NC HVDC User Group 1 st meeting MINUTES. Date: 12 March 2013 Time: 13h00 16h30 Place: Martins Central Park Hotel, Brussels

Similar documents
NC HVDC User Group 2 nd meeting FINAL MINUTES. Date: 11 June 2013 Time: 10h00 16h30 Place: ENTSO-E offices, Brussels

Participants Affiliation Present Excused. Stakeholders

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected

FREQUENCY and VOLTAGE, ranges and durations

Network Code for HVDC Connections and DC-connected Power Park Modules Explanatory Note

Max voltage in 400 kv Networks

FREQUENTLY ASKED QUESTIONS

SELECTING NATIONAL MW BOUNDARIES

Identification number : Jean-Louis MARTINAUD. 1, Place Samuel de Champlain PARIS LA DEFENSE Cedex. Address

IMPLEMENTATION PLAN : CONSULTATION PROCESS AND

Network Code for HVDC Connections and DC-connected Power Park Modules Requirement Outlines

Wind Energy Technology Roadmap

Requirements for Generators European Network Code High Level Implementation Issues

Publishing date: 22/12/2014 Document title: ACER Opinion on the draft ENTSO-E Work Programme We appreciate your feedback

Considerations and Recommendations for the Harmonisation of Under Frequency Loadshedding Schemes in Multi Zone Meshed Grids

European Wind Energy Technology Roadmap

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013

FNN comments on NC HVDC submitted to ENTSO E

Mid-term Adequacy Forecast July 2016

ENTSO-E User Group meeting on Network Code for Requirements for Grid Connection applicable to all Generators (NC RfG) FINAL MINUTES

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

INCIDENTS CLASSIFICATION SCALE METHODOLOGY

each time the Frequency is above 51Hz. Continuous operation is required

Offshore Grid Development in the North Seas ENTSO-E views

PC-07- PUBLIC CONSULTATION ON DRAFT FRAMEWORK GUIDELINES ON INTEROPERABILITY RULES AND DATA EXCHANGE FOR THE EUROPEAN GAS TRANSMISSION NETWORKS

ACTIVE POWER CONTROL WITH UNDEAD-BAND VOLTAGE & FREQUENCY DROOP APPLIED TO A MESHED DC GRID TEST SYSTEM

Parameters related to frequency stability

At its meeting on 18 May 2016, the Permanent Representatives Committee noted the unanimous agreement on the above conclusions.

RADIO SPECTRUM POLICY GROUP. Opinion on Spectrum Aspects of Intelligent Transport Systems

South West Public Engagement Protocol for Wind Energy

Introduction to HVDC in GB. Ian Cowan Simulation Engineer 12 March 2018

Annex: HVDC Code comments

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

Fact Sheet IP specificities in research for the benefit of SMEs

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014

PROJECT GRANTED UNDER INDO-EUROPEAN COOPERATION ON RENEWABLE ENERGY

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

(EC) ), 11(8) 347/ /2009, (EC)

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

WG/STAIR. Knut Blind, STAIR Chairman

We appreciate your feedback

Committee on Development and Intellectual Property (CDIP)

Consequently proposal is made to set up a joint group Gas Quality SFGas Utilisation/Infrastructure to perform pre-normative activities.

GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles

D12.1 Preliminary analysis of key technical, financial, economic, legal, regulatory and market barriers and related portfolio of solutions

NETWORK CODE FOR REQUIREMENTS FOR DEMAND CONNECTION

SSE Offices, Glasgow and Teleconference

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

Wind Power Plants and future Power System Frequency Stability

II. The mandates, activities and outputs of the Technology Executive Committee

EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology CONCEPT NOTE

Parameters related to voltage issues

1

This document is a preview generated by EVS

Real-time Monitoring of Power Oscillations and Modal Damping in the European ENTSO-E System

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES:

1400 MW New Zealand HVDC Upgrade: Introducing Power Modulation Controls and Round Power Mode

Cluster Control of Offshore Wind Power Plants Connected to a Common HVDC Station

GIE response to public consultation Interoperability NC of ENTSOG

2

COMMISSION IMPLEMENTING DECISION. of XXX

RADIO SPECTRUM COMMITTEE

(Text with EEA relevance)

Policy co-ordination for a North Sea Grid

UN GA TECHNOLOGY DIALOGUES, APRIL JUNE

Terms of Reference. Call for Experts in the field of Foresight and ICT

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

Overview: where do we stand? What is built, what is planned? Bergen, 27 June 2013 Theresa Schneider

clarification to bring legal certainty to these issues have been voiced in various position papers and statements.

Comments from CEN CENELEC on COM(2010) 245 of 19 May 2010 on "A Digital Agenda for Europe"

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

Advanced Impacts evaluation Methodology for innovative freight transport Solutions

Conclusions on the future of information and communication technologies research, innovation and infrastructures

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Update on relevant points discussed at 27 th Madrid Forum. Walter Boltz

Wind Requirements and Testing for Steady-State Voltage and Frequency Control

15890/14 MVG/cb 1 DG G 3 C

OFFSHORE WIND ACCELERATOR (OWA)

European Update. 3 rd December 2015

The EU Network Code on Requirements for Generators A Summary

VGB / EURELECTRIC s generators RfG Network Code: Needs, Feasibility, Alternative Solutions and Costs

European Commission. 6 th Framework Programme Anticipating scientific and technological needs NEST. New and Emerging Science and Technology

BRIEF POLICY. What future(s) for the EU power transmission industry? 1. Authors: Jean-Michel Glachant, Vincent Rious and Jorge Vasconcelos

Publishing date: 23/07/2015 Document title: We appreciate your feedback. Share this document

OPERATIONAL RESERVE AD HOC TEAM REPORT

UK offshore wind industry progress to cost reduction

COMMISSION IMPLEMENTING DECISION. of

Working together to deliver on Europe 2020

Facilitating Bulk Wind Power Integration Using LCC HVDC

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Power-to-Hydrogen : key challenges and next steps

QUALITY CHARTER FOR THE RESEARCHER S MOBILITY PORTAL

Partial Power Operation of Multi-level Modular Converters under Subsystem Faults

TYNDP 2016 public consultation

Authors and affiliations. Introduction. Approach

EVCA Strategic Priorities

Huawei response to the Ofcom call for input: Fixed Wireless Spectrum Strategy

FP9 s ambitious aims for societal impact call for a step change in interdisciplinarity and citizen engagement.

WIPO Development Agenda

CREDITING-RELATED READINESS ACTIVITIES UNDER THE PMR: UPDATE AND SUGGESTED NEXT STEPS

Transcription:

NC HVDC User Group 1 st meeting Date: 12 March 2013 Time: 13h00 16h30 Place: Martins Central Park Hotel, Brussels MINUTES Participants Affiliation Present Excused Stakeholders Peter LUNDBERG ABB X Andrew McINTOSH BritNed X Damian BACH BritNed X Muhammad JAFAR DNV X Simon LUDLAM Eleclink X Angus NORMAN Eleclink X Ton GERAERDS Eurelectric X Jean-Baptiste COGNAT Eurelectric X Paul WILCZEK EWEA X Frans van HULLE EWEA X Jan SUCKOW FNN/VDE X Stijn COLE GDF Suez X Oliver MAYER GE Global Research X Ara PANOSYAN GE Global Research X Emad AHMED GE Global Research X Stephen MILLAR Iberdrola Engineering X Peter CLAES IFIEC X Mukund BHAGWAT IFIEC X Petter LONGVA IFIEC X Michelle MANNING Mitsubishi Electric X Steve LANGDON Mitsubishi Electric X Mike WILKS Pöyry X Eckhart LINDWEDEL Pöyry X Kim WEYRICH REpower X Christian FELTES RWE Wind X Frank SCHETTLER Siemens X

Manfred POHL Siemens X Kamran SHARIFABADI Statoil X Ifigeneia STEFANIDOU Swisselectric X Chuan ZHANG The Crowne Estate X Peter Wibæk CHRISTENSEN Vestas Wind Systems A/S Michael ALDERS VGB PowerTech X Helge REGBER VGB PowerTech X Claudio GIANOTTI World Energy SA X Mario GENOVESI World Energy SA X Observers Philippe ADAM CIGRÉ B4-56 X ACER X EC X ENTSO-E drafting team Wilhelm WINTER TenneT DE X Thomas AHNDORF Transnet BW X Carmen LONGÁS VIEJO REE X Kent Hans SØBRINK Energinet.dk X Anders DANELL Svenska Kraftnät X Edwin HAESEN ENTSO-E Secretariat X Ádám SZÉKELY ENTSO-E Secretariat X 1. Introduction ENTSO-E welcomed all participants and proposed the agenda of the meeting, which was accepted. An open call for nominations to a User Group dedicated to support the development of a Network Code on HVDC Connections was published end of January 2013. ENTSO-E welcomes the extensive response from various sectors and invited all interested parties for this first User Group meeting. All participants introduced themselves, mentioning the organisation they are representing. Unfortunately, a relative high number of representatives previously expressing interest are not present at the 1 st meeting of the group due to extreme weather conditions in Brussels. A short listing of all parties expressing interest was given. ENTSO-E presented a general overview of the regulatory framework and overall process of network code development. It is stressed that the ACER Framework Guidelines determine to a large extent which topics need to be tackled by the relevant draft network codes delivered by ENTSO-E. The expected timing of the HVDC NC development process was explained, subject to the assumption that the EC formal mandate is received by ENTSO-E in April 2013. After a brief overview on the topic and status of the other 8 network

codes, the role of national codes and practices as well as standards after the adoption of NCs has been outlined to give a broader overview of the envisaged regulatory framework. Regarding the involvement of all interested parties in the drafting process, this User Group has been set up with a preference to organisations with a Europe-wide activity, although not excluding other organisations ex ante. Apart from the User Group, other forms of interaction (such as public workshops, participation in the public consultation of the Scope and later the draft Network Code, as well as regular updates of the ENTSO- E website) are offered to organisations only requesting to be informed about the process. In case of special interest, bilateral meetings with organisations requesting so are not excluded. As for the participants of this User Group, ENTSO-E expects all members to always communicate the agreed position of the organisation they are representing (or clearly indicate otherwise), and to focus on the expected impact of specific requirements on their sector, notwithstanding of course the possibility to give more general comments as well. ENTSO-E aims to send draft minutes of the User Group meetings to all participants about a week after each meeting, allowing sufficient time to review and comment before published (together with the presentations) on the ENTSO-E website. Responding to the question of EWEA, it is confirmed that EC and ACER are invited to all User Group meetings but were excused for this first meeting. 2. User Group members All present members are requested to introduce their organisation, focusing primarily on the following questions: - To which extent would the organisation/sector be impacted by a European Code on HVDC connections? - How can the organisation/sector actively contribute to the development of the NC HVDC, with focus on e.g. experience, performance data, cost implications, related involvement in national codes/standards? - What benefit do you believe a European code on HVDC connections could bring to the organisations/sector and the wider power system? Swisselectric - Representing all large electricity utilities in Switzerland, including DSOs, and generation companies (also outside Switzerland), with special focus on pump-storage facility operators. - Involved in the drafting and evaluation of Swiss and international regulations and standards Impact of HVDC Pump-storage plants, being very important for balancing services, could benefit from better access to European markets if more HVDC links are installed. Security of supply since a strong impact on the distribution system and generating units is expected. Contribution - Research experience and technical expertise of members - Involvement in grid connection studies for HVDC links

- Participation in CIGRÉ - Involvement in national and international codes and providing formal opinion on them Benefits of network code - Enabling more transit, reducing congestions - Full access of pump-storage units and other Swiss power plants to the European markets - Merchant lines must be HVDC in Switzerland - Harmonization of systems and therefore, contribution to security of supply It was pointed out that although Switzerland is not a member of the European Union, its location in the centre of the interconnected system of continental Europe, as well as the importance of its pumped storage potential and projects for balancing services in Europe, imply that requirements would be applicable, and therefore an involvement in the drafting process is desirable. On the question of ENTSO-E, it was clarified that in Switzerland, the TSO (Swissgrid) is responsible for security of the 380 and 220 kv network, while members of Swisselectric are responsible to lower voltage levels, ranging from 150 down to 16 kv. EWEA EWEA is representing a very wide range of wind industry stakeholders. The requirements on offshore PPMs have been suggested to be removed from the scope of NC RfG (to be dealt with in NC HVDC) by EWEA, with the rationale of being at too early a stage of technology development, and thus enabling the formulation of more appropriate requirements in a later code on HVDC with possible synergies with the DC link capabilities. EWEA acknowledged the adoption of its proposal by ENTSO-E. Impact of HVDC - Connection requirements for DC-connected PPMs (majority expected to be wind-generation) - A generally well interconnected European system is of interest of renewable generators - Present off-shore connection requirements are too diverse among TSOs, and in most cases no specific HVDC requirements exist Expectations - A more consistent approach across Europe on connection requirements, reducing investment cost, thus overall cost of renewable energy - NC to facilitate off-shore (and on-shore) DC grid development - In the initial phase of drafting, a clear focus on determining the most appropriate scope and structure of the Code is suggested Contribution

Vestas ABB - Structured view on requirements - Offering contribution with a proposal for a generic Grid Code structure - Know-how Vestas pointed out that it is very important to get clarified what is the exact scope of the code, particularly in light of the very short working period of 1 year only. Vestas suggested to categorize possible requirements in 5 layers: 1. Point-to-point, back-to-back and few terminal HVDC schemes (i.e. between synchronous zones and embedded) 2. HVDC connected PPM plants main AC grid side (plant could be situated offshore or onshore) 3. HVDC connected PPM plants local AC grid of small extension ( AC cluster typical a few plants and 1-2 HVDC connections) 4. HVDC connected PPM plants local AC grid of large dimensions (AC offshore grids, e.g. 5-7- 11 GW) 5. Supergrid (systematically built meshed DC grid layer) Vestas added that category 1 and 2 is what for sure must be covered to cope with short term needs. Category 3 and 4 is what the renewable industry has a very hard wish to get clarified. On the other hand with a 1 year working period only, the key question is if it is realistic to include also category 3. The issue is also to be seen in light of the technology and concepts still being discussed and evolving. Category 3 and 4 should in principle be possible to be specified in the same way generic way, but parameters and characteristics will be quite different. Vestas suggested that ENTSO-E performs realistic estimates of what may be the largest anticipated size of synchronous operated AC islands. Vestas did not consider it realistic to include supergrid requirements (category 5) in the scope of this code now. Vestas suggested to strive hard for a good platform which will make a sequential development process possible, i.e. make it possible to expand the scope of the code, still ensuring consistency between former and future parts of the code (sizable scope and sizable code). Vestas further stated that it is a key principle to decide upon if the code is intended to be a one European code only or it is intended as a top-level code then to be followed by national codes. Vestas suggests to first of all strive to go for one European code to take full advantage of the harmonization advantages. It is also desirable that the code does not preclude the optimal exploitation of the advantages of different HVDC technologies by setting too general requirements. Impact of the code The requirements of the code are seen as a foundation on how HVDC equipment shall be designed, and should facilitate DC usage wherever it has technological or economic advantages. Therefore, ABB would like to monitor the development process and point out if a planned requirement is expected to unnecessarily hinder applications. Contribution Experience in LCC production since the 1950s, and recently in VSC equipment as well Benefits of network code

Clear, uniform rules across Europe would remove uncertainties from the design and permitting process. On the question of ENTSO-E regarding the robustness of the requirements of the code in light of the long-term development, ABB supported the approach of not fixing very detailed requirements at this stage on technologies/issues that are still at an early stage of development. Siemens Siemens would like to learn more about the needs of TSOs, being important customers for its HVDC equipment, as well as take part in the discussion on new markets. Siemens view is that more system integration will help market development, while the HVDC technology will play an important role in the technical realisation of the new generation of power systems. Siemens is ready to share its experience in the code development process. The representative of Siemens is also the convener of a related, newly established CENELEC working group, and as such, expressed his view that standardisation shall be strongly linked to and build on the Network Code requirements. Therefore cooperation is essential. The standards for equipment to be used in HVDC grid/systems shall be based on the functional requirements set by the NC HVDC. GE Global Research Scope of research focuses mainly on generators, but issues of grid components are also tackled. GE Global Research has an outlook to the trends of global markets and regulatory environment in US, South America and other parts of the world, thus their contribution to the work of the User Group is expected to enable incorporating the experience already gained outside Europe, bearing in mind the specificities of the European energy system. World Energy SA World Energy SA is a project developer undertaking, having experience in managing HVDC projects. Having a stable and good network code is seen as beneficial for financing and other aspects of such projects. RE power IFIEC Being a turbine manufacturer, RE power primarily seeks to understand the requirements of DC-connected generating units. Its contribution is foreseen to be mainly delivered via EWEA. The main benefit of a European code is seen in allowing for clear requirements, thus better optimisation of equipment capabilities, that in turn reducing the overall costs of renewable generation and enhancing its public acceptance. As the association for industrial consumers, the contribution of IFIEC is expected to focus on monitoring how the code contributes to a better functioning of market and better overall efficiency of the system, as well as making sure all costs imposed by the requirements are well justified and optimal. RWE Wind As a developer of generators, the benefit expected from the network code is allowing for the development of stable and optimised designs for off-shore systems. RWE Wind expects to be able to contribute to the User Group thanks to its experience with previous projects. Iberdrola Engineering

Key expectations from the User Group participation are a better understanding of key parameters of HVDC components, as well as standardisation issues, while Iberdrola is expecting to contribute with its experience from projects of the entire group. VGB PowerTech VGB PowerTech represents power plant companies. Impact of HVDC - Strong connection with NC RfG requirements is foreseen, considering the HVDC connections as virtual power plants - It needs to be ensured that converter stations do not have a negative impact on generating units, especially with regard to torsional oscillations introduced no regulation in force yet - What is the impact on market of the way HVDC lines are utilised and operated? - How will development of very high capacity HVDC links affect the necessary amount of system reserves? Eurelectric Experience - Power plant operations - Large frequency converters in power plant auxiliary systems - Power electronics operation in excitation systems - Participation in CIGRE NSC B4 (HVDC) since several years An important aspect proposed to be addressed in the requirements is to ensure the mandatory use of equipment of sufficient quality, in order to limit the impact of converter stations on power quality (esp. THD, voltage spikes, torsional oscillations, assymetry), and thus limit the possibility of damage or additional losses in equipment of other grid users. In addition, Eurelectric expressed its view that to ensure similar robustness levels of the system as now, requirements need to be strongly linked to comparable articles of RfG. Vestas added that the mentioned power quality issues are very relevant on the other hand the Framework Guidelines only scope cross-border issues. As a part of best-utility practice these issues have to be dealt with anyway and it is highly wishful to get included in the code. To strive for harmonization and rule out uncertainty, Vestas had the opinion that the Framework Guidelines should in principle not prevent ENTSO-E from doing more than required but this process itself should not lead to more stringent requirement unless it is really required and can be documented. 3. Presentation of the preliminary Scope of NC HVDC ENTSO-E presented the main items of a preliminary Scope of requirements for the NC HVDC.

In order to improve security of supply, handle bulk power flows and accommodate increasing amounts of renewable generation, a hybrid system consisting of AC and DC elements is envisaged in the future in many countries, as opposed to the present systems relying only on AC transmission. Moreover, an increasing amount of non-synchronous generation is expected to be connected to the system via a DC connection. These make it necessary to define the technical capabilities of such DC connections in order to maintain stability of the European transmission system, while exploiting the technical advantages offered by DC technology to the fullest extent possible. The full presentation with the proposed list of topics to be covered by NC HVDC is available for download on the ENTSO-E website. On the question of VGB PowerTech regarding the location of the connection point in case of DCconnected power park modules (i.e. whether the link itself is included or not), the general principle of applying requirements of connection points, regardless of ownership has been explained. Requirements are imposed on the AC collection grid ( offshore ) connection point for the PPM, and at the onshore connection between the main AC grid and the HVDC converter station for the HVDC system. Requirements on the DC connected PPM and HVDC system should be coordinated to reach an optimal solution without impairing the requirements on the main AC grid connection point. Regarding Significant Grid Users, GE Global Research and EWEA commented that the Framework Guidelines contain only very broad descriptions. It will be the task of the drafting team to set up significance criteria that reflect system needs and are in line with the Framework Guidelines as well, this shall be done with the involvement of the User Group. Siemens commented that criteria comparable to those applied when assessing n-1 security could be considered, however, ENTSO-E deems it necessary to define significance criteria for connection codes separately from operational issues, while of course respecting consistency between network codes. With respect to the listing of proposed requirement categories and requirements, following comments were given: - Vestas considered all the proposed categories to be significant grid users as they are all connected to transmission voltage level and of very large MW block size. ENTSO-E comments that transmission voltage levels varies widely across Europe, therefore an approach allowing for such differences and focusing on cross-border impact will be elaborated. - ABB: Control as such is considered to be too wide a category, splitting up into sub-categories such as control of generator, grid controller, etc. is suggested. ENTSO-E expressed that at this point, all requirements are foreseen to be defined at the AC side of the connection point. ABB supports this approach, while Siemens asks whether converters connecting existing DC networks should also be subject to requirements applicable on the DC side. ENTSO-E s viewpoint is that system needs justify requirements on the AC side, and believes that these should cover all possible issues in DC networks sufficiently. The approach is to transfer all relevant requirements for the converter DC connection point to the AC connection point of each converter. Siemens notes that disturbances to existing DC networks caused by new converter connections need to be prevented, but acknowledged the need of limiting the scope of the initial issue of the code due to practical and timing constraints. ENTSO-E s viewpoint is that the initial issue of the code shall focus on the impact of Grid Users identified as significant to the main (AC) system. Vestas added that for some of the upcoming Supergrid codes a DC-PPC-point is foreseen. Requirements for the DC-PPC-point intend to ensure interoperability and dynamic robustness (DC system integrity) for the DC system in the same way as an AC-PPC-point intends to ensure the robustness in an interconnected AC system (AC system integrity). To include DC side requirements for small multi-terminal systems or Supergrids will not be possible for time reasons and is further too premature technically at this point. Siemens and Eurelectric acknowledge that without DC side requirements, the last connecting party to the DC system shall adapt to the technical specificities of the existing system, however express that Europe-wide

standards could be useful if defined. ENTSO-E s view is that so far no requirement has been identified that could not be defined in legal terms as a requirement applicable on the AC side, but when defining such requirements, the system needs of the DC networks will be taken into account. - Eurelectric: the capability of HVDC technology to detect and damp (inter-area) system frequency oscillations could be utilised and would be very useful for the system. ENTSO-E welcomes the comment and foresees this issue to be covered in the network code. - VGB PowerTech: in connection with LFC&R network code and with regard to necessary system services reserves, how will largest loss of power from HVDC links be handled? ENTSO-E sees two distinct possible issues: loss of active power infeed to the system, to be covered in the network code, and loss of active power transmission capacity within the system, deemed as an operational issue, therefore out of the scope of this connection code. - EWEA: the proposed requirements on frequency and active power control seem to be tackling very similar, possibly overlapping issues. ENTSO-E acknowledges the comment - Eurelectric: The requirements in NC RfG are a good starting point especially for frequency, voltage withstand capability and FRT requirements, noting that possible deviations from those in RfG need to be justified sufficiently. Also, with regard to active power control, generation units need to be able to follow the change of active power injected/withdrawn by a DC interconnector linking synchronous areas. 4. Next steps Shortly after receiving the formal EC mandate for drafting the network code, a public consultation on the Scope and some additional questions will be launched on the ENTSO-E website. Feedback to this consultation is welcomed from all interested parties but at minimum expected from User Group members. A public workshop may be organised during this first consultation. The next User Group meeting is suggested to be organised shortly after the end of this consultation period (approximately late May), to enable members to elaborate and discuss their feedback with ENTSO-E. All dates presented are subject to the EC mandate, the exact dates of following meetings will be finalised and suggested/ to User group members as soon as possible afterwards. Everybody s active input and constructive feedback in this first meeting is much appreciated.