The stylish light weight bitumen shingle tile strip roofing system Design and installation manual

Similar documents
HOW TO Fix Onduline Corrugated Bitumen Sheets

video 10 YEAR GUARANTEE Durable and lightweight Guaranteed waterproof for 10 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

BBA BRITISH BOARD OF AGREMENT CERTIFICATE NO. 87 / 1823 / C

Installation guide for 20/20

15 YEAR GUARANTEE. Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

BARDOLINE INSTALLATION INSTRUCTIONS

Three layer Felt Roofing using cold applied adhesive

IKO0716 July Roofing Shingles. Selector & Fixing Guide

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

TECHNICAL BULLETIN 28

Shingle Installation Guide

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

FIXING GUIDE. Designed for Garages & Sheds, Houses, DIY, Flat Roofs, Industrial & Agricultural Buildings etc. IS THE LONG TERM ROOFING SOLUTION

Polytegola N. Bitumen Roof shingles. Application guide

TYPICAL BARGE DETAIL - CROSS SECTION

PROFESSIONAL PITCHED ROOFING ANCILLARIES

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

Shingle Installation Guidelines

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

SUPER-UNDERLAY SHEET

Installation Manual. Future Roof Shingle / Slate Products

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Installation Instructions

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

Roll-Fix Kit The complete dry hip kit RFIG

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

EASY SLATE FIXING GUIDE

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

Installation Instructions

installation guide Villa

Tuff-Rib Install Guide

Dry Verge System. For more information on CEMEX visit

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

How-To-build guide Garden shed

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

NEW equinox INSTALLATION GUIDE Issue

A P P L I C A T I O N I N S T R U C T I O N S

SmartVent Eave Edge Installation Instructions

Potting Store Assembly Instructions

NEW equinox INSTALLATION GUIDE Issue

BARRELL VAULT BATTENLESS

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

eco-shake INSTALLATION INSTRUCTION

Installation Manual. Future Shingle Products

Stone coated steel roof tile INSTALLATION GUIDE

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

Recommended Slating Tools

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

ROOFING DESIGN AND FIXING GUIDE

DIRECTIONS FOR APPLICATION

Barrel Vault Counter Batten and Batten

DIRECTIONS FOR APPLICATION

Guardian warm roof conversion system. Installation Guide

Special Roofs and Vertical Slating

Asphalt Shingle Roofing NZ PO Box , Royal Oak Auckland

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

Corner Potting Store Assembly Instructions

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

Multi-layer Insulation Blanket for use in Roofs

IRONWOOD SHAKE & FLASHING SPECIFICATIONS

SpeedDeck. Fixing and Handling Guide

LAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT

Cambridge English Application Instructions

Playaway Swiss Cottage Assembly Instructions

RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

Installation Instructions

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

How To Install Asphalt Shingles. Part 1 of 3: Preparing the Roof. Tutorial

PROJECT INSTRUCTIONS Roofing

Terrabella Shake & Shingle Znap Ver. 2.0

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

Installation Instructions

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Tuff-Rib. Installation Manual. Nationwide supplier of quality metal roofing. Toll-Free (800) S. Lee Hwy. Cleveland, TN 37311

The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

AS TESTED TBA FIREFLY TBA FIREFLY BAL-FZ BUSHFIRE ROOF SYSTEM INSTALLATION GUIDE EASY TO INSTALL EASY TO CARRY EASY TO TRANSPORT

DIRECTIONS FOR APPLICATION

INSTALLATION GIUDE.

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top.

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION

Greenhouse Assembly Instructions

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

REGENCY TIMBER BUILDINGS

Transcription:

CI SfB (4-) Nn2 BARDOLINE Shingles By Onduline The stylish light weight bitumen shingle tile strip roofing system Design and installation manual Complementary leaflet to the Bardoline instructional film available online www.onduline.co.uk

Bardoline fixing guide: This guide provides comprehensive design and installation guidance, you can either select & click on the specific information you require from the index below or view this guide and instructional video in full. Contents: 01 Introduction 01 Bardoline shingle material composition 02 Product specification and packaging 03 Colour range 02 Roof design 01 Roof structure 02 Roof types and terminology 03 Recommended tool kit 03 Roof construction 01 Minimum recommended roof slope 02 Bardoline roof build up 05 General fixing details 01 Ridge fabricated detail 02 Prefabricated ventilated ridge 03 Side wall abutment 04 In line roof ventilator 05 End wall abutment 06 Valley lining options 06 Roof renovation system 01 Roof preparation 02 Cold roof application 03 Warm roof application 07 Wall cladding application 01 Fixing specification 04 Fixing shingles details 01 Aligning shingle tile strips 02 Fixing shingle tile strips 03 Eaves preformed tray detail 04 Eaves detail strip application 05 Verge preformed verge strip detail 06 Verge detail strip application 07 Verge alternative fixing options 08 Ridge and hip using shingle tile tab pieces 09 Fixing Bardoline ridge and hip tiles Note: Professional advice should be sought to detail your specific project specification and mechanical fixing requirements as required. Please remember the covering of roofs can be hazardous. Always work from a secure ladder or platform and use the appropriate safety equipment. Guidance can be found in Health and Safety Guide HSG33 working on roofs.

Bardoline Introduction For an attractive and durable roof, please take the time to read this instructional guide. Make all relevant preparations before fixing the Bardoline shingles in accordance with these simple design and fixing instructions. It will also save you time and money in the long run! Bardoline shingle tile strips Bardoline is manufactured from high quality materials, using the latest production technology to provide first rate weathering performance. Composition 1. 4. 2. 3. 2. 5. 1. Ceramicised granules: high temperature process vitrifies the colour pigments providing assured colour stability, Ext. S.AA fire resistance and UV protection. 2. Asphalt: specially formulated oxidised asphalt for stability in fluctuating temperatures. 3. Pre-impregnated 125g/m 2 Classic ( 95g/m 2 Base grade) bonded glass fibre mat: guarantees outstanding mechanical resistance. 4. Heat sensitive adhesive strip just apply gentle heat with hot air gun to bond the tile tabs of the overlapping tile. 5. Silicon sand: under surface finish to the tile strip. Material specification and packaging Bardoline is available in two durable qualities: DIY 100G ideal for the domestic garden house and timber frame building market and the Pro 125S designed for high end specification housing, commercial and industrial projects. Pro 125S shingles Nominal Thickness 3.4mm Weight 10.7kg/m 2 Package 21 tiles pack Effective surface area 3.05m 2 14 tiles per pack Effective surface area 2.03m 2 DIY 100G shingles Nominal Thickness 3.0 mm Weight 8.5kg/m 2 Package 21 tiles pack Effective surface area 3.05m 2 14 tiles pack Effective surface area 2.03m 2

1.000 m Slots act as guide to ensure vertical tile alignment 145 mm 195 mm 340 mm Interlocking tile tabs to ensure horizontal tile strip alignment Attractive durable ceramicised granule surface finish Heat activated bitumen tile tab adhesive strips 242 mm Bardoline colour range Red shingles Green Slate Grey Red multi-colour (clay effect) Brown Note: Other colours are available to special order only (typical minimum quantity 6000 m 2 Benefits: Auto tile tab alignment: Durability Light weight Versatility Ease of fixing Cost effective Attractive appearance Virtually maintenance free Low maintenance Material guarantee* Auto shingle alignment *Terms and conditions apply Shingle tile strip alignment Interlocking side tabs automatically aid the horizontal alignment of the shingle tile strips. Slots postioned in the top of the shingle tile strip engage with the edge of the next course to provide assured alignment of the tile tabs vertically.

Roof design: Roof structure It really is worth taking the time to first check your roof and carefully set out the design for the support structure on your project. It will save you time and money! New build project: Just follow the information contained in this leaflet to create a long lasting trouble free roof covering. Existing roofs: Survey your roof structure this will allow you to decide if it requires maintenance, upgrading or strengthening prior to fixing the Bardoline shingles. Make note of the roof construction; normally built using a decked roof laid on rafters or purlins supported on a trussed roof structure. Support structure design: A fully supporting rigid deck must be provided below the Bardoline. Any irregularity in the decking will be apparent through the tile strips. The roof should be constructed in accordance with relevant Building Standards and Codes of Practice, with all timber treated with preservatives. Exterior quality plywood board is the preferred decking for Bardoline; it should be a minimum of 12 mm thick with all fixing head finished flush with the sheet surface. The board should be be fully supported on at least three purlins and laid in a broken bond pattern. If close boarding is used it should be a minimum of 15mm thick and should be interlocking to avoid movement distortion in the decking. Note: Alternatively suitable roofing grade 18 mm Stirling / OSB boards can also be used below Bardoline fixed in strict accordance with the manufacturers instructions. Roof types and terminology Roof types: Hipped roof: Roofing terminology: Hip: Verge: Barge board: End wall abutment: 5 Duo-pitch roof: Mono-pitch roof: Ridge: Recommended tool kit 12 5 4 1 2 3 Valley: Side wall abutment: Fascia board: Roof decking: Purlins / battens: Eaves: 10 11 6 7 8 9 If you are in doubt over your roof condition or design professional advice should always be sought 1 Hammer: 7 Hand saw for decking: 2 3 Tin snips: Roofers knife: 8 9 Power saw for decking: Angle to form ridge tiles: 4 Tape measure: 10 Protective gloves: 5 11 Straight edge: Protective glasses: 6 Hot air gun: 12 Protective hard hat:

Roof construction: So let s get started with the first two steps to create your durable, attractive and long lasting roof you can be proud of... Minimum recommended roof slope The minimum recommended roof slope to which Bardoline roof strips can be fixed is: 12.5 0 degrees. Bardoline roof strips must always be laid on an Onduline roof underlay membrane on roof slopes below 20 0 degrees. (Indeed its good practice to always use an underlay) First calculate the slope of your roof using a protractor. Then measure your roof and take note of the materials and tools required to cover your roof including any Bardoline shingle tile strip system accessories required for your project. 20 0 12.5 0 Bardoline roof construction a, b, c, a Make ready the roof Deck Lay Onduline roof underlay Fix Bardoline tile strips b c Bardoline shingle tile strips must be laid on a roof deck in accordance with relevant British Standards and Codes of Practice. Minimum roof slope: 12.5 0 degrees. Minimum deck thickness: 12 mm to 18 mm. Note: Any irregularity in the surface of the decking will become apparent through the shingle strips in service. Onduline underlay must be used on roof slopes below 20 0 degrees, the membrane laid with a 15 cm end laps and nailed at 10 cm centres using large headed galvanised clout nails. Note: Select one of the range of Ondutiss underlays either conventional or vapor permiable to match your design requirements. Finally fix the Bardoline tile strips in accordance with the instructions set out in the Bardoline fixing instructions. Note: Remember before fixing the shingles to your roof take time to look at the instructional video available on the Onduline website.

Fixing shingles Aligning shingle tile strips Fixing tile strip Interlocking side and top slots aid positioning shingle strips. Start alternate trimmed to a form tile bond pattern. Vertical alignment slot Guide slots are cut into the top edge of the tile strip, which when opened form a slot into which the next course is engaged for vertical alignment. Horizontal alignment tag Ensure the shingles are positioned square to the line of the eaves and verge. Interlocking side tags provide horizontal alignment of shingle tile strip. Fixing shingle tile strips Fixing shingle tile strips Lay the tile strips diagonally, square to the eaves and ridge. Fixing shingles Lay the shingles diagonally across the roof taking care to keep them square to the line of the eaves and verge at all times in a broken bond pattern. Securing shingle strips Fix using 5 x 20mm large headed galvanised clout nails per tile strip. Nail through the adhesive strip band into the top edge of the lower course. Fixing tile tab Bond the tile tabs by gently heating the bitumen tab on the lower course with a hot air gun Note: Take care to keep the bitumen strip clean of roof debris prior to heating. Consolidating bond Consolidate the bonding of the tile tab by pressing with batten. Check the bond after cooling and reinforce laps joints with gun applied adhesive as required.

Eaves preformed eaves tray detail Onduline eaves tray Fix the Onduline universal eaves tray to form a drip edge into the gutter. Allow a 20cm end lap and fix using 20 mm galvanised clout nails at 20 cm centres. Preparing base course Cut off tile tabs with knife from shingle strip using a deep straight edge to cut agianst to protect fingers should the blade slip. Eaves base course The remaining strip forms the eaves base course which is nailed onto the roof. Note: Cut the underside of the shingles to reduce blade wear. Fixing base course Position and nail the base course strip onto the roof, aligning the bitumen tabs with the position of the shingle eaves course tile tabs. Fixing eaves course The eaves course is then fixed. Heat is used to consolidate the bond of the eaves course tile tab onto the eaves base course. Eaves and Verge The shingles are then fixed diagonally across the roof to the line of the verge. Eaves detail strip application Fixing eaves course Position and unroll the detail strip square to the line of the eaves. Note: The detail strip is often not an exact colour match to the shingle granules. Forming drip edge Nail the detail strip using 20 mm galvanised large headed clout nails, form the drip edge either dressing into a gutter or nailing at 5 cm centres to the fascia. Detail tape eaves verge The detail strip can also be used to seal the verge by forming the drip edge and securing by nailing at 5 cm onto the bargeboard fascia. Fixing eaves course Overlay the eaves course strip onto the roof and nail into place as described above. Fixing eaves course Apply bitumastic adhesive below the eaves shingles course tile tabs to secure the tile tabs in position. Fixing to verge Apply bitumastic adhesive below the shingles up the line of verge to secure the shingles in place.

Verge detail using preformed verge Bardoline verge detail Provides a heavy duty finish to weather the verge abutment. Bardoline verge trim To secure the verge unit provide a 25mm deck overhang over verge fascia line. Position the verge onto the decking lap and nail dry verge trim to decking through preformed slots (A). Basic verge detail Fix membrane / shingles by lifting the cover strip (B) (use wedges). Slide shingles into position (C). Use trim connectors to join verge trims (D) and align verge units at ridge cut and seal with sealant. Verge and ridge using detail strip Verge using detail tape The detail strip is used to seal the verge weathering. Form the drip edge by folding down 5 cm drip edge and secure by nailing at 5 cm into the bargeboard fascia. Fixing detail tape Lay membrane over detail tape and nail in position at 10 cm centres. Next fix the shingles using bitumastic adhesive to bond the shingles onto the detail tape up the line of the verge. Ridge using detail tape The detail strip at the verge is cut and sealed at the ridge verge abutment. Detail strip is then fixed square to the ridge line on a line of bitumastic adhesive and nailed at 10 cm centres. Verge alternative fixing options Fabricated verge option A raised verge detail can be used with a seperate cover flashing can be fabricated. Fabricated verge detail Fix timber-tilting fillet to raised bargeboard. Cut and form Bardoline strips using gentle heat from hot air gun up upstand. Seal edge with bitumastic sealant adhesive. Fabricated verge detail Form verge cap using metal flashing, or Bardoline ridge tiles. Alternatively Onduline batten cloak pieces can be used nailed and sealed to shingles using Onduline adhesive.

Ridge and hip using shingle tile pieces Fabricating ridge tiles For a superior aesthetic and weathering of ridge and hips. Fabricating ridge tiles On a bench cut the underside of the rectangular shingle into four pieces, trimming the top lapped section removing the side slot sections as illustrated. Ridge tile coverage The cut ridge pieces provide a coverage of 14.5 cm per tile, so prepare sufficiant for your project. Caution always use a deep straight edge to protect fingers. Forming ridge tiles Next, either make a former or use the edge of the bench to form the shingle ridge tiles. Then gently heat along fold line using a heat gun. Forming ridge tiles The Bardoline ridge tile is then formed by bending over the angled former to fabricate the Bardoline ridge tile. Forming ridge tiles Place the Bardoline ridge tiles over the edge of the bench, they can then be taken to the roof and laid as described below. Fixing Bardoline ridge and hip tiles Ridge and hip bond On exposed locations reinforce the tile lap bonding with Onduline lap adhsive applied to the section to be lapped or as a continuous bead if Detail tape is used. Laying ridge and hip tiles The ridge tiles are positioned on the roof and nailed through the lapped section using 20 mm large headed galvanised clout nails. Preparing eaves course The fixing is completed by heating the shingle bitumen sealant strip and using a batten to consolidate the joint. On exposed locations reinforce this bond with Onduline sealant.

General fixing details Fabricated vented ridge Fix ridge as Fig. 9. Nail 12 x 150mm support battens (A) at 200mm centres. Fix ventilator comb and overlay with 12mm plywood raised ridge (B), allow a 12mm overhang at ridge. Overlay with Bardoline strips/ridges. Preformed ventilated ridge Provide 25mm gap in decking at ridge and lay tile strips to ridge. Lap and fix ridge unit by nailing through designated line. Overlay with Bardoline ridge tiles fixed as previously described. Side wall abutment Dress the underlay 65 mm up the wall abutment, then form a 75 mm upstand in the shingles by gently heating and bending the fold line using a hot air gun. Finish with a separate cover flashing. Bardoline ventilator Select the correct ventilator to suit roof pitch. Cut hole in decking and form a welt in the Ondutiss (A) under tile strip above. Fixing in line ventilator Position and fix ventilator by nailing apron. Cut and overlay Bardoline tile strips using adhesive to bond onto ventilator. Connectors are available to connect to soil vent pipes. End wall abutment Gently heat tile strip and fold up 75mm upstand to wall abutment. use adhesive to bond tile strips. Alternatively use a metal apron flashings Finish with a separate cover flashing. Valley preformed lining Proprietary valley linings can be easily incorporated into decked roof construction. Envelope the exposed edge of decking with trimmed detail tape. Fix the Bardoline strips with a 6mm overhang from the deck into the valley. Bardoline lined valley High performance mineral surfaced membrane to line valley. Fix tile strips to valley line. Alternatively lay ridge pieces on membrane and overlap strips, sealing edges with sealant adhesive. Bardoline lapped valley Line the valley base with Ondutiss underlay, then lap alternative courses of tile strips over it. Mechanical fixings should not be made within 125mm of valley base.

Bardoline roof renovation system Over roofing of existing deteriorated felt pitched roofs: The light weight of the Bardoline system makes it an ideal solution for oversheeting existing failing and deteriorated pitched roof coverings in either cold or warm roof configurations. It can also be used to form vertical wall rain screen applications. Cold roof application 5 2 4 3 1 Roof preparation: First survey, clean and upgrade the roof structure as required and repair any deteriorated to make it suitable to accept Bardoline over roofing. Determine the fixings required to secure the support battens to the existing roof support structure as required to confirm to British Standards and Codes of Practice. Note: The fixings must offer sufficient resistance to wind uplift specialist fixings suppliers should be consulted for advice. Warm roof application 8 8 Wall cladding application 7 4 7 4 5 6 7 2 2 3 1 1 Bardoline tile shingles 2 12 mm plywood decking 3 50 x 25 mm deck framing batten 4 50 x 50 mm support treated batten 5 Ventilation channel 6 50 mm* rigid insulation board 7 Ondutiss underlay membrane 8 Existing roof covering Cold roof application (typical). Overlay existing roof deck with Onduline Ondutiss underlay membrane laid with 100mm laps. Next fix 50 x 50 mm treated counter battens at 450mm centres to eaves, then overlay and screw 50 x 50 mm treated battens to the lower support battens to form framing to accept the 12mm exterior quality plywood decking. Provide high and low ventilation to complete the ventilated roof section. Warm roof application (typical). Differs from the cold roof in laying roof insulation boards laid between counter battens laid at 50cm centres to which 50 x 50 mm treated battens to the lower support battens to form framing to accept the 12mm exterior quality plywood decking. The Bardoline roof can then be fixed onto the decking in compliance with the fixing instructions. Wall cladding fixing specification Form studded plywood framed partition with vapour permeable mebrane. Fix the tile strips as per roofing specification, but with an additional line of nail fixings at the top of each strip. 1 Note: Technical advice should be sought to detail your specific project specification and mechanical fixing requirements

Other Instructional leaflets www.onduline.co.uk Onduline Classic The Classic Onduline bituminous corrugated roofing and cladding system is lightweight but delivers a heavy duty roofing performance, which combined with its low maintenance attributes make Onduline Classic the professional s choice for a wide range of roofing projects, ranging from large industrial and agricultural projects to a simple garden shed. Onduline Classic sheets are also the only approved sheet for use with the Ondutile tile underlay system. Onduvilla tiles Onduvilla tile strips are produced with a unique three tone colour in an attractive bold roll tile profile. This recreates the warm natural colours that are normally only associated with expensive and heavy clay roof finishes. Onduvilla is produced in an easy to handle and fix tile strip format, making them the ideal roof covering for a wide range timber framed garden and commercial buildings. OnduLINE MINI 18 SHEETS Onduline Mini 18 sheets are designed with a low profile corrugation which compliments perfectly the scale of sheds, summer houses, workshops and garages. Making Mini 18 the ideal Do it Once upgrade to your garden and timber frame buildings. Mini profile sheets are also the only approved sheet for use with the Ondutile low line tile underlay system. Maintenance To ensure a long service life for your shingles the roof should be cleaned regularly of leaves and debris, as leaf mould can reduce the service life of the product. Also check that tree and shrub overhanging branches are not into contact with the surface of the roof; as wind generated movement can cause surface damage. Terms and Conditions Although the colouring process in the manufacture of the Onduline products are long lasting, as with similar natural roofing materials it is subject to the effects of weathering over its lifetime. The colour can also differ between production batches. Copyright 2016 All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of Onduline Building Products Ltd. www.onduline.co.uk Onduline Building Products Ltd Eardley House, 182-184 Campden Hill Road, Kensington, London, W8 7AS Tel: 020 7727 0533 Fax: 020 7792 1390 E-mail: enquiries@onduline.net Note: The information in this brochure is correct at the time publishing, Onduline reserve the right to change specifications at any time without prior notice. Production team: Tony & Kev Knell, Claire Hayzer, Ian McDonald, Bob & Richard Gibson, Hollie Walker, Video: FACT Liverpool - VERSION 01.01-2016