OnSite 19 /15U Wall Rack Model WR-15U

Similar documents
OnSite 19 /15U Wall Rack Model WR-15U

Powerware Series. Eaton Rail Kit 9- and 12-Slot Cabinets Installation Guide

Tilting & Swiveling Plasma/LCD Flat Panel Wall Mount Installation Guide Model: A380SM

S6 User s Manual USER S MANUAL ver. 1.0

INSTALLATION INSTRUCTIONS Small Flat Panel Height-Adjustable, Extended Pitch Swing Arm Wall Mount Model KWE-110

COPPER / FIBER MANAGER RACK INSTALLATION INSTRUCTIONS PX Standard Release A March 2008

FOLDING TONNEAU RACK. 1. Rack Rail Assembly

INSTALLATION INSTRUCTIONS Flat Panel Static Wall Mount Model: GSM-111

IBM xseries 345 Third Party Slide Rail Kit

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

ASSEMBLY INSTRUCTIONS FOR SERVICE BODY A MOUNT RACKS

Model MSPPWRTW Large Flat Panel Single Arm Wall Mount

Extensive cable management on a footprint that fits on a 24-inch floor tile.

ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK

VirtualEdge SwingRack Wall-mount 19/23" Equipment Rack (Model VESR-24)

INSTALLATION INSTRUCTIONS Lateral Shift Accessory Model: PAC-800

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Desk/Wall-Mount Rack

MSP-DCCLFSD LCD Flat Screen Swing-Down Mount

Single-Sliding Header Mount INSTALLATION INSTRUCTIONS

AC 1000 Single-Slot T1 Mini Repeater Apparatus Case

OWNER S MANUAL STORAGE SHED MODELS: STOR-96-G-W-1RH & STOR-912-G-W-1RH

NetShelter VX. Four-Post Open Frame. User s Manual

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

MSP-DCCPGSU Large Screen Static Display Mount

INSTALLATION INSTRUCTIONS FOR SMLS/SMSS Surface Mount Lock Shear & Surface Mount Strike Shear

MSP-DCCPGTU Large Screen Tilt Display Mount

Fixed Wall Arm. Installation Guide. Part number Rev E 2012 PolyVision Corporation All rights reserved

INSTALLATION INSTRUCTIONS

Install Instructions. NewAge Steel Welded Tall Locker

INSTALLATION INSTRUCTIONS

Ceiling Mount - 32" to 60" - Single Installation Instructions

10-PIECE. Garage Storage Set OWNER'S MANUAL. Patent pending

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

4Post Server Rack-111 Assembly For Floor Anchored Models

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

Tilting Flat Panel Wall Mount Installation Guide

PRORAC CONTRACTOR SERIES UNIVERSIAL STEEL TRUCK / CAP RACK INSTALLATION INSTRUCTIONS

4Post and 2Post Sliding Rails for Lenovo/IBM M5

ASSEMBLY INSTRUCTIONS FOR HAULER II UNIVERSAL CAMPER SERIES RACKS

ASSEMBLY MANUAL WALL MOUNT RACK SR-WM-10U SR-WM-12U SR-WM-16U

Modern Gatherings 60" TV Console Assembly Instructions

INSTALLATION INSTRUCTIONS

Stainless Steel Bench Stand

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

Model 6360/6361. Ambulance Cot Fastener INSTALLATION/OPERATION INSTRUCTIONS. IMPORTANT Keep manual on file at all times.

Assembly Instructions

Installation Instructions PP-FCMA

ADJUSTABLE MOUNTING POST

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

INSTALLATION MANUAL PBC-UMS

INSTALLATION INSTRUCTIONS

Performance 2.0 Series

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

Models 2230 and 2240

CM340B STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING SERVER CABINET FROM SKID

Installation Instructions Hinged Roof Rack

F l a t S c r e e n A R M S I n s t a l l a t i o n

PART #MSP-DCCST Flat Panel Tilt Mount

CM543 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

MODEL 83 Pail Handler

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

PART #MSP-DCCPPWS Plasma Wall Swing-Out (PWS) Wall Mount

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

F-150 Structural Holding System

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

CTTR Tire Rack Required tools

4" Oval Nerf Bar. Part No. A1007S/B. PARTS LIST: Qty Part Description Qty Part Description

AST-2446 INSTALLATION INSTRUCTIONS

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

INSTALLATION INSTRUCTIONS

Height Adjustable Benching End Panel and Utility Pole

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

SLW 6 Channel Letter Brake. User Guide. Operation and Mounting Instructions

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

INSTALLATION INSTRUCTIONS

Track Rack. * Track Racks are not lockable

ASSEMBLY MANUAL WALL MOUNT RACK SWING KIT SR-WM-SWING-10U-3IN SR-WM-SWING-12U-3IN SR-WM-SWING-16U-3IN

OWNER S MANUAL CONTENTS. The only table saw fence with Automatic Positioning Control TM

Model: SS660-PT-R Stainless Steel Poly-Top Floor Scale Series. Installation, Set-Up and Operation Manual

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF

INSTALLATION MANUAL ELPMBUNI

OWNER S MANUAL CONTENTS. The only table saw fence with Automatic Positioning Control TM

Models 2030 and 2040

YGR-LO-8 GUARD RAILING YGR-TP18 & YGR-TP42 POSTS Installation Manual

GearBoss II High Density storage

NetShelter VS Enclosure. User s Manual

Flat Panel Dual Swing Arm Wall Mount (FWD-110) MSP-SA

For all Davis weather consoles including Vantage Pro2,

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty

Aluminum Sprinter Rack Installation

FSD-4100 LCD Flat Screen Swing-Down Mount

4 Post Adapter Kit for Dell PowerEdge 2U & 3U

INDUSTRIAL WORKBENCH

TechBench Installation Manual

Factory Assistance: Phone: Fax: Page 1

LAN Locker Adjustable Shelves

Mighty Mo GX Series Cabinet Installation Guide. OR Rev /11

Transcription:

WR-15U November 2018 001-01-000091 Rev.001 OnSite 19 /15U Wall Rack Model WR-15U 1. OVERVIEW... 1 2. APPLICATIONS... 1 3. DESCRIPTION... 2 4. INSTALLATION... 2 5. TESTING AND TROUBLESHOOTING... 5 6. CUSTOMER SERVICE... 5 7. WARRANTY & REPAIRS... 5 8. SPECIFICATIONS... 6 1. OVERVIEW Enginuity s OnSite Model WR-15U (Figures 1 and 2) is a wall-mounted equipment rack that supports up to fifteen 19-inch rack units (15U) in a compact footprint. Cable management options include side-mounted guides for cable grooming and take-up reels for cable slack. The carrier-class assembly is an ideal fit for equipment rooms, cabinets, or customer premises locations. Document Status This document has been reissued to include instructions for using the drill template. Figure 1. WR-15U Wall Rack Product Features 15U height for 19-inch rack-mounted equipment Easily installed on a wall or backboard Welded, carrier-class design Optional side-mounted cable guides and take-up reels Reduces wall space requirements for multi-chassis applications Symmetrical frame design enables mounting with ground connections facing upward or downward 2. APPLICATIONS For service delivery, the WR-15U allows carriers to securely wall mount rack-based equipment in equipment rooms, cabinets, or on customer premises. The WR-15U offers the following technician-friendly solutions: Rack-Mount Compatibility The WR-15U supports any combination of standard 19- inch rack-based equipment, up to a total of fifteen rack Figure 2. WR-15U w/ equipment installed (example) OnSite is a trademark of Enginuity Communications Corp. 2018 Enginuity Communications Corporation Page 1 of 6

units high. The mounting arrangement provides the density benefits of a floor rack, but in a compact wallmounted footprint that requires only a single technician to install. Cable Management Cable guides can be installed on either side of the WR- 15U to groom cables from the front of each equipment chassis back to the wall. A package of five cable guides is available as Model CG-5. Side plates with cable take-up reels can be added to store excess cable length being fed to installed equipment. Model SPL-4H mounts to either side of the WR-15U and includes two adjustable, split reels. 3. DESCRIPTION The WR-15U (Figure 3) features welded steel, carrierclass construction. The front of the frame provides two vertical rails with standard threaded hole spacing for up to fifteen rack units. Ten pairs of threaded grounding holes and pre-installed screws are provided on the rear crossbar for attachment of ground lugs. One pair of holes supports grounding of the WR-15U itself and the other nine pairs of holes support ground connections from installed equipment. The unpainted grounding area provides metal-to-metal contact with ground lug surfaces. Cable Guides Optional cable guides with removable covers (Figure 4) can be attached to either side of the WR-15U frame. Up to fifteen cable guides can be installed per side. Slide on/off cover Figure 4. Cable guide Side Plate with Take-up Reels An optional side plate, Model SPL-4H (Figure 5), provides two adjustable cable take-up reels. The reels are sized to maintain proper bend radius in fiber applications. One or two plates can be attached to either side of the WR-15U frame using the included hardware. Threaded grounding holes Figure 5. Model SPL-4H Side Plate 4. INSTALLATION The WR-15U shipping carton contains the following: Pre-assembled mounting frame Ten (10) #12 x 1 slotted hex screws, self-tapping Product documentation Drill template Installation steps are described in detail below. Standard threaded hole spacing for up to 15 rack units Figure 3. WR-15U Features A. Mounting frame Select an appropriate location on a wall or backboard to install the mounting frame. Choose a mounting surface and hardware that can support the combined weight of the mounting assembly and equipment that is to be installed. Mounting to a 3/4 thick backboard 001-01-000091 Rev. 001 Page 2 of 6

with #12 x 1 screws is recommended. Maximum weight holding capacity of the WR-15U is 200 lbs. Determine the desired orientation of the ground lugs. The symmetrical design of the WR-15U frame allows it to be installed with the grounding holes facing upward or downward. Tape the drill template to the wall ensuring it is level. The drill template provides information for multiple wall mounted racks. Be sure to use the hole symbol C. Drill ten (10) 3/16 pilot holes. These holes mate with the mounting brackets located at the rear of the frame. The frame will be fastened with two screws in the topmost bracket on each side and one screw in each of the other brackets, as shown in Figure 6. holes on 5/8 centers beneath the included screws and washers on one pair of grounding holes. Tighten the screws to fasten the lug to the mounting frame. The example in Figure 7 illustrates the frame positioned with grounding screws facing downward. Connect a ground wire of appropriate gauge to the ground lug and attach the other end of the wire to a bonded ground point, per local procedures for network equipment. Figure 7. Frame grounding example Figure 6. Mounting screw locations Before attempting to fasten the mounting frame to the wall, insert a screw into the top pilot hole on either the left or right side. Partially thread the screw into the hole, leaving the screw head approximately 1/4 from the surface. Hold the mounting frame against the wall while resting the cutout of the bracket on the installed screw. Align the other nine mounting holes and install a screw in each hole. Tighten all ten (10) screws securely. B. Frame grounding Locate the ten (10) pairs of pre-installed grounding screws with lock washers on the crossbar of the frame. The grounding screws are 10-32 x 3/8 on 5/8 centers. Install a dual ground lug (customer provided) with C. Equipment Installation Install rack equipment with 19 hole spacing by carefully sliding the chassis through the front of the WR-15U and aligning chassis mounting ears with the threaded holes in the rails of the WR-15U frame. Insert and tighten #12-24 machine screws (customer provided) on each side of the chassis. An example of a fully populated wall rack is shown in Figure 2. Attach ground lugs associated with each equipment chassis to the threaded ground holes on the WR-15U crossbar as needed. D. Optional Cable Guide Installation To install a cable guide to the side of the mounting, first remove the sliding cover from the cable guide. Insert two of the #10-32 x 3/8 screws (included in CG-5 package) through the cable guide and into the threaded holes on the side of the WR-15U frame (Figure 8). 001-01-000091 Rev. 001 Page 3 of 6

Groom cabling from the front of the chassis to the wall through the cable guide on the side of the WR-15U, as shown in Figure 9, and replace the sliding cover. E. Optional Side Plate Installation One or two side plates (Model SPL-4H) can be installed on either side of the WR-15U chassis for cable slack management. The SPL-4H provides two split and adjustable take-up reels, as illustrated in Figure 5. To install and use the SPL-4H side plate, refer to Figure 10 and the steps below. Slide the two narrower tabs at the edge of the SPL-4H into the openings on the side of the WR-15U, toward the rear of the mounting. Align the wide tabs at the front edge of the SPL-4H with the threaded holes on the side of the WR-15U frame. Use the two (2) included #10-32 x 3/8 screws to securely fasten the side plate to the frame. Carefully wrap cables around the take-up reels to reduce slack as needed. Example routing is shown in Figure 11. Alternate mounting holes are included on the side plate for repositioning the half-reels, if desired. Figure 8. Cable guide installation Figure 10. SPL-4H installation Figure 9. Cable guide application 001-01-000091 Rev. 001 Page 4 of 6

7. WARRANTY & REPAIRS Warranty Enginuity warrants this product for one (1) year from date of purchase. Any attempt to repair or modify the equipment by anyone other than an authorized Enginuity representative will void the warranty. This limited warranty does not cover any losses or damages resulting from shipment to or from the customer, or from improper installation, abuse, modifications, or unauthorized repair by other than Enginuity personnel. Figure 11. Cable take-up reel routing 5. TESTING AND TROUBLESHOOTING Each piece of equipment installed in the WR-15U should be tested according the manufacturer s instructions. 6. CUSTOMER SERVICE If technical or customer assistance is required, please contact Enginuity at the following: Customer Service Technical Support 1-800-980-3266 sales@enginuitycom.com 1-800-841-1005 support@enginuitycom.com Repair and Return Enginuity equipment will be repaired or replaced without cost during the warranty period if the product is defective for any reason other than abuse, improper use, or improper installation. Before returning defective equipment, first request a Return Material Authorization (RMA) number from Enginuity. Once an RMA number is obtained, return the unit, freight prepaid, along with a brief description of the problem, to: Enginuity Communications 3545 Stern Avenue St. Charles, Illinois 60174 ATTN: Repair & Return Dept. Replacements will be shipped in the fastest manner consistent with the urgency of the situation. Repair or replacement of faulty equipment beyond the warranty period is available for a nominal charge. Enginuity Communications 3545 Stern Avenue St. Charles, Illinois 60174 www.enginuitycom.com 001-01-000091 Rev. 001 Page 5 of 6

8. SPECIFICATIONS Mounting Frame Part Number Description Dimensions (H x W x D) Weight Capacity Operating Temperature Standards Compliance Optional Side Plate Part Number Description Dimensions (H x W x D) Weight Additional Cable Guides Part Number Description Dimensions (H x W x D) Weight WR-15U OnSite 19 /15U wall rack 28.0 x 22.7 x 18.0 inches 18.0 pounds 15 rack units, total installed equipment weight not to exceed 200 lbs. 0 to 50 C Meets applicable Telcordia NEBS requirements, including Zone 4 seismic. SPL-4H Side plate for wall rack with (2) adjustable take-up reels 10.5 x 11.3 x 1.3 inches 2.5 pounds CG-5 Pack of (5) cable guides for wall rack 1.0 x 1.3 x 7.8 inches (each) 2.0 ounces (each) 001-01-000091 Rev. 001 Page 6 of 6