TZ400 Self - elevating Drilling Unit General Specification (Revision: B1)

Similar documents
Eclipse. Pipelay Accommodation Work Barge. Large shallow water pipelay barge. 300 T Huisman pedestal crane. Suitable for cable lay

9 x kg Flipper Delta Anchors 10 x 2.45m (L) x 1.83m (O) foam-filled type

Eclipse. Pipelay Accommodation Work Barge. Large shallow water pipelay barge. 300 T Huisman pedestal crane. Suitable for cable lay

ROV/IMR - OFFSHORE SUPPORT VESSEL

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible

Offshore Drilling Rigs

SWS Ultra deepwater drillship

BT-4000 LIGHT WORKOVER UNIT

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF MOBILE OFFSHORE DRILLING UNITS TITLE MOBILE OFFSHORE DRILLING UNITS NAUTIC AND ELECTRONICS CHAPTERS

Contents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14

Record of approved GMDSS radio installation

ATTACHMENT E. How to Conduct a GMDSS Inspection.

BERGEN SURVEYOR TECHNICAL SPECIFICATION

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment

OILWELL PT1100A, S/N P199A61, p/b CAT 3508, S/N 95Y01254, w/5 x 6 Charge Pump (Rebuilt)

Casing Recovery. Pre-Job Meeting

VESSEL IDENTIFICATION. Ready to work:

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

The Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS

Click to edit Master title style

IS Shore Based Maintenance. Definition and Pricing

Global Maritime Distress and Safety System (GMDSS)

Havila Fortune Outline Specification. Design MT 6009 MK II. D n V + 1 A 1, E 0, S F, D K ( + ), H L ( 2, 5 ) Builders. Port of reg. Nassa u.

Gulfstar One FPS. Nathan Davidson. February 26, 2015

Mongoose PT Platform Shale Shaker

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

M/S PROSPER. Standby / Rescue / Tug / Supply/ Service Vessel / FIFI Class I &II

IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Personalized Service, Industry Expertise. Franklin Howard

The Future in Marine Radio Communication GMDSS. Department of Transportation United States Coast Guard

BENITA BLUE. Evolution 110

GTSC Rig for Hands-on Training

03/31/2012. Site Preparation. Classifying Oil & Gas Operations. Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV

Offshore & onshore drilling market for LV AC drives

GMDSS RADIO INSTALLATION

MASTER/CREW. IMO No. 12 Dec CALL SIGN GROSS. NET International Suez Canal Panama Canal

FOR SALE m (172'10"ft) Golden Yachts O'Neiro

Topaz Tangaroa Multipurpose Field and ROV Support Vessel. Vessel Specifications

MASTER/CREW. IMO No GROSS Panama Canal LR: 100A1, *IWS, LI, ICE CLASS 1D, LMC, UMS

Slim-hole Technology NEXT SLIDE. "Slim-hole Technology" ENG Page 1. Slim-hole Technology. Schlumberger Sedco Forex.

PowerPlex Panel Modul PP-M-PM024

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

BRIEF INTRODUCTION OF OILMAN

M.V. OTAIO NEW ZEALAND SHIPPING COMPANY LIMITED

An Introduction to Oil & Gas Drilling and Well Operations

Subsea Well Engineering

Chapter 02. Casing and Tubing

CEPT/ERC/RECOMMENDATION E (Bonn 1994)

Drilling Courses Overview Pressure control and drilling equipment course offering

R/V PROFESSOR VODYANITSKIY

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

RECOMMENDATION ITU-R M * Technical characteristics for search and rescue radar transponders

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE SHORT RANGE CERTIFICATE (SRC)

Klemm 806 Drilling Rig

Dry trees for cost effective solution with the Wellhead Barge: WHB

Oil & Gas T T S O I L & G A S.

GMDSS communication systems

HM-46 - Mill Drill - Geared & Tilting Head (X) 475mm (Y) 195mm (Z) 450mm Dovetail Column

HM-32 - Mill Drill - Belt Drive (X) 540mm (Y) 190mm (Z) 410mm

Chapter M03: Tile Cutting Machines, Saw Benches, Joint Cutters and Vibratory Plates

GMDSS modernisation and e-navigation: spectrum needs

IMO HARMONIZATION OF GMDSS REQUIREMENTS FOR RADIO INSTALLATIONS ON BOARD SOLAS SHIPS. Submitted by Germany

Merchant Shipping Act 57 of 1951 section 356

When a drilling project is commenced, two goals must be achieved:

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Casing while Drilling. Enhanced Casing Installation

What are the GMDSS requirements?

Seeing through software

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Cátedra de Idiomas Inglés VI. Ingeniería Marítima

REVISED QUESTIONNAIRE ON SHORE-BASED FACILITIES FOR THE GLOBAL MARITIME DISTRESS AND SAFETY SYSTEM (GMDSS)

MARITIME & ENERGY DIVISION PRODUCT CATALOGUE - MAY

Polish Oil & Gas Company in Warsaw, Inc. Branch of Exploration for Oil & Gas in Wolomin

CS3 represents manufacturers of products for use in the municipal waterworks industry.

@balance Deepwater. MPD services

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

AIS MARINE SERVICES ABN: AIS Marine Group Pty Ltd

Radio Log Book. for Canadian Flag Vessels. 1 Master s Signature. Transports Canada. Transport Canada TP 13926E MARINE SAFETY

RECOMMENDATION ITU-R M * (Questions ITU-R 28/8 and ITU-R 45/8)

Proposed 40-series Rule Amendments. Invitation to Comment

OFFSHORE EQUIPMENT. Pipelay Umbilical lay flex lay cable lay. Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR INSTALLATION & CONSTRUCTION PLATFORM

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

HM-46 - Mill Drill - Geared & Tilting Head (X) 475mm (Y) 195mm (Z) 450mm Dovetail Column

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

Texas Oil Tools Bop Manual READ ONLINE

Multilift (B613 & B355)

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

RESEARCH SHIP AFRICANA

DRILLFLEX CNC HORIZONTAL MACHINING CENTER

Model FAR-2xx8 Model FAR-3xx0

NEW VALID VT-1000 VERTICAL LATHE

Marathon Drilling Indonesia

R/V L ATALANTE D SHEET METAL WORKS SHIP REPAIRS In your fixed prices, you shall include the paint treatment after sheet metal works.

Investor Relations Presentation April 30, 2013

Offshore.

for High School Students Presented in collaboration by:

Brand New - Three 15.5m Crew Boats - Price Reduced! Listing ID:

A Division of Engtek Manoeuvra Systems Pte Ltd. SubSea Propulsion Technology

Transcription:

TZ400 Self - elevating Drilling Unit General Specification (Revision: B1) Name : TZ 400ft Self-elevating Drilling Unit (TZ301-1) Flag/Port of registration : Panama Call sign : T.B.A Built : 2014 Official Number IMO Number MMSI Number : T.B.A : T.B.A : T.B.A GENERAL Class : CCS Notation : CSA Self-elevating Drilling Unit, HELDK PLATFORM DESIGN SERVICE LIFE Design service life : 20 years Self-sustaining capability : 20 days PRINCIPAL DIMENSIONS Length overall. : Approx. 98.67m Width overall. : Approx. 72.0m Length Moulded : 70.27m Width Moulded : 72.0m Depth moulded : 9.50m Transit Draught : Approx. 5.7m No. of legs : 3 Leg length : 166.97m (with spud can) Spud can diameter : 17.8 m Spud can projective area : 3 x 248 m 2 Effective areas of deck : Approx.3700m 2 DESIGN ENVIRONMENT Air Temperature : 0 ~ 50 (Steel structure design temperature:-10 ). Humidity : 90%max. (Ambient temperature + 20 ) Wind Survival Operations : 51.4m/s (100kn) SW Temperature : 0 ~ +32 Density : 1025 kg/m 3 (For design purposes)

DESIGN OPERATING CONDITION Design Storm Survival Condition Unit Survival Survival Survival Condition I Condition II Condition III Operating water depth m 122 106 91 Maximum wave height m 14.3 17.0 18 Relative wave period s 14.5 15.0 15.5 Maximum wind speed m/s 51.5 51.5 51.5 Current speed m/s 0.77 0.77 0.77 Air gap m 12.5 15.3 20 Leg penetration m 5.6 5.6 5.6 Variable load t 2900 2900 2900 Ps: The locking system is engaged Design Normal Operating Condition Unit Operating Condition I Operating Condition II Operating Condition III Operating water depth m 122 106 91 Maximum wave height m 16.0 18.5 20.5 Relative wave period s 14.7 14.7 16.0 Maximum wind speed m/s 36.0 36.0 36.0 Current speed m/s 0.77 0.77 0.77 Air gap m 12.5 15.3 20.0 Leg penetration m 5.6 5.6 5.6 Variable load t 3900 3900 3900 Ps: The locking system is engaged. Above data is based on: Class approved calculation method. 50 years return period environmental condition. The length of leg: 166.97m. Without marine growth. According to the P-delta effect ion and dynamic amplify coefficient. MAIN PERFORMANCE Maximum operating water depth 122m Maximum drilling depth of rig 9000m Variable load at drilling condition (including hook load) 3900t Maximum longitudinal outreach of cantilever 22.5m Maximum transverse movement of drill floor ±4.57m

CARGO CAPACITIES Main deck (within pipe rack) 2.64 t/m 2 Main deck (outside pipe rack) 2.08 t/m 2 Cantilever deck (outside pipe rack) 1.30 t/m 2 Cantilever deck (within pipe rack) 2.64 t/m 2 Drill floor Working area 1.95 t/m 2 Setback 22.7 t/m 2 Living quarter deck 0.46 t/m 2 Living quarter roof 0.73t/m 2 Mud pit 7.00 t/m 2 Engine room 1.32 t/m 2 Sack storage room 2.64t/m 2 BOP storage area 2.64t/m 2 Helicopter deck load According to Sikorsky S-92 helicopter MACHINERY Main engines : 5 sets CAT 3516B, 5x1717kW, 1500rpm, V16. Main Generators : 5 sets Caterpillar SR4B, 5x1600kW, AC600V/50Hz/3P, cos 0.8. Emergency : 1 x CAT3508B, 750 kw, AC400V/50Hz/3P,1500rpm Jacking system : NOV Rack chock : TZ Fuel Purifier : 2000L/H Oily Water Sep : 5m 3 /h Sewage Plant : 1 x 150 man capacity. Ballast System : Computerized hydraulically control FW Generator : 2 sets RO fresh water generator, be each of a capacity of 50m 3 /24h. Air Compressors : 3 sets, 0.8~1.0MPa, 14.2m3/min, 2 sets air dryer. Pumps : 2 x diesel oil transfer pumps, 40m 3 /h, 0.45Mpa, 970rpm(75cst), 15kW 4 x fresh Water pumps, 15m 3 /h, 0.5Mpa 1 x General Service pump 300m³/hr at 0.3Mpa FIRE FIGHTING & SAFETY Fire Fighting : 2 x pumps 200 m³/hr h X 0.8Mpa Life Boats :2 x 120 persons+1 x 30 persons life/rescue boat Life Rafts :10 x 30 men

1 x Heli-deck, 22.2m in diameter, suitable for Sikorsky S-92 helicopter POWER SUPPLY 600VAC, 50Hz, 3Phase 3Wire insulation system 400VAC, 50Hz, 3Phase 3Wire insulation system 220VAC, 50Hz, 3Phase/1Phase 2Wire insulation system and 24VDC system INTERNAL COMMUNICATION, BROADCASTING SYSTEM One set of marine SPC telephone exchange One set of sound power telephone One set of marine broadcast system for the production, radio, alarm, entertainment One set of satellite TV receive system RADIO COMMUNICATION (A1+A2+A3): Name Quantity(set) 250W MF/HF Radio telephone/dsc/nbdp 2 VHF Radio Telephone with DSC function 2 Helicopter VHF air band radio telephone 1 Helicopter VHF air band radio telephone (portable) 1 Helideck radio non directional beacon 1 INMARSAT-C station (with SSAS/EGC function) 1 NAVTEX receiver 1 Weather Facsimile 1 DGPS Navigator 1 INMARSAT-F communications station 1 Search and rescue radar transponder (SART) 5 406MHz Satellite EPIRB 1 two way GMDSS handheld VHF radio 5 Echo Sounder 1 Weather Data system 1 ACCOMMODATION The accommodation and mess facilities are fit for 150 persons. Fire proof of the ship meet requirement of SOLAS (1974), material of lining panel, lining bar and ceiling using for living space, service space and machinery space is non-combustible. REFRIGERATED STORAGE CAPACITY The refrigerating system is used for freezer, refrigerator, and dry production store. The design can meet the requirement of 150 persons for 20 days food supply. DECK MACHINERY Main Deck Crane : 1 diesel-driven 50tx 36.5m deck crane is located at portside,

2 electrical- hydraulic driven 50t x 36.5m deck crane are located at starboard and aft-starboard respectively Moor System : 4 x electrical motor anchor winches 50t, 100t brake holding, for first layer Anchors : 4 x anchors, 7.5t ea Towing : Tow Brackets 585t MBL Recovery Winches : 1 x 100KN, 7m/min, 120m 1 x 50KN, 12m/min,100m Drilling Rig Dimensions of derrick 40ft x 40ftx170ft Derrick load 6750KN Setback volume: 5 1/2 drill pipe 320 strings 8 drill collar 8 strings 9 1/2 drill collar 4 strings Hook load 6750kN (750st) Rotary Load 6750kN Set-back 409t Power of Drawworks About 2880kW Power of high pressure mud pumps 3 x 2200hp Rotary table opening diameter and power 49 1/2, 720kW Top drive rated load 6750kN(NOV TDS-8SA) Rotary table 491/2, 720kW Traveling block 675 t, Φ1524mm(Φ60 ), 7 sheaves, Φ45mm (1 3/4 ) wire line Max working pressure of choke & kill manifold 105MPa Well control equipment: Diverter 47 x 500 psi BOP 18 3/4 x 105 MPa Cement Unit Double pump cement skid, 97.6MPa Conductor tension load 272t BOP stacks Annular BOP: Quantity 1 set Drift diameter 475mm, (183/4 ) Rated working pressure 70MPa (10000psi) Hydraulic control pressure 14MPa (2000psi) Working temperature -29-121 (-20.2 ~+249.8 ) Double ram BOP: Quantity 2 sets Drift diameter 475mm(18 3/4 ) Rated working pressure 105MPa(15000psi) Hydraulic control pressure 21MPa(3000psi) Medium used crude oil, natural gas and the drilling fluid containing H 2 S 5

CIRCULATING SYSTEM Reserve and active mud pit 918m3(8+2) Mud sand trap pit 70m 3 (5) Trip tank 12+3 m 3 (2+1) Mud scraper 2 sets Shale shakers 4 sets DERRICK, 900GPM (58L/S) / 1.09 g/cm3 Mud cleaner 1 set Degassers 2 sets, Centrifuges 2 sets JACKING SYSTEM There are three (3) NOV D110H jacking assemblies for each leg, for a total of nine (9) assemblies. Each jacking assembly consists of six (6) pinions, each 2 pinions as a unit driven by an electric motor. Therefore there are 27 jacking units in total. The leg jacking system is designed to elevate the hull out of the water or lower the hull for floating, NOV jacking system: Model of jacking unit D110H Leg shape Lattice - Triangular Number of legs 3 Number of Chords per Leg 3 Number of Jacking Frames 9 Total number of jacking unit 27sets (54 pinions ) Number of jacking units per leg 9 Number of pinion per leg 18 Ambient Temperature 0 ~+50 RACK CHOCK SYSTEM The 400ft Self Elevating Unit is fitted with three (3) triangular legs. On each leg are welded three (3) TZ racks. Each rack meshes with six (6) teeth unit mounted in a frame. Each frame takes place in a jack house. Functions: Vertical rated loads 7400 MT/set Number 9 (each set includes two jackscrew up and down) 6

7

8