Basic Installation HOFFMANN KEY HOFFMANN KEY. Page Revised: DEC. 2017

Similar documents
Getting Started. Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box knife, Countersink Drill Bit, #2 Phillips Head Drill Tip.

NORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 Sided Z Frame. (Inside Mount - 2 panel) Getting Started

NORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 sided Deco Frame. (Outside Mount - 2 Panel) Getting Started

NORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 Sided L Frame. (Outside Mount - Single Panel) Getting Started

Bi-Pass And Bi-Fold Sliders

How To Measure Your Finished Opening

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Rockwell 4-in-1 Sliding Door

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

Installation Operation Care

Installation Operation Care

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

Rugged Ridge Engine Transmission Skid Plate JK

Assembly Instructions

a.k.a. casegoods instructions

NORMAN SHUTTERS INSTALLATION INSTRUCTIONS. Hang Strip. (Inside Mount 2 Panel) Getting Started

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

MAG-CONV Basic, 48, 48R & Midline Front Mount

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

Installation Operation Care

Heavy Duty I-Beam Trolley

Stag Hanger ASSEMBLY INSTRUCTIONS

ICU TRACKLESS SLIDING DOOR

Box Track INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLING YOUR NEW SPRING LIFT ARM KIT

2300 BI-FOLD INSTALLATION GUIDE

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

COACT MEDIA UNIT ASSEMBLY WITH X9 OPEN SHELF STORAGE OPTION PART # INSTALLATION INSTRUCTIONS

Installation And Care Instructions. Vertical Honeycomb Shades

1 PREPARE HEADER AND ROUGH OPENING

INSTALLATION INSTRUCTIONS

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Art Rack Assembly Instructions:

INSTALLATION INSTRUCTIONS

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Chapter 18. Interior Doors

NORMAN SHUTTERS INSTALLATION INSTRUCTIONS. Direct Mount. Getting Started

CABINETRY Assembly Instructions

INSTALLATION AND CARE INSTRUCTIONS

ESA-100 Fixed Sidelite/Non Breakout

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

COPPER / FIBER MANAGER RACK INSTALLATION INSTRUCTIONS PX Standard Release A March 2008

Installation Instructions

Qwik-Fence Installation Instructions

ESA-300 Full Breakout

Industrial Hanger ASSEMBLY INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS

Transit Connect Full/Half Installation Instructions

Assembly Instructions & General Overview

SIDE FOLDING POST ADJUSTMENTS

ESA-200 Fixed Sidelite

Dublin Stalls Installation Instructions

ICU TRACK SLIDING DOOR

Deck Mount Installation with Bench

SINGLE TRACK BYPASS (patent pending) barn door hardware

Laminate Cabinet Installation Instructions

INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY

C-Series & S-Series Classic Frame with Transom (Single or Pair)

Balishutters. INSTALLATION guide FOR L-FRAME MOUNT INSTALL OPTIONS B OR C

ACCESS COVER INSTALLATION INSTRUCTIONS (Kit #601 for 2006 Honda Ridgeline)

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

LOWLINE SINGLE FOLD DOWN WALL BEDS

For additional assistance call

Assembly of Deluxe and Ultimate Trays supplied as flat packs

BX2173 Installation Instructions Ford Focus (including the 2.3L engine) 2003 Ford Focus SVT

Sit Down Table Assembly Instructions

Cellar Hanger ASSEMBLY INSTRUCTIONS

Oxford Stalls Installation Instructions

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Sliding Glass Door Assembly and Installation Guide

Installation Instructions for Vista Air Vertically Folding Walls

Installation Operation Care

Installation Instructions - Model V4JSD 1

Vertical Honeycomb Shades

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

Pillar Hanger ASSEMBLY INSTRUCTIONS

Parts List (Continued) 18 each: #8 x 0.625" Truss Head Phillips Screw 20 each: #8 x 1.75" Flat Head Phillips Screw 4 each: #8 x 1.25" Flat Head Philli

Installation Instructions Kit, Base Rail Bracket Part # 31413

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

INSTRUCTION SHEET U19

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

FOLDING HARDWARE STARTEC T-SNAP G2/G4

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

Straight Stringer Installation Instructions

Pet Door Panel Installation Manual

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

MISCELLANEOUS CABINET REPAIRS

Spoked GARRICK HANGER

HONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual)

Installation Manual MODEL NE-42

mila-wall (Series100) General Operating Instructions page 1 of 15

Installation Instructions. Oakmont Folding Doors

Shetland Stalls Installation Instructions

Quill Stop V2 Installation Guide 11/16/2014

Chevy Tahoe Utility Vehicle

Transcription:

Basic Installation Frame Assembly If you received the shutter disassembled, you will first have to assemble the frame. All frames are routed to accept a Hoffmann Key. Position the four frame pieces face down according to how they are marked being sure to use an installation mat to avoid damage to the face of the frame. Insert the Hoffman Keys into the routed out frames. Gently tap in the keys with a small rubber mallet until the face of the frame is even. The next step would be to attach any T-posts that may be included through the pre-drilled holes in the T-post holes in the frame. HOFFMANN KEY HOFFMANN KEY Page 48

Basic Installation Frame Installation On an outside mount, where the frame is to be mounted around the opening, determine where the outside edges of the frame are to be located. With the frames in position, secure the left or right side of the frame just above the top hinge using a nail or screw. Using a level on top of the frame, next secure the other side in the frame. = Nail/Screw On inside mounts, place the frame inside the opening making sure there is enough clearance for the louver size selected. With the frame in position, secure the left or right side of the frame just above top hinge using a nail or screw, being sure to center the frame from side to side. = Nail/Screw Page 49

Basic Installation Panel Installation The next step is to insert the panels in the appropriate locations. All hinges have been attached to the panels and frame, so the only thing that will be necessary is to gently tap in the hinge pins with a rubber mallet. The hinge pins should go in without much problem if the panels are in the right positions. If one pin seems to be tight, just loosen one part of the hinge with a small Phillips screw driver allowing the pin to slide into the other, and re-tighten the hinge screws. Once the panels are inserted, close the panels and move the bottom of the frame left or right to align the panels. Once the panels are aligned, and all the margins are even, open one panel and secure the side of the frame just above the lowest hinge. Continue attaching the frame with nails or screws just above every hinge. On wider shutters it will be necessary to secure the top and bottom frames as well. On inside mounts, if the frame has a T-post it may be necessary to place a shim under each T-post and each side of the frame before securing the sides, this way if the T-post needs to be moved down for adjustments you will have the room. = Nail/Screw SHIMS Page 50

Track System Installation The frame for the tracking system consists of: a header with two side legs, a mounting piece (L- frame), the track(s), two leg trim pieces, and a fascia piece with returns (on outside mounts). The first step is to attach the L-frame mounting piece to the header. Center the L-frame piece as shown in the drawing, leaving 1 on each side. This can be accomplished by screwing down through the top to the header into the L-frame. HEADER Side View HEADER 1" 1" L-FRAME L-FRAME Next, attach the track to the header. If the track is the double bi-pass track, be sure to move the track back next to the L-frame. Once the track is attached insert the wheel hangers, and/or top pivot bracket(s) into the track. The next step is to secure the two legs to the header. The header is to be mounted on the top of the both legs. Screw down through the top of the header into the legs using 3 screws. Side View Page 51

Track System Installation If the installation is outside mount, you will secure the frame to the wall through the L frame as shown below. If there is baseboard you may want to scribe out the backs of the two legs before assembly. The legs can be secured to the wall by drilling a 3/8 hole 2/3 of the way through the leg, and then securing the leg with an installation screw. The leg trim pieces can be attached to the face of the legs using a small brad. Side View LEG TRIM PIECES LEG 3/8" HOLES CUT OUT FOR BASEBOARD BASE BOARD On an inside mount, you will have to remove the base board where it returns into the opening. Save the removed pieces as you may have to cut them and replace them behind the legs. Once this is done insert the frame into the opening and secure it, making sure the header is level. BASE BOARD BASE BOARD Page 52

Track System Installation Once the frame is securely installed the panels can be attached. Fasten the wheel carrier bolts into the wheel carrier receivers at the top of each panel and lock them in place. If the panels are to be connected in pairs, simply slide the hinge pins provided into the hinges. WHEEL CARRIER BOLT WHEEL CARRIER RECIEVER ADJUSTMENT KNOT LOCK On Bi-fold systems you will need to attach the bottom pivot bracket(s) either to the side leg or the floor. Mount the bottom pivot into the bottom pivot bracket, and then push the spring loaded top pivot into the top pivot bracket. SPRING LOADED TOP PIVOT PIN ADJUSTABLE BOTTOM PIVOT BOLT BOTTOM PIVOT BRACKET Once all the panels are attached, use the panel adjustment nut to raise or lower the panels as needed. Attach the fascias using brads. Page 53

Track System Installation 2-WAY BIPASS BOTTOM RUNNERS INSTALL INSTRUCTION PANEL PANEL BIPASS RUNNER BOTTOM BIPASS RUNNER TOP WITH PANELS ON THE FLOOR, ATTACH THE FRONT BOTTOM RUNNER TO ONE PANEL AS SHOWN USING 2" SCREWS. NEXT, ATTACH THE BACK BOTTOM RUNNER TO THE OTHER PANEL AS SHOWN USING 2 SCREWS. WITH THE BOTTOM RUNNERS ATTACHED, INSTALL THE BACK PANEL INTO THE TRACK FIRST AND THE FRONT PANEL SECOND. Page 54