CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL

Similar documents
Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

SURFACE FINISH. A galvanized finish is MnDOT s standard on new traffic control signal poles, mast arms, transformer bases, and luminaire extensions.

PUBLICATION 213. Think Safety First

Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Guidelines on the Use of Portable Traffic Signals (PTS)

CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

I. Travel Time Determinations on London Bridge Road and_i-264 Corridor using of Bluetooth Detection Devices

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Operation Manual February Opticom Infrared System

TEO Signal Committee Meeting Minutes Meeting Date: 02/09/06 Waters Edge Conference Rm A Meeting Time: 9:00am - Noon. Meeting Attendees: Old Business

Just Announced! General Registration : Includes all three days of Technical Sessions, $150 for Florida Section Members / $300 for Nonmembers

Clark County Fire Prevention Las Vegas Nevada

Wireless Occupancy Sensor User Guide

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

IMPORTANT! Please take the time to read through the manual before you start to install/program your equipment.

Greenwald Industries

TRAFFIC ENGINEERING DIVISION

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

* * APPLICABLE MODELS: 2014 > MAZDA 3

Installation Instructions

P.O. Box 8400 Green Bay, WI (920)

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 919 RAILROAD PREEMPTION INTERFACE. January 15, 2016

Sign Combo Permit Application For a Development and Building Permit for Permanent Signs APPLICANT DETAILS

S&C Scada-Mate Switching Systems Outdoor Distribution Interrupter Replacement 14.4 kv through 34.5 kv

SPECIAL SPECIFICATION 8590 Emergency Vehicle Traffic Signal Priority Control System

GETTING STARTED. Instructions IMPORTANT PS B PS B. Record the serial number from the tag on the door front.

SECTION EQUIPMENT WIRING

Guide Sign Policy for Secondary State Highways Edition

Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS

Installation & Operation Manual SAGA1-K Series Industrial Radio Remote Control

Print Head Installation Guide

TOYOTA TACOMA ROOF RACK Preparation. Part Number: PT

Medium Flat Panel Universal Interface Bracket (MSB-V)

Frequently Asked Questions

OPERATING MANUAL SESAM 800 MOBILE TAIL LIFT EN -D0

TOYOTA TACOMA 2005 TRAILER WIRE HARNESS Preparation

580 - NOISE BARRIERS OPSS 580 INDEX

MnDOT Contract Exhibit A- Scope of Services. Project Information -

TOYOTA TACOMA TRAILER WIRE HARNESS Preparation

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

CLARK COUNTY FIRE CODE AMENDMENTS

Minnesota Department of Transportation Rural Intersection Conflict Warning System (RICWS) Reliability Evaluation

V00029KX READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

DISPLAY REGULATIONS PAGE 1 OF 6

Pushbutton Bollard. Wireless Control for BlinkerSign, RRFB or BlinkerBeacon User Guide. Blinker Division Solar LED Solutions

GMINI 300PE AM/FM/Shortwave Radio OWNER S MANUAL

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

OhioHealth Emergency Medical Services Event Medicine

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

Presented By: Todd Ward Project Manager

Agenda. Morning. TS2 Cabinet Components and Operation. Traffic Signal Ring Structure. Afternoon. Basic Preemption/Priority

SECTION SUBMITTAL PROCEDURES

Frequently Asked Questions

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Georgia s Regional Traffic Operations Program

Mighty Mo GX Series Cabinet Installation Guide. OR Rev /11

RCF 3.4. Portable Traffic Signal - Technical Specifications. North America Traffic Inc REV#

Agenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Decorative Driveway Gate Installation Manual

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

Parts. Backplate. Battery Cover. Backup Key. Touchscreen Assembly. Inside Assembly. Thumbturn. Strike. Reinforcement Plate. Bolt.

Overboard Recovery Communications Apparatus (ORCA ) RX-102 Receiver User s Manual

Constructing a Traffic Control Process Diagram

RADIO ANTI TWO-BLOCK SYSTEM

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A1000 ALPHA and A1200 ALPHA Meter Installation Instructions. General. Installation. For A1000 ALPHA Type R, A1000 ALPHA Type C, and A1200 ALPHA Meters

RECTANGULAR RAPID FLASHING BEACON WITH LARGE LED ARRAYS TAPCO RRFB-XL : Solar Powered; Extra Large LED Arrays, Wirelessly Synchronized

How to Pair AbiBird Sensor with App and Account

Assembly Manual for VFO Board 2 August 2018

Section 7 Specification 7.2 Painted Roadway Lines TABLE OF CONTENTS

PRORAC CONTRACTOR SERIES UNIVERSIAL STEEL TRUCK / CAP RACK INSTALLATION INSTRUCTIONS

ClearSpan End Frame Kit 30' Wide x 11' High

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

REQUEST FOR PROPOSALS

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

TRAINING BULLETIN. EFFECTIVE DATE: 05/06 DOC NO: TB198 CROSS REF: Communications Checklists

City of Orlando Alpha Test July 10, 2000

ASSEMBLY INSTRUCTIONS FOR HAULER II UNIVERSAL CAMPER SERIES RACKS

Customer Requirements RF Antenna Installations

OPERATING MANUAL SESAM 800 MOBILE TAIL LIFT C0

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

MRT. Instruction Manual. Remote Crane Controls. PSMRTINST-01A October, 2001 Part Number: Copyright 2001 Electromotive Systems

Update: July 20, 2012

SECTION PROJECT MANAGEMENT AND COORDINATION

This page is intentionally left blank

ClearSpan End Frame Kit 26' Wide x 12' High

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS. ITEM QTY DESCRIPTION Usage Chart

Check us out on-line! Installation Instructions

TOYOTA TACOMA LED BED LIGHTS Preparation

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

Transcription:

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL ACTIVATING/DEACTIVATING A SIGNAL Activating a traffic control signal requires careful planning and coordination between the project engineer, the contractor and the district traffic office. Cooperation between these three groups is essential to ensure a safe and efficient activation of the traffic control signal. 28.1 Activating Guidelines The guidelines presented below should be followed in order to ensure a safe and efficient activation procedure. 28.1.1 FUNCTIONAL TEST Prior to activating the signal, the contractor shall make a functional test to demonstrate to the engineer that each and every component part of the traffic control signal functions as intended. The traffic control signal shall not be placed in operation until all the required field tests have been completed and accepted. 28.1.2 TURN-ON PROCEDURE Traffic control signal system turn-on should not be scheduled on Fridays or before a holiday because of possible malfunction of the new traffic control signal. Prior to activating a traffic control signal system, the contractor shall notify the engineer a minimum of 48 hours before the scheduled traffic control signal activation (Standard Specification 2565.3AA). The traffic control signal system cannot be put in flash or made operational unless authorized by and in the presence of the engineer. Prior to activating the traffic control signal system, the contractor shall remove the bags from all the signal indications. MnDOT personnel shall place the traffic control signal system into operation unless otherwise authorized by the engineer. The contractor shall aim the vehicle and pedestrian signal heads as directed by the engineer. All appropriate signs shall be installed. Conflicting signs (for example, stop signs) shall be covered or removed. Figure 28-1: Signal Switch Figure 28-2: Functional Test Figure 28-3: Bagged Signals Figure 28-4: MnDOT Personnel 28-1

Although the engineer is responsible for the following work, it is often done by district traffic office representatives. The Minnesota Manual of Uniform Traffic Control Devices (MnMUTCD) 4D.31 requires the traffic control signal be brought out of flash in a precise and consistent manner. It requires the signal to have an all red time and then the major street shall have a green interval. It is required that this procedure for taking a traffic control signal out of all red flash is followed. Stop traffic flow from all approaches (with the help of the contractor). Turn the traffic control signal system on. Allow traffic on the major approach to go, hold the traffic on the minor approaches until they get a green light. Note the time so that it can be entered in the log book and included in the official turn-on letter. Figure 28-5: Traffic Control Signal Wait for the signal indications of the major street to turn red and their traffic to stop. Do not allow cross street traffic to move until they get a green light. Figure 28-6: Stop Traffic Flow Check that all vehicle indications are working properly through several cycles. Check that all pedestrian push buttons and indications are working properly. Observe all the phases in a cycle to ensure that each phase has the correct timing. When a signal is turned on, district traffic office personnel will observe its operation in the A.M. and P.M. peak periods as well as off peak operation. This will continue until they are satisfied with the operation. Figure 28-7: Wait for Major Street Traffic Figure 28-8: Pedestrian Push Button Check 28-2

The following personnel should be present when a traffic control signal system is activated: Project engineer (or their representative) Contractor (with the appropriate equipment and personnel) City police (if necessary) MnDOT s Electrical Services Section personnel (if necessary) District traffic engineer (or representative) Please note that MnDOT personnel may choose to operate the new traffic control signal system in a flashing mode for a few days before turning the traffic control signal system to normal operation. This is not done in all MnDOT districts. The MnDOT Standard Specifications for Construction (Spec Book) defines TURN-ON date as the time when the complete traffic control signal and lighting system meets all installation and operational requirements of the contract and is placed in automatic operation. 28.1.3 TURN-ON LETTER After a traffic control signal system is activated, the district traffic office is responsible for sending a memorandum of notification (turn-on letter) to each of the following: City County Power Company State Patrol Project engineer Emergency Operations Officer, MnDOT Truck Center Electrical Services Section Office of Traffic Engineering (CO Traffic) The memorandum should include the following: State Project Number Intersection ID number Figure 28-9: Turn-On Letter Location of the signal Date and time of signal activation A listing of maintenance responsibilities (who is responsible for what) Name of the power company Name of the project engineer Meter address Dates of warranties affecting the signal Vertical clearances of any objects suspended over the roadway 28-3

28.2 Deactivating Guidelines Prior to turning a traffic control signal system off, the contractor shall notify the engineer within a timeframe as specified in the contract. The traffic control signal system cannot be put in flash or deactivated except by the MnDOT personnel, unless authorized by, and in the presence of the engineer. 28.2.1 TURN-OFF PROCEDURE Turning a traffic control signal system off should be conducted with the same care and planning used for a turn-on. The following procedure should be followed: Figure 28-10: Clear Intersection Make sure that no pedestrians or vehicles are in the intersection. Wait until the major street traffic is stopped by a red light. Wait until the minor street indications change from yellow to red then place the intersection in flash when traffic on the minor street permits. Make sure all the appropriate signing is in-place before the traffic control signal system is turned off. The traffic control signal system shall be put into flashing operation. Turn the traffic control signal system off and record the time in the log book. Turn the power from the service equipment off. Figure 28-11: Signal Switch Figure 28-12: Power Switch 28.3 Signal Removal and Salvage Guidelines The person responsible for removing the equipment shall, using tape and a water proof marker, label all the control equipment with the date, time and intersection location. Using the same method, label the electric meter. Secure all the connectors and electronic equipment that is not being removed with tape or nylon tie wraps. Figure 28-13: Label Equipment 28-4

Remove the controller from the cabinet and place it in a location to prevent damage during transport. If the cabinet is to be removed from its foundation, it shall be lifted using the holes near the roof of the shell (or the lifting ears). The cabinet shall be transported in an upright position and protected from dents and scratches. Place the removed cabinet on the pallet the new cabinet was delivered on if available. Figure 28-14: Secure Connectors When battery backup service cabinets including type SSB are to be removed and salvaged, the batteries (if installed) must be removed from the cabinet prior to lifting the cabinet off the pad. The batteries must be shipped separately from the cabinet. The contractor shall transport all salvaged equipment to the locations specified in the contract. After a traffic control signal system is deactivated, the district traffic office is responsible for sending a memorandum of notification (turnoff letter) to the same people as the turn-on letter. Figure 28-15: Battery Removal 28.4 Chapter 28 Resources Minnesota Manual of Uniform Traffic Control Devices 4D.31 Traffic Engineering Manual (TEM) MnDOT Standard Specifications for Construction 28-5

This Page Intentionally Left Blank 28-6