MILL HILL ARTS VILLAGE

Similar documents
City of Massillon Site Plan Checklist

Porter County Plan Commission

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Minor Site Plan Application and Checklist Land Disturbing Activities

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

List of Figures. List of Forms

Essential Skills: Reading and Interpreting Maps and Plans

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

STATE UNIVERSITY CONSTRUCTION FUND

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

SECTION SITE SURVEYS

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

PLANNING AND DEVELOPMENT

Grading, Erosion and Sediment Control (GESC) Checklist

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

APPLICATION FOR SITE PREPARATION PERMIT

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

CHAPTER 11. Plan Standards

Site Plan/Building Permit Review

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

3. DESIGN SPECIFICATIONS

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

CONCEPT REVIEW GUIDELINES

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

10010 RECORD DRAWING INFORMATION

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

City of Palmetto Florida

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

PRECISE GRADING PLAN CHECKLIST

Town of Apex, North Carolina

DEVELOPMENT PLAN CHECKLIST

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

CITY OF MERCER ISLAND

Town of Westlake Construction Plans Review Checklist

KC Water Rules and Regulations For Water Main Extensions and Relocations

Conceptual, Preliminary and Final Site Plan Review in Holladay City

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Application for Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

MAJOR GRADING PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST

Washington County Road Engineering Plan Submittal/Review Checklist

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Survey Control Point Observations

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Clarifications in italics added July 2018

Section 1. Introduction

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

7000 Fifteen Mile Road Sterling Heights, Michigan

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Phone Number: Address:

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

5.7 Plan Documentation and Supporting Information.

PRELIMINARY PLAT CHECK LIST

Operating Standards Attachment to Development Application

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

MARQUETTE GREENWAY TRAIL

Rezoning Application for Planning Commission

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

SECTION III SUBMITTALS AND APPROVALS

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Project Name: County File No.: Checked by: For: Date:

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

MINOR SITE PLAN APPLICATION COVER SHEET

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Owner Information and Authorization:

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS

Transcription:

OWNER CIVIL ENGINEER MACON-BIBB URBAN DEVELOPMENT AUTHORITY ALEX MORRISON, EXECUTIVE DIRECTOR 200 CHERRY STREET, SUITE 300 MACON, GA 31201 OFFICE PHONE : (478) 803-2402 TRIPLE POINT ENGINEERING DAN WALLACE, P.E. 5223 RIVERSIDE DRIVE, SUITE 101 MACON, GEORGIA 31210 PHONE: 478.476.0700 FAX: 478.476.0776 dwallace@tpointeng.com LAND SURVEYOR 24 HR CONTACT EXISTING CONDITIONS SHOWN ARE BASED ON THE 24 HR CONTACT SHALL BE A A FIELD RUN TOPOGRAPHIC AND BOUNDARY REPRESENTATIVE OF THE CONTRACTOR SURVEY BY DONALDSON, GARRETT, & NAME: ASSOCIATES, INC. PHONE: EXISTING SOIL TYPE LIMITS PROPERTY LINE SILT FENCE THE PROJECT SITE IS LOCATED WITHIN THE CITY OF MACON, GEORGIA. THE MILL HILL ARTS PROJECT CONSISTS OF SITE IMPROVEMENTS TO AN EXISTING NEIGHBORHOOD TO ADD PEDESTRIAN AND VEHICULAR ACCESSIBILITY. ADDITIONALLY, PARALLEL PARKING WILL BE ADDED ON HYDROLIA STREET AND SCHELL AVE. BOTH OF THESE CITY STREETS WILL BE CONVERTED WITH SIGNANGE AND PAVEMENT MARKINGS INTO ONE-WAY STREETS. TOTAL SITE ACREAGE: TOTAL DISTURBED AREA: 1.67 AC. 0.46 AC. GPS LOCATION OF CONSTRUCTION EXIT: 32 50' 34.46" N, 83 36' 53.19" W. PROPOSED - TITLE 1 TOPOGRAPHIC AND UTILITY SURVEY 2 DEMOLITION AND SITE PREPARATION PLAN 3 SITE IMPROVEMENT PLAN 4 INTERSECTION SIGNING AND MARKING PLAN 5 MISCELLANEOUS DETAILS 6 EROSION & SEDIMENTATION CONTROL PLAN 7 EROSION & SEDIMENTATION CONTROL DETAILS SANITARY SEWER STORM PIPE STORM MANHOLE, SDMH STORM DRAIN DROP INLET WATER METER WATER LINE WATER VALVE GENERAL NOTES 1. ABOVE GROUND UTILITY LOCATIONS WERE OBTAINED FROM FIELD OBSERVATIONS AND AVAILABLE RECORDS. UNDERGROUND UTILITY LOCATIONS AND EASEMENT LOCATIONS AND/OR REFERENCES WERE FURNISHED TO US BY AGENCIES OR INDIVIDUALS AND WE DO NOT CERTIFY THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. UTILITY LOCATIONS SHOULD BE CONFIRMED IN THE FIELD PRIOR TO PROCEEDING WITH CONSTRUCTION. GAS LINE GAS METER SANITARY SEWER MANHOLE, SSMH OVERHEAD POWER OVERHEAD POWER, TELEPHONE, CABLE OVERHEAD POWER, TELEPHONE UNDERGROUND POWER UNDERGROUND TELEPHONE 2. IF ANY CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS ARE DISCOVERED EITHER ON THE CONSTRUCTION DOCUMENTS OR THE FIELD CONDITIONS, THE CONTRACTOR MUST NOTIFY THE ENGINEER IMMEDIATELY AND SHALL NOT COMMENCE OR CONTINUE OPERATION UNTIL THE CONFLICTS, DISCREPANCIES, AND/OR OTHER UNSATISFACTORY CONDITIONS ARE RESOLVED. 1" = 20' POWER POLE POWER STRUCTURE LIGHT POLE SIGN TREE LINE BOLLARD 3. THIS PROJECT IS NOT SUBJECT TO THE REQUIREMENTS OF NPDES GENERAL PERMIT GAR 100001. CONTOUR FIRE HYDRANT PROJECT DESCRIPTION INDEX TO DRAWINGS LEGEND TITLE SHEET SITE NO. DATE MACON, GA 31201 DESCRIPTION Triple Point Engineering, Inc., 2018 (all FENCE IRON PIN -

LEGEND R 20 0 20 40 60 GRAPHIC SCALE IN FEET 1"=20' 1" = 20' 2 DEMOLITION AND SITE PREPARATION PLAN NO. DATE DESCRIPTION Triple Point Engineering, Inc., 2018 (all

20 0 20 GRAPHIC SCALE IN FEET 1"=20' 40 60 3 SITE IMPROVEMENT PLAN LEGEND R 1" = 20' NO. DATE DESCRIPTION Triple Point Engineering, Inc., 2018 (all

R 10 0 10 20 30 GRAPHIC SCALE IN FEET 1"=10' 1" = 10' 4 INTERSECTION SIGNING AND MARKING PLAN NO. DATE DESCRIPTION Triple Point Engineering, Inc., 2018 (all

3"Tape (Detectable Mylar) 3" Tape (Detectable Mylar) R 5 Metal Tape (Detectable Mylar) Sewer Main S Min. DATE 5'-0" Varies DESCRIPTION Lateral (Typical) NO. SECTION Varies Property Line 5'-0" Min. MISCELLANEOUS DETAILS Sewer Main Road Triple Point Engineering, Inc., 2018 (all Curb line Property Line Curb Line 3" Metal Tape (Detectable Mylar) Install at a maximum of 36" deep minimum of 24" S Metal Tape PLAN 1" = 10'

±90 SQUARE FEET OF GDOT TYPE 3 RIPRAP SHALL BE PLACED ON THE SURFACE BETWEEN THE SIDEWALK AND RETAINING WALL 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. These notes are taken from the Erosion, Sedimentation, and Pollution Control Plan Checklist for stand alone construction projects as published by the Georgia Soil and Water Conservation Commission on January 1, 2018. The Level II certification number and seal of the certified Design Professional can be found on each sheet pertaining to the ES&PC plan (see This Sheet). The name and phone number of the 24-hour local contact responsible for erosion, sedimentation and pollution controls shall be the general contractor's on-site representative who will be named prior to construction. Total acreage of project area: 1.67 Acres Disturbed acreage of project area: 0.46 Acres The GPS location of the construction exit for the site is Latitude 32 50' 34.46" N, Longitude 83 36' 53.19" W. The initial and/or revision date of this plan is depicted on the title block of each plan sheet. A notation shall be made on the plan of any revisions to the plan, the date of revision, and the entity that requested the revisions. The construction activity includes BMP installation and construction of pedestrian site improvements for the renovation and additions to an existing neighborhood. A vicinity map showing site's relation to surrounding areas is depicted on the Title Sheet of this plan. The project receiving waters include an existing piped storm drain system and ditch system to the Ocmulgee River, which is not an impaired waterway. Due to the size of the proposed disturbed area and the proximity of the site to state waters, this plan does not include additional erosion control measures to fullfill TMDL's or a 3 phase plan. I certify under penalty of law that this plan was prepared after a site visit to the locations described herein by myself or my authorized agent, under my direct supervision. Design Professional Date 11. 12. Non-exempt activities shall not be conducted within the 25- or 50-foot undisturbed stream buffers as measured from the point of wrested vegetation without first acquiring the necessary variances and permits. The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. Erosion control measures shall be maintained at all times. If full implementation of the approved plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source. Any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding. All petroleum products shall be stored and used in an area that provides a secondary containment feature, and shall be located in an area with the least foreseeable impact if a catastrophic event should occur. Emergency contact numbers and procedures for spills shall be available on-site. All petroleum spills and leaks shall be remediated immediately. The flow must be stopped, contained, and affected soils removed. In the event of a spill or leak, contact First Environmental Nationwide toll free at (888) 720-1330. A description and chart or timeline of the intended sequence of major activities which disturb soils for the major portions of the site (i.e., initial perimeter and sediment storage BMP's, clearing and grubbing activities, excavation activities, utility activities, temporary and final stabilization) is depicted on Sheet 7 of this plan. A graphic scale and north arrow are depicted on this Sheet. Existing and proposed contour lines are depicted on this Sheet. Contour lines are drawn at an interval of 1'. The existing contour lines are based on a field run survey by Donaldson, Garrett, & Associates. No alternate BMP's are proposed in this plan. There are no 25-foot state waters buffers proposed for this project. There are no state waters buffers impacts proposed for this plan. No storm drain pipe outlets or weir outlets are proposed for this project. Stormwater discharge is to existing storm sewers. Soil series and their delineation are depicted on this sheet. The limits of disturbance for this site are depicted on this sheet. Best management practices depicted on this sheet of this plan are consistent with the requirements of the Manual for Erosion and Sediment Control in Georgia. The legend for the BMP's can be found on this sheet. Detailed drawings for all structural practices are depicted on Sheet 7 of this plan. The installation of these practices must, at a minimum, meet the guidelines set forth in the Manual for Erosion and Sediment Control in Georgia. A vegetative plan, noting temporary and permanent vegetative practices, is depicted on Sheet 7 of this plan. Maintenance of all soil erosion and sedimentation control measures and practices, whether temporary or permanent, shall be at all times the responsibility of the contractor. Vehicles shall be cleaned of accumulated soil prior to exiting the construction site to a public right of way. No mud or soil shall be tracked off-site. The contractor shall achieve final stabilization before the project is considered complete. James D Wallace Level II Certified Design Professional EROSION AND SEDIMENTATION CONTROL PLAN NO. DATE DESCRIPTION Triple Point Engineering, Inc., 2018 (all 0000003053 Sd2 12/07/2008 12/07/2018 R 1" = 20' 20 0 20 GRAPHIC SCALE IN FEET 1"=20' 40 60 6

Co James D Wallace Level II Certified Design Professional 12/07/2008 0000003053 12/07/2018 1" = 10' 7 EROSION AND SEDIMENTATION CONTROL DETAILS NO. DATE DESCRIPTION Triple Point Engineering, Inc., 2018 (all