Z07- SWING GATE HOME AUTOMATION. zero Z07 - SWING GATE MOTOR SUPPLY V HOME AUTOMATION IT EN FR Z07.REV USER MANUAL AND CONFIGURATION PG1

Similar documents
ECO FAST DOOR USER S AND INSTALLER S MANUAL

HOLE CUTTER SHARPENER ASSEMBLY & SERVICE MANUAL

Repair manual. Fifth-wheel coupling JSK 38/50

VARIABLE SPEED WOOD LATHE. Model DB900 INSTRUCTION MANUAL

ITEM NO. PART NO DESCRIPTION QTY.

Fifth-wheel coupling JSK 38/50

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

BL-ER-P Ethernet Radio Unit for Pedestal Installation Guide

TUCANA-02 P PORTABLE END MILLING MACHINE USER S MANUAL

SHEREX FASTENING SOLUTIONS PNEUMATIC SPIN-SPIN INLINE STYLE RIVET NUT INSTALLATION TOOL SSG-902 MANUAL

Door window. Front door window, assembly overview

model tsa-sa48 Sliding Crosscut Table installation guide

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual

Shepherd 210A Fingerprint Door Lock Installation Manual V1.1

P/N B ProBlue and DuraBlue Thermostat Service Kit - P/N

SHEREX FASTENING SOLUTIONS PNEUMATIC SPIN-SPIN RIGHT ANGLE INLINE STYLE RIVET NUT INSTALLATION TOOL SSG-913 MANUAL

Instructions for Stone Cutting Machine

Installation and Operating Instructions

VARIABLE SPEED WOOD LATHE

Robot e.do. Safety requirements and technical specifications. Rel axes and 6 axes versions

WARNING!! DO NOT LIFT DOORS UP WHEN THE HOOD IS OPEN. THE DOORS WILL HIT THE HOOD!

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

MODEL 83 Pail Handler

Mechanical Technical Assistance Manual for washers

Installing Your Electronic Deadbolt

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

Arc Trainer Main Frame Assembly

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

Tube Facing Tool.

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

Sliding Crosscut Table installation guide

Model Series T o r s i o n

OPERATION AND SERVICE MANUAL

Version: 1.0 Revised: 6/8/2011. CBU Assembly Instructions Manual

Maintenance Information

OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE

NEWS Part. N /0 MINITEC NEWS

Projector Flush Mount

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

Specifications. Important Safety Information

Maintenance Information

Universal Adaptor Kit

7. Operating instructions: EFL 300

Installation and Assembly: Full Service Video Wall Mount

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

PHTM200 - Phantom 200 Flat Screen Wall Mount with Wafer Thin Projection Fits Screens up to 50 lbs with 200mm Mounting Patterns

INTERCOOLER UPGRADE INSTALLATION INSTRUCTIONS PART NUMBER D APPLICATION: F87 M2

Installers guide Deadbolt 02.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

BW-100 Door Upgrade

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

Victory Fire Door Inspections

AFB (AIR FAN BEARING) INSTALLATION GUIDE

Senior Swing. Caution

Model PLM5113N PETROL LAWN MOWER

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

JARVIS. Model BR-3 Blade Reconditioner ... EQUIPMENT TABLE OF

Full-Motion TV Mount - 47" to 90" Installation Guide

INSTALLATION INSTRUCTIONS Flat Panel Static Wall Mount Model: GSM-111

Number Wheeler P/N Description Set Rex P/N Notes Base 1 J Support, Right 1 J Support, Left 1 J Nut (M8)

С 800 CASSIDA C 800 HIGH SPEED COIN COUNTER

DUMP N GO MODEL PV 212 JOHN DEERE

ABM International, Inc. Navigator Assembly Manual

ApexDesk Assembly Guide

MhouseKit WG20 S. For power-operated swing gate. Installation instructions and warnings, and User Manual

Table of Contents. B. Base Tool Changer...2 MC-16 Manual Tool Changer...2

INSTALLATION MANUAL. Decoration panel BYCQ140E2W1 BYCQ140E2W1W BYCQ140E2W1B

1 of 2 3/3/2017 4:49 PM

Installation Manual Porter Road, Sarasota FL fax

CHAINSAW SHARPENER MODEL: ECSS-1

FUNCTIONAL DESCRIPTION

VERTICAL PLATFORM LIFT

PFT CABLE GYM INSTRUCTION MANUAL

INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY

Operating instructions Contrast sensor O5K / / 2016

BX3230 Installation Instructions Oldsmobile Silhouette Chevy Venture

BX1965 Installation Instructions 2004 Chrysler Sebring Convertible

Installation & Operation Manual SAGA1-K Series Industrial Radio Remote Control

Name Standard or Description QTY.

HANDHOLE SEAT GRINDER

MTV-1-CP 230 VAC POTENTIOMETER WITH MIN & MAX SETTINGS, DRY CONTACT. Mounting and operating instructions

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

From the library of: Superior Sewing Machine & Supply LLC

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.

Limit switch set BOA-H DN PN 16/25 Material variant EN-GJS LT

All Purpose Hardware

LC6X4WTM Security Wall Mount with Tilt for up to 60" Flat Screens with VESA 600mm x 400mm or less

ELECTRIC SLIP ROLL MACHINE. Model: ESR-1300X2.5/ESR-1300X4.5 ESR-1550X3.5/ESR-1580X2.0

Trouble Free Hardware

INSTALLATION AND MAINTENANCE MANUAL FOR GROUND MONITOR GM-250 COPYRIGHT 1983 AMERICAN MINE RESEARCH, INC.

Model 44, Double Flush

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

H8508 Impact Wrench SERVICE MANUAL. Model (Serial Code FWN) Model (Serial Code FWP)

ELECTRONIC ROTARY GEAR MOTOR SERIES SED (AR2...SE )

Pow-R-Feed Systems Service Manual

C70 Window Roller Repair Taken from: Heres the problem:

>> ACCESSORIES 5 2 METALPLAST-SOPRANA

General Four-Way Operation, Maintenance & Service Manual

Transcription:

Z07- SWING GATE Z07 - SWING GATE MOTOR SUPPLY 230-24V IT EN FR Z07.REV01.2018 USER MANUAL AND CONFIGURATION PG1

Z07 - SWING GATE PG2

Z07- SWING GATE INDEX 01. SAFETY INSTRUCTIONS 02. OPERATOR TECHNICAL SPECIFICATIONS DIMENSIONS 03. INSTALLATION INSTALLATION STEPS 04. MAINTENANCE MANUEL RELEASE 05. TROUBLESHOOTING 01. SAFETY INSTRUCTIONS ATTENTION: To ensure the safety of people, it is important that you read all the following instructions. Incorrect installation or incorrect use of the product can cause physical injury and material damage. Keep these instructions in a safe place for future reference. This product was designed and produced strictly for the use indicated in this manual. Any other use, not expressly indicated here, could compromise the good condition/ operation of the product and/or be a source of danger. ZERO SRLS. is not responsible for the improper use of the product, or other use than that for which it was designed. ZERO SRLS. is not responsible if safety standards were not taken into account when installing the equipment, or for any deformation that may occur to it. ZERO SRLS. is not responsible for the safety and proper operation when using components not sold by them. Do not make any modifications to the operator components and / or their accessories. Before installation unplug the automatism from the source of power. The installer must inform the client how to handle the product in case of emergency and provide this manual to user. Keep remote controls away from children, to prevent the automated system from being activated involuntarily. The customer shall not, under any circumstances, attempt to repair or tune the operator.must call qualified technician only. Connect the automatism to a 230V plug with ground wire. Operator for outdoor and indoor use. PG3

Z07 - SWING GATE 02. OPERATOR TECHNICAL SPECIFIATIONS Z02 specifications are as follow: Z06 Z06.24 Power Supply 230Vac 50/60Hz 24Vdc Power 300W 70W Current 1,4 A 4 A Capacitor 12.5µF - RPM 1400 1600 Maximum gate weight/leaf 300 kg Torque 350 Nm 150 Nm Operating temperatures -25 C to 65 C Thermal protection 120 C - Protection class IP68 Working frequence 50% INTENSIVE Opening time 90 16 seconds DIMENSIONS Z06 dimensions are the following: PG4

Z07- SWING GATE 03. INSTALLATION INSTALLATION STEPS GATE LEAF OPENING 90 : Verify that the axis of the hinges is at a distance of 55-75 mm from the edge of the finished column. Place the foundation box BOX at a maximum distance of 140 mm from the column. Provide a drain on the bottom of the box BOX. Insert the corrugated tube in the hole of the box BOX. Place the BOX on the ground, make sure that the top edge of the box is at the same level of the finished floor. Check with a spirit level that the foundation box is perfectly horizontal. Verify that the distance between the lower edge of the gate and the finished floor is between 50-60 mm for the installation of the lever. Weld the pin provided with the lever under the wing at a distance of 360 mm from the axis of the hinges. It is very important that these dimensions are respected! Only this way can be assured the correct functioning and durability of the operators! It is also very important to have a levelled ground/terrain! PG5

Z07 - SWING GATE GATE LEAF OPENING 135 : 135 55-75 mm 0-100 mm 135 Verify that the axis of the hinges is at a distance of 55-75 mm from the edge of the finished column. Place the foundation box BOX at a maximum distance of 100 mm from the column. Provide a drain on the bottom of the box BOX. Insert the corrugated tube in the hole of the box BOX. Place the BOX on the ground, make sure that the top edge of the box is at the same level of the finished floor. Check with a spirit level that the foundation box is perfectly horizontal. Verify that the distance between the lower edge of the gate and the finished floor is between 50-70 mm for the installation of the lever. Weld the pin provided with the lever under the wing at a distance of 360 mm from the axis of the hinges. 360 mm 0-100 mm 50-70 mm pin It is very important that these dimensions are respected! Only this way can be assured the correct functioning and durability of the operators! It is also very important to have a levelled ground/terrain! PG6

Z07- SWING GATE GATE LEAF OPENING 180 : 0-100 mm 180 180 Verify that the axis of the hinges is at a distance of 55-75 mm from the edge of the finished column. Place the foundation box BOX at a maximum distance of 140 mm from the column. Provide a drain on the bottom of the box BOX. Insert the corrugated tube in the hole of the box BOX. Place the BOX on the ground, make sure that the top edge of the box is at the same level of the finished floor. Check with a spirit level that the foundation box is perfectly horizontal. Verify that the distance between the lower edge of the gate and the finished floor is between 50-60 mm for the installation of the lever. Weld the pin provided with the lever under the wing at a distance of 370 mm from the axis of the hinges. 370 mm pin It is very important that these dimensions are respected! Only this way can be assured the correct functioning and durability of the operators! It is also very important to have a levelled ground/terrain! PG7

Z07 - SWING GATE Dig a hole in the ground large enough to hold the foundationboxes. Spread 1 corrugated pipe diameter 20 mm from the excavation to the undertground pit of the electrical connections as shown in the figure. Insert the corrugated tube into the hose at the back of the BOX. Wall up the BOX with the inlet tube facing the center of the gate. Take account of any coatings of the columns, to make sure that amcolumn completed the coating does not prevent the insertion of the gearmotor in the foundation box. Wall up the BOX holding the upper edge of the box flush with the finished floor level (taking account of any flooring). screws cover gasket cable gland Remove: - 2 inox screws M6x16 - lid of terminal compartment - gasket of terminal compartment Insert the motor cable in to the corrugated pipe, then in the hole in the foundation box and then through the cable gland of the motor. Tighten the cable gland making sure it go to press the cable sheath and not the individual cables. Make the electrical connections as shown in the figure. PG8

Z07- SWING GATE Insert the motor into the foundation box as shown. You may have to disengage the gate leaf from the column: - Remove the pin from the lower hinge - Move aside the leaf - Insert the motor into the box - Pull the power cord while sliding the engine so that it is not pinched between the drive and the foundation box. Make sure all surfaces are clean and refit the seal and the cover by tightening the 2 screws M6x16 steel (Tightening torque 10 Nm). Make sure the covers of the motor are out of the ground as shown in the figure. Assemble the lever as shown, and tighten the screw M8x20 countersunk head. Put bolt under the leaf at the distance indicated in previouse paragraphs (depending on your type of installation). pin Flip down the leaf and make sure that the pin is going to fit into the slot on the lever. Replace the pin on the bottom hinge of the door. Fit the washer and tighten the screw M6x12 on the pin. washer screw M6x12 PG9

Z07 - SWING GATE As an alternative to weld the pin below the leaf which involves having to remove the leaf from the lower hinge you can install the optional bearing kit : - Install the pin with ball bearing on the hole at the end of the lever and tighten the nut M8 lower. - Close the 2 plates around the bearing and secure with 3 screws to the bottom edge of the door. Insert the corrugated tube into the hose at the back of the CANTILEVER BOX. Wall up the BOX with the inlet tube facing the center of the gate. Take account of any coatings of the columns. Wall up the BOX holding the upper edge of the box flushwith the finished floor level (taking account of any flooring). Weld the support with spherical hollow to the leaf, face down and perfectly aligned with the upper hinge. Weld the pin of the lever under the wing toa 360 mm distance from the hinge. Insert the ball on the foundation box into the spherical hollow and insert the pin into the top hinge of the LEVER. Insert the motor in foundation box as shown in figure. Pull the power cord while sliding the engine so that it is not pinched between the drive and the foundation box. Make sure all surfaces are clean and refit the seal and the cover by tightening the 2 screws M6x16 steel (Tightening torque 10 Nm). Make sure the covers of the motor are out of the ground as shown in the figure. PG10

Z07- SWING GATE Attach the cover to the foundation box with the supplied 4 stainless steel screws M5x16. 1 2 3 4 5 6 7 8 9 10 COANTILEVER BOX : Install the lever, broached (3) on the motor shaft (5) and tighten the grub screw M6x6 (4). Fix the plate (2) to the plate (3) and tighten the countersunk head M8x16 screw with hexagon socket (1). Insert the pin welded under the wing into the slot present on the lever (8) and tighten the screw M6x12 (6), fitting the washer 6x24 (7). Attach the lever (8) to the motor shaft (5) by inserting the spacer (9) and tighten the screw M8x20 countersunk screws (10). 04. MAINTENANCE Check motor supports: Make sure that supports remain well fixed on the pillars and gate to ensure proper functioning of the equipment. These maintenance measures must be applied every year in order to insure proper functioning of the automated system. MANUAL RELEASE To open manually the gate in case of electric power failure or in case of damage, follow the below steps: Insert the key C provided into the appropriate hole on the lever L1 and turn the key. PG11

Z07 - SWING GATE 05. TROUBLESHOOTING Problem Procedure Behavior Procedure II Door work doesn t Make sure you have 230V power supply connected to control board and if it is working properly. Still not working. Consult a qualified ZERO technician. Encountered problems? Consult an experienced gate expert. Motor doesn t move but makes noise Unlock motor and move the gate by hand to check for mechani cal problems on the movement The gate moves easily? Consult a qualified ZERO technician. Check if there is any obstacle in front of the photocells; Motor opens but doesn t close Unlock motor and move the gate by hand to closed position. Lock motor again and turn off power supply for 5 seconds. Reconnect it and send start signal using transmitter. Gate opened but didn t close again. Check if any of the controldevices (key selector, push button, video intercom, etc.) of the gate are jammed and sending permanent signal to control unit; Consult a qualified ZERO technician. Encountered problems? Consult an experienced gate expert. Gate doesn t make complete route Unlock motor and move ate by hand to check for mechanical problems on the gate The gate moves easily? Consult a qualified ZERO technician. PG12

Z07- SWING GATE Discovering the origin of the problem 1. Open control board and check if it has 230V power supply 2. Check input fuses 3. Disconnect the motor from control board and test them by connecting directly to power supply in order to find out if they have problems. 4. If the motor works, the problem is on the control board. Pull it out and send it to our ZERO technical services for diagnosis. 5. If the motor doesn t work, remove them from installation site and send to our ZERO technical services for diagnosis. Check all motion axis and associated motion systems related with the motor and the gate to find out what is the problem. 1. Check capacitors, testing operator with new capacitors; 2. If capacitors are not the problem, disconnect motors from control board and test them by connecting directly to power supply in order to find out if they have problems. 3. If the motors work, the problem is from control board. Pull it out and send it to our ZERO technical services for diagnosis; 4. If the motors don t work, remove them from installation site and send to our ZERO technical services for diagnosis All ZERO control boards have LEDs that indicate the functioning of connections to allow easy diagnosis of faults. All safety devices LEDs (DS) in normal situations remain On. All START circuits LEDs in normal situations remain Off. If LEDs devices are not all On, there is some security systems malfunction (photocells, safety edges), etc. 1 Close with a shunt all safety systems on the control board (check manual of the control board in question). If the automated system starts working normally check for the problematic device. 2 Remove one shunt at a time until you find the malfunction device. 3 Replace it for a functional device and check if the motor works correctly with all the other devices. If you find another one defective, follow the same steps until you find all the problems. 1. Check capacitors, testing with new capacitors; 2. If capacitors are not the problem, disconnect motor from control board and test it by connecting directly to power supply in order to find out if it is broken; 3. If the motor doesn t work, remove it from installation site and send to our ZERO technical services for diagnosis. 4. If motor work well and move gate at full force during the entire course, the problem is from controller. Set force using P1 button on the board. Make a new working time programming, giving sufficent time for opening and closing with appropriate force. 5. If this doesn t work, remove control unit and send it to ZERO technical services services. Check all motion axis and associated motion systems related with the motor and the gate to find out what is the problem. NOTE: Setting force of the controller should be sufficient to make the gate open and close without stopping, but should stop and invert with a little effort from a person. In case of safety systems failure, the gate shall never cause physical damaged to obstacles (vehicles, people, etc.). PG13

Z07 - SWING GATE NOTE: PG14

Z07- SWING GATE PG15

Z07 - SWING GATE ZERO SRLS Via ROMA 25/A ALTAVILLA VIC. ITALIA info@mio.it - www.mio.it PG16