 (Version 2.4.1) Common Interface (CI). Part 1. Overview Page 1 of 17

EN 300 175-2: April 2012 (Version 2.4.1) Common Interface (CI). Part 2. Physical Layer (PHL) EN 300 175-3: April 2012 (Version 2.4.1) Common Interface (CI). Part 3. Medium Access Control (MAC) layer EN 300 175-4: April 2012 (Version 2.4.1) Common Interface (CI). Part 4. Data Link Control (DLC) layer EN 300 175-5: April 2012 (Version 2.4.1) Common Interface (CI). Part 5. Network (NWK) layer EN 300 175-6: April 2012 (Version 2.4.1) Common Interface (CI). Part 6. Identities and addressing EN 300 175-7: April 2012 (Version 2.4.1) Common Interface (CI). Part 7. Security features EN 300 175-8: April 2012 (Version 2.4.1) Common Interface (CI). Part 8. Speech and audio coding and transmission EN 300 392-9: April 2012 (Version 1.5.1) Terrestrial Trunked Radio (TETRA). Voice plus Data (V+D). Part 9. General requirements for supplementary services EN 300 392-12-4: April 2012 (Version 1.3.1) Terrestrial Trunked Radio (TETRA). Voice plus Data (V+D). Part 12. Supplementary services stage 3. Sub-part 4. Call Forwarding (CF) EN 300 392-12-20: April 2012 (Version 1.2.1) Terrestrial Trunked Radio (TETRA). Voice plus Data (V+D). Part 12. Supplementary services stage 3. Sub-part 20. Discreet Listening (DL) EN 300 392-12-21: April 2012 (Version 1.5.1) Terrestrial Trunked Radio (TETRA). Voice plus Data (V+D). Part 12. Supplementary services stage 3. Sub-part 21. Ambience Listening (AL) EN 300 392-12-23: April 2012 (Version 1.2.1) Terrestrial Trunked Radio (TETRA). Voice plus Data (V+D). Part 12. Supplementary services stage 3. Sub-part 23. Call Completion on No Reply (CCNR) EN 300 444: April 2012 (Version 2.3.1) Generic Access Profile (GAP) EN 302 755: April 2012 (Version 1.3.1) Digital Video Broadcasting (DVB). Frame structure channel coding and modulation for a second generation digital terrestrial television broadcasting system (DVB-T2) EN 303 213-1: April 2012 (Version 1.3.1) Advanced Surface Movement Guidance and Control System (A- SMGCS). Part 1. Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004 for A-SMGCS Level 1 including external interfaces EN 303 213-2: April 2012 (Version 1.2.1) Advanced Surface Movement Guidance and Control System (A- SMGCS). Part 2. Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004 for A-SMGCS Level 2 including external interfaces EN 303 214: April 2012 (Version 1.2.1) Data Link Services (DLS) System. Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004. Requirements for ground constituents and system testing I DOCUMENTS ISSUED FOR ONE STEP APPROVAL PROCEDURE (OAP) Page 2 of 17

The following ETSI documents are issued under the One-Step Approval OP20120802. Comments are welcome and should be addressed to the named contact to arrive by 28 June 2012. EN 301 843-1: April 2012 (Version 1.3.1) ElectroMagnetic Compatibility (EMC) standard for marine radio equipment and services. Part 1. Common technical requirements Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635034 DC (ETSI) TCT/ERM/EM The following ETSI documents are issued under the One-Step Approval OP20120810. Comments are welcome and should be addressed to the named contact to arrive by 06 July 2012. EN 300 386: April 2012 (Version 1.6.1) Telecommunication network equipment. ElectroMagnetic Compatibility (EMC) requirements Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635036 DC (ETSI) TCT/ERM/EM The following ETSI documents are issued under the One-Step Approval OP20120814. Comments are welcome and should be addressed to the named contact to arrive by 10 July 2012. EN 300 468: April 2012 (Version 1.13.1) Digital Video Broadcasting (DVB). Specification for Service Information (SI) in DVB systems Contact: Steve Ripley Email: steve.ripley@ofcom.org.uk reference 12/635042 DC (ETSI) TCT/ERM/17 EN 301 489-17: April 2012 (Version 2.2.1) ElectroMagnetic Compatibility (EMC) standard for radio equipment. Part 17. Specific conditions for Broadband Data Transmission Systems Contact: Andrew Gowan Email: andrew.gowans@ofcom.org.uk reference 12/635041 DC (ETSI) TCT/ERM/EM AL ETSI DRAFTS FOR VOTE Vote V20120603 EN 300 328: April 2012 (Version 1.8.1) Radio spectrum Matters ERM. Wideband transmission systems. Data transmission equipment operating in the 2,4 GHz ISM band and using wide band modulation techniques. Harmonized EN covering the essential requirements of article 3.2 of the R&TTE Directive Contact: David Donachie Email: david.donachie@ofcom.org.uk reference 12/635030 DC (ETSI) TCT/ERM/11 Vote V20120617 EN 301 559-1: April 2012 (Version 1.1.2) Short Range Devices (SRD). Low Power Active Medical Implants (LP- AMI) operating in the frequency range 2 483,5 MHz to 2 500 MHz. Part 1. Technical characteristics and test methods Contact: Robin Donoghue Email: robin.donoghue@ofcom.org.uk reference 12/635038 DC (ETSI) TCT/ERM/SR EN 301 559-2: April 2012 (Version 1.1.2) Short Range Devices (SRD). Low Power Active Medical Implants (LP- AMI) operating in the frequency range 2 483,5 MHz to 2 500 MHz. Part 2. Harmonized EN covering the essential requirements of article 3.2 of the R&TTE Directive Contact: Robin Donoghue Email: robin.donoghue@ofcom.org.uk reference 12/635039 DC (ETSI) TCT/ERM/SR ER ETSI (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) PUBLICATIONS EG 203 165: April 2012 Speech and multimedia Transmission Quality (STQ). Throughput Measurement Guidelines ES 201 554: April 2012 Environmental Engineering (EE). Measurement method for Energy efficiency of Core network equipment Page 3 of 17

ES 201 873-1: April 2012 (Version 4.4.1) 3. Part 1. TTCN-3 Core Language ES 201 873-4: April 2012 (Version 4.4.1) 3. Part 4. TTCN-3 Operational Semantics ES 201 873-5: April 2012 (Version 4.4.1) 3. Part 5. TTCN-3 Runtime Interface (TRI) ES 201 873-6: April 2012 (Version 4.4.1) 3. Part 6. TTCN-3 Control Interface (TCI) ES 201 873-7: April 2012 (Version 4.4.1) 3. Part 7. Using ASN.1 with TTCN-3 ES 201 873-8: April 2012 (Version 4.4.1) 3. Part 8. The IDL to TTCN-3 Mapping ES 201 873-9: April 2012 (Version 4.4.1) 3. Part 9. Using XML schema with TTCN-3 ES 201 873-10: April 2012 (Version 4.4.1) 3. Part 10. TTCN-3 Documentation Comment Specification ES 202 786: April 2012 3. TTCN-3 Language Extensions. Support of interfaces with continuous signals ES 202 789: April 2012 3. TTCN-3 Language Extensions. Extended TRI SR 003 091: April 2012 Infrastructures (ESI). Recommendations on Governance and Audit Regime for CAB Forum Extended Validation and Baseline Certificates TR 101 533-2: April 2012 (Version 1.3.1) Infrastructures (ESI). Data Preservation Systems Security. Part 2. Guidelines for Assessors TR 101 534: March 2012 Broadband Radio Access Networks (BRAN). Very high capacity density BWA networks. System architecture, economic model and derivation of technical requirements TR 102 684: April 2012 Reconfigurable Radio Systems (RRS). Feasibility Study on Control Channels for Cognitive Radio Systems TR 103 088: March 2012 Using the EN 301 489 series of EMC standards TR 134 902: March 2012 (Version 9.2.0) System (UMTS). Derivation of test tolerances for multi-cell Radio Resource Management (RRM) conformance tests (3GPP TR 34.902 version 9.2.0 TR 136 903: March 2012 (Version 9.3.0) Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN). Derivation of test tolerances for Radio Resource Management (RRM) conformance tests (3GPP TR 36.903 version 9.3.0 TR 180 003: April 2012 (Version 3.1.1) Telecommunications and Internet converged Services and Protocols for Advanced Networking (TISPAN). Technical Report on NGN National IP Interconnection Page 4 of 17

TS 101 211: April 2012 (Version 1.11.1) Digital Video Broadcasting (DVB). Guidelines on implementation and usage of Service Information (SI) TS 101 533-1: April 2012 (Version 1.3.1) Infrastructures (ESI). Data Preservation Systems Security. Part 1. Requirements for Implementation and Management TS 101 580-1: April 2012 IMS Network Testing (INT). Diameter Conformance testing for Rx interface. Part 1. Protocol Implementation Conformance Statement (PICS) TS 101 580-2: April 2012 IMS Network Testing (INT). Diameter Conformance testing for Rx interface. Part 2. Test Suite Structure (TSS) and Test Purposes (TP) TS 101 580-3: April 2012 IMS Network Testing (INT). Diameter Conformance testing for Rx interface. Part 3. Abstract Test Suite (ATS) and partial Protocol Implementation extra Information for Testing (PIXIT) proforma specification TS 101 586: April 2012 IMS Network Testing (INT). User Documentation and IMS Codec and Adapter layer software for IPv6 and 3GPP Release 9 TS 101 587: April 2012 IMS Network Testing (INT). Abstract Test Suite for IMS & EPC Interoperability TS 102 361-1: April 2012 (Version 2.1.1) Digital Mobile Radio (DMR) Systems. Part 1. DMR Air Interface (AI) protocol TS 102 361-2: April 2012 (Version 2.1.1) Digital Mobile Radio (DMR) Systems. Part 2. DMR voice and generic services and facilities TS 102 573: April 2012 (Version 2.1.1) Infrastructures (ESI). Policy requirements for trust service providers signing and/or storing data objects TS 102 694-1: March 2012 (Version 8.2.0) Smart Cards. Test specification for the Single Wire Protocol (SWP) interface. Part 1. Terminal features (Release 8) TS 102 694-2: March 2012 (Version 9.0.0) Smart Cards. Test specification for the Single Wire Protocol (SWP) interface. Part 2. UICC features ( TS 102 695-3: March 2012 (Version 8.2.0) Smart Cards. Test specification for the Host Controller Interface (HCI). Part 3. Host Controller features (Release 8) TS 102 835: March 2012 (Version 8.1.0) Smart Cards. Test Specification for SCWS Application Invocation API for Java CardTM. Tests Environment and Annexes (Release 8) TS 102 874-3: March 2012 (Version 1.2.1) Access, Terminals, Transmission and Multiplexing (ATTM). External Common Power Supply for Customer Premises Network and Access Equipment. Part 3. CPS Type 1 implementation details TS 102 874-4: March 2012 (Version 1.2.1) Access, Terminals, Transmission and Multiplexing (ATTM). External Common Power Supply for Customer Premises Network and Access Equipment. Part 4. CPS Type 2.b implementation details TS 102 874-5: March 2012 (Version 1.2.1) Access, Terminals, Transmission and Multiplexing (ATTM). External Common Power Supply for Customer Premises Network and Access Equipment. Part 5. CPS Type 2.c implementation details TS 102 969: March 2012 Reconfigurable Radio Systems (RRS). Radio Reconfiguration related Requirements for Mobile Devices TS 103 066: April 2012 (Version 1.1.2) Railway Telecommunications (RT). Rel-4 Core Network requirements for GSM-R Page 5 of 17

TS 103 090: April 2012 Infrastructures (ESI). Conformity Assessment for Trust Service Providers issuing Extended Validation Certificates TS 119 134-5: April 2012 Infrastructures (ESI). XML Advanced Electronic Signature (XAdES) Testing Compliance & Interoperability. Part 5. Conformance Testing for XAdES Baseline Profile TS 119 412-2: April 2012 Infrastructures (ESI). Profiles for Trust Service Providers issuing certificates. Part 2. Certificate Profile for certificates issued to natural persons TS 123 003: April 2012 (Version 6.17.0) System (UMTS). Numbering, addressing and identification (3GPP TS 23.003 version 6.17.0 Release 6) TS 123 003: April 2012 (Version 7.11.0) System (UMTS). Numbering, addressing and identification (3GPP TS 23.003 version 7.11.0 Release 7) TS 123 003: April 2012 (Version 8.16.0) System (UMTS). Numbering, addressing and identification (3GPP TS 23.003 version 8.16.0 Release 8) TS 123 003: April 2012 System (UMTS). Numbering, addressing and identification (3GPP TS 23.003 version 9.10.0 TS 123 003: April 2012 System (UMTS). Numbering, addressing and identification (3GPP TS 23.003 version 10.5.0 TS 123 007: April 2012 (Version 10.7.0) System (UMTS). LTE. Restoration procedures (3GPP TS 23.007 version 10.7.0 TS 123 060: April 2012 (Version 8.15.0) System (UMTS). General Packet Radio Service (GPRS). Service description. Stage 2 (3GPP TS 23.060 version 8.15.0 Release 8) TS 123 060: April 2012 (Version 9.12.0) System (UMTS). General Packet Radio Service (GPRS). Service description. Stage 2 (3GPP TS 23.060 version 9.12.0 TS 123 284: April 2012 (Version 10.4.0) System (UMTS). Local Call Local Switch (LCLS). Stage 2 (3GPP TS 23.284 version 10.4.0 TS 124 229: April 2012 (Version 9.11.1) System (UMTS). LTE. IP multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP). Stage 3 (3GPP TS 24.229 version 9.11.1 TS 125 101: March 2012 (UMTS). User Equipment (UE) radio transmission and reception (FDD) (3GPP TS 25.101 version 10.5.0 TS 125 104: March 2012 (UMTS). Base Station (BS) radio transmission and reception (FDD) (3GPP TS 25.104 version 10.5.0 Page 6 of 17

TS 125 106: March 2012 (UMTS). UTRA repeater radio transmission and reception (3GPP TS 25.106 version 10.1.0 Release TS 125 123: March 2012 (Version 8.13.0) (UMTS). Requirements for support of radio resource management (TDD) (3GPP TS 25.123 version 8.13.0 Release 8) TS 125 123: March 2012 (UMTS). Requirements for support of radio resource management (TDD) (3GPP TS 25.123 version 9.8.0 TS 125 123: March 2012 (UMTS). Requirements for support of radio resource management (TDD) (3GPP TS 25.123 version 10.5.0 TS 125 133: March 2012 (Version 9.11.0) (UMTS). Requirements for support of radio resource management (FDD) (3GPP TS 25.133 version 9.11.0 TS 125 133: March 2012 (UMTS). Requirements for support of radio resource management (FDD) (3GPP TS 25.133 version 10.5.0 TS 125 141: March 2012 (UMTS). Base Station (BS) conformance testing (FDD) (3GPP TS 25.141 version 10.5.0 Release TS 125 143: March 2012 (UMTS). UTRA repeater conformance testing (3GPP TS 25.143 version 10.1.0 TS 125 144: March 2012 (UMTS). User Equipment (UE) and Mobile Station (MS) over the air performance requirements (3GPP TS 25.144 version 10.1.0 Release TS 125 331: April 2012 (Version 7.22.0) (UMTS). Radio Resource Control (RRC). Protocol specification (3GPP TS 25.331 version 7.22.0 Release 7) TS 125 331: April 2012 (Version 8.18.0) (UMTS). Radio Resource Control (RRC). Protocol specification (3GPP TS 25.331 version 8.18.0 Release 8) TS 125 331: April 2012 (UMTS). Radio Resource Control (RRC). Protocol specification (3GPP TS 25.331 version 9.10.0 TS 125 331: April 2012 (Version 10.7.0) (UMTS). Radio Resource Control (RRC). Protocol specification (3GPP TS 25.331 version 10.7.0 Release TS 125 419: April 2012 (UMTS). UTRAN Iu-BC interface. Service Area Broadcast Protocol (SABP) (3GPP TS 25.419 version 10.2.0 TS 125 423: April 2012 (Version 8.13.0) (UMTS). UTRAN Iur interface Radio Network Subsystem Application Part (RNSAP) signalling (3GPP TS 25.423 version 8.13.0 Release 8) TS 125 423: April 2012 (Version 9.9.0) (UMTS). UTRAN Iur interface Radio Network Subsystem Application Part (RNSAP) signalling (3GPP TS 25.423 version 9.9.0 TS 125 423: April 2012 (UMTS). UTRAN Iur interface Radio Network Subsystem Application Part (RNSAP) signalling (3GPP TS 25.423 version 10.6.0 Page 7 of 17

TS 126 114: April 2012 (Version 8.10.1) (UMTS). LTE. IP Multimedia Subsystem (IMS). Multimedia telephony. Media handling and interaction (3GPP TS 26.114 version 8.10.1 Release 8) TS 129 002: April 2012 System (UMTS). Mobile Application Part (MAP) specification (3GPP TS 29.002 version 9.8.0 TS 129 002: April 2012 System (UMTS). Mobile Application Part (MAP) specification (3GPP TS 29.002 version 10.6.0 TS 129 060: April 2012 System (UMTS). General Packet Radio Service (GPRS). GPRS Tunnelling Protocol (GTP) across the Gn and Gp interface (3GPP TS 29.060 version 9.10.0 TS 129 060: April 2012 System (UMTS). General Packet Radio Service (GPRS). GPRS Tunnelling Protocol (GTP) across the Gn and Gp interface (3GPP TS 29.060 version 10.5.0 TS 129 168: April 2012 (Version 9.5.0) (UMTS). LTE. Cell Broadcast Centre interfaces with the Evolved Packet Core. Stage 3 (3GPP TS 29.168 version 9.5.0 TS 129 168: April 2012 (UMTS). LTE. Cell Broadcast Centre interfaces with the Evolved Packet Core. Stage 3 (3GPP TS 29.168 version 10.2.0 TS 129 173: April 2012 (Version 9.3.0) System (UMTS). LTE. Location Services (LCS). Diameter-based SLh interface for Control Plane LCS (3GPP TS 29.173 version 9.3.0 TS 129 173: April 2012 System (UMTS). LTE. Location Services (LCS). Diameter-based SLh interface for Control Plane LCS (3GPP TS 29.173 version 10.2.0 TS 129 228: April 2012 (Version 8.16.0) System (UMTS). LTE. IP Multimedia (IM) Subsystem Cx and Dx Interfaces. Signalling flows and message contents (3GPP TS 29.228 version 8.16.0 Release 8) TS 129 228: April 2012 (Version 9.9.0) System (UMTS). LTE. IP Multimedia (IM) Subsystem Cx and Dx Interfaces. Signalling flows and message contents (3GPP TS 29.228 version 9.9.0 TS 129 228: April 2012 System (UMTS). LTE. IP Multimedia (IM) Subsystem Cx and Dx Interfaces. Signalling flows and message contents (3GPP TS 29.228 version 10.5.0 TS 129 230: April 2012 System (UMTS). LTE. Diameter applications. 3GPP specific codes and identifiers (3GPP TS 29.230 version 9.10.0 TS 129 230: April 2012 System (UMTS). LTE. Diameter applications. 3GPP specific codes and identifiers (3GPP TS 29.230 version 10.6.0 TS 129 272: April 2012 (UMTS). LTE. Evolved Packet System (EPS). Mobility Management Entity (MME) and Serving GPRS Support Node (SGSN) related interfaces based on Diameter protocol (3GPP TS 29.272 version 9.10.0 Page 8 of 17

TS 129 272: April 2012 (UMTS). LTE. Evolved Packet System (EPS). Mobility Management Entity (MME) and Serving GPRS Support Node (SGSN) related interfaces based on Diameter protocol (3GPP TS 29.272 version 10.6.0 TS 129 273: April 2012 (Version 8.10.0) (UMTS). LTE. Evolved Packet System (EPS). 3GPP EPS AAA interfaces (3GPP TS 29.273 version 8.10.0 Release 8) TS 129 273: April 2012 (Version 9.9.0) (UMTS). LTE. Evolved Packet System (EPS). 3GPP EPS AAA interfaces (3GPP TS 29.273 version 9.9.0 TS 129 273: April 2012 (UMTS). LTE. Evolved Packet System (EPS). 3GPP EPS AAA interfaces (3GPP TS 29.273 version 10.5.0 TS 129 274: April 2012 (UMTS). LTE. 3GPP Evolved Packet System (EPS). Evolved General Packet Radio Service (GPRS) Tunnelling Protocol for Control plane (GTPv2-C). Stage 3 (3GPP TS 29.274 version 9.10.0 TS 129 274: April 2012 (UMTS). LTE. 3GPP Evolved Packet System (EPS). Evolved General Packet Radio Service (GPRS) Tunnelling Protocol for Control plane (GTPv2-C). Stage 3 (3GPP TS 29.274 version 10.6.0 TS 129 275: April 2012 (UMTS). LTE. Proxy Mobile IPv6 (PMIPv6) based Mobility and Tunnelling protocols. Stage 3 (3GPP TS 29.275 version 9.8.0 TS 129 275: April 2012 (UMTS). LTE. Proxy Mobile IPv6 (PMIPv6) based Mobility and Tunnelling protocols. Stage 3 (3GPP TS 29.275 version 10.5.0 TS 129 305: April 2012 (Version 9.1.0) (UMTS). LTE. InterWorking Function (IWF) between MAP based and Diameter based interfaces (3GPP TS 29.305 version 9.1.0 TS 129 305: April 2012 (UMTS). LTE. InterWorking Function (IWF) between MAP based and Diameter based interfaces (3GPP TS 29.305 version 10.2.0 Release TS 129 328: April 2012 System (UMTS). LTE. IP Multimedia (IM) Subsystem Sh interface. Signalling flows and message contents (3GPP TS 29.328 version 9.8.0 TS 129 328: April 2012 System (UMTS). LTE. IP Multimedia (IM) Subsystem Sh interface. Signalling flows and message contents (3GPP TS 29.328 version 10.5.0 TS 129 333: April 2012 (Version 8.6.0) System (UMTS). Multimedia Resource Function Controller (MRFC). Multimedia Resource Function Processor (MRFP) Mp interface. Stage 3 (3GPP TS 29.333 version 8.6.0 Release 8) TS 129 333: April 2012 (Version 9.2.0) System (UMTS). Multimedia Resource Function Controller (MRFC). Multimedia Resource Function Processor (MRFP) Mp interface. Stage 3 (3GPP TS 29.333 version 9.2.0 Page 9 of 17

TS 129 333: April 2012 (Version 10.3.0) System (UMTS). Multimedia Resource Function Controller (MRFC). Multimedia Resource Function Processor (MRFP) Mp interface. Stage 3 (3GPP TS 29.333 version 10.3.0 TS 131 102: April 2012 (UMTS). LTE. Characteristics of the Universal Subscriber Identity Module (USIM) application (3GPP TS 31.102 version 10.5.0 Release TS 131 111: April 2012 (Version 6.15.0) System (UMTS). LTE. Universal Subscriber Identity Module (USIM) Application Toolkit (USAT) (3GPP TS 31.111 version 6.15.0 Release 6) TS 131 111: April 2012 System (UMTS). LTE. Universal Subscriber Identity Module (USIM) Application Toolkit (USAT) (3GPP TS 31.111 version 10.6.0 Release TS 131 124: April 2012 (Version 10.4.0) (UMTS). LTE. Mobile Equipment (ME) conformance test specification. Universal Subscriber Identity Module Application Toolkit (USAT) conformance test specification (3GPP TS 31.124 version 10.4.0 TS 131 130: April 2012 (Version 9.3.0) System (UMTS). LTE. (U)SIM Application Programming Interface (API). (U)SIM API for Javaâ Card (3GPP TS 31.130 version 9.3.0 TS 131 130: April 2012 (Version 9.4.0) System (UMTS). LTE. (U)SIM Application Programming Interface (API). (U)SIM API for Javaâ Card (3GPP TS 31.130 version 9.4.0 TS 131 130: April 2012 System (UMTS). LTE. (U)SIM Application Programming Interface (API). (U)SIM API for Javaâ Card (3GPP TS 31.130 version 10.2.0 TS 132 445: March 2012 (Version 8.2.0) (UMTS). LTE. Telecommunication management. Trace Management Integration Reference Point (IRP). extensible Markup Language (XML) file format definition (3GPP TS 32.445 version 8.2.0 Release 8) TS 132 445: March 2012 (Version 9.2.0) (UMTS). LTE. Telecommunication management. Trace Management Integration Reference Point (IRP). extensible Markup Language (XML) file format definition (3GPP TS 32.445 version 9.2.0 TS 132 446: March 2012 System (UMTS). LTE. Telecommunication management. Trace Management Integration Reference Point (IRP). Solution Set (SS) definitions (3GPP TS 32.446 version 10.5.0 TS 132 636: March 2012 (Version 10.3.0) System (UMTS). LTE. Telecommunication management. Configuration Management (CM). Core network resources Integration Reference Point (IRP). TS 132 752: March 2012 System (UMTS). LTE. Telecommunication management. Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP). Information Service (IS) (3GPP TS 32.752 version 10.2.0 TS 133 220: March 2012 (Version 8.9.0) System (UMTS). LTE. Generic Authentication Architecture (GAA). Generic Bootstrapping Architecture (GBA) (3GPP TS 33.220 version 8.9.0 Release 8) Page 10 of 17

TS 133 220: March 2012 (Version 9.4.0) System (UMTS). LTE. Generic Authentication Architecture (GAA). Generic Bootstrapping Architecture (GBA) (3GPP TS 33.220 version 9.4.0 TS 133 220: March 2012 System (UMTS). LTE. Generic Authentication Architecture (GAA). Generic Bootstrapping Architecture (GBA) (3GPP TS 33.220 version 10.1.0 TS 133 234: March 2012 (UMTS). LTE. 3G security. Wireless Local Area Network (WLAN) interworking security (3GPP TS 33.234 version 10.2.0 TS 133 402: March 2012 (Version 8.7.0) System (UMTS). LTE. 3GPP System Architecture Evolution (SAE). Security aspects of non-3gpp accesses (3GPP TS 33.402 version 8.7.0 Release 8) TS 133 402: March 2012 (Version 9.7.0) System (UMTS). LTE. 3GPP System Architecture Evolution (SAE). Security aspects of non-3gpp accesses (3GPP TS 33.402 version 9.7.0 TS 133 402: March 2012 (Version 10.3.0) System (UMTS). LTE. 3GPP System Architecture Evolution (SAE). Security aspects of non-3gpp accesses (3GPP TS 33.402 version 10.3.0 TS 134 108: March 2012 (UMTS). LTE. Common test environments for User Equipment (UE). Conformance testing (3GPP TS 34.108 version 9.8.0 TS 134 108: March 2012 (UMTS). LTE. Common test environments for User Equipment (UE). Conformance testing (3GPP TS 34.108 version 10.1.0 Release TS 134 114: March 2012 System (UMTS). LTE. User Equipment (UE) / Mobile Station (MS) Over The Air (OTA) antenna performance. Conformance testing (3GPP TS 34.114 version 10.2.0 TS 134 121-1: April 2012 (Version 10.2.1) (UMTS). User Equipment (UE) conformance specification. Radio transmission and reception (FDD). Part 1. Conformance specification (3GPP TS 34.121-1 version 10.2.1 TS 134 121-2: March 2012 (UMTS). User Equipment (UE) conformance specification. Radio transmission and reception (FDD). Part 2. Implementation Conformance Statement (ICS) (3GPP TS 34.121-2 version 10.2.0 TS 134 122: March 2012 (UMTS). Terminal conformance specification. Radio transmission and reception (TDD) (3GPP TS 34.122 version 9.8.0 TS 134 122: March 2012 (UMTS). Terminal conformance specification. Radio transmission and reception (TDD) (3GPP TS 34.122 version 10.1.0 TS 134 123-1: April 2012 (UMTS). User Equipment (UE) conformance specification. Part 1. Protocol conformance specification (3GPP TS 34.123-1 version 9.8.0 TS 134 123-1: April 2012 (Version 10.0.0) (UMTS). User Equipment (UE) conformance specification. Part 1. Protocol conformance specification (3GPP TS 34.123-1 version 10.0.0 Page 11 of 17

TS 134 123-2: March 2012 (UMTS). User Equipment (UE) conformance specification. Part 2. Implementation conformance statement (ICS) proforma specification (3GPP TS 34.123-2 version 9.8.0 TS 134 123-2: March 2012 (Version 10.0.0) (UMTS). User Equipment (UE) conformance specification. Part 2. Implementation conformance statement (ICS) proforma specification (3GPP TS 34.123-2 version 10.0.0 TS 134 123-3: April 2012 (Version 9.3.0) (UMTS). User Equipment (UE) conformance specification. Part 3. Abstract test suite (ATS) (3GPP TS 34.123-3 version 9.3.0 TS 134 171: March 2012 (Version 9.4.0) (UMTS). Terminal conformance specification. Assisted Global Positioning System (A-GPS). Frequency Division Duplex (FDD) (3GPP TS 34.171 version 9.4.0 TS 134 172: March 2012 (UMTS). Terminal conformance specification. Assisted Global Navigation Satellite Systems (A- GNSS). Frequency Division Duplex (FDD) (3GPP TS 34.172 version 10.2.0 TS 134 229-1: March 2012 (UMTS). LTE. Internet Protocol (IP) multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP). User specification. Part 1. Protocol conformance specification (3GPP TS 34.229-1 version 9.8.0 TS 134 229-2: March 2012 (UMTS). LTE. Internet Protocol (IP) multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP). User specification. Part 2. Implementation Conformance Statement (ICS) specification (3GPP TS 34.229-2 version 9.8.0 TS 134 229-3: March 2012 (Version 9.3.0) (UMTS). LTE. Internet Protocol (IP) multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP). User specification. Part 3. Abstract test suite (ATS) (3GPP TS 34.229-3 version 9.3.0 TS 136 101: March 2012 (Version 8.17.0) Equipment (UE) radio transmission and reception (3GPP TS 36.101 version 8.17.0 Release 8) TS 136 101: March 2012 (Version 9.11.0) Equipment (UE) radio transmission and reception (3GPP TS 36.101 version 9.11.0 TS 136 101: March 2012 Equipment (UE) radio transmission and reception (3GPP TS 36.101 version 10.6.0 TS 136 104: March 2012 (Version 9.11.0) Radio Access (E-UTRA). Base Station (BS) radio transmission and reception (3GPP TS 36.104 version 9.11.0 TS 136 104: March 2012 Radio Access (E-UTRA). Base Station (BS) radio transmission and reception (3GPP TS 36.104 version 10.6.0 TS 136 106: March 2012 (Version 10.3.0) Radio Access (E-UTRA). FDD repeater radio transmission and reception (3GPP TS 36.106 version 10.3.0 TS 136 133: April 2012 (Version 8.17.0) Radio Access (E-UTRA). Requirements for support of radio resource management (3GPP TS 36.133 version 8.17.0 Release 8) Page 12 of 17

TS 136 133: April 2012 Radio Access (E-UTRA). Requirements for support of radio resource management (3GPP TS 36.133 version 10.6.0 TS 136 141: April 2012 Radio Access (E-UTRA). Base Station (BS) conformance testing (3GPP TS 36.141 version 10.6.0 TS 136 143: April 2012 (Version 10.3.0) Radio Access (E-UTRA). FDD repeater conformance testing (3GPP TS 36.143 version 10.3.0 TS 136 300: March 2012 (Version 10.7.0) Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN). Overall description. Stage 2 (3GPP TS 36.300 version 10.7.0 TS 136 302: March 2012 (Version 10.4.0) Radio Access (E-UTRA). Services provided by the physical layer (3GPP TS 36.302 version 10.4.0 TS 136 304: March 2012 Equipment (UE) procedures in idle mode (3GPP TS 36.304 version 9.10.0 TS 136 304: March 2012 Equipment (UE) procedures in idle mode (3GPP TS 36.304 version 10.5.0 TS 136 306: March 2012 Equipment (UE) radio access capabilities (3GPP TS 36.306 version 10.5.0 TS 136 307: April 2012 (Version 8.5.0) Radio Access (E-UTRA). Requirements on User Equipments (UEs) supporting a releaseindependent frequency band (3GPP TS 36.307 version 8.5.0 Release 8) TS 136 307: April 2012 (Version 9.5.0) Radio Access (E-UTRA). Requirements on User Equipments (UEs) supporting a releaseindependent frequency band (3GPP TS 36.307 version 9.5.0 TS 136 307: April 2012 (Version 10.3.0) Radio Access (E-UTRA). Requirements on User Equipments (UEs) supporting a releaseindependent frequency band (3GPP TS 36.307 version 10.3.0 Release TS 136 321: March 2012 (Version 8.12.0) Radio Access (E-UTRA). Medium Access Control (MAC) protocol specification (3GPP TS 36.321 version 8.12.0 Release 8) TS 136 321: March 2012 (Version 9.6.0) Radio Access (E-UTRA). Medium Access Control (MAC) protocol specification (3GPP TS 36.321 version 9.6.0 TS 136 321: March 2012 Radio Access (E-UTRA). Medium Access Control (MAC) protocol specification (3GPP TS 36.321 version 10.5.0 TS 136 331: March 2012 Radio Access (E-UTRA). Radio Resource Control (RRC). Protocol specification (3GPP TS 36.331 version 9.10.0 TS 136 331: March 2012 Radio Access (E-UTRA). Radio Resource Control (RRC). Protocol specification (3GPP TS 36.331 version 10.5.0 TS 136 508: April 2012 Radio Access (E-UTRA) and Evolved Packet Core (EPC). Common test environments for User testing (3GPP TS 36.508 version 9.8.0 TS 136 508: April 2012 (Version 10.0.0) Radio Access (E-UTRA) and Evolved Packet Core (EPC). Common test environments for User testing (3GPP TS 36.508 version 10.0.0 Page 13 of 17

TS 136 521-1: March 2012 specification. Radio transmission and reception. Part 1. Conformance testing (3GPP TS 36.521-1 version 9.8.0 TS 136 521-1: March 2012 specification. Radio transmission and reception. Part 1. Conformance testing (3GPP TS 36.521-1 version 10.1.0 TS 136 521-2: March 2012 specification. Radio transmission and reception. Part 2. Implementation Conformance Statement (ICS) (3GPP TS 36.521-2 version 9.8.0 TS 136 521-2: March 2012 specification. Radio transmission and reception. Part 2. Implementation Conformance Statement (ICS) (3GPP TS 36.521-2 version 10.1.0 TS 136 521-3: March 2012 specification. Radio transmission and reception. Part 3. Radio Resource Management (RRM) conformance testing (3GPP TS 36.521-3 version 9.8.0 TS 136 521-3: April 2012 (Version 10.0.0) specification. Radio transmission and reception. Part 3. Radio Resource Management (RRM) conformance testing (3GPP TS 36.521-3 version 10.0.0 TS 136 523-2: March 2012 Radio Access (E-UTRA) and Evolved Packet Core (EPC). User specification. Part 2. Implementation Conformance Statement (ICS) proforma specification (3GPP TS 36.523-2 version 9.8.0 TS 136 523-2: March 2012 (Version 10.0.0) Radio Access (E-UTRA) and Evolved Packet Core (EPC). User specification. Part 2. Implementation Conformance Statement (ICS) proforma specification (3GPP TS 36.523-2 version 10.0.0 TS 136 523-3: April 2012 (Version 9.3.0) Radio Access (E-UTRA) and Evolved Packet Core (EPC). User specification. Part 3. Test suites (3GPP TS 36.523-3 version 9.3.0 TS 137 104: April 2012 System (UMTS). LTE. E-UTRA, UTRA and GSM/EDGE. Multi- Standard Radio (MSR) Base Station (BS) radio transmission and reception (3GPP TS 37.104 version 10.6.0 TS 137 141: April 2012 (Version 9.7.0) System (UMTS). LTE. E-UTRA, UTRA and GSM/EDGE. Multi- Standard Radio (MSR) Base Station (BS) conformance testing (3GPP TS 37.141 version 9.7.0 TS 137 141: April 2012 System (UMTS). LTE. E-UTRA, UTRA and GSM/EDGE. Multi- Standard Radio (MSR) Base Station (BS) conformance testing (3GPP TS 37.141 version 10.6.0 TS 137 571-1: March 2012 (Version 9.1.0) (UMTS). LTE. Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core (EPC). User Equipment (UE) conformance specification for UE positioning. Part 1. Conformance test specification (3GPP TS 37.571-1 version 9.1.0 Page 14 of 17

TS 137 571-2: March 2012 (Version 9.1.0) (UMTS). LTE. Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core (EPC). User Equipment (UE) conformance specification for UE positioning. Part 2. Protocol conformance (3GPP TS 37.571-2 version 9.1.0 TS 137 571-3: March 2012 (Version 9.1.0) (UMTS). LTE. Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core (EPC). User Equipment (UE) conformance specification for UE positioning. Part 3. Implementation Conformance Statement (ICS) (3GPP TS 37.571-3 version 9.1.0 TS 137 571-5: March 2012 (Version 9.2.0) (UMTS). LTE. Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core (EPC). User Equipment (UE) conformance specification for UE positioning. Part 5. Test scenarios and assistance data (3GPP TS 37.571-5 version 9.2.0 TS 143 068: March 2012 (Version 7.10.0) system (Phase 2+). Voice Group Call Service (VGCS). Stage 2 (3GPP TS 43.068 version 7.10.0 Release 7) TS 143 068: March 2012 (Version 8.6.0) system (Phase 2+). Voice Group Call Service (VGCS). Stage 2 (3GPP TS 43.068 version 8.6.0 Release 8) TS 143 068: March 2012 (Version 9.3.0) system (Phase 2+). Voice Group Call Service (VGCS). Stage 2 (3GPP TS 43.068 version 9.3.0 TS 143 068: March 2012 system (Phase 2+). Voice Group Call Service (VGCS). Stage 2 (3GPP TS 43.068 version 10.1.0 Release TS 143 069: March 2012 (Version 7.7.0) system (Phase 2+). Voice Broadcast service (VBS). Stage 2 (3GPP TS 43.069 version 7.7.0 Release 7) TS 143 069: March 2012 (Version 8.2.0) system (Phase 2+). Voice Broadcast service (VBS). Stage 2 (3GPP TS 43.069 version 8.2.0 Release 8) TS 143 069: March 2012 (Version 9.2.0) system (Phase 2+). Voice Broadcast service (VBS). Stage 2 (3GPP TS 43.069 version 9.2.0 TS 143 069: March 2012 system (Phase 2+). Voice Broadcast service (VBS). Stage 2 (3GPP TS 43.069 version 10.1.0 TS 143 129: March 2012 (Version 8.3.0) system (Phase 2+). Packedswitched handover for GERAN A/Gb mode. Stage 2 (3GPP TS 43.129 version 8.3.0 Release 8) TS 143 129: March 2012 (Version 9.2.0) system (Phase 2+). Packedswitched handover for GERAN A/Gb mode. Stage 2 (3GPP TS 43.129 version 9.2.0 TS 143 129: March 2012 system (Phase 2+). Packedswitched handover for GERAN A/Gb mode. Stage 2 (3GPP TS 43.129 version 10.1.0 TS 144 003: March 2012 system (Phase 2+). Mobile Station. Base Station System (MS. BSS) Interface Channel Structures and Access Capabilities (3GPP TS 44.003 version 10.1.0 TS 144 018: March 2012 (Version 7.21.0) system (Phase 2+). Mobile radio interface layer 3 specification. Radio Resource Control (RRC) protocol (3GPP TS 44.018 version 7.21.0 Release 7) TS 144 018: March 2012 (Version 8.15.0) system (Phase 2+). Mobile radio interface layer 3 specification. Radio Resource Control (RRC) protocol (3GPP TS 44.018 version 8.15.0 Release 8) TS 144 018: March 2012 (Version 9.12.0) system (Phase 2+). Mobile radio interface layer 3 specification. Radio Resource Control (RRC) protocol (3GPP TS 44.018 version 9.12.0 Page 15 of 17

TS 144 018: March 2012 system (Phase 2+). Mobile radio interface layer 3 specification. Radio Resource Control (RRC) protocol (3GPP TS 44.018 version 10.6.0 TS 144 060: March 2012 (Version 7.26.0) system (Phase 2+). General Packet Radio Service (GPRS). Mobile Station (MS). Base Station System (BSS) interface. Radio Link Control / Medium Access Control (RLC/MAC) protocol (3GPP TS 44.060 version 7.26.0 Release 7) TS 144 060: March 2012 (Version 8.15.0) system (Phase 2+). General Packet Radio Service (GPRS). Mobile Station (MS). Base Station System (BSS) interface. Radio Link Control / Medium Access Control (RLC/MAC) protocol (3GPP TS 44.060 version 8.15.0 Release 8) TS 144 060: March 2012 (Version 9.11.0) system (Phase 2+). General Packet Radio Service (GPRS). Mobile Station (MS). Base Station System (BSS) interface. Radio Link Control / Medium Access Control (RLC/MAC) protocol (3GPP TS 44.060 version 9.11.0 TS 144 060: March 2012 (Version 10.8.0) system (Phase 2+). General Packet Radio Service (GPRS). Mobile Station (MS). Base Station System (BSS) interface. Radio Link Control / Medium Access Control (RLC/MAC) protocol (3GPP TS 44.060 version 10.8.0 TS 145 002: March 2012 (Version 9.6.0) system (Phase 2+). Multiplexing and multiple access on the radio path (3GPP TS 45.002 version 9.6.0 TS 145 002: March 2012 (Version 10.3.0) system (Phase 2+). Multiplexing and multiple access on the radio path (3GPP TS 45.002 version 10.3.0 TS 145 005: March 2012 system (Phase 2+). Radio transmission and reception (3GPP TS 45.005 version 9.10.0 TS 145 005: March 2012 (Version 10.4.0) system (Phase 2+). Radio transmission and reception (3GPP TS 45.005 version 10.4.0 Release TS 145 008: March 2012 (Version 8.14.0) system (Phase 2+). Radio subsystem link control (3GPP TS 45.008 version 8.14.0 Release 8) TS 145 008: March 2012 system (Phase 2+). Radio subsystem link control (3GPP TS 45.008 version 9.10.0 TS 145 008: March 2012 (Version 10.4.0) system (Phase 2+). Radio subsystem link control (3GPP TS 45.008 version 10.4.0 TS 148 008: March 2012 system (Phase 2+). Mobile Switching Centre. Base Station system (MSC-BSS) interface. Layer 3 specification (3GPP TS 48.008 version 9.8.0 TS 148 008: March 2012 system (Phase 2+). Mobile Switching Centre. Base Station system (MSC-BSS) interface. Layer 3 specification (3GPP TS 48.008 version 10.5.0 TS 148 018: March 2012 (Version 8.8.0) system (Phase 2+). General Packet Radio Service (GPRS). Base Station System (BSS). Serving GPRS Support Node (SGSN). BSS GPRS protocol (BSSGP) (3GPP TS 48.018 version 8.8.0 Release 8) TS 148 018: March 2012 (Version 9.7.0) system (Phase 2+). General Packet Radio Service (GPRS). Base Station System (BSS). Serving GPRS Support Node (SGSN). BSS GPRS protocol (BSSGP) (3GPP TS 48.018 version 9.7.0 Page 16 of 17

TS 148 018: March 2012 system (Phase 2+). General Packet Radio Service (GPRS). Base Station System (BSS). Serving GPRS Support Node (SGSN). BSS GPRS protocol (BSSGP) (3GPP TS 48.018 version 10.5.0 TS 148 049: March 2012 (Version 9.4.0) system (Phase 2+). Base Station Controller. Cell Broadcast Centre (BSC-CBC) interface specification. Cell Broadcast Service Protocol (CBSP) (3GPP TS 48.049 version 9.4.0 TS 148 049: March 2012 system (Phase 2+). Base Station Controller. Cell Broadcast Centre (BSC-CBC) interface specification. Cell Broadcast Service Protocol (CBSP) (3GPP TS 48.049 version 10.1.0 TS 148 071: April 2012 (Version 9.1.0) system (Phase 2+). Location Services (LCS). Serving Mobile Location Centre. Base Station System (SMLC-BSS) interface. Layer 3 specification (3GPP TS 48.071 version 9.1.0 TS 148 071: March 2012 system (Phase 2+). Location Services (LCS). Serving Mobile Location Centre. Base Station System (SMLC-BSS) interface. Layer 3 specification (3GPP TS 48.071 version 10.1.0 TS 151 010-2: March 2012 (Version 9.9.0) system (Phase 2+). Mobile Station (MS) conformance specification. Part 2. Protocol Implementation Conformance Statement (PICS) proforma specification (3GPP TS 51.010-2 version 9.9.0 TS 151 010-2: March 2012 (Version 10.0.0) system (Phase 2+). Mobile Station (MS) conformance specification. Part 2. Protocol Implementation Conformance Statement (PICS) proforma specification (3GPP TS 51.010-2 version 10.0.0 TS 151 010-4: March 2012 (Version 4.22.0) system (Phase 2+). Mobile Station (MS) conformance specification. Part 4. Subscriber Identity Module (SIM) application toolkit conformance test specification (3GPP TS 51.010-4 version 4.22.0 Release 4) TS 151 010-5: March 2012 (Version 9.9.0) system (Phase 2+). Mobile Station (MS) conformance specification. Part 5. Inter-Radio-Access- Technology (RAT) (GERAN / UTRAN) interaction Abstract Test Suite (ATS) (3GPP TS 51.010-5 version 9.9.0 TS 151 010-5: March 2012 (Version 10.0.0) system (Phase 2+). Mobile Station (MS) conformance specification. Part 5. Inter-Radio-Access- Technology (RAT) (GERAN / UTRAN) interaction Abstract Test Suite (ATS) (3GPP TS 51.010-5 version 10.0.0 TS 151 021: March 2012 (Version 10.4.0) system (Phase 2+). Base Station System (BSS) equipment specification. Radio aspects (3GPP TS 51.021 version 10.4.0 Release TS 151 026: March 2012 (Version 9.4.0) system (Phase 2+). Base Station System (BSS) equipment specification. Part 4. Repeaters (3GPP TS 51.026 version 9.4.0 TS 151 026: March 2012 (Version 10.3.0) system (Phase 2+). Base Station System (BSS) equipment specification. Part 4. Repeaters (3GPP TS 51.026 version 10.3.0 Page 17 of 17