TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM

Similar documents
d e n v e r a r t m u s e u m

Total precast solution for large stadium projects meet tight schedule

How to Estimate the Cost of a. Precast Concrete Parking Structure

Listed below are the competencies required and examples from the aforementioned job:

National BIM Standard - United States Version 3

BRIDGE TYPE CONCEPT EVALUATION

Breadth: Change CIP Structural Walls and Beams to Precast

SECTION PROJECT COORDINATION VIA BIM

PRECAST CONCRETE STRUCTURES

Jointed Precast Concrete Pavement

Proven precast solutions for every application

Construction Drawings: A Cost/Benefit Case Study of Weather and Tear Resistant Drawings

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

In Denver, a recently completed flyover

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado

Automated Machine Guidance

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

WestEnd25. Final Report. Exterior Façade: Building Façade History:

Value Engineering Design Build MODULAR INFRASTRUCTURE

Darden & Company Uses UAV Mapping and Imagery to Manage the Demolition of an Atlanta Landmark

About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP

Construction Tolerances - The following tolerances apply to cast-in-place structures:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

What is Meant by Level of Accuracy? As a service provider who. By John M. Russo, AIA. room width = 10'-0' building length = 100'-0' x = 1/4"

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

Unit 8 Precast Concrete

ABC and Innovative Bridge Construction for Minnesota Local Roads

CASE STUDY 50 ASCENT, WINTER 2017

Making Building Easy

OpenBridge Modeler: What is it and how can I use it today?

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

MTJ Outdoor Baggage Claim

Sun Sculpture. By Scott L. Melnick

Total Precast Concrete Structures

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

BUILDING PLANS. BUILDING DEPARTMENT

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF

MANuFACturers industry QuALity statement.

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

ISO 9001: :2004 OHSAS 18001:2007. Civil Construction Precast Concrete & Hollow core Factories Readymix Concrete Plants Earthwork & Blasting

Digitally Signed 06/02/2015

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

MP BIM at the Heart of the MEP Subcontractor Business

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

THE TRANSPORTATION ISSUE

ENGINEERING SERVICES FOR CREATING PRECAST PROJECTS

CR BIM at the Heart of the MEP Subcontractor Business

Phase 2 Silver Line Update

Chapter 6: SHOP DRAWINGS AND OTHER SUBMITTALS

H20 Beam for Elevated Slabs Application Guide

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

Ursinus College Residence Hall 2

Wisconsin Place Residential Chevy Chase, MD

Michelle Muro, AIA, NCARB

Chapter 1 General Design Information

SECOND CONSTRUCTION TECHNOLOGY FORUM CONSTRUCTION FOR SUSTAINABILITY

adopted in Hong Kong

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

Deacon Corp. Three Week Schedule

City of San José, California CITY COUNCIL POLICY

QuickMark Layout. White Paper April 2016

PRECAST CONCRETE INNOVATION BUILD WITH BISON BISON.CO.UK. brand. BP Launch Campaign Brochure V11.indd 1

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

Advancements in precast concrete are

Nasri Group Hollowcore factory

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

Why BIM? VASQUEZ MARSHALL ARCHITECTS

Carpentry/Carpenter CIP Task Grid

Design and Construction Responsibilities for Architectural Precast Concrete

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION PROJECT MANAGEMENT AND COORDINATION

Project: # Solano Community College District

RAPID CONSTRUCTION-INOVATIVE APPROCH OF PREFABRICATED CONSTRUCTION

Accelerated Bridge Construction (ABC) and the Utah Experience

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

CEMCON Tekla Structures. Cast In Place (Reinforced Concrete) Precast. Prithviraj CM

HIGH TENSION CABLE BARRIER (HTCB)

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

B. The designated coverage areas shall include both indoor and outdoor coverage.

PART MATERIALS. Section Fencing Materials. Description

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Exton, PA FUTURE. Façade. Figure 1: C.4.1 C.4.2 C.4.3 C.4.4 o o o o. Proposed. Solution. Page 117. the Current. o o o o. Page 116.

MOVING TOWARD AN INTELLIGENT SHOP MODELING PROCESS

No limitations to precast

5789 STATE FARM DRIVE, ROHNERT PARK, CA 94928

Create Structural Shop Drawings and Fabrication Models Using Autodesk Revit

Precast Concrete Industry Extensions for Autodesk Revit Structure 2014

Precast Multistorey Highrise Residential & Commercial Buildings. Buildings & Factories IC

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

WHO WE ARE. Our Client base. - USA - Canada - Hawaii. - Australia - New Zealand - UAE. - UK - Netherlands - Oman. - Singapore - Norway - Qatar

Forming and Shoring Product Selector

ARCHITECTURE CADD Course Syllabus

Transcription:

TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM contents Introduction Owner s Statement Architect s Statement Contractor s Statement Cast in Place Coordination Structural Steel Working Within the Site AIA 2010 TAP/BIM Awards Category A: BIM Excellence Awards Bassett Creek Building Around the Rail Lines Following the Bridges Two Structures, One Building Summary

The site conditions made this ballpark the most complex we ve ever completed. - Senior Principal, Sports Facility Engineer Successes Structural shop drawings review durations were minimized in many cases to 2-3 days through collocation and electronic/model sharing. Responses to RFI s were able to be determined as a team through model analysis. Often times resulting in same day turnaround of associated documentation. Involving field personnel in coordination activities improved constructability and provided a better understanding of upcoming work. Challenges The central building information model was comprised of numerous models. A major challenge on a job of this size and speed is to reconcile design and construction models and maintain a single accurate base file. Sharing models without rights of reliance and a supporting contract structure. Hardware and network capabilities for managing large detailed models. Introduction: Fitting In Built on one of the most complex sites imaginable, the Minnesota Twins new stadium, Target Field, faced challenges that could only be surmounted through extensive use of building information tools and procedures. Situated on a roughly 8 acre site, the building expands to nearly 12 acres on the main concourse. At that elevation the building ties in with elements on every side of the job. To the north and south, two bridges. To the east, a 99,000 square foot plaza extending over an interstate highway. To the West, a smaller promenade spanning two heavy rail lines. And below, an underground creek of unknown size and location. Each of these elements presented potentially precipitous obstacles that could only be averted through careful and precise modeling. Cast in Place Design Through Coordination

Owner s Statement This is truly an historic day in Twins history, said Jerry Bell, president of Twins Sports, Inc. Considering the complexity of the site and extreme level of attention to detail in design and construction, to be complete two months ahead of schedule is a feat to be recognized and celebrated. Architect s Statement Building information modeling was invaluable to maintaining the integrity of our design by giving us the flexibility to understand design options before any work is put in place. Contractor s Statement The construction BIM, created from the 2D contract documents, was this job s bible. We basically used it as the lexus of all design and construction information. It was crucial for shop-drawings, schedule logic review, for MEP coordination and constructability issues. In other words, it was used not only to track, but to choreograph construction activities. Our subs, for instance, could only have managed their extensive workforces amidst all the other workforces with the ability to preplan in great detail, an ability unthinkable without the model. This was the largest schedule and the most complicated site in company history and we finished it early three months ahead of schedule. It would have never been done without BIM.

coordination models MEP/Interior Walls Ceilings Field Use Drawings & Layout 3D Survey Field Coordinates Architectural Precast Structural Precast Structural Precast Back-up Support Steel Steel Structure Enclosure Miscellaneous Metals Cast-in-Place Concrete Structure Structural Steel Foundation + Pipe Piles + Underground MEP MEP Above & Below Ground Coordination MEP Penetrations Deck Formwork Cast in Place Reinforcing Request for information Contract Documents Pipe Pile Layout Erection Plans Safety & Logistics Plans The workflow diagram represents the development of the model. Specifically, creating a base model from the contract documents, in much the same way that the information would be processed in the field. Building upon this required incorporating shop drawing information as well as field verified 3D survey coordinates, the model was continuously developed in concert with the various stages of coordination. From this information, field assistance drawings and field use drawings were created to ensure that work was installed as coordinated, greatly reducing the need to work out problems after they were already put in place.

Main Concourse Sleeve Layout Main concourse pan and joist deck with reinforcing and sleeves Cast in Place Design Through Coordination Apart from the spatial constraints on the project, time also served as a possible stumbling block. In many cases decks were being poured well in advance of the final, fully dimensioned interior plans. Heavy design team involvement was required to identify provisions for further programming and design development. To ensure deck sleeving and layout was able to work real-time with the evolution of the design, new technologies and systems had to be developed. Traditional methods of layout rely on using tape measures to triangulate locations from marked grid. This is a time consuming task that does not have a high degree of accuracy, especially with complex radial geometry. Using a robotic total station and dynamic tags created within the 3D model, the mechanical contractor was able place over 5,000 sleeves and openings with an extremely high degree of efficiency. This was especially important to ensure accurate layout while at the same Mezzanine Sleeve Layout Sleeve Layout Detail 55,000 cubic yards of concrete 5,000 tons of rebar

D-Line column model with pipe penetration Main concourse column intersection at grid In many cases decks were being poured well in advance of the final, fully dimensioned interior plans. Heavy design team involvement was required to identify provisions for further programming and design development. To ensure deck sleeving and layout was able to work real-time with the evolution of the design, new technologies and systems had to be developed. Traditional methods of layout rely on using tape measures to triangulate locations from marked grid. This is a time consuming task that does not have a high degree of accuracy, especially with complex radial geometry. Using a robotic total station and dynamic tags created within the 3D model, the mechanical contractor was able place over 5,000 sleeves and openings with an extremely high degree of efficiency. This was especially important to ensure accurate layout while at the same time reducing the time and labor required. Cast in Place Design Through Coordination D-line column section D-line column in the field with pipe penetration

View from plaza looking west at metro club Structural Steel Shop Drawing Review Snapshot of the steel model, February 25, 2008 A critical component of the project schedule was delivering the 3,000+ tons of structural steel on time. This meant that traditional shop drawing review methods, especially for many of the intricate connections would not be sufficient to maintain field progress. The result was a period of collocation by the design team, general contractor, and steel fabricator and detailers. The model created by the detailer was reviewed by the structural engineer where the accuracy of forces, connections, length and locations were discussed face to face. By using the model as the primary means for real-time coordination, the traditional RFI & 2D shop drawing review process became a formality. This allowed for significant efficiencies in the design, detail and review process. Snapshot of the steel model, June 20, 2008 3,000 tons of steel Canopy: 1,387 tons, Scoreboard: 257 tons

4D model shot looking east Working Within the Site Due to the complexities of the job site: bordered on the North and South by bridges, East by an active hi-way, and the West side by an active railroad, the stadium needed to be built from the inside out. During preconstruction, a 4D model of the ballpark was created using design models (structural & architectural) in part to determine the scheduling of the cranes, all of which were to operate inside the building footprint. A total of 3 tower cranes (123 tall to 166 tall) were used for cast in place structure and three primary crawler cranes for steel, precast concrete enclosure, and precast concrete stadia. Coordinating tradeflow for up to five of these cranes simultaneously within a tight site required a virtual review of each crane s pick locations and their ability to reach the proper building elements. Another major component of ensuring successful installation was the steel erector s use of the model to communicate with the fabricator. Initial as-builts were first gathered to verify field fit-up. Trusses and major structural components were then evaluated for access & safety. Site progress, August 26, 2008 It was like stuffing 12 pounds of potatoes into an 8 pound bag. - Nadine Post, Engineering News-Record

Field varified coordinates of the creek Transfer beam #11 in the field Another component of this effort was detailed modeling and coordination of features contained within the concrete. Components such as rebar, post tension cables, and stud rails were all reviewed in detail with members of the structural design team, general contractor, concrete crew, ironworkers & third party inspectors. This allowed for realtime coordination for many of the complicated connections, thereby providing immediate feasibility and a better work product. Model shot of transfer beam and creek Structural Steel Shop Drawing Review A critical component of the project schedule was delivering the 3,000+ tons of structural steel on time. This meant that traditional shop drawing review methods, especially for many of the intricate connections would not be sufficient to maintain field progress. The result was a period of collocation by the design team, general contractor, and steel fabricator/ detailers. The model created by the detailer was reviewed by the structural engineer where the accuracy of forces, connections, length and 90% of rainfall is captured + treated Field use drawing of transfer beam

Cast in place girder over rail lines Model shot looking north over BNSF and Northstar rail lines Building Around the Rail Lines Running below the main concourse on the western edge of the stadium are two rail lines, Burlington Northern Santa Fe and Minnesota s new heavy gauge commuter train service (Northstar). Trains for these lines moved through the construction site up to 14 times a day, during work hours. In addition to presenting scheduling challenges--work had to be stopped each time a train passed--these functioning railroads also required that stringent clearances be adhered to, both above and below grade Northstar train at Target Field Station and model shot looking south

Field use drawing generated from model of railroad girder Section from model showing excavation in relation to rail line zones of influence Accessed by: light rail, city bus, pedestrian bridges, Northstar commuter rail, Cedar Lake bike trail, I-394, I-94 Building Around the Rail Lines Above the track are 14 large, post-tensioned girders, 8 of which are cantilevered over 34. These girders support precast double-tees and hollow core panels, all covered by a topping slab. Below the slab, engineered shoring for footings and utilities were evaluated based on depth and proximity to the active rail line. All of this led to extensive preplanning of work through detailed field use drawings. Contained within a single document were specific geometry details, rebar and embed layout, and pour information. The core of this system was a detailed model that incorporated contract documentation, shop drawings and team review comments. It was this information that facilitated the intensive communication with the field. Ensuring that every piece put in place met even the tightest clearances, which were often times less than an inch.

5th Street bridge steel elevations plan Model shot looking west along 7th Street Model shot looking west along 5th Street Following the Bridges The north and south ends of the ballpark main concourse are defined by the 5th Street and 7th Street bridges. The 5th Street Bridge was torn down and rebuilt to accommodate the extenstion of the Metro Transit Hiawatha Line, the local light rail transit system. The 7th Street Bridge is an existing structure that was to be modified to accommodate the ballpark design.upon completion of the 5th St Bridge, the survey team acquired the as-built conditions and real-world coordinates at the locations of the tie-in points with the ballpark structure. The same survey was completed for the 7th St Bridge. From this information, a virtual profile was created of both bridges which was merged with the design to ensure that the elevations and extents of the bridges and the building were consistent. Field photo looking west along 5th Street

Retail store/plaza structure progress Model shot retail store, skyway connection and plaza structure looking east Retail store/plaza structure progress, April 9, 2008 Two Structures, One Building The 394 plaza bridge connection provided an intensive stretch of coordination. Essentially two completely distinct structure types had to be merged to support each other. Similarly, two completely distinct structural engineering firms in different parts of the country with specialized design experience had to work with two different companies doing the cast in place concrete structures. A similar technique to coordinating the 5th and 7th street bridge structures was used to better understand the interface. Specifically, modeling of the primary structural components; pre & post tensioned beams, structural & topping slabs. Due to the complexity of this connection, three dimensional as-builts were gathered as components were completed. over 100,000 square feet of limestone Retail store/plaza structure progress, July 25, 2008

Two Structures, One Building Model shot of the right field overlook, precast plaza bridge This information was fed back into the model and used as a baseline for shop drawing review and coordination. This was especially valuable for evaluating the precast stadia seating sections that relied on both building and plaza structures for support. By modeling each precast piece it was determined that a number of pieces had to be altered to accommodate the field-verified bridge elevations. This was accomplished in the factory before the pieces had gone into production thereby preventing costly field fit-up and rework issues. Coordination plan generated from model of structure at overlook over 2,000,000 total workhours Service level looking north with overlook structure progress above over 3,100 tradespeople

I ve never seen a sports facility of this complexity completed this far ahead of time. - Jeffrey Applebaum, Lead Management Consultant to the Minnesota Twins Opening Day: April 12, 2010 Canopy steel rendering Proactive Collaboration Results in Success Phased design with heavy overlap of construction activities typically leads to strained relationships and substantial rework. This is especially true on a job where nearly one million dollars of work was being put in place per day by up to 900 workers. Target Field, however, served as a shining example of how total team collaboration can be achieved through use of building information modeling. The best evidence for this was the unprecedented early issuance of a certificate of occupancy, over three months prior to the contractual substantial completion date. All parties agree that modeling provided a forum for communication where complex issues could be resolved without impacting critical path activities.